REG ASP MIL APO USE INT IND NM

Similar documents
REG ASP MIL APO USE INT IND NM

SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

Civil-Military Cooperation. Advanced Flexible Use of Airspace

The European Experience Flexible Use of Airspace (FUA)

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Advanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

European ATM Master Plan Level 3. Implementation View

ICAO GANP Requirements and Evolution

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine

Air Space Management - ASM Workshop March 2013 Rabat, Morocco. Advanced Flexible Use of Airspace. Presented by Petri Hartikainen, Integra A/S

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

TWELFTH AIR NAVIGATION CONFERENCE

NEFAB Project Feasibility Study Report Operational Concept

Dynamic Airspace Overview concepts, complexities, benefits and outlook

Flight Efficiency Initiative

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

The situation before the FUA

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

- Define temporary airspace structures and procedures to offer multiple airspace

The Network Manager User Forum 2017

Operational Instruction

Home LIST OF ACRONYMS

EUROCONTROL SPECIFICATIONS SYNOPSIS

Sharing the Airspace- Effectively The UK Approach to FUA

How CFSPs work. processes, requirements, difficulties. Tuesday, June 19th, 2018 CFPSG PRESENTATION FABEC SC OPS/AOG RADISSON ZURICH AIRPORT 1

Centralised Services 4 Advanced Flexible Use of Airspace Service

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

European ATM Master Plan Level 3. Implementation View Plan 2018

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

European ATM Master Plan Level 3. Implementation View

Continuous Improvement of the Global Air Traffic Management System

Network Manager Adding value to the Network 29 September 2011

The Network Manager tasks and the ASM improvement initiative

Towards a Global ATFM Manual. Brian Flynn Head Network Operations

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

Implementation of SESAR Pilot Common Project. - expected effects

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

Flexible Use of Airspace. in ITALY. EUROCONTROL, 11 December 2018

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

- Establish criteria and procedures providing for the creation and use of adjustable lateral and vertical limits of the airspace

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

DIRECTORATE CIVIL-MILITARY ATM COORDINATION. FLEXIBLE USE of AIRSPACE in EUROPE «Challenges»

ATFM/CDM ICAO s Perspective

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

TWELFTH AIR NAVIGATION CONFERENCE

Civil Military Cooperation

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

TWELFTH AIR NAVIGATION CONFERENCE

EUROCONTROL General Presentation

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore

Civil-Military ATM Coordination. Edgar REUBER EUROCONTROL/DECMA/CMC/ARD September, 12th 2018

European Joint Industry CDA Action Plan

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

L 342/20 Official Journal of the European Union

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Performance Review Body 18

ICAO EUR Region Civil/Military Cooperation Seminar/Workshop

TWELFTH AIR NAVIGATION CONFERENCE

EUROCONTROL. An introduction to the EUROCONTROL Network Manager Operations Centre

NEFAB Annual Report 2016

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

Seen through an IATA lens A-CDM Globally

A FOCUS ON TACTICAL ATFM. ICAO ATFM Workshop Beijing, 29 th -30 th October 2014

ORGANISER HOST LEAD SPONSOR

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

Operations Control Centre perspective. Future of airline operations

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Concept of Operations Workshop

ICAO ASBU Implementation Monitoring Questionnaire. Reference period 2017

DANUBE FAB real-time simulation 7 November - 2 December 2011

Future Network Manager Methods

EUROCONTROL REVIEW OF CIVIL MILITARY COORDINATION AND COOPERATION ARRANGEMENTS

The SES Performance Scheme. ICAO Regional Performance Framework Workshop Bishkek, Kyrgyzstan May 2013

TWELFTH AIR NAVIGATION CONFERENCE

MY AGENDA FOR TODAY. Today s Partners for Tomorrows aviation. Page 3

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

ATTACHMENT 2 ADDITIONAL AIRSPACE ALLOCATION PROCEDURES

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015

FUA TEMPORARY INSTRUCTION Doc. ID : FTI/17-013

Surveillance Opportunities and Challenges

Single European Sky Benefits for the airline industry. Warsaw, 28 November 2011

User Forum ASM Recent Improvements. Anders HALLGREN Manager, ASM/ATFCM Procedures EUROCONTROL Network Management

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

Network Operational Concept 2019

Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Transcription:

