Birmingham City Centre Vision for Movement

Similar documents
Specification Details: Coded Dash Number M28803/1 -MC PART LISTINGS MANUFACTURER'S DESIGNATION OR TYPE NUMBER TEST OR QUALIFICATION REFERENCE

Make Model Number(s) STC No: Description System Covered SA449GL

HEAT TRANSFER PRODUCTS INC.

FEDERAL AVIATION ADMINISTRATION (FAA) APPROVED MODEL LIST (AML) SA02430SE FOR

FOR REFERENCE ONLY. FAA Approved Model List (AML) STC Number SA01899WI. Description. AML Amendment Log. 3/15/2019 Original

Delivering and Investing in Future Infrastructure Projects

2015 June Non-Ad Valorem Recap 5/27/2015

Cessna Aircraft Company: Amendment ; Docket No. FAA ; Directorate Identifier 2008-CE-066-AD.

2015 Proposed Non-Ad Valorem Recap 08/05/15

Number SA01800SE. Seaton Engineering Corp. 217 West Garden Court Spokane, WA 99208

Vision Planning for Metropolitan Areas. Ian Macleod Head of Development (East) and Planning Strategy Birmingham City Council

J.P. INSTRUMENTS FAA APPROVED MODEL LIST (AML) NUMBER SA00954SE FOR INSTALLATION OF THE EDM 711 SERIES PRIMARY INSTRUMENTS (CHT, TIT, OIL

NU N SPRINGS DRAIN-3A NU , , NZ N SPRINGS DRAIN-3B NZ , , NE N SPRINGS

Out-of-District Placement December Extraordinary Services ESY

CESSNA AIRCRAFT COMPANY

SERVICE BULLETIN FLIGHT CONTROLS - FLIGHT CONTROL (GUST) LOCK INSPECTION / REPLACEMENT SYNOPSIS OF CHANGE

Birmingham Connected Briefing October Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council

West Midlands Sustainable Urban

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by:

Figure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct.

H1: BIRMINGHAM CURZON STREET STATION

CONSTRUCTION Straights and shapes are manufactured from CA360, CA345 or CA377 brass

Enterprise and Business Scrutiny Panel

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

Bolton Council Invest in Bolton. Welcome INVEST IN

East Sussex Strategic Partnership Transport Update 2 March Jon Wheeler Team Manager Strategic Economic Infrastructure

Preft j Lt-Modification Class or Type Manufacturer Model Prefix: X - Experimental (Army or Navy) Y - Service Test Or Limited Procurement (Army only)

P\'1A NO. PQ2101CE-D PRODUCTION APPROVAL LISTING - SlTPPLEMENT NO. 70 DATED: June 23, 2003 AD 1INISTRATION - PARTS MANUFACTURER APPROVAL

Urban Design Meets Economic Regeneration. Weston Civic Pride Initiative. Weston Civic Pride Initiative. Weston Civic Pride Initiative

Infrastructure for Growth

Masterplanning Study Contents

!!!! "#$%&'($)(*! +!,-.'/-&!-$0!1'2-$!134.#/5!#%!.6(! 7'#&'2$(!839(/!:-.(/46(0!!

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

2019 may september alaska cruises & cruisetours

NOTICE TO MEMBERS No February 5, 2003

Wallasey public bank holiday pharmacy opening hours Easter August 2014

Draft City Centre Transport Proposals

Our Future City. Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

International standard flanges acc.to SAE, ISO, DIN, GOST

Growth and Connectivity Conference. 12 th September, Birmingham CONFERENCE SUMMARY

2015 Leaf Trinity Football Final Checklist Set Subset Name Checklist

AIRCRAFT RESALE - VALUE ADDED COMPARISON AIRCRAFT BLUEBOOK PRICE DIGEST ~ SUMMER 2017 Vol 17-2

304 King Street DOWNTOWN CHARLESTON, SC FOR SALE OR LEASE APPROXIMATELY ± 6,866 SF

Creating a High Quality Business District

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

WELCOME. Members of the development team are on hand to answer questions and feedback forms are available for your comments.

