OMNI Departures 12/30

Similar documents
Doha Hamad International OTHH - Guideline for pilots

Gulf Region Division of IVAO Rev Jan 26, Dubai Pilot Guide. Dubai Pilot Guide. Strictly for Flight Simulation use only Page 1

ENR 1.9 Air Traffic Flow Management (ATFM)

JeppView for Windows. General Information. Communication Information Airport Use: Public Daylight Savings: Not Observed.

JeppView for Windows. General Information. Runway Information. Communication Information. jep=jeppesen

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

NETHERLANDS ANTILLES ATC PHRASEOLOGY GUIDE ATC OPERATIONS BY: MATHIEU LAFLAMME

LFMN / Nice Côte-d Azur / NCE

Standard Operating Procedures (SOPs) for Arabian Control (OGCC)

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

ENR 1.9 AIR TRAFFIC FLOW MANAGEMENT (ATFM) 0.1

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

Honeywell.com PBN Concepts Krakow, Poland

JeppView for Windows. General Information. Runway Information. Communication Information. jep=jeppesen

Pi Aero Instrument Rating Syllabus

IVAO XG Division IVAC2 Human Machine Interface (HMI) Handbook Version /05/2017

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)

Standard Operational Procedures

APCH m HI coded C/L with 5 bars. (Supplementary inner 300m). TDZ 900m. RWY 08/26 HI elev bi-d with LI omni-d component. End lights red.

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

PORTUGAL DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO LISBOA CODEX

VATUSA Approval 3/21/18

Burlington ATCT Standard Operating Procedures

ADELAIDE/Parafield ELEV 57 AVFAX CODE 5002 REMARKS AVAILABILITY OPERATIONAL HOURS

SHARM ELSHEIKH INTERNATIONAL AIRPORT (SSH/HESH) BRIEFING & AERODROME CHARTS

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

IFR SEPARATION WITHOUT RADAR

International Civil Aviation Organization. Air Traffic Services Route Network Task Force (ARN TF) Sixth Meeting (Cairo, Egypt April 2013)

AERODROME CHART ATIS CLNC DEL

Lisboa RFE. Respect the ATC and the other pilots at all times and be understanding.

COMMISSIONING OF RAPID EXIT TAXIWAYS AND CHANGE IN DESIGNATOR OF TAXIWAYS KEMPEGOWDA INTERNATIONAL AIRPORT, BENGALURU (VOBL)

Northern Regional Training Scheme. EGBB Birmingham Airport Pilot s Guide. REVISION 1 (Monday, 30 January 2012)

S2 Tower Controller. Allama Iqbal Int l Airport Lahore ( OPLA ) June 2016 Pakistan vacc

MHTG (Toncontin Intl)

Standard Operating Procedures (SOPs) for UAE Centre (OMAE)

TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW


LZMC/MLC MALACKY 01 JAN IEff 01 FebI. MALACKY, SLOVAKIA Additional Airport Informations. 1. Services ATC and Meteo services available H24.

OMAA ABU DHABI / INTERNATIONAL OMAA ABU DHABI / INTERNATIONAL

Pilot Briefing for: New Islamabad Int l Islamabad (OPIS) 8/16/2018 Pakistan vacc

IVAO Switzerland Division

LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT

Pilot ATC RT Phraseology

LOCALIZER I-SAM CH 28 VOR/DME SAC CH 98. CAUTION : ft Obstacle located R 245/12DME from VOR/DME. D2 (MAPt) GAFOA I-SAM (SDF) I-SAM

Airservices Australia 2016

Cross the Pond westbound 2013 Pilot Briefing Berlin Tegel EDDT

+ JEPPESEN 1. GENERAL

Pilot: ELAL 385 Position J6 Request IFR clearance Info D to Larnaca as filed.

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

- Updated formatting - Re-drawn airspace delegation diagram

FLIGHT PROCEDURE AT SUVARNABHUMI INTERNATIONAL AIRPORT

JEPPESEN JeppView General Info Surabaya, IDN S ' E ' Mag Var: 0.0 W Elevation: 9' Runway Info Runway ' x 148' asphalt

ARP N W EAST MIDLANDS. I-EMW & I-EME D (Ch 30Y) IEMW / IEME N W 322' Radar VDF. 2893m x 46m.

