AMC ICAO DOC 9613 AMC 20-4 ICAO DOC 9613 TGL-10 ICAO DOC 9613 AMC AMC AMC ICAO DOC 70300

Similar documents
Signature: Signature:

General Information Applicant Name and Address: Tel./Fax/ Contact Person Name/Tel./Fax/

CHAPTER 24 D APPROVAL OF SPECIAL OPERATIONS- PERFORMANCE BASED NAVIGATION OPERATION

Navigation 101 Chapter 3 RNP-10

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

Flight Operations Inspector Manual

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS

Application for an Air Operator Certificate AOC

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

Application for Low Visibility Operation

Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

APPLICATION FOR SPECIAL OPERATIONAL APPROVALS

FAA RNP 10 JOB AID With FAA Order B References (20 May 2010)

PBN Operational Approval Continental En Route Navigation Specifications

RNP AR APCH Approvals: An Operator s Perspective

General Guidelines for Obtaining Airworthiness and Operational Approvals for PBN Navigation Specifications. Version 1.0 8/8/08

Approach Specifications

Required Navigation Performance (RNP 10) Revision 1 18 March Related Rules This AC relates specifically to , , and

PBN Operational Approval Overview

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.

Guidance material AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1O OPERATIONS (DESIGNATED AND AUTHORIZED AS RNP 10)

RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI

Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations

VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATION CHAPTER 1 AIR NAVIGATION, COMMUNICATIONS, AND SURVEILLANCE. Section 4 Class II Navigation

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

SUPPLEMENT 9 EASA CERTIFIED AIRPLANES

1 JAR-OPS 1 AND 3 SUB-PARTS K AND L COMPLIANCE DOCUMENT

REPUBLIC of SAN MARINO CIVIL AVIATION AUTHORITY

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

Airworthiness Directive

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

Technical Standard Order

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

Advisory Circular. Radius to Fix (RF) Path Terminator

OPS General Rules for Operations Manuals

Intentionally left blank

An advisory circular may also include technical information that is relevant to the standards or requirements.

Seychelles Civil Aviation Authority. EU-OPS 1 and JAR-OPS 3 Subpart K and L Compliance Document

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

Excerpts from ICAO PBCS Manual

Annex to Decision 2016/015/R

IRELAND SAFETY REGULATION DIVISION IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel Fax AFTN EIDWYOYX

PERFORMANCE-BASED NAVIGATION (PBN) OPERATIONAL APPROVAL MANUAL

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Flight Safety Division Case Nr. Page 1 of 11

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

4/29/13 FY13 THIRD QUARTER EDITORIAL UPDATES CHG 224 VOLUME 3 GENERAL TECHNICAL ADMINISTRATION CHAPTER 18 OPERATIONS SPECIFICATIONS

ADVISORY CIRCULAR AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 5 OPERATIONS

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018

Mijloace acceptabile de conformitate. Electronic Flight Bag (EFB)

NOTE: This guidance does not apply to RNP-1 routes and procedures planned in the U.S.

Subpart H. 2042/2003

OPERATIONAL BULLETIN

CAR 21 CERTIFICATION OF AIRCRAFT

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Aircraft and Operators approval for RNP 2 operations

INSTRUMENT FLIGHT RULES

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders

Advisory Circular. Special Authorization (SA) for Required Communications Performance (RCP) 240 and Required Surveillance Performance (RSP) 180

Advisory Circular. Automatic Dependent Surveillance - Broadcast

TABLE OF CONTENTS 1.0 INTRODUCTION...

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

APAC PBN UPDATE Slide 1 of xx

CIVIL AVIATION PUBLICATION CAP 10 CPDLC

Performance Based Communication and Surveillance

Policy Letter (PL) Global Positioning System (GPS) Equipment and Installation Approval

REPUBLIC of SAN MARINO CIVIL AVIATION AUTHORITY

OPERATIONS APPROVAL - EU-OPS OPERATOR NAME... SCHEDULE - THE SPECIFIED REQUIREMENTS Required Yes/No A/C Type Ops Manual Ref. e.g.

