Similar documents
TWELFTH AIR NAVIGATION CONFERENCE

ICAO Regional Seminar on Performance - Based Navigation (PBN) Nairobi, Developments and Benefits. 4 December 2008.

Special Africa-Indian Ocean Regional Air Navigation Meeting (Durban, South Africa 24 to 29 November 2008) FOLLOW-UP ON ATM RECOMMENDATIONS

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

2012 Performance Framework AFI

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING

Performance Based Navigation (PBN) Implementation Plan. The Gambia

International Civil Aviation Organization Eastern and Southern African Office. Performance Based Navigation (PBN) and AFI ATS Route Network

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

(RN R A N V A V & & RN R P N

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

APAC PBN UPDATE Slide 1 of xx

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

TABLE OF CONTENTS 1.0 INTRODUCTION...

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

Status of PBN implementation in France

Implementation of PBN in Armenian airspace

ICAO Asia-Pacific Flight Procedure Programme

UK Implementation of PBN

Pacific Project. CPWG/8 - WP/6 Appendix A

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Global Operational Data Link Doc 10037

SOUTH AFRICA. Performance Based Navigation (PBN) Roadmap

PBN Implementation in the UK

Measurement of environmental benefits by ICAO Secretariat

GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR

TWELFTH AIR NAVIGATION CONFERENCE

AFI Air Navigation Services Key Performance Indicators

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

TWELFTH AIR NAVIGATION CONFERENCE

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

The support of an European ANSP

PBN and Procedure Design training

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

PBN/TF/7 DRAFT Appendix D to the Report D-1

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Flight Procedure Design and Cartography

ATNS. Performance Based Navigation Roadmap SOUTH AFRICA

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

JOINT PBN AND GNSS TASK FORCE MEETING Nairobi, Kenya 8-10 September 2009 AGENDA. Adoption of the agenda and election of chairperson

CNS/ATM Systems Interoperability and Harmonization

Título ponencia: Introduction to the PBN concept

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

NEW CALEDONIA PBN PLAN

Russian Federation ATM modernization program

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

Open Questions & Collecting Lessons Learned

PBN Implementation Plan Tonga

OVERVIEW OF ICAO S ACTIVITIES IN AIR TRANSPORT

Performance Based Navigation Implementation in Thailand

ASSEMBLY 39TH SESSION

EANPG PROGRAMME COORDINATING GROUP (COG) PERFORMANCE BASED NAVIGATION IMPLEMENTATION TASK FORCE (PBN TF)

Information Paper 2 SUMMARY

Air Navigation Bureau ICAO Headquarters, Montreal

ICAO PBN Symposium Montreal - October Captain Johnny Woods Head of Flight Operations & Chief Pilot

UK Performance-based Navigation (PBN) Implementation Status

Performance Based Navigation (PBN) Implementation Plan Ethiopia

COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) NINETEENTH AFI PLAN STEERING COMMITTEE MEETING

AIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers

EUR/SAM corridor airspace concept

EASA RNP (AR) Workshop The Landscape Working Together

EUROCONTROL approach to the execution of the PBN IR Mandate

(Presented by the Secretariat)

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN (ESAF) REGIONAL OFFICE MEETINGS, SEMINARS AND WORKSHOPS PROGRAMME FOR 2017

SDM WORKSHOP ON PBN (19/10/2017)

Global ATM System ~Interoperability and Harmonization ~

Performance Based Navigation Implementation Plan SINGAPORE. December Published by Civil Aviation Authority of Singapore

AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop. ICAO NACC Office

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

No Exchange of notes constituting an agreement amending the above-mentioned Agreement (with map). Dublin, 5 and 23 April 1990

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

Flight Operations Inspector Manual

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

PBN Implementation Plan - Fiji Version 1 19 January 2010

TANZANIA CIVIL AVIATION AUTHORITY. TANZANIA Performance Based Navigation Implementation Plan

Draft PBN Implementation Plan Papua New Guinea

Sudan PBN Implementation Plan PBN SG/2

DEPARTMENT OF CIVIL AVIATION MALAWI. PBN Implementation Plan Malawi

ICAO framework for LPV

PBN Operational Approval Overview

Performance Based Navigation Implementation of Procedures

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

AFI COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) TWENTIETH AFI PLAN STEERING COMMITTEE MEETING

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

RNP AR APCH Approvals: An Operator s Perspective

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING

Transcription:

