room solutions brochure

Similar documents
Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL

For further advice and information, please contact the Leisure Sales Team. RBH Groups Desk E: T:

For further information please refer to: Allinthevenue.co.uk

Healthwatch is the independent champion for people who use health and social care services.

#element of bullying / harassment South West 2gether NHS FT Mental Health Small

Sixth Form University Open Days

S31 Grant determination for a high needs strategic planning fund in : DCLG ref 31/2916

For further advice and information, please contact the Leisure Sales Team. Redefine BDL Groups Desk E: T:

grade A space grade a location FOR SALE TO LET

PQ Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015

City employment: An overview from the Business Register & Employment Survey (BRES)

School improvement monitoring and brokering grant provisional allocations for illustrative purposes

PHASE 2 UNDER CONSTRUCTION

75,402 sq ft. 88,866 sq ft NOTTINGHAM. panattoni park CONSTRUCTION UNDER. Two industrial/warehouse units TO LET AVAILABLE Q3 2018

grade A space grade a location FOR SALE TO LET

RUGBY GATEWAY RG-2 290,000 SQ FT SPECULATIVE UNIT TO LET JUNCTION 1 M6 CV23 0XF OCCUPATION FROM SEPTEMBER

Oriel 2018 (2019intake) Hospital and Health Board Employers

Gateway. Leeds. A new national centre for logistics & manufacturing. TO LET Ready for immediate development M1/J45 LEEDS LS9 0PS

CONSTRUCTION UNDER. Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q M1/J26 PANATTONI PARK NOTTINGHAM NOTTINGHAM 550

UK Universities Quick Dial

EMPIRE. Bromley Clydebank Newcastle Sunderland ODEON UK & IRELAND

Census 2011: City snapshot

HEALTHCARE MEETINGS AND EVENTS SPECIALISTS

Planned Expenditure by Local Authorities: Services for Young People

Happiness is a town called Harrogate destination named happiest place to live for THIRD year running

Programme of Asbestos Training UK dates for 2014 International courses available

Numbers achieving 3 A grades in specific A-Level combinations by school type and LEA

Introduction to European Commission Funding: ERDF and JESSICA

2016-BASED HOUSEHOLD PROJECTIONS

PHASE 3 UNDER CONSTRUCTION

House prices in London continue to climb

Virtual Freehold Leisure Investment Kiss Gyms, Paramount Building, Princes Street, Swindon, SN1 2SD

Dear Louise. I can confirm that the full list of approved sites for this study is:

Most regions saw price falls during 2012

House prices fall in most regions during the third quarter

PHASE 3 UNDER CONSTRUCTION


Winners of the Exemplar Awards 2016

UK Airport Operators Association

Northampton Commercial Park

Table 12.2 Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for 2016 Comparison with Percentage


DRAFT TO LET 91,365 SQ FT (8,488.1 SQM) MODERN, HIGH QUALITY DISTRIBUTION WAREHOUSE SITUATED JUST OFF THE A1(M)

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for August 2016 Comparison with August 2015

Northampton Commercial Park

1.6 million sq ft TO LET/FOR SALE AVAILABLE Q4 2019

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for July 2016 Comparison with July 2015

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK

For information. The information in this circular does not affect the content of the HB Guidance Manual.

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for December 2017 Comparison with December 2016 December 2017.

ALDERNEY GUERNSEY 3 BARRA BENBECULA 1 BELFAST CITY (GEORGE BEST) BELFAST INTERNATIONAL 17 BELFAST INTERNATIONAL LIVERPOOL (JOHN LENNON) 1

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for June 2017 Comparison with June 2016

4O,OOO - 41O,OOO sq ft

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for January 2018 Comparison with January 2017

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for February 2018 Comparison with February February 2017.

