A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

Similar documents
A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

A358. Taunton to Southfields Dualling Scheme Public consultation

A303 Stonehenge Amesbury to Berwick Down

M621. Junctions 1 to 7 Improvement scheme. Share your views

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

M2 Junction 5. improvements scheme. Preferred route announcement

A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement

M56. New Junction 11a Preferred route announcement

Major Scheme Business Case Summary Report for Programme Entry

Public consultation exhibition

Trans-Pennine Upgrade Programme. Preferred route announcement

in Northumberland Preferred Route Announcement September 2017

M54 to M6/M6 Toll Link Road Public consultation

A63 Preferred Route Announcement

A31 Ringwood improvement scheme

A30 Chiverton to Carland Cross Statement of Community Consultation

EXPLANATORY STATEMENT

M4 Junctions 3 to 12 Smart motorway

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

THE WELSH MINISTERS STATEMENT OF REASONS

M20 junction 10a improvement scheme. We want to hear your views

Welcome. Great Yarmouth Third River Crossing. Norfolk County Council

M56. New Junction 11a Summary of the consultation report

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

Improving rail links to Heathrow from the West and beyond

Statement of Community Consultation. Trans Pennine Upgrade: Statement of Community Consultation (SoCC)

Improving the A47 Great Yarmouth junction improvements. Public consultation

South of England north-south connectivity

4 Are you responding on your own behalf or on behalf of an organisation or group?

Economic Development Sub- Committee

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement

Lower Thames Crossing

Proposed M9 Spur Extension. Kirkliston

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

M56. New Junction 11a. Public consultation. January March If you need help accessing this or any other Highways England information,

A30 Carland Cross to Chiverton Cross Project Development Team EDG0769_PA_PE01

Non-technical summary

A140 study and Major Road Network

M621 Junctions 1 to 7 Improvement Scheme Public Consultation Report

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Regional Investment Programme

RW Bruhn Bridge and Approaches Project

TRANSPORT UPDATE. September/October 2018

A303 Stonehenge Amesbury to Berwick Down

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Road Investment Strategy A1 East of England Strategic Road Study

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

PUBLIC INQUIRY QUESTION

Inside Government Conference Case Study: Norwich Northern Distributor Road

Section A: Scheme Summary

LISTED BUILDING AND FIRE STATION CENTRAL SITE WHITGIFT STREET OLD PARADISE GARDENS

Smart Motorways Programme

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Statement of Community Consultation (SoCC)

Part four. In this part you will find: The next steps to deliver the master plan

North West smart motorways 100 miles of extra lanes

A Master Plan is one of the most important documents that can be prepared by an Airport.

The Point Roundabout Improvement Scheme

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Business Case Approved. Under Construction. Business Case Approved. Under Construction

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange,

Chapter 21 Route window W6 West Ealing station. Transport for London

Cuadrilla Elswick Ltd

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

A12 Chelmsford to A120 widening Have your say

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016

5.1 Traffic and Transportation

Regulatory Committee

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

Commissioning Director - Environment

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

John Betts School Crossing Review

A358 Taunton to Southfields Dualling Scheme. Corfe Parish THE FACTS

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. Spring 2016

Chapter 2 Route window W25 Maidenhead station. Transport for London

North Somerset District Council s Statement of Community Consultation pursuant to Section 47 of the Planning Act 2008

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

M3 junction 9 improvements scheme

Planning Act The Network Rail (Western Rail Link to Heathrow) Order. Statement of Community Consultation

Ashton Vale Industrial Estate alternative access report on second micro-consultation. MetroWest Phase 1

The Problem.. SuDS: Controlling the Flow. LANDF RM Technical delivery of SuDS 15/10/2013. Bridget Woods Ballard HR Wallingford 1.

PORTISHEAD BRANCH LINE (METROWEST PHASE 1) ORDER NOTICE PUBLICISING A PROPOSED APPLICATION FOR A DEVELOPMENT CONSENT ORDER

Penzance Heliport Ltd.

Wolverhampton City Council

Northern Beaches Transport Action Plan

North Somerset District Council s Revised Statement of Community Consultation pursuant to Section 47 of the Planning Act 2008

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

Transcription:

Sparkford to Ilchester Dualling Scheme Public consultation Welcome

Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities and businesses, including the tourist industry which is so important to the south west. However, there are problems along the route. These include several single carriageway sections where road users can suffer congestion and long delays. The problems are even worse at peak holiday times during the summer months and on weekends. In recognition of this and the harmful effects this has on the south west s economy, the Government s Road Investment Strategy (RIS) sets out the intention to transform connectivity by upgrading the /A358 corridor to a high quality dual carriageway from the M3 motorway to the M5 motorway at Taunton. To support this, we are developing 3 major road improvement schemes along the /A358 corridor: A358 Taunton to Southfields Sparkford to Ilchester Stonehenge: Amesbury to Berwick Down Why we need the scheme The section of the between Sparkford and Ilchester comprises of a mix of dual and single lane carriageway, which leads to localised congestion, impacting adversely on journey times and journey time reliability. Currently, on a normal day, up to 23,500 vehicles use this single carriageway section. At weekends in the summer the number of vehicles using this section of road can increase by nearly half as many again. This is more traffic than the road is designed to carry. Due to the increase in traffic, average travel times can double on the westbound direction on a Friday in August, making it impossible to predict the time a journey will take. This traffic is forecast to further increase as local authorities along the length of the corridor seek to deliver economic growth and new development. This scheme will have significant benefits for the local area including: Capacity: the proposal will reduce congestion, by increasing the road s capacity for free-flowing traffic and making mile-a-minute travel the norm Safety: the proposal will boost road safety and ease driver stress. It will also make it safer and easier for cars, pedestrians and other local road users to reach facilities Resilience: there will be fewer road closures due to incidents or accidents /A358 route corridor schemes 1. A358 Taunton to Southfields 2. Sparkford to Ilchester 3. Amesbury to Berwick Down Economic growth: by making trips quicker and safer, and arrival times easier to predict the proposal will by making the south west more attractive for tourists and commerce. Increasing the capacity of the road will also support the predicted growth in jobs and housing

Looking at the options During our previous consultation, we asked for your views on 2 shortlisted options for improving the between Sparkford and Ilchester: Option 1: A dual carriageway that follows the existing from east of Podimore Roundabout to Downhead. At this point, the road moves north before reverting to follow the route of the existing in the direction of Hazlegrove. Option 2: A dual carriageway that starts east of Podimore Roundabout before leaving the existing to pass south of Annis Hill and then north of Steart Hill. It re-joins the existing near Sparkford. The single carriageway section of the existing would be retained as a local route. We considered a number of factors in deciding between the options, including: Scheme objectives Safety Benefits Public consultation feedback Costs Environmental effects Construction We selected Option 1 as our preferred route judged against the factors outlined above. Scheme proposal Since announcing the preferred route, we have continued to develop the scheme proposal. The plan below shows the proposed dual carriageway and local access connections. Crown copyright and database rights 2018 OS 100030649 Downhead junction Small slip road connection between the local road network and the eastbound. Sparkford Rd. A359 Lytes Cary A37 Dyke Brook Yarcombe Wood Park Brook A372 River Cary Podimore Roundabout The existing westbound slip road to Podimore will be closed. Annis Hill Steart Hill Steart Wood Camel Hill Traits Ln. Gason Ln. A359 High St. Sparkford Hazlegrove Roundabout Podimore Plowage Ln. Howell Hill Wales Queen Camel River Cam Church St. Heathcote Rd. B3151 Bridgehampton River Cam Camel Cross junction West Camel Hazlegrove junction Slip road junction that provides connection between the A359, Hazlegrove School, properties at Camel Hill and both carriageways of the. To Hazlegrove School B3151 Royal Naval Air Station, Yeovilton River Yeo 0 500m DIAGRAMMATIC Yeovilton Small slip road connection between the local road network and the westbound.

Hazlegrove junction We are proposing a new junction, built on 2 levels, at Hazlegrove. This would provide connections to Hazlegrove House, the A359, Camel Hill and access to villages south of the route. Our proposals for this junction take into account the significant amount of feedback we received on its design during the previous consultation. Computer render of the redesigned junction after 15 years of planting growth.

Downhead Lane junction Following feedback from the previous consultation, we have considered a number of different options for a junction at Downhead, including: an all-movements junction allowing people to travel in any direction a limited movement junction, which might be smaller but would only allow road users to travel in certain directions no junction at all Below is the proposed arrangement for a junction in the vicinity of Downhead Lane. The all movements junction, built across 2 levels, allows vehicles to join and leave the in all directions. Computer render of the redesigned junction after 15 years of planting growth.

Caring for the environment Understanding the impact on the environment and the community within the corridor is very important to us. Our aim is to reduce any adverse effects while capturing the wider opportunities for improvement created by this scheme. The area surrounding the between Sparkford and Ilchester has a number of sensitive and valued environmental sites, as well as a number of dwellings and farm businesses. We have prepared a Preliminary Environmental Information (PEI) Report to help local people understand the potential environmental effects of our proposal. This is available on our website at www.highways.gov.uk/sparkford-to-ilchester. Following this consultation, we will prepare an Environmental Statement setting out in full our assessment of the potential effects of the scheme on the environment, and our proposed mitigation and enhancement measures. We will also produce a Construction Environmental Management Plan of how the mitigation and enhancement measures will be incorporated into our construction stage. We will submit these as part of our Development Consent Order application. More information about the potential environmental impact is available on page 17 of the consultation booklet.