Northern RTS. EGNT and EGNV vmats Part 2. REVISION 1 (Saturday, 19 February 2011 at 22:29) Newcastle and Durham Tees Valley

VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION

AIP ENR JORDAN 01 MAY 2014

LGAV LTAI Real Flights Event Partnership EUROPE. PILOT's BRIEFING. March 7 th 2009 Event time: 1200z 2200z. 1 Athens FIR Guide 2 LGAV Procedures

APPENDIX B DRO INSTRUMENT APPROACH CHARTS & DEPARTURE PROCEDURES

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

Providence ATCT Standard Operating Procedures

VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT

Effective: GOLD COAST (YBCG) NEW PROCEDURES FOR INTRODUCTION OF ILS ON RWY 14

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

airservices AERODROME CHART - Page 1 MELBOURNE/ESSENDON, VIC (YMEN) AD ELEV 282 S E Airservices Australia 2018 ATIS AWIS SMC PAL (AH)

HOLDING STACK MANAGEMENT

Charlotte - Douglas International Airport Traffic Control Tower

AREA NAVIGATION RNAV- MANAGEMENT

The IFR Burger. Here is the flight plan: FIM.V186.DEANO.V27.KWANG Cruise Altitude: 6000 ft. ZLA Tech Route: BURN39

LIRF ROME FIUMICINO Pilot Briefing

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

AIRAC AIP SUPPLEMENT 02/16 26 th MAY 2016

ATC BRIEFING March 7th 2009 Event time: 1200z-2200z

SKUKUZA OPERATIONAL BRIEFING

THE AREA CONTROL CENTRE (CTR) POSITION

LETTER OF AGREEMENT BETWEEN DENMARK FIR AND SWEDEN FIR. VATSIM Scandinavia 4 April 2013

Denmark FIR and Sweden FIR

SECTION 4 - APPROACH CONTROL PROCEDURES

PTA RADAR M INI MUM ALTI TUDE S PUERTO PLATA, DOM REP MDPP/POP PTA ,000 13,000 PUERTO PLATA

LFPG / Paris-Charles de Gaulle / CDG

PILOT BRIEFING GENEVA RFE 2018

June 10, EST

LFBO / Toulouse-Blagnac / TLS

JeppView for Windows. jep=jeppesen. Airport Information For LGKO Printed on 11 Dec 2017 Page 1. General Information. Runway Information

Airport Information. Details for DOHA INTL. State/Province

MARCH Resources ZMA ATC Terminal Layout Passenger Feedback

IVAO Switzerland Division

JeppView for Windows. General Information. Runway Information. Communication Information. jep=jeppesen

Terminal- Area Opera.ons Prof. Hamsa Balakrishnan

JeppView for Windows. Trip Kit Index. Printed on 13 Jan 2016 Page 1. List of pages in this Trip Kit. Trip Kit Index

Work Package 1: Final Project Report Appendix C: Analysis of the current situation in the Frankfurt TMA

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)

JeppView for Windows. General Information. Runway Information. Communication Information. jep=jeppesen

Instrument Refresher Course. Airfield Operations Flight Tower 412 OSS/OSAT

GENEVA OM ATC OPERATING MANUAL LSAG FIR DEPARTMENT LSAG-CH LSAG-ACH

Frankfurt (EDDF) Pilot Briefing. Cross the Pond 2016 Westbound

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

JeppView for Windows. Runway Information. jep=jeppesen. Abu Dhabi Tower: Abu Dhabi Ground:

Transcription:

