railfuture response to Northern RUS

Similar documents
Manchester Victoria 11 day blockade Easter 2016

Christmas Engineering Works

The New Northern Franchise

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

TRANSFORMING TRANSPENNINE

Re-opening of the Skipton to Colne Railway Executive Summary

TransPennine Express. Our webchat and webform tpexpress.co.uk Telephone or our Facebook page TPExpressTrains

1.1 We note that the following WCML access applications have been made:

May 2018 rail timetable changes: Route-by-route overview

North West smart motorways 100 miles of extra lanes

HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY

Sand and Aggregates

Jim Steer. Director Greengauge 21. HS2 and the North. Transport Times Conference. October October 2016 Transport Times, London 1

ALL CHANGE NEW TRAIN TIMES FROM SUNDAY 20 MAY

Northern Powerhouse Rail

THE STOPS ARE JUST THE START

Central Retail Park Manchester, M4 6DL

Doncaster Chamber of Commerce. Andy Taylor Head of Public Affairs, HS2 Ltd

New Northern, new look. Customer Report

Robin Retail Park Wigan, WN5 0UH

CHRONOLOGICAL LIST OF THE RAILWAYS OF CHESHIRE,

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co.

This report, and information or advice which it contains, is prov ded by MVA Consultancy Ltd solely for internal use and reliance by ts Client in

Department for Transport

UPPER CALDER VALLEY RENAISSANCE SUSTAINABLE TRANSPORT GROUP

Wakefield District Consultation Sub Committee. Date: 14 February 2019

STJOHNSHOUSE DESCRIPTION DESCRIPTION SPECIFICATION LOCATION SITUATION CURRENT AVAILABILITY FLOORPLANS TERMS/CONTACT

Report of the Strategic Director (Place) to the meeting of Environment and Waste Management Overview & Scrutiny Committee to be held on 28 March 2017.

Campaigning by the Railway Development Society Ltd.

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR INFORMATION. Local Rail Service Performance and Stations Update

Railfuture Cymru response to consultation: Inquiry into the priorities for the future of Welsh rail infrastructure

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: MANCHESTER AIRPORT. (extract from HS2 High Speed to Nowhere)

High Speed UK. Regional Mapping covering the East and West Midlands

ECCLES STATION NEWS JUNE 2016 NEWS

TransPennine Express. For any feedback you may have, good or bad, about our service, we have a variety of ways you can get in touch:

M6 CORRIDOR. Strategic Infrastructure Prospectus

Central Section Conditional Outputs Statement

High Speed UK. Regional Mapping covering the Northern Powerhouse Region

Lakeside3400 GRADE A OFFICES FROM 5,672 SQ FT TO 36,479 SQ FT SET IN ONE OF SOUTH MANCHESTER S PRESTIGIOUS BUSINESS PARKS

West Coast Main Line Track Access Applications Consultation:

CREWE HALL FARM CREWE CW1 5UE

The Northern Hub. Darren Kirkman Rail Programme Officer, GMPTE

Care Home Live Bed State System. North East & North Cumbria UEC Network. Jonathan Maloney Programme Director. 5 th July 2018

Call: * northernrailway.co.uk/comments Customer Experience Centre Freepost NORTHERN RAILWAY Customer

An Introduction to HS2

Leeds and Sheffield City Region Partners High Speed Rail to the Leeds and Sheffield City Regions Technical Report- Options Assessment and Wider

EAST WEST RAIL EASTERN SECTION. prospectus for growth

Chapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Calder Valley Line and beyond: HADRAG s concerns, aspirations and priorities

Connecting HS2 to Scotland: the North of England Criteria

Find your local IRV in NORTH WEST ENGLAND (listed in postcode order) (FIRVs are in blue)

Central 12 Shopping Park Derby Road, Southport

Rail North West. FLAG fights for Fair Franchise. Newsletter of the North West Branch of Railfuture Winter 2013/14