ECAC REG ASP MIL APO USE INT IND NM Subject matter and scope This objective is linked to ATM Functionality 3 of Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project, but it is not bound to its deployment target dates. Implement enhanced Airspace Management (ASM) by automated exchange services of ASM data during the tactical phase continuously in real time. ASM information (real-time Airspace Reservation (ARES) status) is shared between ASM systems, civil and military ATS units/systems and communicated to NM in the tactical phase. These data, consisting of pre-notification of activation, notification of activation, de-activation, modification and release of airspace are collected, saved and processed in order to be exchanged between ASM stakeholders and be made available by the NM system to ATM actors and all Airspace Users (AUs) not involved in ASM processes but concerned by them. The scope of this objective encompasses: Procedural and system upgrades (ASM, ATM, NM and AU systems (Computer Flight Plan Software Providers (CFSP)) for exchange of real time airspace status data; Integration and management of ASM real-time data into ANSPs ATM systems and into AUs (CFSPs) flight planning systems; Full sharing of real-time airspace status updates in order to take early advantage of possible opportunities and/or to achieve real-time awareness of airspace situation; Network impact assessment of the changes resulting of the application of the above processes. FOR MILITARY AUTHORITIES: It is the responsibility of each Military Authority to review this ESSIP Objective IN ITS ENTIRETY and address each of the SloAs that the Military Authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SloAs which identify actions EXCLUSIVE to MIL Authorities Operating Environment(s): Applicability Area: Operating Environment(s), Applicability Area(s) & Timescale(s) En-route, TMA, Network All ECAC States Timescales: Applicable to: Initial operational capability 01/01/2017 Applicability Area Full operational capability 31/12/2021 Applicability Area European relationship References Operational Change / Key Feature: Airspace Management and Advanced FUA / Optimised ATM Network Services OI step - AOM-0202-A-Automated Support for strategic, pre-tactical and tactical Civil-Military Coordination in Airspace Management (ASM) Enablers - AAMS-06b AOM19.1 AAMS-09a AOM19.1 AAMS-11 AIMS-06 ER APP- ATC 77 MIL-0502 COM12 NIMS-42 PRO-011 PRO-024 Legend: WXYZ-001 Covered by SLoA(s) in this objective WXYZ-002 zzz Covered in another objective Objective covering the enabler WXYZ-003 Not covered in the ESSIP Plan Applicable legislation Regulation (EC) No 2150/2005 of 23 December 2005 on Implementation and Application of the Flexible Use of Airspace Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project Deployment Programme Family 3.1.2 - ASM Management of real time airspace data ICAO GANP - ASBUs B1-FRTO Improved Operations through Optimized ATS Routing B1-NOPS Enhanced Flow Performance through Network Operational Planning Stakeholder Lines of Action (SloA) SloA ref. Title From By AOM19.2-ASP01 Adapt ATM systems for real-time ASM data exchanges ESSIP Plan Edition 2015

AOM19.2-ASP02 Adapt local ASM support system for real-time ASM data exchanges with NM systems AOM19.2-ASP03 Implement procedures related to real-time (tactical) ASM level III information exchange AOM19.2-USE01 Adapt airspace users systems for real-time ASM data exchanges with NM 01/12/2017 31/12/2021 AOM19.2-NM01 Adapt NM systems for real-time ASM data exchanges AOM19.2-NM02 Implement procedures related to real-time (tactical) ASM level III information exchange 01/12/2017 31/12/2021 Expected performance benefits Safety : Capacity : Operational Efficiency : Cost Efficiency : - Environment : Security : - Improved through better co-ordination of civil and military airspace needs at the European Network level. Potential gains through more efficient airspace allocation and better knowledge of traffic environment, common situational awareness, and some enhancement through reduction in controller workload. Increased through better utilization of airspace resources within and across airspace boundaries leading to reduction of flight delays. Increased through the availability of more optimum routes/trajectories allowing lower fuel burn. Emissions reduced through the use of more optimum routes/trajectories. AOM19.2-ASP01 Detailed SloA descriptions Adapt ATM systems for real-time ASM data exchanges 01/12/2017 31/12/2021 Adapt ATM systems to exchange airspace reservation (ARES) messages containing real time (tactical) activation status of predefined airspace structures with local ASM support systems and to display airspace status data at the CWP. Supporting material(s) : http://www.eurocontrol.int/sites/default/files/publication/files/ernip-asm-handbook-part3.pdf EUROCONTROL - SPEC 112 - EUROCONTROL Specifications for the application of the Flexible Use of Airspace (FUA) - [ER APP ATC 77]- ATC Systems enhanced to exchange real-time (tactical) airspace status data with ASM support system 1 ATM systems have been adapted to enable real-time ASM data exchanges with local ASM support systems. AOM19.1-ASP02 Adapt local ASM support system for real-time ASM data exchanges with NM systems Derogations : Adapt local ASM support system to provide NM systems real time airspace status updates through the exchange of ASM data. These data consist of pre-notification of activation, notification of activation, de-activation, modification and release of airspace. None