Positio U.A.E. Ceter (FL265+) 124.850 OMAE_U_CTR U.A.E. Ceter (FL265-) 120.900 OMAE_L_CTR Dubai Arrival South 124.900 OMDB_S_APP Dubai Arrival North 124.450 OMDB_N_APP Dubai Director 127.900 OMDB_F_APP Dubai Departures 126.200 OMDB_N_DEP Dubai Departures 121.025 OMDB_S_DEP Dubai Tower 118.750 OMDB_N_TWR Dubai Tower 119.550 OMDB_S_TWR Dubai 121.650 OMDB_S_GND Dubai 118.350 OMDB_N_GND Dubai Delivery 120.350 OMDB_DEL Eve FL Iteratioal 0501-0577 ACC/APP 6201-6277 SR 30R/L 12R/L ATC DATOB 1C/D 1B South 124.900 IMPED 1C 1B/E North 124.450 LORID 1C/1D 1B South 124.900 PUVAL 4C/1D 4B/1E North 124.450 VUTEB 1C/1D 1B/1E North 124.450 RWY 30L 30R 12L 12R ILS 111.3 110.9 110.1 109.5 TRK 299 299 119 119 IF FIX SEDPO SEDPO UKRIM PEDOV DXB : Dubai Iteratioal Pref Departig 30R / 12R Pref Ladig 30L / 12L SID 30R/L 12R/L It Clb ATC ANVIX 4F 3G 4000 South 121.025 DAVMO 2F 2G 4000 North 126.200 IVURO 1F 1G 4000 North 126.200 KUTLI 1F 1G 4000 South 121.025 MIROT 1F 1G 4000 South 121.025 NABIX 1F 1G 4000' South 121.025 RIDAP 1F 1G 4000 South 121.025 SENPA 1F 1G 4000 South 121.025 VUVUT 1F N/A 4000 North 126.200 supplemetary Iformatio: DATOB // VUTEB 1D/E // IMPED 1B // PUVAL 1D/1E arrival oly o ATC discretio! preferred SR RW directio SR ATC 30 L/R NW VUTEB 1C North 124.450 30 L/R E IMPED 1C North 124.450 30 L/R S LORID 1D South 124.900 12L/R NW VUTEB 1B North 124.450 12 L/R E IMPED 1E North 124.450 12L/R S LORID 1B South 124.900 12L 12R 30R 30L OMNI Departures 12/30 RW Climb Pdg mi ACC Holdigs HOLDS TRK TURNS ATC KIVUS 109 LEFT 10000-FL250 L_CTR 120,900 VUTEB 107 RIGHT 10000-FL250 L_CTR 120,900 ITLAP 204 LEFT 10000-FL180 L_CTR 120,900 IMPED RIGHT 10000-FL180 L_CTR 120,900 Dowwid Holdigs HOLD RWY VELAR // 30L/R TUKAK // 30L/R SOGAP // 12L/R SOLIL // 12L/R TRK/Vm ax 120 / 1mi 120 / 1mi 299 / 210kts 299 / 210kts TRN/T ATC RIGHT/1m i TRK ATC 30 L/R 4000ft 5% 270-310 S_DEP 126.200 30 L/R 4000ft 5% 310-350 N_DEP 121.025 12 L/R 4000ft 5% 160-130 S_DEP 126.200 12 L/R 4000ft 5% 130-090 N_DEP 121.025 ATC Clearace: After departure fly Headig.DEG Climb to feet. supplemetary Iformatio: miimum climb gradiet 5% to 8000ft (300ft per NM) Procedures desig after passig : RW12 L/R 3,3% RW30 L/R 5 % ---------------------------------------------------------------------------------------- Aircraft shall climb straight ahead to 1000ft the tur to assiged HDG- ATTN: NO TURN before the ed of the ruway!! 4000 6000ft North 124.450 4000 6000ft South 124.900 4000 6000ft North 124.450 4000 6000ft South 124.450

