High Speed Two Limited High Speed 2 Optimisation of Route 3

Similar documents
PUBLIC SESSION MINUTES OF ORAL EVIDENCE. taken before HIGH SPEED RAIL COMMITTEE. On the HIGH SPEED RAIL (LONDON WEST MIDLANDS) BILL

Boddington PC Petition

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

This paper outlines the development of the HS2 scheme since the then Government decided to set up HS2 Ltd and explore options in January 2009.

High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond

H1: BIRMINGHAM CURZON STREET STATION

General Summer and Winter Views

EXHIBIT LIST. No Exhibit Name Page. 1 R391 HS2 Residents Charter.pdf (R391) R392 Response to Select Committee

FAO: Sir Howard Davies, Chair, Airports Commission 21 Apr 2013

Major Scheme Business Case Summary Report for Programme Entry

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case

N5 Westport to Bohola Road Project Route Selection Report Volume 1 Main Text

Submitted to: NYX CAPITAL CORP. 1131a Leslie Street, Suite 201 Toronto, Ontario M3C 3L8 Attention: Mr. Tim Jessop Development Manager

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures

Maryland Transit Administration. Master Plan Alignment Trail

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Abbey Chesterton bridge Questions & Answers

THE WELSH MINISTERS STATEMENT OF REASONS

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement

EXPLANATORY STATEMENT

July 2016 Briefing pack: David Higgins South Yorkshire Report

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Appendix C Stage 1 Road Safety Audit

High Speed 2 Limited. High Speed 2 Route Corridor Review. January 2012

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road

Technical Explanation Introduction

Higher Viaduct. Route - January 2012

East West Rail Consortium

Chapter 2 Route window W25 Maidenhead station. Transport for London

In your area. Tibshelf to Shuttlewood LA10. June Introduction

Busway between West Cambourne site and the junction of the A1303 / A428

Appendix 6 Fulbourn Greenway Review

PUBLIC INQUIRY QUESTION

INFORMATION FOR LONGFORD, HARMONDSWORTH, SIPSON, HARLINGTON AND CRANFORD CROSS COMMUNITIES

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

A120 BRAINTREE TO A12 Consultation on Route Options. 17 January 14 March 2017

AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

2nd March, 2017 Corporate Report Format. Conisbrough Mexborough Sprotbrough

EXHIBIT LIST. No Exhibit Name Page. 1 P Lea Marston PC_Local Map.pdf (P1784) 2. 2 P Lea Marston PC_Construction.

CranfordEstate. The. Unique Investment Opportunity with Asset Management & Development Potential

Barnsley, Dearne & Dove Canals Trust HS2 Mitigation Options

Alternatives Study of Alignment

In your area. Warmfield to Swillington and Woodlesford LA15. June Introduction

A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement

Centurion Way Chichester

Burton Green Parish Council

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors

Submission to the Airports Commission

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS.

High Speed UK. Regional Mapping covering the East and West Midlands

Appendix 9 Melbourn Greenway Review

HS2 Plans & Updates. Prof Andrew McNaughton

A. CONCLUSIONS OF THE FGEIS

In your area. Stonebroom to Clay Cross LA09. June Introduction

MEETING MINUTES Page 1 of 5

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

In your area. Manchester Piccadilly Station MA08. June Introduction. High Speed Two (HS2) is

European Aviation Safety Agency 1 Sep 2008 OPINION NO 03/2008. of 1 September 2008

Details of individual in organisation

BARNSLEY METROPOLITAN BOROUGH COUNCIL

4. Safety Concerns Potential Short and Medium-Term Improvements

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

Maidenhead Bridge. Proposed Work

Felixstowe Branch Line FAQ

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA

Visual and Sensory Aspect

Gatwick Airport Limited. Response to Airports Commission Consultation. Appendix. Ian H Flindell & Associates - Ground Noise Report

Chapter 4 Route Window NE3 Manor Park station. Transport for London

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

Commissioning Director - Environment

Gatwick Airport s Assessment of Heathrow North-West Runway: Air Noise. July The world s leading sustainability consultancy

ISOM & ISSOM forbidden symbol comparison

Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date:

LLANBEDR ACCESS IMPROVEMENTS

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

An Assessment of Lower Boddington

Hamilton School, Hamilton Road, Birmingham, B21 8AH

First Steps Towards Sustainable Operation of Road Tunnels. George Mavroyeni Australia

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

Why build a third runway, when you can build a longer runway?