PRIME FREEHOLD RETAIL INVESTMENT MOSS BROS 31 EASTGATE STREET & 25 EASTGATE ROW NORTH CHESTER, CH1 1LG

TravelWatch NorthWest Disrupted Rail Journeys

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

ASLEF Response to Welsh Affairs Select Committee Inquiry Provision of Cross- Border Services for Wales October 2008

WIGAN PIER. Exciting new retail and leisure development, at the heart of the regeneration of the Wigan Pier Quarter QUARTER

AT RED SCAR. Red Scar Business Park, Longridge Road, Preston, Lancashire, PR2 5NA

RESPONSE TO THE TRANSPORT FOR THE NORTH CONSULTATION ON THE STRATEGIC TRANSPORT PLAN LONG TERM RAIL STRATEGY.

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Emerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine

Rail North West. A Northern Class 319 at Manchester Oxford Road station on a Liverpool Manchester Airport service. Photo courtesy Arthur Thomson.

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes

The future of the TransPennine Express and Northern rail franchises

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

#element of bullying / harassment South West 2gether NHS FT Mental Health Small

SOUTH FYLDE LINE COMMUNITY RAIL PARTNERSHIP A PRESENTATION TO SINTROPHER PARTNERSHIP MEETING

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: and Merseyside conurbation. (extract from HS2 High Speed to Nowhere)

Further details on interventions and funding are available within each Local Area Implementation Plan.

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise.

Meeting, conference and event spaces

Healthwatch is the independent champion for people who use health and social care services.

Introduction to European Commission Funding: ERDF and JESSICA

ECCLES STATION NEWS DECEMBER The Editor and Members of Freccles wish a joyful and rewarding festive season to all readers!

S31 Grant determination for a high needs strategic planning fund in : DCLG ref 31/2916

WITTON BUSINESS PARK. To Let. Good Quality Factory Workshops Available at Reasonable Rentals from 10,000 sq ft up to 487,500 sq ft on 25 acres

East West Rail Consortium

Dear Louise. I can confirm that the full list of approved sites for this study is:

HOTEL LEISURE OPPORTUNITY

HOME NEW RETAIL WAREHOUSE UNITS PROPOSED IN A PROMINENT LOCATION

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL

Preston Leyland Buckshaw Parkway. Chorley Adlington Blackrod. Lostock. Bolton. Salford Crescent. Deansgate

Oriel 2018 (2019intake) Hospital and Health Board Employers

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Roundhouse Offices at South Rings

Section A: Scheme Summary

Why MANCHESTER? MANCHESTER CASE

ConneCting the northern Powerhouse

Rail North West. Newsletter of the North West Branch of Railfuture Winter 2014/5

Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council

5 Rail demand in Western Sydney

1.1 To update the sub-committee on matters of information relating to the Kirklees District.

LOGISTICS 175 TO LET M61/J4 BOLTON BL5 1BT. New build

Summary of questions and discussion

Transcription:

railfuture response to Northern RUS railfuture offers its thoughts below on Northern RUS published in October 2010. Our response is in two parts: firstly responses to strategies identified in the document itself ( Gaps in the language it uses) and then where we feel it does not address particular issues, we offer our alternatives ideas. railfuture have concerns about the forecasting period that is covered in this RUS. Whilst there are many references to a 20 or 30-year timescale, there is very little detail of what a future railway network might look like. We are disappointed that high speed rail appears to be the only long term vision for rail. We need a radical, expansionist vision for the normal railway. The railway should provide a much broader range of travel opportunities than at present through the reopening of old lines, the opening of new lines and the opening/re-opening of stations. The railway should meet the challenge of encouraging modal shift from the roads for both environmental (climate change and pollution reasons) and to ease congestions and make road traffic easier for essential journeys. What is needed are major and significant enhancements to the network to improve both its scope and capacity. What is going to happen by 2050? It is anticipated that the new franchises will cover a 15-year period yet this RUS is essentially concerned with CP4. Too much in this document is about 'nipping and tucking' services within the constraints of the current infrastructure. The importance of the Northern region must not be under estimated; the four Metropolitan counties combined have a similar population to Greater London. Manchester and Leeds are major commuter centres from a wide catchment area, as to a lesser but still very significant extent are Sheffield, Liverpool, Bradford, Preston, York and Hull. To specifics firstly, the Manchester area. With a few exceptions, almost all rail corridors in Manchester can be served from both Piccadilly and Victoria, on existing track, if both the Ardwick Branch (Ashburys - Philips Park), and the route from Ashton Moss North Junction via the Ashton Moss Curve to Denton Junction then via the Heaton Norris and Guide Bridge Line to Heaton Norris Junction were brought into regular use. The exceptions are the CLC line via Warrington Central, the Styal Line via Manchester Airport, and the Rochdale route to Bradford and the Calder Valley, which would require either the Ordsall curve or rebuilding the missing viaduct at Ardwick, in order to reach Piccadilly. Indeed, stations on the Caldervale Line corridor would seemingly be the principal beneficiary of the Ordsall curve. Line speed and headway upgrades are required on several routes, not least the Caldervale Line. For easy reference, we refer to the following groups of routes in Manchester: South: Local: Airport, Alderley Edge, Hazel Grove, Regional: Buxton, Crewe, Macclesfield, Stoke on Trent & beyond. South East: Local: Marple, Rose Hill, New Mills, Regional: Sheffield & beyond. East: Local: Glossop/Hadfield, Stalybridge, Regional: Leeds via Huddersfield, etc.

North East: Local: Rochdale, Regional: Leeds via Calder Valley and both the Bradford and Brighouse routes. [North: MetroBury] North West Local: Bolton, Wigan, Southport, Blackburn, Clitheroe, Colne, Regional: Preston, Blackpool, Lancaster, Morecambe, Barrow in Furness and West Cumbria, Carlisle/ Edinburgh/Glasgow. West: routes). Local: Liverpool all stops (both routes), Regional: Liverpool fast (both South West: Warrington, Local: Metro Altrincham, Regional: Chester via Northwich or 1. The proposed Strategy. To address the acknowledged problems of congestion and conflicting movements in Central Manchester, three options for key new infrastructure are considered, namely: New through platforms 15-16 at Piccadilly, Various alternative options for grade separation between Piccadilly and Ardwick, The Ordsall (a.k.a, Castlefield) curve. On any assessment the new platforms at Piccadilly seem essential to any strategy. Any version of a flyover on the approaches to Piccadilly will be expensive and disruptive during construction. Alternative ways of resolving the conflicts in that area must therefore be examined. The Ordsall curve, however, whilst useful to a degree, seems a doubtful solution to the central problem of congestion in the southern "throat". Yes it would improve distribution around the centre, and remove some conflicts outside Piccadilly, but in doing so it creates new conflicts at (presumed) flat junctions at each end of the new curve, and actually increases the number of trains in the throat through Oxford Road etc. Although we think it would be neutral in its effect on services from the Leeds direction (because of the reversal/waiting time for these services at Piccadilly at present), if services to Sheffield were also taken through Victoria, it will considerably extend journey times for those travelling between Manchester Airport and Sheffield and beyond, by routeing these services right round the city centre (with enormous scope for congestion and delays) to avoid reversal in Piccadilly. 2. An alternative Strategy. Any strategy should seek to do several things: reduce conflicting movement outside Piccadilly, improve distribution around the central area, in particular, redress the imbalance between access to Victoria and the south side,

