Construction Access Routes

Similar documents
Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Transparent Extractive Industry Management. W. Russell King Senior Vice President International Relations Freeport-McMoRan Inc.

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Candelaria and Ojos del Salado Chile

PERU WATER PROJECT: CERRO VERDE CASE STUDY

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

Hospital Link Project Project Update September 2015

Curragh Operational Tour

ON TIME AND ON BUDGET: PROCESSING PLANT OVER 90% COMPLETE AND FIRST PRODUCTION SET FOR MARCH

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

Wild Pacific Trail Society

Score. Category. Access Aesthetics Community Resources

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

INNOVAT MINERAL PROCESS SOLUTIONS LIMITED. INN16CO-CS-001 July 21, INNOVAT Case Study 5M t/a Heap Leach Northern Canada Project

CONSTRUCTION SERVICES FOR MINING

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS

Report to the Strategic Development Committee

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Community Advisory Panel Meeting #

A link to heritage by connecting the community to its history.

SERENJE NAKONDE ROAD PROJECT PROJECT

Mt. Hood National Forest

DRAFT. Dorabelle Campground Rehabilitation

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

Basic Project Information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Report to the Strategic Development Committee

Section XIII. Cost Estimates

Jill L. Jamieson Senior PPP Advisor, BearingPoint. USAID Workshop on PPP Ain Sokhna, Egypt

Barnsley, Dearne & Dove Canals Trust HS2 Mitigation Options

TORONTO TRANSIT COMMISSION REPORT NO.

Lake Erie Commerce Center Traffic Analysis

BNA Master Plan Update Community Advisory Committee Meeting No. 5

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

Windmills & Airspace Can We Work Together?

Overview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension

BNA Master Plan Update Public Meeting No. 2

R.M. OF GULL LAKE NO. 139

Gravel and Rock Extraction Highway Maintenance, Recapitalization and Twinning

Overview of Highway 37 Project. Novato Rotary November 4, 2016

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

CAPITAL IMPROVEMENT PLAN

For personal use only

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

A. CONCLUSIONS OF THE FGEIS

White Mountain National Forest. Rumney Rocks Project Supplemental Environmental Assessment. 30-day Comment Report

Railroad Safety Trail

Transportation TRANSPORTATION PROJECTS

Alternatives Analysis EXECUTIVE SUMMARY

CHAPTER 4: ALTERNATIVES

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

UNVEILING AND OPENING TO TRAFFIC OF THE THIRD GUADARRAMA TUNNEL ON THE AP-6 MOTORWAY

Northern Rail Extension, Phase One

Group similar facilities together separate dissimilar facilities.

Original Report F WIN , F WIN Prepared for Northland Power and Ministry of Tourism and Culture

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

MUNICIPALITY OF ANCHORAGE

PRIORITIES COMMITTEE MEETING

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

THE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

Riverine Sand Mining/Scofield Island Restoration (BA-40)

Update on the Aspen/Pitkin County Airport Improvements

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

Project Deliverable 4.1.3f Individual City Report - City of San Dimas

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

5.1 Traffic and Transportation

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP

Minimum Impact Suppression Tactics Implementation Guidelines

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

Lorena Gold Project Malachite AGM 29 November 2017

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

December 2018 Quarterly Production Report

RIO VISTA MUNICIPAL AIRPORT

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park

TORONTO TRANSIT COMMISSION REPORT NO.