The case for a local rail station. At Great Blakenham, Suffolk.

In your area. South Kirkby to Sharlston Common LA14. June Introduction

RAILWAY BOUNDARY MARKERS IN GLOUCESTERSHIRE. John Putley

Response!to!HS2!Phase!2!Route! Consultation! by! Rixton6with6Glazebrook!HS2!Action! Group!

AUCKLAND INTERNATIONAL AIRPORT MASTERPLAN

Business Case Approved. Under Construction. Business Case Approved. Under Construction

The Hybrid Bill and the journey to Royal Assent. Andy Taylor Head of Public Affairs, HS2 Ltd

Laxon Terrace - Sarawia. Click to add title. Street Rail Level Crossing. Public Forum. December

Teachers' Project Guide

Manhasset Park District Report Use of CARPORT ENGINEERING In Downtown Manhasset

The 5Ws route. Wolverhampton City Centre Options WOLVERHAMPTON, WEDNESFIELD, WILLENHALL, WALSALL AND WEDNESBURY

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016

Depot. Chapel. El Sub Sta. 43 to 53 to to m

Transcription:

Ove Arup & Partners Ltd The Arup Campus Blythe Gate Blythe Valley Park Solihull West Midlands B90 8AE United Kingdom arup.com High Speed Two Limited High Speed 2

Contents 1 Introduction 1 Page 1.1 The December 2009 Report 1 1.2 This Report - August 2010 1 1.3 Layout of this Report 1 1.4 Drawings 1 2 Alignment Options 3 2.1 Areas of Concern 3 2.2 Brackley and Turweston 4 2.3 Calvert to Brackley 4 2.4 Greatworth to Wormleighton 5 2.5 Wormleighton to Boddington 6 2.6 Wormleighton to Southam / Ufton 7 2.7 Southam / Ufton to Crackley 8 2.8 Crackley to Birmingham Interchange 8 2.9 Middleton to Lichfield 10 3 Conclusions and Recommendations 11 Tables Table 1 Route 3 Optimisation Drawings Figures Figure 1 Optimisation at Brackley/Turweston Figure 2 Calvert to Brackley Figure 3 Grebe Lake Figure 4 Thorpe Mandeville to Aston le Walls Figure 5 Topography at Lower Thorpe Figure 6 Vertical Optimisation Lower Boddington Figure 7 Ladbroke to Southam Figure 8 Burton Green Figure 9 View of Hints Hill from Watling Street Figure 10 Route 3 Optimisation Appendices Appendix A Drawings

1 Introduction 1.1 The December 2009 Report In December 2009, Arup prepared a report for High Speed Two Limited (HS2 Ltd). That report presented the findings of a route engineering and alignment study for a potential new high-speed rail line from London to the West Midlands. It described the processes for generating a large number of route options, and the sifting process by which a Preferred Route (Route 3) was chosen, and how some other route options were parked. HS2 Ltd presented its findings to the Secretary of State for Transport on December 31st, 2009. 1.2 This Report - August 2010 The previous Government announced Route 3 as its Preferred Route in March 2010. That announcement was the first public exposure of the scheme, and led to a number of suggestions for route amendments. The sections of route subject to reassessment are: Calvert to Stoneleigh; Burton Green to the proposed station at Birmingham Interchange (Airport / International area); Water Orton Delta Junction to Lichfield. HS2 Ltd therefore asked Arup to re-visit these areas to identify what might be achieved in an alignment review. This report describes the findings of that review. 1.3 Layout of this Report This report is laid out as follows: Chapter 1, this chapter, is introductory. Chapter 2 addresses the alignment options; Chapter 3 captures the conclusions and recommendations; There is only one Appendix: Appendix A contains the Drawings. 1.4 Drawings The table below lists the drawings relating to those lengths of route where HS2 Ltd adopted alignment changes. These are contained in Appendix A. Page 1