JCT 42 A1(M) SHERBURN IN ELMET SELBY LEEDS

Q Embargoed until March 2010

Regional Spread of Inbound Tourism

Cris Tarrant CEO (BVA State of the Nation. Joe Stather Associate Director #2018HIF

LOGISTICS 175 TO LET M61/J4 BOLTON BL5 1BT. New build

550,270 sq ft TO LET AVAILABLE Q1 2019

STAMP IDENTIFICATION NUMBERS

Supplementary information for Parliamentary Questions UIN : VOA Closures and UIN : VOA Staff. 15 December 2017

Table 12.2 Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for 2017 Comparison with Percentage

Kingsnorth Commercial Park

NHS South Warwickshire CCG

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for November 2017 Comparison with November 2016 November 2017

Welcome & Introduction. Steve Sawyer, Executive Director Manor Royal Business District

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for October 2017 Comparison with October 2016

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for February 2017 Comparison with February February 2016.

LOGISTICS 175 TO LET M61/J4 BOLTON BL5 1BT. New build

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for October 2016 Comparison with October 2015

2018 TOWN HALL RICH LIST. Theo Hutchinson April 2018

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for April 2018 Comparison with April 2017

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for October 2018 Comparison with October 2017

BBC Local Democracy Reporter allocation

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for June 2018 Comparison with June 2017

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for October 2018 Comparison with October 2017

C A L E N D A R. The WORLDWIDE Group of the N Gauge Society

130,000 SQ FT OF ENVIABLE OFFICES LANDMARK GRADE A OFFICE DEVELOPMENT IN AN EXCELLENT CITY CENTRE LOCATION CLICK TO ENTER

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for September 2018 Comparison with September 2017.

Identifying Pro-Growth Locations in England. May 2018

Civils & Drainage Solutions

Council Performance Ratings 2010

Identifying Pro-Growth Locations in England. June 2018

Transition of the framework for the economic regulation of airports in the United Kingdom CAP 1017

550,270 sq ft TO LET AVAILABLE Q1 2019

YouGov PlaceIndex results

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for November 2018 Comparison with November November 2017.

Annex 3: CCGs confirmed for waves 1, 2, 3 and 4 for authorisation

DC240 TO LET. 10,515 sq ft (980 sq m) high quality offices with exceptional car parking. high quality offices

MAY-DAY WEEKEND MINI- RUGBY FESTIVAL 2016 RUGBY FESTIVAL

Workless households for areas across the UK in 2010

Proforma Portfolio Summary Big Yellow Stores

Midlands Connect Strategy: Powering the Midlands Engine

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for August 2017 Comparison with August 2016

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for March 2018 Comparison with March 2017

CAA Passenger Survey Report 2017

Table 12.2 Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for 2018 Comparison with Percentage

Transcription:

Precast Concrete Solutions. room solutions brochure v.1.0

FP McCann is the UK s market leader in the manufacture, supply and delivery of precast concrete solutions. Our comprehensive precast concrete business extends to include: Drainage and Water Management Solutions Tunnel and Shaft Solutions Rail Solutions Power and Infrastructure Solutions Walling Solutions Fencing Solutions Room Solutions Agricultural Solutions Flooring Solutions Specialist Precast Solutions Modern manufacturing plants at Alnwick (Northumberland), Cadeby (Warwickshire), Ellistown (Leicestershire), Grantham (Lincolnshire), Knockloughrim (Northern Ireland), Littleport (Cambridgeshire), Lydney (Gloucestershire), Telford (Shropshire) and Weston Underwood (Derbyshire) incorporate the latest computerised batching, distribution, casting, curing and handling systems and are operated by skilled and experienced workforces to ensure consistency of quality. Their geographical spread gives us an unrivalled ability to serve the construction industry throughout the UK and Ireland. fpmccann.co.uk cover University of Birmingham, Mason