Subject: Aircraft and Operators Approval For Approach Operations With Vertical Guidance/Barometric Vertical Navigation (APV/baro- VNAV)

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION N

CIVIL AVIATION REQUIREMENT SECTION 8 AIRCRAFT OPERATIONS SERIES F PART V ISSUE I, 29 TH JULY 2015 EFFECTIVE: 31 ST JULY 2015

SUBPART C Operator certification and supervision

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

Implementation challenges for Flight Procedures

EASA RNP (AR) Workshop The Landscape Working Together

Part 129. Foreign Air Transport Operator - Certification. CAA Consolidation. 18 May Published by the Civil Aviation Authority of New Zealand

CASAS ADVISORY PAMPHLET

Combined CAME & MOE INITIAL / AMENDMENT* COMPLIANCE CHECK LIST

AMC THE OPERATORS MAINTENANCE INSPECTION PROGRAMME (M.I.P.)

Advisory Circular. Required Navigation Performance Approach (RNP APCH)

Insert new Standards in Section II, including Appendix 3, applicable from 20 November 2008, and Attachment F as follows:

Advisory Circular. Requirements to obtain Reduced Vertical Separation Minimum (RVSM) Special Authorization

Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3

Figure 3.1. Foreign Airport Assessment Aid

Section I Page 1 Operator/Airframe Details Completion mandatory. Section III Page 2 Signature Block Completion mandatory

PROCEDURES SPECIAL OPERATIONS

Transcription:

Application for PBN operations approval Completion of form: Application: Each relevant box should be completed with a tick ( ) or a (X). Items marked with an asterisk (*) to be completed only for first aeroplane of each aeroplane typee / model in operator s fleet. Where form must be completed by referring to a document of applicant's documentation system, add manual reference, chapter and sub-chapter. Pleasee ensure all applicable areas are completed. In order to include PBNN operations approval in Operations Specifications, use FOD-FRM-001. Submit forms and application package referenced in paragraph 4 of PBN application form to: CROATIAN CIVIL AVIATION AGENCY HR-10000 ZAGREB, Ulica grada Vukovara 284 1. GENERAL General Information 1. Applicant: 2. Aeroplane Registration: 3. Aeroplane Manufacturer: 4. Aeroplane Type Designation / Model Designation: 5. Serial.: Scope of Application RNAV 10 RNP 4 RNAV 5 RNAV 2 RNAV 1 (P-RNAV) BASIC-RNP 1 RNP APCH (LPV) NAT MNPS Other: Initial requestt for PBN approval for aeroplane type / model referenced in 1.4? Airworthiness and operational approval in accordancee with AMC 20-12 AMC 20-4 TGL-10 AMC 20-27 AMC 20-28 AMC 20-26 ICAO DOC 70300 2. AIRWORTHINESS Type Design Approval for referenced Aeroplane Type Designation 1. The PBN type design approval is reflected in: AFM AFMM Supplements Type Certification Dataa Sheet Supplemental Type Certificate other: 2. Is aeroplane position automatically determined from VOR/DME sensors? 3. Is aeroplane position automatically determined from DME/DME sensors? 4. Is aeroplane position automatically determined from INS/IRS systems with automatic updating from suitable radio based navigation equipment? 5. Is aeroplane position automatically determined from INS/IRS systems without automatic updating from suitable radio based navigation equipment? 6. Is aeroplane position automatically determined from independent (stand-alone) GPS systems? 7. Is aeroplane position automatically determined from FMS / Multisensory navigation systems integratingg GPS? 8. Is a single navigation system installed? 9. Are dual navigation systems installed? 10. Is a single long-range navigation systems installed? 11. Are dual independent long-range navigation systems s installed? 1