Drawing Number Issue Drawing Title HS2-ARP-07-DR-RW-03170 to 1.0 Route 3 Plan and Profile, Optimisation Sheet 1 of 7 to Sheet 7 of 7 HS2-ARP-07-DR-RW-03176 (inclusive - 7 drawings) Table 1 Route 3 Optimisation Drawings Page 2

2 Alignment Options 2.1 Areas of Concern This report considers route alignment options in the following areas, with commentary on the issues giving rise to concern: Calvert to Finmere / Mixbury: o Direct effect on Grebe Lake o Proximity to Twyford; o Proximity to Chetwode; Brackley and Turweston: o Visual impact in the valley between Turweston and Brackley, and proximity to both settlements; Brackley to Wormleighton: o Proximity to Greatworth; o Proximity to Thorpe Mandeville; o Difficult topography around Lower Thorpe; o Proximity to Chipping Warden; Wormleighton to Southam / Ufton: o Proximity to Ladbroke; o Visual impact of long viaduct near Ladbroke; Crackley to Birmingham Interchange: o Severance at Burton Green, together with proximity to housing and adverse community effects; o Proximity to and visual effects on Berkswell; Middleton to Lichfield: o Visual impact on Hints. Although not in geographical order, this report first considers the Brackley and Turweston area, because the logic of the alignment development required consideration of this section first, before the discussion on the Calvert to Brackley section. The Calvert to Brackley considerations could not have arisen without a prior view on whether the route should be moved at Brackley / Turweston. Page 3

2.2 Brackley and Turweston The Preferred Route, approaching this area from the south, followed the alignment of the former Great Central Railway (GCR) from Calvert (see Blue Line on Figure 1). The disused railway passed through Brackley, an option no longer available to the HS2 alignment. The HS2 alignment therefore deviated from the railway near Mixbury, passing a little to the east in order to pass between Brackley and Turweston. In doing so, it would cross the A43 Brackley Bypass at Turweston Road, on a high viaduct over the River Great Ouse, visible from large parts of both settlements. The alignment was reviewed in this area, to identify if there had been too much adherence to the concept of following the GCR. A revision of the route was found which would deviate from the Preferred Route near Mixbury, and would then pass to the east of Turweston (see Purple Line on Figure 1). To the south-east of Turweston, this alternative would be in a deep cutting, up to 17m deep. The route would still cross the valley of the River Great Ouse, but at a much lower elevation in relation to the crossing point and the local topography. The route would then pass under the A43 near Ilett s Farm, before returning to the Preferred Route near Greatworth. About 12km of route could be realigned. Subject to environmental overview, this alternative would appear to have merit. 2.3 Calvert to Brackley Figure 1 Optimisation at Brackley/Turweston If the suggested realignment at Turweston were to be considered acceptable, there would appear to be a much more direct route from Calvert to newly-aligned alternative in the Turweston area (see Orange Line on Figure 2). This would take the route away from the GCR concept, and the route would be on a virtually straight alignment between Calvert and Finmere. The lateral move would be in the order of 1.5km. Page 4

Figure 2 Calvert to Brackley The move would have an advantage in that the straight-line projection of the route north from Calvert would avoid any impact on Grebe Lake Figure 3 but would bring the route close to Preston Bissett, a village that was at some distance from the GCR route. The move would benefit Twyford, moving the route from about 50m from the village edge to 600m, while Chetwode would also benefit. It is this effect on Preston Bissett that would be of concern, but not in an engineering sense both route options would be acceptable in alignment terms, albeit that a straight is to be preferred to a minimum radius curve near Chetwode. Figure 3 Grebe Lake 2.4 Greatworth to Wormleighton Over this 15km length, a move of about 100-150m north-eastwards would reduce the adverse effects on the settlements of Greatworth, Thorpe Mandeville, and Chipping Warden, but would place the route nearer Aston-le-Walls by that amount, albeit that Aston-le-Walls is set back at a greater distance than the closer settlements listed (Orange line Figure 4). The move would similarly place the route nearer Sulgrave and Culworth, but these villages would still lie about 1.5km from the route. Page 5

