CapitaMalls Asia Limited Asia s Leading Mall Developer, Owner and Manager Singapore China Malaysia Japan India

Similar documents
Changi Airport Group and CapitaMalls Asia to jointly develop Project Jewel at Changi Airport

CapitaMalls Asia Limited Annual General Meeting Extraordinary General Meeting

Investor Meeting Presentation. 4 June 2014

Agenda. Overview. The Proposed Acquisitions. Benefits to Suntec REIT. Conclusion. Trust Management (Suntec) Limited

28 November CapitaLand Limited. Joint Acquisition Of 100% Interest In Rock Square In Guangzhou, China With CapitaLand Retail China Trust

CapitaLand Limited. Acquisition Of 94.9% Interest In Main Airport Center in Frankfurt, Germany

2012 Full Year Results Briefing. 28 February 2013

Annexes. USA Non-Deal Roadshow *September 2015* Bugis Junction

CapitaMalls Asia Limited

CapitaLand Limited. Proposed Acquisition Of A Portfolio Of Office And Retail Assets In Greater Tokyo, Japan

The participation in the acquisition by CDL and Tai Tak together with the Group is an endorsement of the Group s expansion plan.

Singapore Changi Airport breaks new ground with Jewel

FAR EAST H-TRUST POSTS 2Q 2014 INCOME AVAILABLE FOR DISTRIBUTION OF $22.1 MILLION

Hilton Rotterdam Hotel, the Netherlands

A-HTRUST to deepen presence in Japan with the acquisition of a portfolio of hotels

Parques Reunidos Expands to Australia with the Acquisition of Wet n Wild Sydney July 2018

UOL Group 3Q2018 Financial Results 13 November 2018

1H2017 Financial Results. 4 August 2017

Win-win-win: LANXESS sells stake in Rubber Good for LANXESS, good for ARLANXEO, good for Saudi Aramco

UOL Group 1H2018 Financial Results 3 August 2018

1Q2017 Financial Results. 12 May 2017

Q3 FY18 Business Highlights

PORTFOLIO APPRAISED VALUE S$6,682 million

Citigroup Investor Conference October 2010

Q2 FY2011 Results Presentation

Half Year F1 Results. November 4, 2015

CapitaLand Limited Acquisition: 3 rd Raffles City Integrated Development in Shanghai. 13 November 2018

2011 Full Year Results Briefing. 24 February 2012

Retail Space for Lease Le Quest (TOP 2020)

Binh Duong New City. Development Update. Mapletree Business Binh Duong

Wizz Air aims to increase market share with F17 capacity growth of 20% Q3 passenger growth of 20%, Load Factor of 88% (+2.3ppt)

1Q FY2014/15. Financial Results Presentation. 13 August 2014 S Y D N E Y M E L B O U R N E B R I S B A N E C A I R N S

For immediate release NEWS RELEASE

HATTEN LAND LIMITED. Shaping the Future, Melaka and Beyond. FY2017 Results. Corporate Presentation 17 August 2017

MEDIA RELEASE GuocoLand Celebrates Topping Out Milestone for Tanjong Pagar Centre Singapore, 13 January, 2016

Positive rental reversions in Hong Kong portfolio. Rising contribution from Singapore office portfolio. Strong performance from Residential business

The Ascott Limited. Scales up lodging business with US$26-million investment in Indonesia s leading hotel operator TAUZIA

Singapore Market Outlook 2008

2010 Full Year Results Briefing. 22 February 2011

PRESENTATION OUTLINE 1. PERFORMANCE REVIEW 2. OPERATIONS REVIEW 3. MOVING FORWARD IN 2013

The Proposed Joint Ventures with The Straits Trading Company Limited And Toga Pty Ltd

20 Annual Report 2015/16 Mapletree Commercial Trust

Saudi Aramco and LANXESS to form a global synthetic rubber powerhouse

Mapletree Commercial Trust. Portfolio Overview. Pasir Panjang Road. Changi Airport. Singapore

Portfolio Overview. (i)

information memorandum Business and Technology Precinct Westlink Green Darra

(Incorporated in the Republic of Singapore) (Company Registration No H)