introduction room solutions Technical helpline 01476 562277 fpmccann.co.uk/rooms At FP McCann (Bell & Webster), we believe in working with you as a partner from the start, which means offering our expertise in designing and manufacturing rooms to suit your every individual project. Far from being an off the shelf solution, our RoomSolutions TM are made to measure whilst maintaining our design philosophies and standard details. All units are manufactured off-site and delivered to site ready for final preparation and decoration, with either wallpaper or emulsion. All sections are designed for ease of construction, fitting together to conform fully with building and structural regulations. And, as the windows are fixed, internal trades can commence work far earlier than on a traditional-build site. All this to ensure peace of mind for you when you partner with us. Our bespoke software is BIM compatbile and ensures excellent design service levels and makes off the shelf manufacturing processes more efficient. 03

university of east london student residencies accommodation One of our most innovative projects has been the development of the University of East London s campus at Royal Albert Docks. The campus provides 788 student bed spaces and ancillary facilities on a previously vacant site adjacent to the University s existing Docklands campus. Located opposite London City Airport, the site is bounded by the Royal Albert Dock, a publicly accessible dock edge path to the south, the Docklands Light Railway, Gallions Reach Roundabout, University Way to the north and Woolwich Manor Way to the east. The building was constructed using mainly precast concrete because of its inherent robust nature, acoustic and thermal properties. This also helped eliminate wet trades, thus saving time and money and increasing the speed of erection. 04

high quality finish room solutions Technical helpline 01476 562277 fpmccann.co.uk/rooms One of the main advantages of FP McCann s (Bell & Webster s) engineered precast concrete frame is that it provides a fair faced finish to the walls. This removes the need for plasterboard or a plaster skim. The frame incorporates the internal walls (excluding the bedroom to corridor wall) and the inner skin of the external wall, thus omitting the need for internal dry lined walls and external metal framed walls. floors without surface treatment being necessary (except the floor coverings being applied). These unique attributes help FP McCann s (Bell & Webster s) RoomSolutions TM reduce the overall cost and programme of the project. A fine example of all these benefits is the University of East London project. The system provides the major contribution to the acoustic rating for the external envelope; the choice of cladding dictates the final rating. This method of construction complies with the internal db ratings as required by building regulations (Part E) for internal party walls and 05

The Ramada Encore, Walsall room solutions Concrete is one of the most versatile durable, strong and cost effective building materials known to man. It has superior fire resistance, vibration and sound performance. It is able to absorb, store and radiate heat. You need to build rooms that are durable, rooms that are compliant with appropriate regulations and rooms that are quick to erect. Be it a hotel, student, military, key worker or prison accommodation project, our RoomSolutions TM deliver a quick, safe and virtually maintenance free solution. 06

room solutions Technical helpline 01476 562277 fpmccann.co.uk/rooms years of experience For over sixty years we have designed and manufactured quality precast concrete products for prestigious clients in the civil engineering, commercial, industrial, agricultural and utilities sectors. Today we are recognised as the market leader in the design and manufacture of Precast Rooms for Hotels and Student Accommodation. Our previous clients include some of the major names in the hospitality industry as well as the education sector i.e. Holiday Inn, Accor Hotels, MacDonald Hotels, Ramada, Travelodge, City Inns, Radisson SAS, Days Inn, Tulip, Arora Hotels and Universities at Loughborough, Reading, Lancaster, Essex, London, Brunel, East London, Hertfordshire to name but a few, plus MOD projects at Shrivenham, Woodbridge and Lucknow. Therefore, if you require a trusted partner with extensive experience, recognised for delivering on-time, with unrivalled quality; FP McCann (Bell & Webster) is the obvious choice. 07

rapid speed of installation Accelerated construction is a key advantage with FP McCann s (Bell & Webster s) RoomSolutions TM. It reduces the time taken to complete a project thus resulting in a shorter period of disturbance for surrounding properties. Our precast units arrive ready for installation and are scheduled to be on-site just-in-time so they can be lifted directly into place. This prevents unnecessary handling and so reduces the diesel or electricity used by mobile plant and cranes. Whats more, this rapid process compared with in-situ options means precast sites are less vulnerable to delays caused by inclement weather. For example using FP McCann s (Bell & Webster s) RoomSolutions TM on a building footprint of 32 beds, 4 kitchens and central core area per floor, it takes approximately two weeks to complete the construction, including the installation of the bathroom pods. 08