Eliminate terminating other than in Piccadilly 1-12, and minimise reversing. The west and North West already enjoy a good choice of services into Victoria and Piccadilly. But the east, southeast and southwest is entirely served from Piccadilly, and the northeast from Victoria. This could be remedied by rerouting a number of east-west services through Victoria instead of Piccadilly - Oxford Road. It requires bringing the Ardwick Branch (via Beswick) into full use -and possibly electrifying it. Not only would this remove many conflicts outside Piccadilly, it would increase the choice of central destinations for users. We think one service that could be diverted now to reap the benefits from this would be the present Hazel Grove Preston service, this would enable a regular service on two stations with a very poor service that deserve better, Reddish South and Denton, would free up paths on the busy Piccadilly Oxford Road corridor and would offer better connections from the south to the shopping centres of central Manchester that are much closer to Victoria than Piccadilly. We also think that this would have the effect of making the Ordsall curve more viable. We would also propose rerouting one or two North Trans-Pennine services and possibly one South Trans-Pennine service through Victoria instead of the southern throat, along with a number of local services to/from New Mills via the Ardwick Branch (Phillips Park South Junction - Ashburys Junction) then onward to connect with certain Bolton / Wigan services. We think that in particular, capacity in Gap 4, the Manchester Sheffield route, is not sufficiently addressed and we think that the strategy above and the possible addition of freight loops on the Manchester Sheffield line would enable capacity to be greatly enhanced here. (Present services are very much at capacity for long periods of the day now.) 3. Stations. A number of locations need to be developed as Interchange points, including: Ashburys, Guide Bridge, Salford Crescent, and possibly a new station at Ordsall Lane (ideally four platforms). Salford Central should have platforms on both Bolton and Liverpool lines. There should be at least one station on the Ardwick Branch - probably at Beswick, also a station at Ashton Tameside between Guide Bridge and Stalybridge, and at Diggle. 4. Other regional developments. There should be a second semi-fast service on the Calder Valley route, Manchester - Rochdale - Hebden Bridge - Halifax - Bradford - Leeds - Selby / Hull, interleaved with the existing Blackpool - Preston - Bradford - Leeds - York service. This service could extend to Manchester Airport (using the slot vacated by the present Chester service -see below) once the Ordsall curve is constructed. (Cross-Leeds local working to York & Selby could revert to the Calderdale local services.) One of the Calderdale services might even work across Manchester and link with the Mid Cheshire local service. In addition to services from Manchester, Birmingham and London to the north via Preston, there ought to be an hourly service between Liverpool and Edinburgh/Glasgow, possibly via Earlestown, interleaved with the Liverpool- Blackpool and Manchester - Scotland services. We think that the Skipton - Lancaster service should be redrafted as previously suggested

in the Lancashire & Cumbria RUS. Although it s not a primary part of the RUS, looking at the proposals for electrification across the North West, we think the Morecambe line should be electrified too, to reduce diesels under the wires. Chester and North Wales: Manchester - Holyhead service should be augmented by a Liverpool - Llandudno service, enabling the former to be speeded up. For now both have to be routed via Earlestown, but the logical route into Liverpool would be via the Halton curve, which could also cater for a Liverpool - Chester - Shrewsbury - Birmingham service. Similarly a more logical route into Manchester Piccadilly would be via the Mid Cheshire line and the airport. This would require construction of a western link into the airport, and some double track restored on parts of the Mid Cheshire line, enabling a semi-fast service to run alongside the existing all-stops service. However we also think that the existing North Wales/Chester-Manchester via Warrington Bank Quay could be extended to Manchester Airport across the day now, possibly with introduction of platform split signalling at Manchester Airport, though in the longer term we would propose an extension of a North Trans-Pennine service from Victoria to Chester instead (see above), giving Chester a choice of Manchester stations and a more direct route to the Airport. Southern access to the Airport from Crewe would ideally be provided by extension of the LM service from Stoke, Stafford, and Trent Valley etc, perhaps augmented by the service from East Midlands via Uttoxeter, although the latter should ideally continue to Chester. We have concerns about the bottle-neck at Leeds. All surviving local lines feed through Leeds. Surely consideration needs to be given to avoiding Leeds. One solution would be connecting Bradford Interchange and Bradford Forster Square. Our vision includes joining the two railway lines in Central Bradford as an urgent project whilst there is a large empty building site between the two routes. The closure of the Bradford Royal Mail Depot in 2013 provides a through route. Forster Square Station would be replaced by new stations in the Westgate shopping complex and in Manningham. A strategic approach would involve reopening the railway between Lancashire (Colne) and Northallerton via Skipton and Ripon as a freight strategic route and to provide a range of additional passenger travel options. With regard to the possibility of reopening currently disused lines, or the construction of some completely new sections of railway (p.13), we would like to suggest the following: Reinstate Todmorden chord to allow a Blackburn to Manchester via Burnley and Rochdale service. New station at Cornholme. This could be a bi-directional service via Bolton if the Bromley Cross/Darwen route were doubled. Reinstate Burscough chord to allow through Preston- Southport services (perhaps originating from Skipton) Skipton-Colne, which has the added advantage of being able to become a major diversionary route for freight trains. Double track throughout to Gannow Junction.