PAN PACIFIC HOTELS GROUP LIMITED 2010 FULL YEAR RESULTS BRIEFING 22 FEB 2011

CapitaLand Limited. Positioning for the Future

3Q2017 Financial Results. 9 November 2017


CapitaMalls Asia to acquire its 10 th shopping mall in Beijing

GATWICK AIRPORT LIMITED

LANXESS builds world scale Nd-PBR rubber plant Mobility-driven growth for high-end synthetic rubber. Bernhard Düttmann, CFO June 01, 2011

HATTEN LAND LIMITED. Shaping the Future, Melaka and Beyond. Corporate Presentation 12 October 2017

Frasers Commercial Trust. Portfolio details as at 31 March 2018

Singapore. 23 October 2007

Centurion Corporation Limited

Saudi Aramco and LANXESS to form a global synthetic rubber powerhouse. Matthias Zachert, CEO Michael Pontzen, CFO

ASCOTT REIT ACQUIRES PRIME FREEHOLD LIMITED-SERVICE BUSINESS HOTEL IN SYDNEY AUSTRALIA FOR A$60.6 MILLION

CRCT to acquire Grand Canyon Mall in Beijing

Frasers Commercial Trust. Portfolio details as at 30 September 2018

2016 Half-Yearly Results

Portfolio Overview PSA BUILDING BANK OF AMERICA MERRILL LYNCH HARBOURFRONT. 10 Mapletree Commercial Trust

Here the city begins

Frasers Commercial Trust. Portfolio details as at 30 June 2018

Parques Reunidos Corporate Presentation March 2016

FULL YEAR FINANCIAL REPORT

For personal use only

Presentation Results. 4th March 2016

NCP KINGSGATE Crawley RH10 1EN Freehold Town Centre Car Park investment with Annual Rent Increases

IJM and Perennial Unveil The Light City, a RM4.5 Billion Integrated Waterfront Development in Penang, Malaysia

The Qantas Group A Strong, Sustainable Future Alan Joyce, CEO Qantas Airways. Macquarie Australia Conference 4 May 2012

Centurion Corporation Limited Presentation. January 2015

51 Queen Street CARDIFF

Joint Announcement. Continuing Connected Transactions

Hongkong Land Officially Opens WF CENTRAL in Beijing

SAUCHIEHALL STREET GLASGOW PRIME RETAIL INVESTMENT

FCOT Portfolio detail as at 30 September 2017

PENTLAND HOUSE, EDINBURGH QUALITY OFFICE INVESTMENT

Lippo Malls Indonesia Retail Trust 4Q 2016 Results Presentation

Corporate Presentation

March 4, Investor Conference

UOL Group FY2017 Full Year Results 27 February 2018

Record Retail Sales Drove Robust Performance. Wharf Real Estate Investment Company Limited 2018 Interim Results 7 Aug 2018

ROXY-PACIFIC & CHIP ENG SENG JOINTLY ACQUIRE GRADE A OFFICE BUILDING IN AUCKLAND, NEW ZEALAND, FOR NZ$174.0 MILLION

Shun Tak Announces Interim Results for Year 2017

Page 1. News Release

THE HONGKONG AND SHANGHAI HOTELS, LIMITED

QUARTERLY UPDATE 31 MARCH 2017

Religare Health Trust 1 st Annual General Meeting. 25 th July 2013

Click to edit Master title style. Investor Presentation. September 2018

UOL S AMBER45 OFF TO A STRONG START

KING S CROSS IS A MODEL OF CONSTRUCTIVE CONSERVATION THAT CAPTURES THE SPECIAL QUALITY OF LONDON AS IT HAS GROWN OVER THE CENTURIES.

Great Portland Estates Trading Update Strong Operational Performance

SECURITIES AND EXCHANGE COMMISSION SEC FORM 17-C CURRENT REPORT UNDER SECTION 17 OF THE SECURITIES REGULATION CODE AND SRC RULE 17.

