First Review Meeting of AFI VSAT Network Managers (AFI VSAT Review/1) (Dakar, Senegal, 3 to 5 October 2011) SUMMARY

Similar documents
7.3d VSAT Network Best Practices and AFI ATN Architecture. (Presented by ATNS)

Agenda Item 1: Use of VSAT technology in the AFI Region

PROJECT: GROUND/GROUND COM PROJECT.1 Coordinator: South Africa DOMAIN: IIM (Infrastructure & Information Management)

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)

Global Operational Data Link Doc 10037

ASSEMBLY 39TH SESSION

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ASSEMBLY 39TH SESSION

CNS/ATM Systems Interoperability and Harmonization

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Global ATM System ~Interoperability and Harmonization ~

NAVISAT Middle East & Africa

ICAO provisions on data link implementation

Priority Definitions within Annex 10 and the Relationship to the ATN SARPs

IRTI/TF/1. DRAFT ICAO Position FOR WRC-15 Agenda Item 5 (WP/09)

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0

SATELLITE DISTRIBUTION SYSTEM OPERATIONS GROUP (SADISOPSG)

AFI REGIONAL DATA LINK MONITORING AGENCY (DL/CMRA)

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

(Presented by the Secretariat)

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

(Presented by the Secretariat) SUMMARY. This Working Paper presents for the Meeting s consideration, the Draft Agenda and suggested schedule

AFI Region AIXM-e AIP Implementation Workshop Dakar, Senegal, 3-5 October 2016

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

COMMUNICATIONS PANEL. WG-I 20 Meeting

ADQ Regulators Working Group

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

3.6 Surveillance Data Exchange Activities. (Presented by the United States of America) SUMMARY

Spectral Efficient COMmunications for future Aeronautical Services. Jan Erik Håkegård ICT

MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING

Russian Federation ATM modernization program

TWELFTH AIR NAVIGATION CONFERENCE

European Aeronautical Common Position WRC 2012

Services for Air Transport. The mobile satellite company

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

(Presented by Secretariat) EXECUTIVE SUMMARY

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

Consider problems and make specific recommendations concerning the provision of ATS/AIS/SAR in the Asia Pacific Region LOST COMMUNICATION PROCEDURES

54 th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS

Coordinations mechanisms between ANSPs themselves and with States: case of ASECNA. ASECNA, May 2018

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

PENS Symposium How to join PENS

Global Aviation Safety Workshop Abuja Nigeria. Group A Road 2. Group A Road 2 Inconsistent Regulatory Oversight

Special Africa-Indian Ocean Regional Air Navigation Meeting (Durban, South Africa 24 to 29 November 2008) FOLLOW-UP ON ATM RECOMMENDATIONS

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

Performance Based Navigation (PBN) Implementation Plan. The Gambia

WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018)

Air Traffic Management

Quality Management System (QMS)

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING

TWELFTH AIR NAVIGATION CONFERENCE

UNMANNED AIRCRAFT PROVISIONS IN FAA REAUTHORIZATION BILL

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1.

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL

GOLD. Global Operational Data Link Document (GOLD) Implementation and Amendments. AFI CNS SG /4, Dakar, Senegal, July 2011

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness

Excerpts from ICAO PBCS Manual

What you should know: Future Air Navigation System (FANS)

Twenty First Meeting of the Africa-Indian Ocean Planning and Implementation Regional Group (APIRG/21) (Nairobi, Kenya, 9 11 October 2017)

Appendix A REQUEST FOR AUTHORIZATION FORM

Flight Procedure Design and Cartography

Verizon Select Services Inc. Massachusetts D.P.U. Tariff No. 2 Original Page 105 SECTION 7 - GOVERNMENT AGENCY SERVICE

COST RECOVERY OF AERONAUTICAL INFORMATION. Presented by Julián de la Cámara (ICAO EPM) AIS-AIMSG First Meeting Montreal, 2-4 December 2008