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

RAPID EQUIPPING FORCE: EXPEDITIONARY CAMP - ERBIL

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

Ammonite Falls Descent

Meeting Notes Public Open House

Transcription:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project Feasibility Study Project No. 12 7606 00 Construction Access Routes Document No. C-EV-10-003 Rev. B 1 March 2004 Prepared by: Fluor Engineering Mgr.: Fluor Project Mgr.: SMCV Approval: Name Patrick Lo Brad Matthews Roger Nendick Terry Linde Signature

Project Name: Primary Sulfide Project - Feasibility Study Page 2 of 8 TABLE OF CONTENTS Page 1. INTRODUCTION... 3 2. SUMMARY AND RECOMMENDATION... 3 3. OPTION 1 EXISTING ACCESS ROUTES... 4 4. OPTION 2 QUEBRADA ENLOZADA... 5 5. OPTION 3 TEMPORARY QUEBRADA HUAYRONDO... 6 6. OPTION 4 PERMANENT QUEBRADA HUAYRONDO... 7

Project Name: Primary Sulfide Project - Feasibility Study Page 3 of 8 1. INTRODUCTION Construction of the Primary Sulfide Project will significantly increase traffic flux into the site. The safest and most efficient method of managing and controlling traffic to a construction area within an operating mine site is to provide separate and dedicate access for mine site traffic and for construction traffic. To provide separate and dedicated construction site access several potential routes were considered. In addition, the existing main highway into the mine site will require future realignment in two locations due to the conflict with the tailing embankment expanding to the North and with the mine waste dumps expanding to the West. This evaluation also considered a new permanent access route to serve initially as the construction access route and ultimately as the permanent site access route. The following options were considered in this evaluation. Option 1 Use existing routes (North and South) for mine and construction traffic Option 2 Temporary road up Quebrada Enlozada (tailing impoundment) Option 3 Temporary road up Quebrada Huayrondo Option 4 Permanent road up Quebrada Huayrondo 2. SUMMARY AND RECOMMENDATION All alternate site access routes require significant expenditure. The cost estimates for each to the routes considered are shown in Table 2-1. The estimated capital to realign the existing mine access highway in two locations is $5,000,000. For the purposes of this evaluation it is assumed the existing highway would be realigned in Year 4. Table 2-1 Initial Capital Cost and NPC Option Route Initial Existing Highway Option Capital Realignment Required NPC @15% 1 Existing Routes $0.6 Yes $3.0M 2 Quebrada Enlozada $2.7M Yes $4.9M 3 Temp. Quebrada Huayrondo $9.0M Yes $10.2M 4 Perm. quebrada Huayrondo $12.0M No $10.4M

Project Name: Primary Sulfide Project - Feasibility Study Page 4 of 8 Using the existing access route for mining and construction activities is the lowest cost option for the Primary Sulfide Project. This option; however, introduces some safety issues that must be addressed and managed. Fluor recommends that the existing mine access route be used for construction traffic. A separate site security entrance should be provided for construction traffic at both the North entrance and the South entrance. Construction traffic will be routed around the Cerro Verde and Cerro Negro pits to avoid congestion in the main traffic route between the two pits. A traffic management program and safety plan will need to be developed and implemented for the construction phase of the Project. The impact of sharing access gates needs to be review with respect to permitting and site classification. 3. OPTION 1 EXISTING ACCESS ROUTES Using the existing access routes for mining and construction traffic will require modifications to the existing site security entrances. A new separate site security facility should be provided for, and dedicated to, construction traffic at both the North and South site entrances. Construction traffic routes on site will be developed to minimize congestion and conflict with the existing operations. It is envisaged that construction traffic will be routed around the Cerro Verde and Cerro Negro pits as shown on sketch C-7000-10C-SK2. A detailed traffic management and safety plan will need to be developed and implemented for the construction phase of the project. This plan should consider, as a minimum: training for all mining and construction personnel special training of all transport operators (busses and trucks) clear signage and route markings manned traffic control points in areas of conflict between operations and construction traffic pilot cars for large or special transport shipments radio communication procedures for traffic on site where possible, divided (bermed) routes dedicated for either mine operations or construction traffic