OfficeWise / March Featured properties. Showcasing the best commercial properties in Singapore

Qantas Group - Positioned for Growth and Sustainable Returns

LAKE DRIVE. ireland s world class business campus

PARK PLACE III BROWNLOW AVENUE DARTMOUTH, NOVA SCOTIA

Transcription:

CapitaMalls Asia Limited Asia s Leading Mall Developer, Owner and Manager Singapore China Malaysia Japan India Joint Venture with Changi Airport Group to Develop an Iconic Mixed-Use Development at Changi Airport

Disclaimer This presentation may contain forward-looking statements that involve assumptions, risks and uncertainties. Actual future performance, outcomes and results may differ materially from those expressed in forwardlooking statements as a result of a number of risks, uncertainties and assumptions. Representative examples of these factors include (without limitation) general industry and economic conditions, interest rate trends, cost of capital and capital availability, competition from other developments or companies, shifts in expected levels of occupancy rate, property rental income, charge out collections, changes in operating expenses (including employee wages, benefits and training costs), governmental and public policy changes and the continued availability of financing in the amounts and the terms necessary to support future business. You are cautioned not to place undue reliance on these forward-looking statements, which are based on the current view of management on future events. The information contained in this presentation has not been independently verified. No representation or warranty expressed or implied is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of the information or opinions contained in this presentation. Neither CapitaMalls Asia ( CMA ) or any of its affiliates, advisers or representatives shall have any liability whatsoever (in negligence or otherwise) for any loss howsoever arising, whether directly or indirectly, from any use, reliance or distribution of this presentation or its contents or otherwise arising in connection with this presentation. The past performance of CMA is not indicative of the future performance of CMA. The value of shares in CMA ( Shares ) and the income derived from them may fall as well as rise. Shares are not obligations of, deposits in, or guaranteed by, CMA or any of its affiliates. An investment in Shares is subject to investment risks, including the possible loss of the principal amount invested. 2

Contents Executive Summary Project Highlights Investment Rationale 3

Executive Summary CMA and Changi Airport Group enter into joint venture (49%:51%) to develop an iconic integrated lifestyle development at Changi Airport ( Project Jewel ) Total project development cost is expected to be ~S$1.47bil 1 Targeted for opening by end 2018, the development will offer an exciting and exclusive range of retail offerings for airport passengers, tourists, airport community and Singaporeans This project will further strengthen CMA s retail portfolio and provide an exclusive landmark property to attract new-to-market retailers and concepts (1) Excludes construction costs for facilities for airport operations and car park spaces for airport users, which will be borne by CAG. Facilities for airport operations will be handed over for CAG s ownership and management upon completion. 4

Project Highlights Artist Impression (subject to change)

Project Details Location Surface car park fronting Changi Airport Terminal 1 Description Site Area Total GFA Development Mix No. of Car Park Spaces An integrated mixed-use development, with retail space from Basement 2 to Level 5 Retail Component Facilities for airport operations 1 Indoor gardens and attractions ~377,000 sq ft ~1,443,000 sq ft GFA ~969,000 sq ft (NLA of ~576,000 sq ft) 270 to 300 tenants ~185,000 sq ft ~238,000 sq ft Hotel 51,000 sq ft Five-storey basement with ~2,500 car park spaces Land Tenure 60 years, expiring in 2073 Joint Venture CAG: 51% and CMA: 49% Targeted Opening By end 2018 (1) Facilities for airport operations will be handed over for CAG s ownership upon completion. Construction and related costs, as well as subsequent operational costs, will be borne by CAG. 6

Location and Connectivity Accessible via multiple modes of public transport and expressways Linked to Terminal 1, 2 and 3 Accessibility via Changi Airport MRT station Linked via two major expressways to the rest of Singapore ~20 min taxi ride from city and an hour s journey by public bus service Free shuttle bus services from Bedok and Sengkang MRT stations and Changi Business Park Direct coach service from Johor Bahru, Malaysia Source: Mass Rapid Transit (MRT) Map, 2011. Land Transport Authority Singapore Project Jewel 7