Terms of Reference for a rulemaking task

TWELFTH AIR NAVIGATION CONFERENCE

PRINCIPLES FOR DETERMINING THE COSTS OF AERONAUTICAL METEOROLOGICAL SERVICE FOR EN-ROUTE AND TERMINAL AIR NAVIGATION, UNITED REPUBLIC OF TANZANIA

Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg

NEW FPL Transition Phase & Implementation Stages

AERONAUTICAL TELECOMMUNICATION FACILITIES JCAR- PART 171

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management)

Official Journal of the European Union L 186/27

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

ATC automation: facts and steps ahead

AERONAUTICAL INFORMATION CIRCULAR 33/17

ADS-B Rule and Installation Guidance

COMMISSION IMPLEMENTING REGULATION (EU)

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Introduction to Amendment 40 to Annex 15

ICAO UPDATE. (Presented by the Secretariat)

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

Transcription:

AFI VSAT/2 WP/04B INTERNATIONAL CIVIL AVIATION ORGANIZATION Western and Central African (WACAF) Office First Review Meeting of AFI VSAT Network Managers (AFI VSAT Review/1) (Dakar, Senegal, 3 to 5 October 2011) Agenda Item 3a: Review of GAP Questionnaire (Presented by ATNS) SUMMARY The working paper provides details of the final GAP Questionnaire submitted to the members of the Technical Team REFERENCE(S) Technical Team Communication Plan 1 Introduction The goal of this project is to draft a report for a VSAT presentation to the APRIG/18 meeting tentatively scheduled for the first quarter 0f 2012, Kampala (Uganda). In order to have the report ready the work will have to be completed by the end of January 2012. The report must cover at least the following information: 1.1 VSAT Technical GAP analysis document 1.2 Response from VSAT network managers 1.3 Planned actions to address identified technical VSAT Gaps 1.4 Estimated budgetary cost to address identified technical VSAT Gaps 1.5 Recommendations 2 Discussion 2.1 Development of a draft Questionnaire document was completed and submitted to the Group Members on 24 August 2011, to provide them with the opportunity to add any additional question, changes required, etc. 1 P a g e

AFI VSAT/2 WP/04B 2.2 The feedback received was incorporated in the GAP Questionnaire and the final version was submitted to the Technical Group members to allow them to study and populate the Questionnaire and returning the completed document for evaluation. 2.3 The subsequent phases will include the evaluation and compilation of the information and inputs received and completion of a draft report before the APIRG/18 preparatory meeting in Dakar. 2.4 It should be noted that the compilation of information, analysis and drafting of the report will be a time consuming process and it will assist the team if more time could be allowed in the program schedule for this the revision of the program schedule is covered in another working paper. 3 Conclusion The meeting is invited to: 3.1 Note the information provided in this working paper. 3.2 Take the information into account during discussions. ---END--- 2 P a g e

Response by Network Service Provider Best practices Guidance material Questions Compliant Elaborate in more detail on compliance option selected Indicate planned actions to address Gap Yes No (Attach separate documentation if necessary) (Attach separate documentation if necessary) Expected Budgetary cost to address Gap 1.Year of completion Not applicable 2.Period of Inception 3.Membership 4.Satellite used Not applicable Not applicable Contingency planning required to ensure continuity of service in case of disruption or failure of operated satellite States shall provide the degree of facility reliability and availability consistent with their operational requirement. ICAO, Annex 11 Air Traffic Services, Section 2.30 ICAO, Annex 10, Volume I, Section 2.5 and Attachment F ICAO, Doc 9859 - Safety Management Manual. 4.1 Indicate which satellite is used 4.2 Indicate the life expectancy of the satellite 4.3 4.4 Satellite contingency Planning Describe what alternative arrangements exist, should there be a catastrophic failure of the satellite in use Indicate whether reserved spectrum is available on another satellite 4.5 Should operation be moved from the existing satellite to another satellite, what will be the procedure to reestablish services? Facility Reliability, Availability & Security 4.6 Indicate whether all the VSAT network terminals are located in a secure area under the jurisdiction of the ANSPs 4.7 4.8 Confirm that no unauthorized persons have access to the VSAT network terminals Is an Un-interruptible Power Supply available for the VSAT terminal 4.9 If so, what is the back-up time 4.10 Describe what happens after the back-up time has elapsed. 4.11 Is there no-break power available on the airport and is the VSAT connected to that supply? 4.12 Indicate whether the ATS/DS services, AFTN services, etc. are dependent on terrestrial data cables or other services located outside the security area of the ANSP's, in other words where the ANSP does not have any control over its availability, management, etc. 4.13 If so, indicate the approximate length of the terrestrial data cable that is outside the security area of the ANSP's 4.14 Indicate any other data cables or supporting services related to the VSAT service that is located outside the security area of the ANSP's 3 P a g e