Figure 4 Thorpe Mandeville to Aston le Walls There is a particularly challenging piece of topography (in high-speed railway alignment terms) near Lower Thorpe (shown in Figure 5). Finding an acceptable route through this area is challenging no matter what alignment is adopted. The move suggested would place the route through the ponds at Lower Thorpe and require the acquisition of property in this area. Figure 5 Topography at Lower Thorpe There is a Scheduled Monument near Edgcote House (brown outline Figure 4). This would be directly impacted by the lateral move being described. There would be two options to overcome the Scheduled Monument issues: Retention of the Preferred Route alignment, but this would then not achieve the alignment move objectives at Chipping Warden, and other ways of reducing the adverse effects of the route would need to be considered, such as false tunnelling and mounding; An even greater move east by about 400m, but this would mean a greater impact on Aston-le-Walls, which would then be at virtually the same distance from the route as is the concern at Chipping Warden. The decision on the alternative between Greatworth and Wormleighton is not clear cut, but in engineering terms, there is nothing to choose between the Preferred Route and the alternative. The alignment at Chipping Warden could be lowered, and the route placed in a false tunnel. 2.5 Wormleighton to Boddington In this area, the Preferred Route is ideally located for engineering purposes, avoiding the steepening hillside running east towards Stoneton. The route would avoid the Fox Covert woodland and Berryhill plantation. Page 6

Significant optimisation of the vertical alignment in the Lower Boddington area reduced embankment heights from approximately 19m to 5m (Figure 6). Before Optimisation Vertically optimised Figure 6 Vertical Optimisation Lower Boddington The Preferred Route position near Wormleighton was therefore taken as a fixed point before considering alignment options in the Ladbroke area. 2.6 Wormleighton to Southam / Ufton The main concern in this area is Ladbroke. The Preferred Route would pass within about 100m of the edge of the village, and there would be an approximate 4000m length viaduct over the A423, the flood plains of tributaries to the River Itchen, and the B4451 to Deppers Bridge (blue line Figure 7). A move northwards (of about 500m) away from the village would eliminate most of the viaduct, and would involve only simple bridge crossings over the A423 and the B4451. The move would clearly increase the lateral distance between Ladbroke and the route to about 600m, and this separation would also allow the incorporation of landscape planting and noise mitigation measures (purple line Figure 7). Page 7

Figure 7 Ladbroke to Southam The move would however bring the route a corresponding distance closer to Southam. It is noted that the nearest properties in Southam are an industrial estate, and other individual property and sports facilities. The move could adversely affect the Dallas Burston Polo Grounds located to the north west of Southam. Both routes would have acceptable alignment parameters, but the moved route would be less costly, resulting from reduced structural requirements. This move is recommended on engineering grounds. 2.7 Southam / Ufton to Crackley On this section of route, generally in the Stoneleigh area, a number of alternative alignments were considered. These options considered various ways of lessening the direct effects on Stoneleigh village, as well as lowering the route and minimising the lengths of viaduct over the River Leam. The options had differing effects on the National Agricultural Centre (NAC). Effects on properties within South Cubbington Wood and at Stareton were also considered. One of the options was found to be the most direct, shortest and most cost-effective route, as it would cross the River Avon only once. It would pass through the NAC to the west of the Stare bridge. This option was preferred on engineering grounds. 2.8 Crackley to Birmingham Interchange The main concerns on this length are Burton Green and Berkswell. The Preferred Route would cross Finham Brook, the Leamington to Coventry railway, and the A429 before following the dismantled rail corridor towards Burton Green. At Burton Green, the route would require widening and deepening the cutting, probably with retaining walls on the approaches, to pass through a gap in property (purple line Figure 8). At Berkswell Station, the route would cross the existing railway in the station car park area, passing just north of the station on elevated structure. Page 8