Swallow House, 10 Swallow Street, Birmingham, B1 1BD

THE FUTURE S HERE. Page 1

Part 005 Implementation Strategy _

ASHTON GATE SPORTS & CONVENTION CENTRE. A New Home For Bristol Flyers

RAPCO INC. FUEL PUMP APPLICATION GUIDE For Electric Fuel Pumps

Birmingham Hotel Market Overview

Draft Greater Sydney Region Plan

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre

Pushbutton Switch A22. Ordering Information. Install in 22-dia. or 25-dia. Panel Cutout. Construction

Hotel and Hospitality Services. Capita Real Estate

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

2008 Manchester Flats Cancelling Machine

FAA Approved Model List (AML) STC SA01818WI

GRAND CENTRAL BIRMINGHAM

Llandudno Junction. Regeneration Proposals for the Future. December 2009

PERMITS ISSUED DURING THE PERIOD 05/01/15 through 05/31/15 PAGE 1. THIS REPORT WAS PRINTED ON Monday, June 01, City of Starkville

Chapter. CPT only copyright 2007 American Medical Association. All rights reserved. 9Ambulance

Business Case Approved. Under Construction. Business Case Approved. Under Construction

RAPCO, I~C. 445 Cardinal Lane Hartland, WI (262)

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

3 Burner ASSEMBLY MANUAL

North West London CCG Phamacy Name Address Postcode Tel. No. Christmas Day 28th Dec 1st Jan

oncourse TRAINING COURSE INFORMATION HIGHFIELD AWARDING BODY FOR COMPLIANCE FOOD SAFETY LEVEL

SOBJ SSOBJ TITLE CA 00 MGMT/ORGANIZ SERVICE CB 00 LEGAL SERVICES CF 00 TECHNICAL RESEARCH CG 00 MARKETING SERVICES CH 00 COMMUNICATION SERVIC CJ 00

PERTH CITY SWAN PERTH AIRPORT CURTIN UNIVERSITY WESTFIELD CAROUSEL TANGNEY CITY OF CANNING JANDAKOT AIRPORT SWAN TANGNEY

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)

UNION PACIFIC RAILROAD ROSTER DATE Brotherhood Maintenance Of Way Employees RUN DATE ROSTER TITLE CODE DATA DATE

Brighton & Hove CCG. Sussex community pharmacy bank holiday opening times, by CCG area - Monday 27 th August Summer BH Monday 27th August 2018

4 Burner ASSEMBLY MANUAL

West of England. Priority Places Requiring Public Investment

chairs & stools-plastic V14b_Layout 1 11/07/ :05 Page 1 CHAIRS AND STOOLS - PLASTIC SHELL Primo Limited

Strategic Transport Forum

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

FAA Approved Model List (AML) STC Number SA01818WI

CENTRAL CONSOLIDATED SCHOOL DISTRICT #22 CREDIT CARD CHECK LISTING

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

4. Proposed Transit Improvements

EXPENDITURE IN THE WEST MIDLANDS

BRT in Developed Countries The Brisbane Experience

S420 Barbecue Assembly Manual

4 Transport projects underway in Western Sydney

Draft Greater Sydney Region Plan

Plugging the greater Midlands region into global wealth

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.