www.worldairops.com This document is part of the World Air Ops online Library The Library contains maps, charts, flight planning documents, international trip planning tools and other public domain resources, and pertinent news and updates for Aircraft Operators. Click below to access the library: NAT North Atlantic AFI Africa EUR Europe PAC Pacific SAM South America NAM North America ASI Asia and Middle East The following sections of our site may also be of interest: International Ops Bulletin Operations Room Published weekly for Aircraft Operators Worldwide - Live airspace, ATC route information fuel, and navigation updates. World Air Operations Ltd. Is a significant worldwide provider of support services to Aircraft Operators providing corporate and airline dispatch support, international flight planning, trip planning, contract fuel, and overflight, landing and diplomatic permits. Click below - when you need assistance 15 minute response time Airline Corporate Aviation Overflight Permits www.worldairops.com/airlines.html www.worldairops.com/corporateaviation.html www.worldairops.com/overflightpermit.html This document is part of the World Air Ops online Resource Library, provided for Aircraft Operators and Pilots Planning NAT / AFI / EUR / PAC / SAM / ASI

The 3rd AFI Regional Air Navigation Services Providers Meeting Cotonou 25-26 November 2010 Implementation of PBN in the AFI Region Session 3: Seamless and Efficient Airspace Presenting Organisation Presented by : Sadou MARAFA International Civil Aviation Organization () «A Single African Sky As A Common Vision of AFI ANSPs»

Presentation contents INTRODUCTION /BACKGROUND PLANNING OF PBN IMPLEMENTATION IN THE AFI REGION PBN IMPLEMENTATION STATUS IN THE AFI REGION LATEST DEVELOPMENT RELATING TO PBN IMPLEMETATION IN THE AFI REGION ACTION BY THE MEETING Cotonou, 25-26 November 2010 2/ 17

INTRODUCTION /BACKGROUND (1/3) Performance-based navigation (PBN) provides the global framework of harmonized modern navigation requirements and the platform to implement and benefit from existing and future area navigation technologies two key building blocks : area navigation (RNAV) and required navigation performance (RNP), encompasses all phases of flight from en-route to approach Cotonou, 25-26 November 2010 3/ 17

INTRODUCTION /BACKGROUND (2/3) Assembly Resolution A36-23 calls for, inter alia, the PIRGs and States to development PBN Implementation plans in 2009 APIRG 16 Decision 16/2: Establishment of an APIRG Performance-based Navigation Task Force (APIRG/PBN/TF) APIRG PBN Task Force developed and adopted the AFI PBN Implementation Plan at its second meeting in Nairobi, 4-6 December 2008 Cotonou, 25-26 November 2010 4/ 17

INTRODUCTION /BACKGROUND (3/3) SP AFI/08 RAN Meeting, Durban, South Africa 24-29 November 2008: eight (8) Recommendations that are applicable to PBN and GNSS implementation, including a set of performance objectives outlining specific actions, responsible parties and action target dates. The performance objectives, which are formulated on performance framework forms (PFFs), have since been reviewed within the framework of APIRG and adopted Cotonou, 25-26 November 2010 5/ 17

PLANNING OF PBN IMPLEMENTATION IN THE AFI REGION (1/2) SARPs provide the necessary legal framework under the Chicago Convention and the referenced manuals provide support to States and stakeholders in the PBN implementation process Regional level: PBN Task Force meetings, Joint meetings of the PBN and GNSS task forces and meetings of APIRG ATM and CNS Sub-groups. Cotonou, 25-26 November 2010 6/ 17

PLANNING OF PBN IMPLEMENTATION IN THE AFI REGION (2/2) Assistance in implementation efforts, increasing awareness and better understanding of PBN: PBN implementation seminar (Nairobi, Kenya, 1-4 December 2008), PBN procedure design course/special implementation project (Dakar, Senegal, 19-30 July 2010) and PBN airspace and operational approval workshop (Johannesburg, South Africa, 6-9 September 2010). APIRG 17 approved the AFI regional implementation plan for PBN. Cotonou, 25-26 November 2010 7/ 17

PBN IMPLEMENTATION STATUS IN THE AFI REGION National PBN Plans: target date 31 December 2009, As of yet, about ten (10) AFI States PBN for terminal airspace and aerodrome operations: A very limited number of States RNAV/GNSS procedures for SIDs and STARs PBN for en-route operations Red Carpet and Gold Carpet RNAV10 routes Thirty (30) user-required RNAV10 routes on the target date of 21October 2010 by PRND/WG Cotonou, 25-26 November 2010 8/ 17

LATEST DEVELOPMENT RELATING TO PBN IMPLEMETATION IN THE AFI REGION (1/5) PBN/GNSS TF1 meeting from 12 to 14 October 2010 in Nairobi, Kenya: Considered the outcome of the 37th Session of the Assembly on the matter of PBN implementation (amendment of Assembly Resolution A36-23) updated the AFI Regional PBN Implementation Plan and the PBN related AFI PFFs (ref. Appendix A and B respectively) Cotonou, 25-26 November 2010 9/ 17

