Planning and Designing Airport Infrastructure to Support GPS and PBN Approach Development

Similar documents
Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Airports and UAS: Managing UAS Operations in the Airport Vicinity

Developing an Aircraft Weight Database for AEDT

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

CHAPTER 1: INTRODUCTION

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013

Geospatial Data Collection for the FAA Airports GIS Program

TRB and ACRP Research Updates: Practical Application

Part 150 Update Status and Recommendation

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

2015 PURDUE ROAD SCHOOL March 11, 2015

Chapter 1 Introduction and Project Overview

Planning. In preparing for battle I have always found that plans are useless, but planning is indispensable. Dwight D. Eisenhower

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Initiated By: AFS-400

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: South Dakota Airports Conference

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.

ACTION TRANSMITTAL

THE NATIONAL ACADEMIES PRESS

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

STATEMENT OF THE NATIONAL BUSINESS AVIATION ASSOCIATION ED BOLEN PRESIDENT AND CEO BEFORE THE COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

Community Noise Consortium Meeting (CNC)

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures

Community Noise Consortium Meeting (CNC)

Appendix C AIRPORT LAYOUT PLANS

Community Noise Consortium Meeting (CNC)

ACRP Problem Statement: Wingtip Collisions on the Ground. Recommended Funding Amount: $400,000. ACRP Staff Comments. No staff comments.

AVIATION. MichiganReportCard.com 5

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

THE NATIONAL ACADEMIES PRESS

Air Navigation Bureau ICAO Headquarters, Montreal

Notice of Policy Change for the Use of FAA Approved Training Devices

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

OBSTACLE IDENTIFICATION SURFACE CALCULATION TOOL (OIS CT) FOR AIRPORT AIRSPACE OBSTRUCTION ANALYSES AT CIVIL AIRPORTS IN THE UNITED STATES

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Environmental Assessment Las Vegas Area Airspace Optimization Project

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS

ACRP Updating Report 16: Guidebook for Managing Small Airports

Community Noise Consortium Meeting (CNC)

FAA. Icing Steering Committee. Federal Aviation Administration. Presented To: In-flight Icing Users TIM By: Tom Bond Date: February 25, 2015

Chapter 1 Introduction and Project Overview

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Hot Topics in Land Use at GA Airports. Peter J. Kirsch

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment

Memorandum City of Lawrence Public Works

AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY

Office of Airport Safety and Standards

NextGen and GA 2014 Welcome Outline Safety Seminars Safety Seminars

Update on FAA Standard Operating Procedures (SOP)

PLUME RISE ASSESSMENTS

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING

Work Programme of ICAO Panels and Study Groups

AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION

RNP AR APCH Approvals: An Operator s Perspective

NON-AERONAUTICAL DEVELOPMENT OF AIRPORT LAND

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

and Forecast Review and Approval Process

AIRPORTS GIS UPDATE. Federal Aviation Administration.

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

TABLE OF CONTENTS 1.0 INTRODUCTION...

** DETERMINATION OF NO HAZARD TO AIR NAVIGATION **

Agenda: SASP SAC Meeting 3

NextGen Priorities: Multiple Runway Operations & RECAT

** DETERMINATION OF NO HAZARD TO AIR NAVIGATION **

at: Accessed May 4, 2011.

DRAFT MASTER PLAN UPDATE

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

UK Implementation of PBN

Community Noise Consortium Meeting (CNC)

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

FAA Requirements for Engine-out Procedures and Obstacle Clearance

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward

Creating a Clear Vision with your Airport Layout Plan

Community Noise Consortium Meeting (CNC)

Norfolk International Airport

Presented to the: NCTCOG Air Transportation Advisory Committee. Presented to the: NCTCOG Air Transportation Advisory Committee

MassDOT Aeronautics Division Capital Improvements Presentation

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

TRANSPORTATION RESEARCH BOARD. Preparing and Using Airport Design Day Flight Schedules. Wednesday, July 18, :00-3:30 PM ET

TRANSPORTATION RESEARCH BOARD. Passenger Value of Time, BCA, and Airport Capital Investment Decisions. Thursday, September 13, :00-3:30 PM ET

** DETERMINATION OF NO HAZARD TO AIR NAVIGATION **

Memorandum of Understanding

Victoria Regional Airport Airport Business Plan. uadrex Aviation, LLC Airport Development Services

CHAPTER 1 INTRODUCTION AND BACKGROUND

Transcription:

ACRP Problem Statement 16-07-04 Recommended Allocation: -- Planning and Designing Airport Infrastructure to Support GPS and PBN Approach Development ACRP Staff Comments -- TRB Aviation Committee Comments AIRFIELD AND AIRSPACE CAPACITY AND DELAY: Do not support. Recommend retaining this problem statement for future consideration upon release of the ACRP Project 03-34, NextGen--Understanding the Airport's Role in Performance-Based Navigation (PBN) final report. Review Panel Recommendation and Comments Not recommended. The proposed research has some overlap with NextGen projects 03-33, NextGen: Airport Planning and Development and 03-34, NextGen: Understanding the Airport's Role in Performance Based Navigation, although it could be a potential building block, as it can go deeper into those two studies. This may already be being done--no need to further research what is already done. Needs to be some installations of additional monitors, if not done under the FAA, it will be the responsibility of the airport sponsor. The audience consists of airports responsible for the infrastructure. The FAA may be making some modifications to their ACs. May be less research oriented and more of a how-to on navigating on existing guidelines. This is more of a compliance issue that will be done before any instrumentation is installed. Could be valuable for small airports, as it could be more useful in connecting GA airports with existing policy to educate airports. AOC Disposition There was no discussion. No funds were allocated.