Project Name: Primary Sulfide Project - Feasibility Study Page 5 of 8 off-set shift changes between mine operations and construction The cost to implement this option is estimated to be $560,000 as summarized in Table 3-1. Table 3-1 Existing Site Access Route Cost Summary Item Description Unit Unit Cost Quantities Item Cost 1 Mass excavation of overburben m3 $1.50 2,000 $3,000 2 Mass excavation, rippable rock m3 $3.00 6,000 $18,000 3 Mass excavation, drill & blast rock m3 $5.00 2,000 $10,000 4 Mass rock dump fill m3 $1.00 7,500 $7,500 5 Compacted engineered fill m3 $3.50 2,500 $8,750 6 Base course, 75 mm minus, 100 mm thick lm $50 300 $15,000 7 Surface course, 40 mm minus, 50 mm thk. lm $27 300 $8,100 8 Asphalt surface, 75 mm thick lm $110 0 $0 9 CMP culvert, 30" diameter lm $150 50 $7,500 10 Guard rail, CMP w/ wooden posts lm $20 80 $1,600 11 Extra traffic control lot $480,000 1 $480,000 Total $559,000 This cost includes about $80,000 to upgrade the existing entrances and on-site roads and about $480,000 to provide additional traffic control during the construction phase of the project. 4. OPTION 2 QUEBRADA ENLOZADA The use of the future fresh water and tailing pipeline corridor on the East embankment of the Quebrada Enlozada was considered a possible option for temporary construction access to the concentrator site. The initial concept was to widen the pipeline corridor to accommodate construction traffic. This is a feasible option between the concentrator site and the tailing embankment but not feasible between the tailing embankment and the mine access highway. The gradient of the pipeline corridor between the tailing embankment and the highway will be about 12%. This is too steep for construction traffic. Fluor s review of options to reduce this gradient was not successful so this route was considered technically unacceptable. An alternate route in the Quebrada Enlozada was developed. This route is illustrated on sketch 7000-10C-SK3. A new 2.8 km long road will start at the existing Booster Pump Station No.3, climb the East side of the quebrada and travel South on the Eastern side of

Project Name: Primary Sulfide Project - Feasibility Study Page 6 of 8 the future starter dam boundary. The new road will join an existing road in the bottom of the quebrada. At the end of the valley bottom, a new 2.5 km road will begin the climb out of the quebrada up to the concentrator site. This section of road will be steep and will require several significant switchbacks to achieve the climb out of the quebrada. The southern section of this route may conflict with the proposed starter dam material haul roads as well as alluvium removal activities for starter dam construction. The cost of this route is estimated to be $2,676,000 as summarized in Table 4-1. Table 4-1 Quebrada Enlozada Route Cost Summary Item Description Unit Unit Cost Quantity Item Cost 1 Mass excavation of overburben m3 $1.50 107,020 $160,530 2 Mass excavation, rippable rock m3 $3.00 321,060 $963,180 3 Mass excavation, drill & blast rock m3 $5.00 107,020 $535,100 4 Mass rock dump fill m3 $1.00 183,638 $183,638 5 Compacted engineered fill m3 $3.50 61,213 $214,244 6 Base course, 75 mm minus, 100 mm thick lm $50 6,900 $345,000 7 Surface course, 40 mm minus, 50 mm thk. lm $27 6,900 $186,300 8 Asphalt surface, 75 mm thick lm $110 0 $0 9 CMP culvert, 30" diameter lm $150 280 $42,000 10 Guard rail, CMP w/ wooden posts lm $20 2,300 $46,000 Total $2,675,991 This route is a temporary construction access route only and will be decommissioned prior to the commencement of production of the Primary Sulfide Project. The realignment of the main highway due to conflicts with the future tailing embankment and mine waste dumps will be required. 5. OPTION 3 TEMPORARY QUEBRADA HUAYRONDO The Quebrada Huayrondo was considered a potential concentrate transport route to the rail line located in the North portion of the Cerro Verde mining concession. Access from the concentrator site to the highway to Arequipa is possible. The route, shown on sketch 7000-10C-SK4, would be approximately 12.5 km from the concentrator site to the rail line near the Rio Chili and an additional 1 km from the rail line