5.Transponder (Up/Down) Contingency planning required to ensure continuity of service in case of disruption or failure of operated satellite States shall provide the degree of facility reliability and availability consistent with their operational requirement. ICAO, Annex 11 Air Traffic Services ICAO, Annex 10, Volume I, Section 2.5 and Attachment F ICAO, Doc 9859 - Safety Management Manual. 5.1 Indicate which satellite transponder(s) are used 5.2 5.3 Indicate what contingency arrangements are in place by the satellite service provider in case to ensure continuity of services Is the spectrum in use based on non-preemptible service 5.4 Indicate when the present lease agreement will expire 5.5 Is a first right of refusal available when the lease expires 5.6 If not, describe what arrangements are in place to ensure continuation of the VSAT services 6.Frequency band In accordance with ITU Radio Regulations ITU, Radio Regulations 6.1 Indicate the frequency bands utilized by the satellite services and the Beam Type (e.g. East Hemi beam, Global beam, etc) 6.2 Confirm that the VSAT services comply with the ITU requirements for the frequency bands utilized 7.Topology Meshed network 7.1 Is the network topology meshed 7.2 Is the network topology a combination of star & meshed 7.3 Is the star topology upgradable to a meshed topology 7.4 If so, describe briefly what the upgrade will involve 8.Satellite access method Multiple Frequency Time Division Multiple Access (MF-TDMA) ICAO, Annex 10, Aeronautical Telecommunications, Volume III ICAO, Doc 9776, Manual on VHF Digital Link Mode 2 ICAO, Doc 9805, Manual on VHF Digital Link Mode 3 8.1 8.2 8.3 Is the network satellite access method based on MF- TDMA If the network satellite access method is based on MF- TDMA, is there a backup synchronization station in place If the network satellite access method is not MF-TDMA, indicate the access method used for the network 8.4 8.5 Indicate the main reasons for selecting the access method used How is bandwidth allocated for all services provided (i.e. permanent, on demand) 9.Lease Bandwidth Available bandwidth should accommodate current and future services ICAO, Annex 10, Aeronautical Telecommunications, Volume II ICAO, Annex 11, Air Traffic Services ICAO, Doc 4444 PANS/ATM ICAO, Doc 9880- Detailed Technical Specifications on ATN ICAO, Doc 7474 (ANP/FASID) 9.1 9.2 If not, how will this issue be addressed 9.3 Is sufficient spectrum available for new terminals, future services and applications. Is the available capacity contended? If so, what is the contention ratio? 4 P a g e