LATEST DEVELOPMENT RELATING TO PBN IMPLEMETATION IN THE AFI REGION (2/5) NEAR TERM IMPLEMENTATION TARGETS (2008-2012) RNP APCH (with Baro-VNAV) in 30% of instrument runways by 2010 and 50% by 2012 and priority given to airports with operational benefits. Each instrument runway will have an associated RNP APCH (LNAV only) RNAV 1 SID/STAR for 30% of international airports by 2010 and 50% by 2012 and priority given to airports with RNP Approach. Review existing conventional and RNAV routes to transition to PBN RNAV 5 or where operationally required RNAV 2/1 by 2012 Cotonou, 25-26 November 2010 10 / 17

LATEST DEVELOPMENT RELATING TO PBN IMPLEMETATION IN THE AFI REGION (3/5) MID TERM IMPLEMENTATION TARGETS (2013 2016) RNP APCH (APV) ( Baro-VNAV or Augmented GNSS) in 100% of instrument runways where pratical by 2016. RNP APCH (LNAV only) in 100% of instrument runways by 2016 RNAV 1 or RNP 1 SID/STAR for 100% of international airports by 2016. RNAV 1 or RNP 1 SID/STAR for 70% of busy domestic airports where there are operational benefits. Implementation of additional RNAV/RNP Routes as required Cotonou, 25-26 November 2010 11 / 17

LATEST DEVELOPMENT RELATING TO PBN IMPLEMETATION IN THE AFI REGION (2/3) /TCB Regional Project on AFI PBN Implementation Objective: give effect and support to Recommendations of the SP AFI RAN08 and APIRG Conclusions through: Development of model regulations to enable the GNSS aspects of air navigation and the implementation of PBN Direct interaction with States needing assistance to ensure that the model regulations are appropriately integrated into the specific States legislation Assistance to States in developing specific actions in order to meet the requirements of the Regional and national PBN Implementation Plan Cotonou, 25-26 November 2010 12 / 17

LATEST DEVELOPMENT RELATING TO PBN IMPLEMETATION IN THE AFI REGION (3/3) AFI States are urged to join this project by submitting formal requests to the Regional Offices. Cotonou, 25-26 November 2010 13 / 17

Action by the meeting The AFI ANSPs, in coordination with the AFI CAAs, are invited to: Participate in PBN implementation activities (meetings, seminars, workshops etc...) carried out in the AFI region by APIRG and its subsidary bodies Take necessary actions to expedite the implementation of PBN in the airspace under their responsibility, in accordance with the AFI regional PBN Plan Cotonou, 25-26 November 2010 14 / 17

References PBN Manual (Doc 9613), Assembly Resolution A36-23 and amendement SP AFI RAN 08 Meeting Report, APIRG/17 Meeting Report, PBN/GNSS TF1 Report Cotonou, 25-26 November 2010 15 / 17

Speaker PRESENTING ORGANISATION LOGO PHOTO MARAFA, Sadou International Civil Aviation Organization () Regional Officer, Air Traffic Management/ Search and Rescue Office phone: +221 338399390 Fax: +221 33 8236926 Mobile phone: +221 766837843 Postal address: 15 Boulevard de la République, Dakar, Senegal smarafa@dakar.icao.int www.icao.int Cotonou, 25-26 November 2010 16 / 17

Implementation of PBN in the AFI Region PRESENTING ORGANISATION LOGO Thank you for your attention END Cotonou, 25-26 November 2010 17 / 17

www.worldairops.com This document is part of the World Air Ops online Library The Library contains maps, charts, flight planning documents, international trip planning tools and other public domain resources, and pertinent news and updates for Aircraft Operators. Click below to access the library: NAT North Atlantic AFI Africa EUR Europe PAC Pacific SAM South America NAM North America ASI Asia and Middle East The following sections of our site may also be of interest: International Ops Bulletin Operations Room Published weekly for Aircraft Operators Worldwide - Live airspace, ATC route information fuel, and navigation updates. World Air Operations Ltd. Is a significant worldwide provider of support services to Aircraft Operators providing corporate and airline dispatch support, international flight planning, trip planning, contract fuel, and overflight, landing and diplomatic permits. Click below - when you need assistance 15 minute response time Airline Corporate Aviation Overflight Permits www.worldairops.com/airlines.html www.worldairops.com/corporateaviation.html www.worldairops.com/overflightpermit.html This document is part of the World Air Ops online Resource Library, provided for Aircraft Operators and Pilots Planning NAT / AFI / EUR / PAC / SAM / ASI