room solutions Technical helpline 01476 562277 fpmccann.co.uk/rooms left manoeuvring precast room sized slabs into position above, anticlockwise from top seating floor / ceiling slabs; bathroom pods in position; erecting wall panels 09

benefits of room solutions Acoustically versatile As a dense material, precast elements in a building make for a peaceful lifestyle. Privacy and effective sound reduction are ensured, which makes precast and makes a precast structure an ideal choice for residential buildings in particular. Because precast can be moulded to any shape, size and texture it can be used to deflect or absorb noise. This makes it a good acoustic host for music but also an effective sound barrier along side busy roads. Thermally efficient Concrete can be dense or lightweight and this choice affects its thermal behaviour. In either case, precast concrete can act as a thermal sink or as an insulator. In some buildings you can see precast doing both. Pre-installed services Precast concrete can carry pre-installed services and fixtures, whether these are communications, plumbing or even windows. Services can be cast within the precast element or panels can include connection plates ready to receive heating and lighting fittings on site. This makes both construction and maintenance easy. Technology friendly With homes and offices increasingly designed for information technology, it is good news that precast concrete buildings do not interfere with radio signals, local wi-fi or internet networks. This makes precast the most technology friendly material for residential buildings and places of work. Fire proof Precast is fireproof. It protects against the spread of fire between rooms or properties and it cannot catch fire, burn or drip molten particles. In tests, concrete performs consistently well in fire, often requiring only minor repairs to make good. Durability Concrete buildings from hundred of years ago are still in use today. Some might say concrete can last up to 2000 years and there are certainly many structures around that are well on their way to such a ripe old age. This is primarily down to the fact that precast concrete goes on increasing its strength for hundreds of years after it is cast. What s more, during that time it won t shrink, warp, move or creep excessively so can be relied upon to perform consistently year after year. 10