Supporting material(s) : LARA (Local and sub-regional Airspace Management Support System) - User Operator Manual V.3, Edition 2016 Url: TB provided by DCMAC LARA (Local and sub-regional Airspace Management Support System), Ed. January 2015 Url: http://www.eurocontrol.int/publications/lara-brochure http://www.eurocontrol.int/sites/default/files/publication/files/ernip-asm-handbook-part3.pdf EUROCONTROL - SPEC 112 - EUROCONTROL Specifications for the application of the Flexible Use of Airspace (FUA) - NM B2B Airspace Services Reference Manual Url: http://www.eurocontrol.int/services/nm-b2b-web-services#field-tabs-tab-3 SESAR - 07.05.04-D49 Real Time Status Airspace TS Url: https://extranet.sesarju.eu/wp_07/project_07.05.04/project%20plan/step%201/technical%20specification/07.05.04-d4 9%20Real%20Time%20Status%20Airspace%20TS.doc [AAMS-11]- ASM support systems enhanced to exchange real-time airspace status updates 1 ASM support systems have been adapted to enable real-time ASM data exchanges with NM. AOM19.2-ASP03 Implement procedures related to real-time (tactical) ASM level III information exchange Develop and implement the ASM/ATFCM and ATC procedures for ASM real time data exchanges with different actors and systems (NM, Military authorities, AMC, ATC). http://www.eurocontrol.int/sites/default/files/publication/files/ernip-asm-handbook-part3.pdf AOM19.2-USE01 [PRO-011]- ASM Procedures to ensure that the change in airspace availability is promulgated through SWIM and reflected in the NOP [PRO-024]- ASM Procedures related to real-time (tactical) ASM level III information exchange 1 - Procedures related to real-time (tactical) ASM level III information exchange implemented Adapt airspace users systems at for real-time ASM data exchanges with NM Airspace Users Adapt airspace users systems (Computer Flight Plan Software Providers (CFSP) for real-time ASM data exchanges.

http://www.eurocontrol.int/sites/default/files/publication/files/ernip-asm-handbook-part3.pdf 1 - Systems have been adapted for real-time ASM data exchanges with NM. AOM19.2-NM01 Adapt NM systems for real-time ASM data exchanges Network Manager NM systems should be enhanced to receive and process and display real-time airspace activation, de-activation and modification of ARES using standard format and protocols and include this information in the NOP. NM system should be enhanced to perform the Network impact assessment of the airspace changes resulting of the real-time airspace data exchanges. http://www.eurocontrol.int/sites/default/files/publication/files/ernip-asm-handbook-part3.pdf [NIMS-42]- NM systems enhanced to receive, process and display real-time tactical (ASM level III) airspace usage information 1 NM systems adapted for real-time ASM data exchanges. AOM19.2-NM02 Implement procedures related to real-time (tactical) ASM level III information exchange Network Manager Develop and implement the ASM/ATFCM procedures for ASM real time data exchanges with different actors and systems (NM, Military authorities, CFSPs, ATC, AMC), including a Network impact assessment of the airspace changes resulting of the real-time airspace data exchanges. http://www.eurocontrol.int/sites/default/files/publication/files/ernip-asm-handbook-part3.pdf

[PRO-011]- ASM Procedures to ensure that the change in airspace availability is promulgated through SWIM and reflected in the NOP [PRO-024]- ASM Procedures related to real-time (tactical) ASM level III information exchange 1 - Procedures related to real-time (tactical) ASM level III information exchange implemented