Located in the Heart of Changi Airport Seamless integration with Terminal 1, 2 and 3 Linkages Terminal 3 Terminal 2 @L3 To and From T2/MRT @L3 To and From T3/Hotel/MRT @L2 Drop Off 8 Artist Impression (subject to change)

Serving Large Pool of Cosmopolitan Shoppers Retail demand underpinned by Changi Airport s strong and growing passenger traffic Strong and increasing passenger movements in Changi Airport to create retail demand Asia Pacific air traffic expected to grow 3 times by 2031 1 World-class Changi Airport positioned to ride on regional growth > 100 international airlines flying to 270 cities ~ 6,500 flights per week >53 mil passengers a year New Masterplan for Changi Airport to double current annual passenger handling capacity from 66 mil to 135 mil Passenger traffic forecast to grow 5% annually for the rest of this decade 2 (1) Estimated by Airports Council International (ACI) (2) Source: Speech by Singapore s Minister of Transport at Groundbreaking Ceremony for Changi Airport Terminal 4 on 5 Nov 2013 9

Serving Large Pool of Cosmopolitan Shoppers Shopper traffic from airport community and Singaporeans Secondary catchment Primary catchment Catchment from airport community and Changi Business Park >30,000 staff at Changi Airport >20,000 workers and professionals from nearby Changi Business Park Ready Pool of Singaporean shoppers ~700,000 residents in primary catchment 1 >1.5 mil secondary residential catchment 2 within 20-min drive Project Jewel Map of Mainland Singapore MRT Line 10 Residential Catchment Changi Business Park (1) Primary catchment refers to residents in Singapore s East region (2) Secondary catchment refers to residents in Singapore s North-east region and parts of central region Changi Business Park Changi Business Park

Iconic Destination with Distinctive Offerings A Great Park and A Great Mall, Side by Side Artist Impression (subject to change) 11

Iconic Destination with Distinctive Offerings Singapore Meets the World, The World Meets Singapore Gateway for Asian brands to build profile with global audience Platform for US and European retailers to showcase flagship products to Asian shoppers Garden Attractions Differentiated lifestyle destination for Singaporeans Garden Dining Shopping Arcade 12

Reinforcing CMA s Portfolio and Scale in Singapore Adds to current 19 shopping malls in Singapore Project Jewel 13 13

Investment Parameters Attractive investment to strengthen pipeline of recurrent income Total Project Development Cost (at 100%) GFA details Cost per NLA on completion Total GFA 2 Retail GFA Retail NLA ~S$1.47 bil 1 ~S$ 2,600 psf Estimated Construction Start Date 2H 2014 Estimated TOP 2H 2018 Target NPI yield on cost 5-6% p.a. ~1,443,000 sq ft ~969,000 sq ft ~576,000 sq ft Comparable NLA (S$ psf) ION Orchard 3 Project Jewel Tampines Mall 3 ~S$4,700 ~ S$2,600 ~S$2,500 (1) Excludes construction costs for faciltiies for airport operations and car park spaces for airport users, which will be borne by CAG. Facilities for airport operations will be handed over for CAG s ownership and management upon completion. (2) Total GFA includes retail (~969,000 sq ft), facilities for airport operations(~185,000 sq ft), indoor gardens and attractions (~238,000 sq ft) and hotel (~51,000 sq ft) (3) Valuation for ION Orchard and Tampines Mall are as of 30 Jun 2013 14

Investment Rationale 1 Iconic integrated development at one of the world s best airports Strategically located at one of the world s best airports Collaboration with world-class airport operator 2 Strong demand for retail at Changi Airport Signature project with exciting and distinctive retail offerings Large and growing pool of shoppers comprising airport passengers, tourists, airport community and Singaporeans 3 Reinforces CMA s portfolio and scale in Asia Exclusive landmark project to attract and introduce new-to-market retailers and concepts Further enhances CMA s profile and scale in Singapore and Asia 15

Thank You Thank You For enquiries from analysts & investors, please contact Teng Li Yeng Investor Relations Tel: (65) 6826 5357 Email: teng.liyeng@capitaland.com