Highway drainage management When rain falls on a natural landscape it soaks into the ground, evaporates, is taken up by plants (evapotranspiration) or some eventually finds its way into streams and rivers. This is often referred to as the Greenfield response. These stages of the water cycle can be impeded when land is altered by development. When rain falls on hard surfaces such as roads much more of it turns into surface water runoff, which can cause flooding, pollution and erosion problems. To mitigate this, the highway drainage network will introduce Sustainable Drainage Systems (SuDS) to mimic the pre-developed Greenfield response to rainfall. Discharge rate Q in Q out Example of a runoff hydrograph Increase peak rate of runoff Post-development (without flow attenuation) Time Volume of runoff post-development (red and blue) Post-development (with flow attenuation) Volume of runoff pre-development (green) Note: volume of runoff equates to the area under the hydrograph Greenfield (pre-development) Reduced baseflow A study has found that the majority of the existing carriageway between Sparkford and Illchester does not include SuDS features. As we plan to introduce these features where previously there were none, this will not only mitigate any impact from the development but should improve the current situation. Uncontrolled inflow rate (Qin) Temporary storage of surface water runoff (attenuation storage volume) Permanent water (for soem SuDS components) Controlling runoff rates using attenuation storage Controlled outflow rate (Qout) Provision for non-motorised users We need to ensure that the design of the scheme allows people travelling on foot, bicycle or by horse to continue to get around the area. We have carried out surveys to identify the most frequently used walking, cycling and riding routes which would be affected by the proposals. As part of this, we have considered how people with disabilities currently get around the area. We have also engaged with a number of user groups to ensure we fully understand what is important to them and those that they represent. Based on this, we have developed proposals for crossing points which use overbridges and underbridges to enable people to cross the road more safely than they do at present. For safety reasons, at no point will non-motorised users be able to cross directly on the dual carriageway. Crown copyright and database rights 2018 OS 100030649 Sparkford Rd. A359 Lytes Cary A37 Dyke Brook Yarcombe Wood High St. Sparkford Park Brook A372 River Cary Podimore Roundabout Annis Hill Steart Hill Steart Wood Camel Hill Traits Ln. Gason Ln. A359 Hazlegrove Roundabout Howell Hill River Cam Podimore Plowage Ln. Wales Queen Camel Church St. B3151 West Camel 0 500m Bridgehampton River Cam Existing Public Right of Way Proposed New Public Right of Way DIAGRAMMATIC

Construction We understand that local people will want to know the likely impact that constructing the scheme will have on their daily life, particularly in relation to traffic rat-running through local villages. A traffic management plan will be drawn up once the scheme proposals are finalised, together with a construction phase plan, detailing exactly how the works will be undertaken and how and local traffic will be managed. In addition, we have appointed a specialist consultant to advise on how the scheme would be constructed and they have already attended site to understand some of the local constraints first hand. Community and environmental impacts will be taken fully into account at all stages of the development, planning and decision-making process. That means working closely with local communities, local authorities, environmental bodies and major employers as work progresses in continuing the development of the scheme into the construction phase. If development consent for the proposed scheme is granted, construction of the main works would be expected to commence in spring 2020 and continue for a period of approximately 2.5 years.

Tell us your views This is the second stage of our consultation process and we would like to know what you think about our proposed scheme. We will listen to your views and publish a consultation report which summarises your feedback and how it will be considered to inform the final design stage. To help us with this, please complete a questionnaire which you can access online at our website www.highways.gov.uk/sparkford-to-ilchester Paper copies of the questionnaire are available at this event, at public information points and can be requested from the project team by: Emailing: SparkfordtoIlchesterdualling@highwaysengland.co.uk Calling us on: 0300 123 5000 Writing to us at: Sparkford to Ilchester Project Team, Highways England, 2/07K Temple Quay House, 2 The Square, Temple Quay, Bristol BS1 6HA Next steps The consultation is your opportunity to give your views on our proposal. If you have further questions or would like to find out more, speak to a member of the project team here at the exhibition event, or visit our website. The public consultation will run from Friday 26 January until 23.59 on Friday 9 March 2018 (inclusive). Please get involved and provide your responses by the closing date. We will analyse your feedback, consider all suggestions made, and respond to it in the report we prepare on the consultation. Your views will help the Secretary of State for Transport make a decision on our application. The Development Consent Order application process This scheme is classified as a Nationally Significant Infrastructure Project (NSIP) under the Planning Act 2008. Because of its national significance, the scheme needs a Development Consent Order or DCO. Following this public consultation, we will carefully consider all comments received before submitting our DCO application. If the application is accepted by the Planning Inspectorate, there will then be an examination of the application in which the public can participate. This examination will take a maximum of 6 months. The Planning Inspectorate then has 3 months to make a recommendation to the Secretary of State, who then has a further 3 months to make a final decision. Autumn 2017 Spring 2018 Summer 2018 Summer 2018 Winter 2018 Winter 2019 Spring 2020 Announce preferred route Consultation on proposed Development Consent Order Submit application Individuals and organisations register as interested parties and submit representations Start of DCO examination Secretary of State decision on DCO application Start of construction 2022/23 End of construction