12. Are triple independent long-range navigation systems installed? 13. Other: 14. Aeroplane Flight Manual ( Supplement) showss following airworthiness approval for navigation system installation: AMC 25-11 C145( ) FAA AC 25-4 FAA TSO-C1455 ( ) AMC 20-5 C146( ) FAA AC 25-11( ) FAA TSO-C146( ( ) AMC 20-27 C106 ( ) FAA AC 20-1299 FAA TSO-C115( ( ) C115( ) ED 26 FAA AC 20-138( ) FAA TSO-C129( ( ) C129 ( ) ED 72A FAA AC 23-1309-1C FAA AC 153 ED-75( )/DO-236( ) ED-76/DO-200A ED-12( )/DO-178( ) ED-77/DO-201AA DO 88 DO 187 DO 208 DO229 ARINC 424 ARINC 706 other: 15. For B-RNAV(RNAV 5) only: Unless otherwise specified s in the AFMM (Supplement) INS/IRS system installations which do not t have automatic navigation updating of INS/IRS position are limited to a maximumm 2-hour time limit for operation in designated RNAV airspace. If "yes"" state limit in hours: 16. For RNP-10 and NAT-MNPS only: Unless otherwise specified in the AFM (Supplement) INS/IRS systemm installations whichh do not have automatic navigation updating of INS/IRS position are limited to a maximum 6.2-hour time limit for operation in designated RNAV airspace. If "yes"" state limit in hours: 17. If RNAV operations are based on stand-alonee GPS navigation equipment, availability of GPS integrity should be confirmed and obtained from a Receiver Autonomous Integrity Monitoring (RAIM) prediction program that is provided in the GPSS unit in the aeroplane, a prediction program run outside the aeroplane, or an alternate method considered acceptable to the CCAA. RAIM prediction program provided in the aeroplane? RAIM prediction program run outside the aeroplane? 18. RNAV operations with stand-alone GPS navigation equipment approved i.a.w. C129, but do not provide pseudorange step detection and health word checking functions, are limited to flights where maximumm RAIM outages do not exceed 5 minutes. 19. For RNP-10 and NAT-MNPS only: If operations are based on stand-alone GPS navigation equipment, availability a of GPS integrity should be confirmed and obtained from an approvedd dispatch fault detection and exclusion (FDE) availability prediction p program. Satellite Fault Detection an Exclusion (FDE) capability? 20. Extended overwater operations shall not be performed p unless at t least dual long-range communication (LRCS) equipment (HF Voice / Data Link, SATCOM, etc.) is installed and operational. Dual LRCS installed? Navigation System Eligibility for referenced Aeroplane Serial Number 21. Navigation system manufacturer / model installed (e.g. Flight Management System (FMS)): 22. The approval of the RNAV systems installation is based on: Type design FAA CCAA STC STC Service Bulletin EASA STC CCAA Major Modification Other (specify): Maintenance Program (*) 23. The applicant should have an established Maintenance Programm that contains all RNAV related maintenance requirements prescribed by the manufacturer or design organisation? RNAV Maintenance program established? Minimum Equipment List (*) 24. The applicant should revise the relevant partss of the Minimum Equipment List to reflect system requirements (e.g. redundancy levels) appropriate to the intended RNAV operations?? Minimum Equipment List revised? 2