Positio U.A.E. Ceter (FL265+) 124.850 OMAE_U_CTR U.A.E. Ceter (FL265-) 120.900 OMAE_L_CTR Abu Dhabi Arrival 124.425 OMAA_N_APP Abu Dhabi Arrival 118.000 OMAA_S_APP Abu Dhabi Director 128.100 OMAA_F_APP Abu Dhabi Tower 119.200 OMAA_S_TWR Abu Dhabi Tower 118.675 OMAA_N_TWR Abu Dhabi 123.975 OMAA_S_GND Abu Dhabi 121.950 OMAA_N_GND Iteratioal 1701-1777 ACC/APP 6201 6277 Eve FL ACC Holdigs HOLDS TRK TURNS ATC ALNEV 117 RIGHT L_CTR 120,900 ROVOS 280 RIGHT L_CTR 120,900 NOTES: AUH : Abu Dhabi Iteratioal SID 31L 13R It Clb 31R 13L It Clb ATUDO 3K 3G 5000ft 3P 3F 4000ft BOSEV 1K 1G 5000ft 1P 1F 4000ft DAXIB 1K 1G 5000ft 1P 1F 4000ft KANIP 3K 3G 5000ft 3P 3F 4000ft LORID 1K 1G 5000ft 1P 1F 4000ft MEKRI 1K 1G 5000ft 1P 1F 4000ft ORNEL 1K 1G 5000ft 1P 1F 4000ft TULON 1K 1G 5000ft 1P 1F 4000ft Dowwid Holdigs HOLD RWY TRK/Vmax TRN/T ATC ORGAD // 31L/R 115 / 230kts 13000 6000ft North 124.425 LOXIX // 31L/R 126 / 210kts 4000 6000ft North 124.425 GEXOD // 31L/R 287 / N/A 13000 6000ft North 124.450 PTO // 31L/R 126 / 210kts 4000 6000ft South 124.450 REXIG // 31L/R 295 / N/A RIGHT/1mi 13000 6000ft South 124.450 OVOLA // 12L/R 306 / 230kts RIGHT/1mi 13000 6000ft North 124.425 PAXIK // 12L/R 306 / 230kts 13000 6000ft South 124.450 GEXOD // 12L/R 287 / N/A 13000 6000ft North 124.450 REXIG // 12L/R 295 / N/A RIGHT/1mi 13000 6000ft South 124.450 RWY 31L 31R 13L 13R ILS 109.3 108.75 110.3 109.15 TRK 306 306 126 126 EMOSU 3000ft LOSOV FSX Default sceery has ruway 31/13 oly This is same as 31L/13R RESIG SOKOV 3000ft 13L 13R 31R 31L SR 31L 31R 13L 13R ATUDO 4B 4B 1A 1A ELOVU 1C 1C 1A 1A EMERU 1B 1B 1A 1A GIDOB 1C/D/J/M 1C/D/J/M 1A 1A NOBTO 4C/D/J 4C/D/J 4A/1H 4A/1H ROVOS 4C 4C 4A/1H 4A/1H UKILI 1C/D/J/M 1C/D/J/M 1A 1A supplemetary Iformatio: GIDOB 1J/M // NOBTO 4D/J 1H // ROVOS 1H // UKILI 1J/M arrival oly o ATC discretio! preferred SR RW directio SR ATC 31 L/R NW GIDOB 1C North 118.425 31 L/R NW UKILI 1C South 118.000 31L/R SE NOBTO 4C South 118.000 31 L/R NE ROVOS 4C North 118.425 31 L/R N EMERU 1C North 118.425 31 L/R S ATUDO 1C South 118.000 13/LR NW GIDOB 1A North 118.425 13 L/R NW UKILI 1A South 118.000 13 L/R SE NOBTO 4A South 118.000 13 L/R NE ROVOS 4A North 118.425 13 L/R N EMERU 1C North 118.425 13 L/R S ATUDO 1C South 118.000