Figure 8 Burton Green Burton Green, and much of the development in the area, is ribbon development alongside the historic road network. Finding an alternative gap through this locality is difficult. Northwards from the proposed gap, the development is continuous, and a move north would offer no advantages. A move about 300m south would place the route clear of property on Cromwell Lane, but would bring it in close proximity to the rear of properties on Red Lane (Blue Line Figure 8). A further effect is that the route engineering would also imply that the route would move between 100m - 200m closer to Berkswell, contrary to the concerns there. At Station Road, Berkswell, the route would enclose property between itself and the existing WCML and station area. It would be on an elevated structure there. The route would then pass only 40m from recently-constructed housing in the Balsall Common area. A tunnelled route would be able to pass under Burton Green, but not emerge east of Berkswell. Conversely, a tunnel under Berkswell would not be able to be accommodated with a surface solution at Burton Green. The only realistic tunnelled option would therefore run from a point about 1.5km east of Burton Green to a point about 1.5km north of Berkswell, a length of about 7km, on a 400kph section of route. Another option would be to lower the vertical alignment a little in the Burton Green area, and then enclose the route in a false tunnel extending some distance both east and west of property. This option would involve the creation of a box constructed in open cut, or the construction of plied retaining walls to form the sides of the structure. In both cases, a lid would be created on which Cromwell Lane could be situated. It would be possible create the permanent structure to the west, divert Cromwell Lane temporarily onto it, create the Cromwell Lane section, then allowing the Lane to revert to its present position, on the lid. There is no clear engineering answer in this area, but all options would meet the 400kph design speed requirement. More detailed exploration of mitigation design opportunities in the Burton Green area is needed. Page 9

2.9 Middleton to Lichfield The Preferred Route would run east of Middleton, and pass west of Hints to avoid the area of higher ground and quarry to the north-east (shown in Figure 9). Bourne Brook passes to the south of Hints, and the route would be carried over it on a 170m bridge. A 320m retaining wall would be required to prevent the railway embankment footprint infringing on the flood plain. This alignment was reviewed, particularly to review how the HS2 route would be threaded through the old A5 (Watling Street) and the new, dual-carriageway A5. A move to the west was considered, but this would result in an alignment on the limits of acceptable design parameters for 400kph operation. This would invoke an on-going maintenance liability. It would also result in greater earthworks volumes and some increased impacts on the topography and woodland. Figure 9 View of Hints Hill from Watling Street Lowering the vertical alignment to lessen the impact on Hints was also investigated. It would appear that this would be possible, with some alterations to Watling Street that need to be investigated in more detail. A lowering by about 7m to 10m would allow the route to pass over the brook and under Watling Street. More topographical detail is needed, but the lowering would seem to be achievable in engineering terms. Page 10

3 Conclusions and Recommendations This report aims to present engineering recommendations, and it is not about concluding whether an alignment alternative should be adopted. These engineering conclusions are: Brackley and Turweston. There is an engineering preference for a move to the north and east of turweston; Calvert to Brackley. If the move at Turweston were to be considered acceptable, the direct route from Calvert to Turweston would be acceptable in engineering terms, indeed it is marginally preferable as a straight alignment is preferable to a curved alignment. Both alignments would be within standards. Greatworth to Wormleighton. In engineering terms, there is nothing to choose between the Preferred Route and the alternative. Wormleighton to Southam / Ufton (Ladbroke). A move of the route by about 500m away from Ladbroke is recommended on engineering grounds. Crackley to Birmingham Interchange (Burton Green and Berkswell). There is no clear engineering answer in this area, but all options would meet the 400kph design speed requirement. More detailed exploration of mitigation design opportunities in the Burton Green area would be needed to identify if there is a better solution. Middleton to Lichfield (Hints). More topographical detail is needed, but lowering the vertical alignment would seem to be achievable in engineering terms. Following a meeting with HS2 on the 5 th of August 2010, Arup were instructed to create an alignment (Figure 10), which incorporated the following changes: Turweston / Brackely: Horizontal and vertical change such that the route would pass to the north eastern side of Turweston. Chipping Warden: The route is to maintain the same horizontal position. The vertical alignment is to be lowered at Chipping Warden to allow the construction of a green tunnel. Boddington to Wormleighton: Vertical optimisation is to be incorporated into the route hereby minimising embankment lengths and reducing embankment height. Southam: Incorporate change to move HS2 away from Ladbroke. Stoneleigh: Incorporate route to pass through grounds of the National Agricultural Centre. Burton Green: Vertical alignment to be lowered to allow the construction of a green tunnel in this area. Page 11

Hints: The vertical alignment is to be lowered to minimise embankment heights. All changes were captured and are shown in Figure 10. Figure 10 Route 3 Optimisation Page 12

Appendix A Drawings

A1 Drawings for Route 3 Optimisation Page A1