Construction Staging Area 197 Redpath Avenue

Similar documents
Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street

Construction Staging Area 19 Western Battery Road

Construction Staging Adelaide Street West

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Construction Staging Area Blue Jays Way (357 King Street West)

As the Toronto Transit Commission (TTC) operates a transit service on Dundas Street West, City Council approval of this report is required.

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Pedestrian Safety Review Spadina Avenue

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Toronto and East York Community Council

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council

Toronto and East York Community Council. Director, Toronto Building, Toronto and East York District

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes

Director, Community Planning, Toronto and East York District

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

Sheraton Centre Toronto Hotel Motor Court - Relocation of Taxi Facilities

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

Toronto and East York Community Council. Director, Toronto Building, Toronto and East York District

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

Wellesley Station Second Exit and Automatic Entrance Public Open House. Tuesday, September 23, 2014 Central YMCA 20 Grosvenor Street

Finchley and Golders Green Area Committee 27 April 2017

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5131 FOR PUBLIC HEARING

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

5.1 Traffic and Transportation

Spadina Avenue Built Form Study Preliminary Report

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

Keele Street Draft Plan of Standard Condominium Application Status Report

Glasgow Street Traffic Review

STAFF REPORT ACTION REQUIRED

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

2175 Lake Shore Boulevard West Official Plan and Zoning Amendment, and Removal of the Holding Provision Applications Final Report

Toronto and East York Community Council. Acting Director, Toronto Building, Toronto and East York District

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

Manager, Municipal Licensing & Standards, Etobicoke York District. This report provides a status update on the Billboard Audit of Ward 17.

YORK UNIVERSITY BUSWAY SERVICE CHANGES

TORONTO EAST YORK COMMUNITY COUNCIL AGENDA MEETING No. 8

Toronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District

Appendix B Connecting Track Options Evaluation Criteria

PROCEEDING COMMENCED UNDER subsection 22(7) of the Planning Act, R.S.O. 1990, c. P.13, as amended

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

KING STREET TRANSIT PILOT

TORONTO TRANSIT COMMISSION REPORT NO.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

TORONTO TRANSIT COMMISSION REPORT NO.

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

A. CONCLUSIONS OF THE FGEIS

KING STREET TRANSIT PILOT

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT SPRING Produced for information by the City of Markham

The District of North Vancouver FACT SHEET

AGENDA ITEM I-6 Public Works

TORONTO TRANSIT COMMISSION REPORT NO.

3529 Souris River Flood Plan (Phase MI-1)

Ontario Municipal Board Commission des affaires municipales de l Ontario

DECISION/DIRECTION NOTE

PennDOT Interstate Work next week March 30-April 3:

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District

State Route 8 Corridor. Northern Summit County s Path to Success

Director, Community Planning, Toronto and East York District

Monday, September 18, 2017 Sunday, October 1, 2017

Application for Outdoor Encroachment Agreement 4906 Dundas Street West

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

Attachment 1: Revitalizing Yonge Downtown Yonge Street

York Street Pedestrian Promenade Plan, Front Street West to Queens Quay West

Expropriation of a portion of 5795 Yonge Street for public street purposes. Government Management Committee

ISTRIO MUNICIPALITY OF MUSKOK

Lake Erie Commerce Center Traffic Analysis

Decision Document. North York Community Council

Re: Item 7- PR13.{)35 - Region of York Municipal Parbtership Grant Application and Approval of Two Grade-Separated Underpasses

Consolidated By-law Index City Council Meeting March 31 and April 1, 2010

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

This report recommends two new TTC transit services in southwest Toronto.

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

Request for Decision. Resolution. Presented: Monday, Feb 22, Report Date Tuesday, Feb 02, Routine Management Reports.

Design Meeting Presentation

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

September 30, 2016 PUBLIC HEARING RESULTS

Cell: (408) Release MA June 25, 2012

NEW YORK CITY TRANSIT AND INFRASTRUCTURE THE G LOOP

Director, Community Planning, Toronto and East York District

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District

TORONTO TRANSIT COMMISSION REPORT NO.

Report to the Strategic Development Committee

Transportation TRANSPORTATION PROJECTS

New Jersey Department of Transportation

Community Development Department Council Chambers, 7:30 PM, October 4, Related Case P: Site Plan Approval

Disposition of Spadina Expressway Properties - Memorandum of Understanding with Infrastructure Ontario

Denis Leger, Commissioner, Transportation, Properties and Emergency Services. Sheila Kidd, Director, Transportation Services

Madison Metro Transit System

TORONTO TRANSIT COMMISSION REPORT NO.

City of Surrey PLANNING & DEVELOPMENT REPORT File:

Transcription:

REPORT FOR ACTION Construction Staging Area 197 Redpath Avenue Date: January 31, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District Wards: Ward 22, St. Paul's SUMMARY As the Toronto Transit Commission (TTC) operates bus route 141 Downtown / Mt. Pleasant Express on Redpath Avenue, City Council approval of this report is required. Sentinel (Broadway) Holdings Incorporated is constructing a 37-storey residential condominium building with a six-level underground parking garage at 197 Redpath Avenue. The site is located in the south-east quadrant of Broadway Avenue and Redpath Avenue and also known by "99 Broadway Avenue". In order to enable construction of the above mentioned project, Transportation Services is requesting approval to close the east sidewalk and a portion of the northbound lane on Redpath Avenue fronting the site for a period of 37 months. It should be noted that pedestrians will be accommodated in a protected walkway and two-way traffic will be maintained on Redpath Avenue. The south sidewalk and eastbound lane on Broadway Avenue also needs to be closed to accommodate the construction staging area. However, this matter is dealt within a companion report "Construction Staging Area - 99 Broadway Avenue" requiring Toronto & East York Community Council approval. RECOMMENDATIONS The Acting Director, Transportation Services, Toronto and East York District recommends that: 1. City Council approve the closure of the sidewalk and 1.7 metres wide portion of the northbound lane on the east side of Redpath Avenue between a point 32.5 metres south of Broadway Avenue and a point 36.2 metres further south from March 13, 2017 to March 31, 2020. Construction Staging Area - 197 Redpath Avenue Page 1 of 5

2. City Council rescind the existing "1 Hour Parking, 8:00 a.m. to 6:00 p.m." regulation on the east side of Redpath Avenue, between Broadway Avenue and a point 83.2 metres south. 3. City Council rescind the existing "No Parking, Anytime" regulation on the east side of Redpath Avenue, between Broadway Avenue and a point 36.9 metres south. 4. City Council rescind the existing "No Parking, Anytime" regulation on the west side of Redpath Avenue, between Broadway Avenue and a point 83.2 metres south. 5. City Council enact a "No Stopping Anytime" restriction on the both sides of Redpath Avenue, between Broadway Avenue and a point 83.2 metres south. 6. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for nighttime illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. City Council direct that Redpath Avenue be returned to its pre-construction traffic and parking regulations when the project is complete. FINANCIAL IMPACT There is no financial impact to the City. Sentinel (Broadway) Holdings Incorporated is responsible for all costs, including payment of all fees to the City for the occupancy of the right-of-way. Based on the area enclosed and projected duration of the proposed closures, these fees will be approximately $157,000. DECISION HISTORY The Ontario Municipal Board, pursuant to its Orders issued on June 19, 2014 in relation to Board File No. PL130547, amended Zoning By-law No. 438-86, for the lands municipally known as 95 & 99 Broadway Avenue and 197 Redpath Avenue COMMENTS A 37-storey residential condominium building will be constructed at 197 Redpath Avenue by Sentinel (Broadway) Holdings Incorporated. The site is bounded by Broadway Avenue to the north, Redpath Avenue to the west and existing residential uses to the east and south. The development will consist of 948 dwelling units with a six-level underground parking garage. Vehicular access to the site will be provided from Redpath Avenue and Broadway Avenue. Construction Staging Area - 197 Redpath Avenue Page 2 of 5

Redpath Avenue, in the vicinity of the site, is a north/south collector roadway and consists of a two-lane (one northbound and one southbound) cross-section with a pavement width of 8.7 metres. Sidewalks exist along both sides of the roadway. TTC bus route 141 Downtown/Mt. Pleasant Express operates on this section of the Redpath Avenue during the morning and afternoon peak periods. The following parking regulations are in effect on the subject section of Redpath Avenue: East Side: "1 Hour Parking, 8:00 a.m. to 6:00 p.m." between a point 30.5 metres north of Roehampton Avenue and Erskine Avenue. "No Parking, Anytime" between Broadway Avenue and a point 36.9 metres south. West side: "No Parking, Anytime" between Manor Road East and the north end of the Redpath Avenue. Based on the information provided by the applicant, the excavation depth for the entire site is approximately 22 metres (approximately 6-storeys). The applicant requires a construction staging area within the road allowance along the western (Redpath Avenue) and northern (Broadway Avenue) limits of the site. Construction staging operations on Broadway Avenue will require closure of the south sidewalk and eastbound lane on Broadway Avenue. However, this matter is dealt within a companion report "Construction Staging Area - 99 Broadway Avenue" requiring Toronto & East York Community Council approval. Construction staging operations on Redpath Avenue will take place within the existing boulevard and the northbound lane on Redpath Avenue. If the construction staging area on Redpath Avenue is approved, 1.7 metres of the northbound lane and sidewalk on Redpath Avenue (between a point 32.5 metres south of Broadway Avenue and a point 36.2 metres further south) fronting the site will be closed. Pedestrians will be redirected into a protected 1.7 metres covered walkway within the closed portion of the northbound lane. The remaining width of 7.0 metres will maintain two-way traffic operations on Redpath Avenue. To enhance traffic flow around the construction site, stopping will be prohibited at all times on both sides of Redpath Avenue (between Broadway Avenue and a point 83.2 metres south). Transportation Services is satisfied that Sentinel (Broadway) Holdings Incorporated has looked at all options to alleviate traffic congestion at this location. Construction Staging Area - 197 Redpath Avenue Page 3 of 5

Councillor Josh Matlow has been advised of the recommendations of this staff report. CONTACT Ann S. Khan, P. Eng. Manager, Traffic Operations Toronto and East York District Transportation Services Telephone: (416) 397-5021 Fax: (416) 392-1920 E-mail: Ann.Khan@toronto.ca SIGNATURE Dave Twaddle, C.E.T. Acting Director, Transportation Services Toronto and East York District ATTACHMENTS Drawing No. 421G-2384, dated January, 2017 p:\2017\cluster B\TRAts2017024te.top.doc Construction Staging Area - 197 Redpath Avenue Page 4 of 5

Construction Staging Area - 197 Redpath Avenue Page 5 of 5