Positio 16R 16L HOLDS COURSE TURNS Bahrai Cetral 127.525 OBBB_CTR Doha Radar Coverig all Qatar airports Doha (OTHH & OTBD) 121.100 OTHH_R_APP 119.725 OTHH_APP Doha Director 119.400 OTHH_F_APP Hamad Tower 118.525 OTHH_E_TWR Hamad Tower 118.025 OTHH_W_TWR Hamad 120.225 OTHH_E_GND Hamad 121.675 OTHH_W_GND Hamad Delivery 120.875 OTHH_DEL Eve FL Iteratioal 2601-2677 Military 0601 -- 0677 DOH : Doha Hamad Iteratioal SID 34L 34R 16L 16R It Clb ALSEM 1W 1E 1M 1C ALVEN 1W 1E 1M 1C BATHA 1W 1E 1M 1C BUNDU 1W 1E 1M 1C NAMLA 1W 1E 1M 1C PATOM 1W 1Z 34L 34R 1E 1M 1C SALWA 1W 1E 1M 1C MUXOP 1W 1E LOXUL 1M 1C GINTO 087 RIGHT 8000-FL210 BAYAN 229 LEFT 8000-FL240 AFNAN 268 RIGHT 8000-FL220 SR 34L 34R 16L 16R GINTO 1W 1E 1M 1C BAYAN 1W 1E 1M 1C AFNAN 1W 1E 1M 1C RWY 34L 34R 16L 16R ILS 111.9 110.1 108.7 108.1 COURSE 336 336 156 156 IMKAT LAGMA TOVAN GOLSI Positio Bahrai Cetral 127.525 OBBB_CTR Doha Radar Coverig all Qatar airports Doha (OTHH & OTBD) Eve FL 121.100 OTHH_R_APP 119.725 OTHH_APP Doha Tower 118.900 OTBD_TWR Doha 121.925 OTBD_GND Iteratioal 2601-2677 Doha Iteratioal 33 SID 33 15 It Clb ALSEM 1N 1S 4000 ALVEN 1N 1S 4000 BATHA 1N 1S 4000 BUNDU 1N 1S 4000 NAMLA 1N 1S 4000 PATOM 1N 1S 4000 SALWA 1N 1S 4000 DERNO 1N 4000 NOPLI 1S 4000 15 HOLDS COURSE TURNS GINTO 087 RIGHT 8000-FL210 BAYAN 229 LEFT 8000-FL240 AFNAN 268 RIGHT 8000-FL220 SR 33 15 GINTO 1N 1S BAYAN 1N 1S AFNAN 1N 1S RWY 33 15 ILS 109.5 108.5 COURSE 336 156 NAJMA IMLEP

Positio Kuwait Radar 125.300 OKAC_CTR Kuwait 121.300 OKBK_APP Kuwait Tower 118.300 OKBK_TWR Kuwait 121.700 OKBK_GND Kuwait Delivery 126.775 OKBK_DEL HOLDS COURSE TURNS RALKA 276 RIGHT 3000-FL460 BTO 242 RIGHT 3000 DEBTI 314 RIGHT 3000-FL460 PEDEL 332 LEFT 3000 SODAP 332 RIGHT 3000 WAFRA 078 RIGHT 3000-FL460 Eve FL Iteratioal 4500-4577 Domestic 1601-1620 VFR / Local 1760-1767 Military 1750-1757 Positio Muscat Ceter 123.950 OOMM_CTR Muscat 121.200 OOMS_APP Muscat Tower 118.825 OOMS_TWR Muscat 121.800 OOMS_GND Muscat Delivery 125.575 OOMS_DEL HOLDS COURSE TURNS KANOL 121 RIGHT 7000-9000 BUBIL 087 RIGHT 8000-9000 LADBA 246 RIGHT 12000 MIGMO 281 LEFT 12000 NONKA 345 LEFT 12000 Eve FL Iteratioal 4001-4077 SID 33L/R 15L/R It Clb ALVIX 3F 3E ASVIR 3F 3E BOXIK 3F 3E RALKA 3F 3E SESRA 3F 3E WAFRA DEKOP tras KATOD tras NIDAO tras RUNWAY HEADING KWI: Kuwait Iteratioal MCT: Muscat Iteratioal 3F 3E 3000' 332 152 SID 08L/R 26L/R It Clb DAPOK 1S 1P 10000 EMURU 1S 1P 1 GERAR 1S 1P 10000 IVETO 1S 1P 10000 IZK 1S 1P 10000 MUSRU 1S 1P 11000 SEVLA 1S 1P 11000 SODEB 1S 1P 11000 TULBU 1S 1P 10000 VUSET 1S 1P 7000 RUNWAY HEADING MURMA 1N ITLAK 1N 08L 08R 15R 15L 33L 33R 26L RWY 08R/26L ot i service SR IAF SIDAD DESLU 33L/R PEDEL 33L/R BTO SR 08L 08L Trasitio 15L/R PASEL 15L/R IVE Trasitio GERAR 1V KANOL 1V 1U KANOL 1U MUSUK 1V BUBIL 1V 1U BUBIL 1U LAKLU 1V BUBIL 1V 1U BUBIL 1U TULBU 1V BUBIL 1V 1U BUBIL 1U VUSET 1V LADBA 1V 1U LADBA 1U ELIGO 1V MIGMO 1V 1U MIGMO 1U TUMET 1V NONKA 1V 1U NONKA 1U EMURU 1V NONKA 1V 1U NONKA 1U RADAX 1V NONKA 1V 1U NONKA 1U 2D 2D RALKA 2C 2D ALVIX 2C 2D SESRA 2C 2D DEBTI 2C NORTH 2D SOUTH 2D ASVIR 2C 2D KUNRU 2C 2D WAFRA 2C 2D RWY 33L 33R 15L 15R ILS 109.5 110.5 110.1 111.3 COURSE 332 332 152 152 RARVA GINBI RERAN DAR RWY 08L 08R 26L ILS 108.9 110.7 COURSE 084 Not i Not i 264 M12WL service service D12IMR 3400 3400