ACRP Problem Statement ACRP Problem Number 16-07-04 1. Problem Statement Planning and Designing Airport Infrastructure to support GPS and PBN Approach Development 2. Background With the onset of satellite navigation and NextGen, runways that could not historically support instrument approaches can now have such approaches published to them. The result is a large number of published GPS and Performance-Based Navigation (PBN) approaches and a safer flying environment. Unfortunately, instrument approach procedure development has progressed rapidly without appropriate infrastructure (lighting, obstacle free approaches, etc.) to support approach minimums desired by Airport Sponsors. The FAA flight procedures division is responsible for generating, reviewing and publishing approach procedures according to FAA TERPS requirements. Meanwhile, the FAA airports division is responsible for building and maintaining airports to current design standards (advisory circulars and FAR Part 77). The flight procedures process is not directly tied to airport division work resulting in unexpected challenges for Airport Sponsors. Sponsors do not have infrastructure in place to support desired approach procedures and are inadvertently becoming responsible to clear trees or power poles off of airport property or in areas where they may not have jurisdiction. In some cases airports may need to alter existing infrastructure to accommodate new approaches; these challenges need to be defined well before procedure development begins. FAR Part 77 surfaces are confusing to both aviation professionals and those outside of the industry. The relationship between GPS approach approaches and infrastructure needed to facilitate GPS approach planning is not well understood at many airports. In many cases airport infrastructure is carried out independently from approach planning; industry guidance is lacking. An analysis should be conducted to help Airport Sponsors tie requirements of the approach procedure development process to the airport design process. Further, Airport Sponsors should be provided with guidance as to their role and requirements throughout approach procedure development. First, Airport Sponsors would benefit from guidance to define procedure minimums appropriate for each of their runways. Then, infrastructure requirements to support the desired minimums could be defined and tools provided to assist Airport Sponsors in defining appropriate capital improvement projects to meet the requirements of the desired minimums. 3. Objective To provide guidance to Airport Sponsors to define appropriate approach minimums and develop guidance to plan, design and construct infrastructure developments necessary for GPS approach procedures. 4. Proposed Tasks Research work may include review of existing FAA guidance related to airport design and associated sections of TERPS and FAR Part 77 to succinctly define useful and practical requirements for appropriate GPS and PBN approach procedure minimums. The deliverable may include two parts:

a. A guide to help Airport Sponsors define appropriate approach minimum goals based on airport need/demand and infrastructure constraints. b. A tool to assist Airport Sponsors and designers in applying appropriate infrastructure standards to support desired approach procedure development. Common research tasks such as literature review, a state of practice survey and interim report would likely be included in the research. One to three case studies applying the draft guidebook at representative airports would also be recommended prior to final publication of the document. 5. Estimated Funding $250,000 6. Estimated Research Duration 15 months 7. Related Research ACRP 04-18 Runway Protection Zone (RPZ) Risk Assessment Tool (on-going) FAA work regarding RPZ requirements is ongoing and may influence this proposed GPS approach research. ACRP 03-37 Using GIS for Collaborative Land Use Compatibility Planning Near Airports (pending) Many communities are using GIS software for land use planning, ACRP 03-37 looks to capitalize on this tool by implementing airport related constraints within GIS systems. Constraints related to approach procedure development (outlined in this problem statement) should also be considered in the GIS systems. ACRP 03-33 NextGen Airport Planning and Development (on-going) and ACRP 03-34 NextGen Understanding the Airport s Role in Performance-Based Navigation (ongoing) These topics are investigating implementation of the approach procedures noted in section 2 Background, of this statement. This problem statement is intended to address the infrastructure needs (and related planning efforts) required to support the future development of PBN approaches. Related publications FAA Advisory circular 5300-13A Airport Design (approach safety area control and clearing requirements) FAR Part 77 Objects Affecting Navigable Airspace FAA Order 8260.3B United States Standard for Terminal Area Instrument Procedures (TERPS) 8. Process Used to Develop Problem Statement Problem statement drafted and submitted by Casey Ries, P.E. (Civil Engineering Manager, Gerald R. Ford International Airport) with input from Dr. Mohamed El-Gafy, P.E. (Michigan State University) and Mark Johnson (Manager, Livingston County Spencer J. Hardy Airport). 9. Person Submitting Problem Statement and Date Problem statement submitted by: Casey Ries Civil Engineering Manager Kent County Department of Aeronautics 5500 44 th Street S.E.

Grand Rapids, MI 49512 616-233-6040 cries@grr.org Date submitted: March 20, 2015

Note: This problem statement was originally submitted, reviewed, and recommended to the AOC for funding last year. It is being resubmitted for review because the AOC did not discuss it and funds were exhausted. Below are comments from the previous review. ACRP Problem Statement: 16-07-04 Recommended Allocation: $450,000 Planning and Designing Airport Infrastructure to support GPS and PBN Approach Development COMMENTS FROM LASTS YEAR S REVIEW ACRP Staff Comments -- TRB Aviation Committee Comments AIRFIELD AND AIRSPACE CAPACITY AND DELAY (AV060): Not supported. There appears to be significant overlap with ongoing ACRP Project 03-34, NextGen--Understanding the Airport's Role in Performance-Based Navigation (PRN). Review Panel Comments Recommended. The proposed research is well thought out. Small airports do not have the same resources as lare airports. The FAA airport GIS design program may be duplicative to 4B. Good improvement to safety. The funding and time are too low if a GIS tool will be developed. Funding should be increased to $450,000 and the timing should be increased to 24 months. Suggest the project panel makes sure the study takes into account the sourcing for geospatial data for the airport and the community and how to leverage existing data to cost effectively establish PBN or GPS approaches, as this data is very expensive. AOC Disposition This problem statement received an average rating of 3.0 points out of a possible 5 points among voting AOC members. There was no discussion. No funds were allocated.