FAA Approval Information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

141305BP Whistlers Bar Menu 2017_Layout 1 16/05/ :11 Page 1 FOOD

Overview of Ford Land Projects PTY Limited aspirations

LEASING OPPORTUNITIES

Transcription:

Birmingham City Centre Vision for Movement Wes Sedman - Centro Commissioning Team Laying the foundations for a vibrant and liveable global city

Birmingham Big City Plan - A City Centre Masterplan A vision and framework for transforming the city centre over the next 20 years: Growing the City Core Raise liveability Improve connections Strengthen authentic character Diversify the culture and retail offer Developed by Birmingham City Council Centro a major stakeholder CITY CENTRE MASTERPLAN Sept 2010

The Big City Plan seeks to deliver: 1,500,000 sq.m. of new office, retail, leisure and cultural floorspace A 2.1 billion growth in the local economy/annum 50,000 new jobs 65,000 sq.m. of new or improved public spaces 28,000m of enhanced walking and cycling routes 5,000 new homes

Previously plans only considered city core (red) City Core has grown in the last 20 years (yellow) Current masterplan focuses on wider area (approx. 800ha) City centre made up quarters Each quarter reflects character and land use Character areas help the city to define direction

Areas of Transformation Westside New Street Station Snow Hill District Eastside Southern Gateway

Westside Library of Birmingham

New Street Station Gateway

Eastside Park

Snow Hill District

Southern Gateway - HS2

The Vision for Movement - supports delivery of the Big City Plan 3 Key Priorities: A Well Connected City Delivering a world class, easy to use integrated public transport system Key Objective: provide additional capacity for growth and regeneration in the city centre An Efficient City Making best use of the existing highway network with an appropriate hierarchy of priorities Key Objective: reduce dependence on the private car A Walkable City Creating and outstanding pedestrian environment Key Objective: put the needs of pedestrians at the heart of the strategy Birmingham City Centre Vision for Movement Laying the foundations for a vibrant and liveable global city November 2010

A Well Connected City To support the growth and regeneration, focus will be on improving the quality, legibility and choice of sustainable transport modes Rapid Transit Routes (Birmingham Sprint) Extension of the Metro system Heavy rail capacity High Speed Two Cycle routes/parking Improved pedestrian linkages

Concept Rapid Transit Network

Rapid Transit Walsall to Five Ways Phase 1 Key Elements: Builds upon the existing X51 Connects Moor Street with New Street High levels of existing priority Low infrastructure requirements Rapid Transit/Bus Gate needed on Broad Street Changes to traffic signal operations Terminates at Sheepcote Street Cost = 11.5M

An Efficient City Priority access for public transport, pedestrians and cyclists at congested locations. Improvements to key road junctions Improve the efficiency of parking within the city centre. Improve servicing in the city centre and access for emergency vehicles. Promote sustainable travel options through existing business and residential communities.

A Connected Walkable City

A Connected Walkable City

Birmingham City Centre Interchange (BCCI) JEWELLERY QUARTER RF EASTSIDE Stop key Primary stops Secondary stops TC TL SF SE SA SD SB SC RH Alighting only stops Primary, secondary and alighting only stops for the city loop (16+24) TJ Snow Hill/Colmore Row Interchange 17% of total services BH BG PN PP RA RB RC RG FD FE Primary, secondary and alighting only stops for Megabus, Park & Ride and Expressess JH TG TH TB TA TD TF TK TE AF AE AD AC AB AA DB DC DA DE PM PA PL PB PK PJ Bull Street/Priory Queensway Interchange 47% of total services DD PC PD PH MK MJ MH MG PE MN MO ML MM FB FA Total coverage from Interhanges 100% of total services JF JG JE JA JB JC Paradise Circus Interchange 22% of total services CITY CORE DH DH DI DJ DK MD MC ME MF MQ MP Moor Street Interchange 23% of total services FC JD NG NH HA MB MA New Street Gateway Interchange 24% of total services VC VB VE VA VF LB EE EA DIGBETH GA GB GC LC UH EB EC ED KC KA LA LF LE LD GD UD UC UB UA UF UG UE KD GF GE WESTSIDE

Whole Journey Experience

Whole Journey Experience

BCCI Information Configuration

BCCI Information Configuration

BCCI On Street Product Range

BCCI On Street Product Range

BCCI On Street Product Range

BCCI Modular Product Types

BCCI Modular Product Types

Thank you