Dewsbury-Bradford via Spen Valley Route (tram-train) Menston-Otley-Harrogate- Ripon- Northallerton (also allows Ilkley- Leeds alternate service via Otley) Clitheroe Hellifield with a regular service (not summer Sundays only). Garsdale-Hawes to modem freight standards (connecting to the Wensleydale Railway) Skipton-Grassington (requires a small extension from Rylstone Quarry) Skipton-Bolton Abbey (requires a small chord and joint use of the Embsay Railway) Malton to Pickering (would generate considerable traffic volumes from North York Moors Railway and Pickering Showground visitors) Beverley to York Crewe- Altrincham via Middlewich (using existing freight route from Sandbach) Penrith Keswick There is a need for enhanced services on poorly served routes including Goole-Leeds via Knottingley, York-Sheffield via Pontefract, Stockport Huddersfield via Stalybridge, Preston and East Lancashire to Sheffield via Brighouse and Barnsley. There is a need for new stations on existing routes where the population is currently deprived of convenient access to the railway. Examples include Garstang, Hipperholme/Lightcliffe, Elland, Low Moor, Kirkstall Forge, Apperley Bridge, Haxby, and the re-opening of Dore for trains on the Midland main line. The current snail s pace of (re- )openings is in our view a complete disgrace. We are concerned with the forecasting models you are using. In Table 3.1 the drivers of demand are identified. Firstly, these primarily rely on standard DfT assumptions. Are these standard assumptions good enough given the substantial under-forecasting of demand in previous years? Secondly, there are numerous other factors which need to be taken into account in determining demand: Suppressed demand. This is not mentioned at all in the document. The cost of workspace car parking: if a charge is levied on all workplace car parking, there will be a modal shift from the roads Future charges for road use Congestion. Especially important in areas like the Calder Valley where road capacity is extremely limited. Individual responses to concerns regarding climate change/carbon footprint

Government responses to concerns regarding climate change/carbon emissions Clarity is needed about the effects of recession on demand. Does it suppress demand or is demand unaffected? The need to take account of issues regarding demand for transport identified in recent 'thought pieces' from the Commission for Integrated Transport, http://cfit.independent.gov.uk/pubs/2010/tco/report/pdf/tco-report.pdf We are concerned about the costings approach taken by government bodies, which vastly inflates the cost of capital projects. Until a more commercial approach to costings for infrastructure development is taken, the necessary development of the rail network will continue to be jeopardised by excessive cost. This consolidated national response has been prepared after consultations with the following railfuture branches: Yorkshire, North West, Lincolnshire, and East Midlands. The railfuture national Passenger Committee was also consulted. For further information contact Mr C R Hyomes Chairman, railfuture Yorkshire 12 Monument Lane, Pontefract, West Yorkshire, WF8 2BE T: 07971 766207 E: chris.hyomes@railfuture.org.uk www.railfuture.org.uk www.railfuturescotland.org.uk www.railfuturewales.org.uk www.railwatch.org.uk The Railway Development Society Limited Registered in England and Wales No: 5011634 A Company Limited by Guarantee Registered Office: 24 Chedworth Place, Tattingstone, Suffolk IP9 2ND