SHJ: Sharjah Itl SID 30 12 ANVIX 3R 5000 2G DAVMO 1R 1Q SR 30 12 ALRAR 3M 2P 2K 1N ELELA 2M 2P 4K 3N BAH Bahrai Itl DEP 30R 12L RUNWAY HEADING Headig 301 Headig 121 SR 30R NAGAT 12L ALRAS KOBOK 1 1 Dubai Arrival 124.900 Dubai Departures 126.200 Sharjah Tower 118.600 Sharjah 121.875 MIADA 3R 5000 2Q 5000 MUVLA 2R 5000 1Q 5000 NADIL 2R 2Q5000 RIKET 2R 1Q SIT 2R 5000 1Q 5000 MIADA 2M 2P 2K PUVAL 2M 1P 3K 2N RWY 30 12 ILS 111.95-301 108.55 121 IAF SJ501 SJ402 Bahrai Cetral 127.525 Bahrai 127.850 Bahrai Tower 118.500 Bahrai 121.850 Bahrai VOR BAH 115.3 RWY 30R 12L ILS 110.3-301 111.5 121 FAP D8 BAH 1500 D8.4 BAH 1500 LADNA 1 1 SOGAT 1 1 DENVO 1 1 After NAGAT vectors After ALRAS vectors SID 30 12 SR 30 12 SID 29 11 ARR ILS 29 RNAV 29 DWC Al Maktoum It Dubai Arrival 124.900 Dubai Departures 121.025 ANVIX 1L 1J MIADA 2L 2J MUVLA 2L 2J NADIL 2L 2J DESDI 2Z 2A BUBIN 2Z 2A MIADA 2Z 2A RWY 30 12 FJR Fujairah It Fujairah 129.400 Fujairah Tower 124.600 ALAIN (ALN) 1N 7000 2F 7000 GABKO 1N 7000 1F 7000 RAK 1N 7000 3F 7000 SERSA 1N 7000 1F 7000 TONVO 2F 8000 FJV VOR ILS W 29 DESPA ILS W 29 RNAV Y 29 BORUL ILS W 29 RNAV Y 29 FJ297 RNAV Y 29 RWY 29 11 Al Maktoum Radar 124.025 Al Maktoum Twr 118.625 Al Maktoum Gd 118.375 RIKET 2L 2J SIT 2L 2J ILS 109.75-300 111.75 120 IAF GEXIK IVALA Fujairah 119.450 OBSEN 1N 6000 Fujairah VOR FJV 113.8 ILS 111.5-291 Not available for IFR arrival due to IAF BORUL high terrai SID 01 19 SR 01 19 DEP 34 16 ARR 34 16 AAN Al Ai Itl Al Ai 133.550 Al Ai Tower 119.850 Al Ai 129.150 LABRI 1H 1J RES 1H 1J ROVOS 1H 1J ITRAX 1K 1L 1M ROVOS 1K 1L RWY 01 ILS 19 VOR ILS/VOR 111.9-006 112.6 ALN 190 IAF ALN 5000 KEDAD 2500 RKT Tower 124.000 118.250 121.600 Ruway Headig Iitial Climb The vectors or directs to iitial waypoits with climbs RAV VOR ILS Z 34 VOR Z 16 ALSIL ILS Z 34 NADNI ILS Z 34 GENUK VOR Z 16 KANUD VOR Z 16 ILS/VOR 110.5-343 113.6 RAV 163 IAF ALSIL 2500 KANUD