10.Administrative arrangements States commitment should be formalized and documented, including delegation of operational, technical and financial authority (as applicable). ICAO, Doc 7474 (ANP/FASID) 10.1 Are there any formal arrangements between States Guidelines for multinational and network service provider in place in respect of facility/service technical, operational and financial responsibilities. 10.2 Briefly describe the format and structure of formal arrangements 10.3 What is the term (duration) of these formal arrangements 11.Technical arrangements (Maintenance Management) Network control center (NCC) should be implemented for all networks. ICAO, ALLPI RG/5, Conclusion 5/16 11.1 Is an NCC implemented for maintenance and management of the network 11.2 Briefly describe the network maintenance philosophy and how corrective & preventative maintenance are conducted 11.3 Indicate the Network management protocol, and type communication circuits used (e.g. SNMP, ethernet IP) a) Is there a pro-active management facility? 11.4 Briefly describe the management of spares used for corrective maintenance 11.5 Briefly describe the fault reporting procedure between the remote VSAT terminals and the NCC a) Is there a dedicated helpdesk/service desk for fault reporting b) If so, how is it accessed (phone call - international/local or other communication medium - mail/fax, etc) c) What is the percentage of fault resolution on first call? d) What is the escalation procedure and how is this activated e) How is fault resolution reporting done? Are there SLAs on fault resolution with regard to Mean-Time- To-Respond and Restore 11.6 Provide a list of all VSAT network terminals and a) indicate: the antenna size for each terminal b) the ampliifier output power fo reach terminal c) the minimum excess amplifier power available to add another RF carrier 11.7 Provide a list of all interconnections between all the VSAT network terminal listed (AFTN & ATS/DS) 11.8 Provide a list of all connections between all the VSAT network terminal listed and adjacent networks 11.9 What is the current VSAT circuit availability (Recommended availability >= 99.8%) 11.10 Indicate the BER applicable to the physical layer of communications (with Forward Error Correction employed) (recommended BER <= 1 in 10-7 ). 11.11 Indicate the total one-way voice circuit latency (including voice compression and encoding) (recommended value < 400 ms) 11.12 Indicate the network call blocking probability (recommended value <= 2.5 x 10-3 (or 1 in 400 attempts 11.13 Indicate the set-up time for a voice call (Recommended set-up time <= 2 s) 11.14 Indicate the voice compression ratio and type of compression (G.729, G.726,G.711, etc) 11.15 Will any components reach it's end-of-life during the operation of the network 11.16 If so how will these end-of-life components be managed 11.17 Is training provided to the local on-site technicians 11.18 Is refresher training provided for technician 11.19 If so, how often does refresher training take place 11.20 At what level of training is maintained (I,O,D Level) 5 P a g e

12.Dedicated engineering service channel A dedicated service ICAO Annex 10, Volume I, channel is recommended Attachment F to facilitate coordination of maintenance between networks' stations 12.1 12.2 Is a dedicated engineering maintenance channel available for voice communication between the NCC and the on-site technicians If not, is a dedicated engineering maintenance voice channel planned 13.Services supported Aeronautical fixed services (AFTN, ATS/DS) Aeronautical mobile service (AMS) Extended VHF radio "coverage Aeronautical Telecommunication Network (ATN) applications (AMHS, AIDC)" ICAO, Annex 10, Aeronautical Telecommunications, Volume II ICAO, Annex 11, Air Traffic Services ICAO, Doc 4444 PANS/ATM ICAO, Doc 9880- Detailed Technical Specifications on ATN ICAO, Doc 7474 (ANP/FASID) 13.1 13.2 Indicate which primary services can not be supported 13.3 Confirm that all primary services mentioned are supported If not all primary services are supported, can the network be adapted to support these services 14. New Services to be supported To be defined. 14.1 Indicate what new aeronautical services, e.g. as required by ANSPs, are planned that will utilize the VSAT network 14.2 Can the network support these services 14.3 What additional new services can be supported by the VSAT network (e.g. radar data, Met services, ADS-B/C, CPDLC, GNSS, AIM, etc.) 15. Funding mechanism for the networks Sustainable funding mechanism required for all networks. ICAO, Doc 9082 Policies on user charges 15.1 Briefly describe how the operation of the network is presently funded 15.2 Briefly describe how new services will be funded to ensure sustainability of the network 6 P a g e

