DECON EXERCISE
AFTER HURRICANE KATRINA MISSISSIPPI
DECON EXERCISE
Command Center, Sept 11, 2001 Manhattan, NY Site of Flight 93, Sept 11, 2001 Somerset County, PA
(1) BASIC NEED FOR SHELTER A) DECONTAMINATION B) COMMAND POST C) REHAB D) HOSPITAL SURGE E) PATIENT ISOLATION F) COMBINATION OF ABOVE G) OTHER
(2) CHOOSE SHELTER SIZE A) MODEL 150 13 5 Wide X 11 0 Long B) MODEL 216 13 5 Wide X 16 0 Long C) MODEL 284 13 5 Wide X 21 0 Long D) MODEL 311 14 8 Wide X 21 0 Long E) MODEL 400 19 1 Wide X 21 0 Long F) MODEL 860 20 5 Wide X 42 0 Long G) MODEL QUAD 19 4 Wide X 29 3 Long
(3) CHOOSE SHELTER COLOR A) BLUE B) YELLOW C) GREEN D) RED STANDARD ROOF HAS CENTER WHITE STRIP FOR LIGHT E) TAN F) OLIVE DRAB G) WHITE H) BLACK I) COMBINATION
(4) EXTERIOR CONFIGURATION A) LAUNDRY PORTS (DECON) B) CLEAR VINYL WINDOWS ONLY (Do not open) C) CLEAR VINYL WITH ROLL UP COVER D) SCREEN ONLY WITH ROLL UP COVER E) SCREEN WITH ROLL UP CLEAR VINYL AND COVER F) ID PANELS WITH VELCRO G) TEXT REQUIRED FOR ID PANEL
(5) WINDOW LAUNDRY PORT ID PANEL PLACEMENT 15 16 13 14 5 3 1 FRONT 11 9 7 8 6 4 2 12 10 MODEL 860 MODEL 150 MODEL 216 MODELS 284, 311, 400 ENTER
(6) CHOOSE DOOR STYLES Center Zip Only (Standard) Center Zip With Dual Roll-Up (7836) Wide Roll Up 7834 Connector With Dual Roll-Up 7837 Connector With Single Roll-Up 7812 Connector Only
(7) INTERIOR CONFIGURATION (NON-DECON) DIVIDER CURTAIN - CENTER DIVIDER CURTAINS SIDE TO SIDE CLIPS ONLY FOR FUTURE CURTAINS WATER SYSTEM RETAINERS FOR FUTURE DECON ADDITIONAL UTILITY STRAPS ATTACHABLE INSULATION PACKAGE OTHER
(8) INTERIOR CONFIGURATION (DECONTAMINATION) NUMBER OF CORRIDORS NUMBER OF STAGES NUMBER SHOWER HEADS- DECON & RINSE HAND HELD SHOWER NOZZLES CONTAINMENT POOL ELEVATION GRIDS SUMP PUMP SYSTEMS WASTE WATER CONTAINMENT
(9) AIR CONDITIONERS SHELTER HEATERS DECONTAMINATION HOT WATER HEATERS LIGHTING NON AMBULATORY STORAGE OPTIONS
AIR CONDITIONING 120 VAC 13,500 BTU 220 VAC 24,000 BTU 220 VAC 42,500 BTU 220 VAC 60,000 BTU
SHELTER HEATERS Propane Fuel, 70,000 BTU
SHOWER HEADS Quick Connect Shower Head 1.2 GPM With On/Off Valve Quick Connect Hand Held Shower 1.0 GPM With On/Off Valve
Wastewater Containment Sump Pump Wastewater Bladder Roll Out Containment Pool With Elevated Grids
Injector for decon solution or soap.
HOT WATER HEATERS Diesel Fueled 6 to 16 GPM Propane Fueled 5.8 GPM
Shelter Lighting 120 VAC Fluorescent 30 Watt, 25 Cord
NON AMBULATORY SYSTEMS NON AMBULATORY DECON SYSTEM, WITH GLIDERS NON AMBULATORY ROLLER SYSTEM TEMPS BED GURNEY
Shelter and Accessory Storage STORAGE CARTS Drop Down Tray for Shelter Roll Off Additional Accessory Storage
Complete Trailered Systems
Z-SIPs Zumro Shelter In Place System
Z-SIPs Front panel unlocks, opens, and shelter selfdeploys from within Shelter encased within shell, ready to deploy. Pre-positioned onsite. No need to move heavy components. May be inflated by electric blower or compressed air tank.
Z-SIPs
Z-SIPs
Z-SIPs
Z-SIPs Z-SIP Accessories 860 DEPLOY 860 Z-SIP QUAD Z-SIP QUAD DEPLOY Conceptual Site Layout