Project Name: Primary Sulfide Project - Feasibility Study Page 7 of 8 to the existing highway to Arequipa. The route would have a maximum gradient of about 8%. The cost of this route is estimated to be $8,960,000 as summarized in Table 5-1. Table 5-1 Quebrada Huayrondo Temporary Route Cost Summary Item Description Unit Unit Cost Quantities Item Cost 1 Mass excavation of overburben m3 $1.50 400,000 $600,000 2 Mass excavation, rippable rock m3 $3.00 1,200,000 $3,600,000 3 Mass excavation, drill & blast rock m3 $5.00 400,000 $2,000,000 4 Mass rock dump fill m3 $1.00 720,000 $720,000 5 Compacted engineered fill m3 $3.50 240,000 $840,000 6 Base course, 75 mm minus, 100 mm thick lm $50 13,500 $675,000 7 Surface course, 40 mm minus, 50 mm thk. lm $27 13,500 $364,500 8 Asphalt surface, 75 mm thick lm $110 0 $0 9 CMP culvert, 30" diameter lm $150 540 $81,000 10 Guard rail, CMP w/ wooden posts lm $20 4,000 $80,000 Total $8,960,500 The realignment of the main highway due to conflicts with the future tailing embankment and mine waste dumps will be required. 6. OPTION 4 PERMANENT QUEBRADA HUAYRONDO This option is identical to Option 3 with the exception of this road would be constructed as a permanent Cerro Verde mine site access route. The cost of this road is estimated to be $12,021,000 as summarized in Table 6-1. Table 6-1 Quebrada Huayrondo Permanent Route Cost Summary Item Description Unit Unit Cost Quantities Item Cost 1 Mass excavation of overburben m3 $1.50 500,000 $750,000 2 Mass excavation, rippable rock m3 $3.00 1,500,000 $4,500,000 3 Mass excavation, drill & blast rock m3 $5.00 500,000 $2,500,000 4 Mass rock dump fill m3 $1.00 900,000 $900,000 5 Compacted engineered fill m3 $3.50 300,000 $1,050,000

Project Name: Primary Sulfide Project - Feasibility Study Page 8 of 8 Table 6-1 Quebrada Huayrondo Permanent Route Cost Summary Item Description Unit Unit Cost Quantities Item Cost 6 Base course, 75 mm minus, 100 mm thick lm $50 13,500 $675,000 7 Surface course, 40 mm minus, 50 mm thk. lm $27 0 $0 8 Asphalt surface, 75 mm thick lm $110 13,500 $1,485,000 9 CMP culvert, 30" diameter lm $150 540 $81,000 10 Guard rail, CMP w/ wooden posts lm $20 4,000 $80,000 Total $12,021,000 The realignment of the main highway due to conflicts with the future tailing embankment and mine waste dumps would not be required.

Cerro Verde Primary Sulfide Project Construction Access Road Alternatives Comparison Captial Cost for Option 4 - Permanent Road up Quebrada Huayrondo Project No. 12760600 Date: Feb. 27, 2004 Rev.: A Item Description Unit Unit Cost Quantities Item Cost 1 Mass excavation of overburben m3 $1.50 500000 $750,000 2 Mass excavation, rippable rock m3 $3.00 1500000 $4,500,000 3 Mass excavation, drill & blast rock m3 $5.00 500000 $2,500,000 4 Mass rock dump fill m3 $1.00 900000 $900,000 5 Compacted engineered fill m3 $3.50 300000 $1,050,000 6 Base course, 75 mm minus, 100 mm thick lm $50.00 13500 $675,000 7 Surface course, 40 mm minus, 50 mm thk. lm $27.00 0 $0 8 Asphalt surface, 75 mm thick lm $110.00 13500 $1,485,000 9 CMP culvert, 30" diamter lm $150.00 540 $81,000 10 Guard rail, CMP w/ wooden posts lm $20.00 4000 $80,000 Total: $12,021,000