16. Connectivity (internal connectivity and interconnections with other networks) Full connectivity required within and between all the networks ICAO to address all the identified nontechnical issues. ICAO, Doc 7474 Air Navigation Plan (FASID) Connectivity Matrices for ATS/DS and AFTN AFI AFTN Routing Director 16.1 Are all interconnections required with adjacent networks in terms of the AFI Plan addressed in such a way that it provides seamless operation 16.2 How are these seamless operations achieved 16.3 Indicate all the interconnections that are not seamless 16.4 Briefly describe the reason for these interconnection not being seamless 16.5 Are there any adjacent networks that need to be interconnected that are currently not connected 16.6 If so, name these networks 16.7 Will it be possible to provide seamless operation for any planned interconnections with adjacent networks 16.8 Briefly describe how this will be achieved 16.9 If seamless operation can not be achieved, briefly describe the reasons for this 7 P a g e

17. Management of interconnections Formal agreements recommended to address interconnection issues 17.1 Are there agreements currently in place between adjacent network service providers in respect of operation, fault reporting, maintenance, etc. 17.2 If so, briefly describe how interconnections between adjacent networks are managed in respect of operation, fault reporting, maintenance, etc. 17.3 If not, indicate how this deficiency will be addressed 17.4 Is your current network capable of supporting a Multinational facility/service as envisaged in Conclusion 1/11 of the 1ST AFT VSAT Managers Meeting? If so, please describe how? 18. Base band transmission protocols Use of standardized bitoriented protocols Internet Protocol Suite (I PS) recommended X25 to be discontinued ICAO, Annex 10, Aeronautical Telecommunications, Volume III ICAO, Doc 9896 Manual on ATN using IPS Standards and Protocols AFI/7 Recommendation 9/6 APIRG Conclusion 13/10 APIRG Conclusion 16/13 APIRG Conclusion 16/14 18.1 18.2 Can the network support IP operation as recommended by ICAO Is it planned that the network will still accommodate legacy protocols in future 19. Transmission speed AFTN main circuits: 1200 bauds ATN circuits 9.6 Kbps ATN backbone circuits: 64 Kbps APIRG Conclusion 12/13 APIRG ATN/TF/2 Report 19.1 19.2 Does the current network comply with the recommended transmission speeds for AFTN and ATN If it does not comply, indicate what the current transmission speeds are and identify the specific services and circuits that it is applicable to. 20. AFTN circuit Circuit availability should ICAO, Doc 7474, ANP (AFT/7 be Recommendations 9/3 and monitored and provided to 9/4) ICAO Regional Office on monthly basis. Minimum requirement is: 99.8% (excluding the end-user equipment attached to the VSAT circuit) 20.1 Is AFTN circuit availability monitored 20.2 If not, what is the reason for the non-compliance 20.3 20.4 Does the AFTN circuit availability comply with the recommended minimum value of 99.8% Is the information made available to the ANSPs for submission to the ICAO Regional Office 8 P a g e

21.Message transit times Message transit times should be monitored and provided quarterly to ensure that operational requirements are met: high priority message (5 minutes) and a low priority message (10 minutes) ICAO, Annex 11, Air Traffic Services, Chapter 6, Paragraph XXX ICAO, Doc 8259, Manual on the Planning and Engineering of AFTN APIRG Conclusion 12/13 21.1 Is the message transit times monitored in the network 21.2 If so, is it provided to ICAO on a quarterly basis 21.3 If not, are there any provisions in place to provide this information in future 22.AFTN circuit loading Performance evaluation of ICAO, Doc 8259, Manual on AFTN circuits is required the Planning and Engineering on the basis of of AFTN statistics collected for a period of minimum three days at the interval of six months from 23 to 25 April and October. These include traffic volume, traffic statistics and circuit occupancy, which are needed to assess the suitability of the modulation rate of AFTN circuits. 22.1 22.2 Is the AFTN circuit loading measured as required by ICAO If not, is there any provision in place to perform measurements in future 9 P a g e