completed projects list room solutions Technical helpline 01476 562277 fpmccann.co.uk/rooms Hotels No. of beds Arora Hotel Crawley 96 Arora Hotel Gatwick 311 City Inn Manchester 284 Days Inn Glasgow 110 Etap Bradford 86 Etap/IbisBirmingham Airport 282 Express By Holiday Inn Aberdeen N/A Express By Holiday Inn Ayr 108 Express By Holiday Inn Bath 126 Express By Holiday Inn Bath 120 Express By Holiday Inn Bedford 80 Express By Holiday Inn Brentford Lock 120 Express By Holiday Inn Bristol 133 Express By Holiday Inn Burnley 98 Express By Holiday Inn Cheltenham 100 Express By Holiday Inn Chester Racecourse 97 Express By Holiday Inn Chingford 102 Express By Holiday Inn Colchester 99 Express By Holiday Inn Cowgate, Edinburgh 133 Express By Holiday Inn Derby 120 Express By Holiday Inn Doncaster 94 Express By Holiday Inn Dundee 93 Express By Holiday Inn Epsom 120 Express By Holiday Inn Exeter 122 Express By Holiday Inn Fulham 96 Express By Holiday Inn Golders Green 83 Express By Holiday Inn Greenwich 162 Express By Holiday Inn Greenwich 150 Express By Holiday Inn Hamilton 104 Express By Holiday Inn Harlow 130 Express By Holiday Inn Hemel Hempstead 112 Express By Holiday Inn Kent 104 Express By Holiday Inn Kettering 121 Express By Holiday Inn Leicester 109 Express By Holiday Inn Lincoln 118 Express By Holiday Inn Luton 147 Express By Holiday Inn Luton Airport 37 Express By Holiday Inn Manchester 150 Express By Holiday Inn Milton Keynes 178 Express By Holiday Inn North Acton 108 Express By Holiday Inn Northampton 127 Express By Holiday Inn Oldbury 109 Express By Holiday Inn Oxford 162 Express By Holiday Inn Priddys Yard, Croydon 150 Express By Holiday Inn Redbridge 126 Express By Holiday Inn Redditch 100 Express By Holiday Inn Sheffield N/A Express By Holiday Inn Slough 142 Express By Holiday Inn Southampton 131 Express By Holiday Inn Southampton 45 Express By Holiday Inn Stevenage 108 Express By Holiday Inn Stoke 123 Express By Holiday Inn Stratford 114 Express By Holiday Inn Stratford 45 Express By Holiday Inn Swiss Cottage 69 Express By Holiday Inn Tamworth 120 Express By Holiday Inn Tamworth N/A Express By Holiday Inn Taunton 92 Express By Holiday Inn The Armouries Leeds 130 Express By Holiday Inn Walsall 100 Express By Holiday Inn Wandsworth 148 Express By Holiday Inn Warwick 117 Express By Holiday Inn Watford 98 Express By Holiday Inn Winnersh 174 Express By Holiday Inn Witney N/A Golden Tulip Manchester 50 Hilton Croydon 120 Hilton Edinburgh 110 Hilton Luton 180 Holiday Inn Woking 161 Holiday Inn Woking 150 Howard Johnson Glasgow 108 Ibis Aldgate 348 Ibis Birmingham 90 Ibis Borehamwood 122 Ibis Bristol Harbourside 180 Ibis Carlisle 102 Ibis Gatwick 131 Ibis Hull 106 Ibis Leicester 150 Ibis Liverpool 127 Ibis Luton Airport 64 Ibis Manchester 127 Ibis Temple Quay 2, Bristol 141 Ibis Wembley 210 Macdonalds Hotel Sheffield 166 Park Inn Manchester 252 Quest Shoreditch 180 Radisson Blu Guildford 180 Radisson Jersey 166 Ramada Birmingham 120 Ramada Chatham 93 Ramada Derby 112 Ramada Hotel, Chase Pk, Doncaster N/A Ramada Newcastle Airport 156 Ramada Swansea 102 Ramada Walsall 121 Splash Landings Alton Towers 120 Telford International Hotel 101 Travelodge Slough 180 Village Ashton Moss 120 Village Elstree 120 Village Farnborough 114 Village Leeds South 115 Village Solihull 122 Westbridge Hotel Stratford 75 Student accommodation No. of beds University of Worcester 177 University of Sussex 228 University of London 197 University of Lancaster 422 University of Kent, Pier Rd, Gillingham 350 University of Hertfordshire 1601 University of East London, Docklands Campus 788 University of Abertay, Dundee N/A Swansea 500 Southend on Sea 561 Sheffield University N/A Reading University, Bridges Hall 400 Reading University 120 Reading University 967 Plymouth University 329 Pitfield St, Hackney 350 North Cambridge 321 Newcastle 300 Masons Hall, Birmingham 800 Mallet St, London 166 Loughborough University London Mile End Rd 595 London Metro Univ, Huddleston, Tufnell Pk 450 Lancaster Phase 3 1500 Lancaster Phase 2 1870 Homerton College, Cambridge 138 High Wycombe 234 High Wycombe 200 Great Dover Street 350 Crewe 51 Colchester 767 Brunel University Phase 5 538 Borough high Street 300 Abertay 700 Ministry of Defence No. of beds JRSLA, Lucknow Barracks 450 SNCO, Lucknow Barracks 50 RAF Woodbridge 344 RAF Woodbridge 58 DACI Shrivenham 460 DACI Shrivenham B36 250

Grantham Office: Alma Park Road Grantham Lincolnshire NG31 9SE Tel: 01476 562277 Mob: 07976 206521 precast@fpmccann.co.uk fpmccann.co.uk