3. OPERATION Operating Practices and Procedures (*) The applicantt must institute PBN/RNAV Operating Practices P and Procedures. RNAV 10 in accordance with AMC 20-12, Chapter 4.4 RNP 4 in accordance with, Chapter 3.4.3.2 and 3.55 RNAV 5 in accordance with AMC 20-4, Chapter 5 RNAV 2 - in accordance with, Chapter 3.4.3.2 and 3.5 RNAV 1 (P-RNAV) in accordance with TGL-10, Chapter 10.1 till 10.33 BASIC-RNP 1 - in accordance with, Chapter 3.4.3.2 and 3.5 in accordance with AMC 20-27, Chapter 10 and Appendix 4 RNP APCH (LPV) in accordance with AMC 20-28,, Chapter 10 and Appendix 3 in accordance with AMC 20-26, Chapter C 10 and Appendix 3 These practices and procedures should cover the following subjects: 1. Flight planning (verification of aeroplane PBN/RNAV approval, RNAV time limits, ICAO Flight Plan annotations, requirements for GPS (RAIM, FDE) ), operating restrictions related to RNAV approval, etc.). 2. Pre-flight procedures (review of technical log, external inspection (navigation antennas), use of MEL), verification of NAV database validity, etc.). 3. En-route procedures (cross checking procedures to identify navigation errors, use of INS/ /IRS navigation systems without automatic radio navigationn updating, use of GPS, minimum navigationn and communication systems when entering RNAV area, alternate routings, position check before entering RNAV area, etc.). 4. Procedures with respect to flight crew response to abnormal situations (response to non-normacontingency procedures, selection of other navigation aids in case of loss of RNAV events, notification of ATC of navigation n equipment problems, capability, etc.). 5. Date base integrity assurance procedures (supplier evaluation, integrity checks (software tools), reporting of discrepancies too suppliers, notification of discrepancies to flight crews, updating process, etc.). Flight Crew Training and Qualification (*) The applicantt is required to establish the following (covering subjects under 3.1 to 3.5): 6. Flight crew qualification equirements. 7. Description of initial and recurrent training, checking and training-syllabi. RNAV 10 in accordance with AMC 20-12, Chapter 4.4.3 RNP 4 in accordance with, Chapter 3.4.3.3 RNAV 5 in accordance with AMC 20-4, Chapter 5 RNAV 2 - in accordance with, Chapter 3.4.3.3 RNAV 1 (P-RNAV) in accordance with TGL-10, Chapter 10.5 BASIC-RNP 1 - in accordance with, Chapter 3.4.3.33 in accordance with AMC 20-27, Chapter 10.2 RNP APCH (LPV) in accordance with AMC 20-28,, Chapter 10.2 in accordance with AMC 20-26, Chapter C 10.3 To be completed by applicant RNAV Operatingg Practices and Procedures are described in (add manual reference, chapter and sub-chapter): To be completed by applicant Description in ( add manual reference, chapter and sub-chapter): 4. APPLICATION PACKAGE Documentation to be submitted to the CCAA Submitted? 1. Compliance statement which shows how the criteria of AMC 20-12 (RNAV 10), (RNP 4, RNAV 2, BASIC-RNP 1), AMC 20-44 (RNAV 5), TGL 10 (RNAV 1 (P-RNAV), AMC 20-27 (), AMC 20-28 (RNPP APCH (LPV) and AMC 20-26 (RNP ARR APCH),, have been satisfied (*). 2. Sections of the AFM or AFM Supplements that document RNAV airworthiness approval. 3. Flight crew RNAV training programmes and syllabi s for initial andd recurrent training (*).( 4. Operation manuals and checklists that include RNAV operating practices and procedures (OM-A, OM-B, OM-D, AOM, FCOM, Route Manuals, stand-alone P-RNAV manual, etc.) (*). 5. Minimum Equipment List (MEL) that include items pertinent to RNAV operations (*). 6. (*). Maintenance program or revision thereof thatt include items pertinent to RNAV equipment 7. Servicee Bulletin, Supplemental Type Certificate (STC) or Major Modification Approval Documentation, iff approval based onn documents as detailed in 2.22 above (except if based on approved type design). 3

4

5. APPLICANT'S STATEMENT The undersigned certifies the above information to be correct and true and that aeroplanee system installation, continuing airworthiness of systems,, minimum equipment for dispatch, operating procedures and flight f crew training comply with the requirements referenced under "Applicability". Name of Postt Holder Maintenance: Name of Postt Holder Operations: Name of Postt Holder Training: (For official use only) Subject 1. FOD-FRM-001 and and item 4 application package checked for completeness. 2. Airworthiness Approval granted (Appendix to Certificate of Airworthiness). 3. Operational Approval granted (AOC, OS ) 4. PBN/RNAV approval process administratively completed (OPS Update, Exchange of Certificates). Withdrawal of RNAV Approval Responsible OI AWI FOI OI Date Signature Reason: Name: 5