Transportation Supporting Dulles Airport

Similar documents
County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

SECTION 106 ACTIVITIES ANNUAL REPORT

A New Era of Transportation Solutions

SECTION 106 ACTIVITIES ANNUAL REPORT

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

Silver Line Rail Project Update

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Dulles Toll Road Rate Setting Process

Transform66 Transportation Management Plan: Transit & TDM Strategies

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Report to the Dulles Corridor Advisory Committee

CONTACT: Michelle T. Holland

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Basic Project Information

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

Dulles Corridor Improvements. Drive to Ride

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE

Leesburg Streets and Highways. Tom Brandon Manager, Office of Capital Projects Potomac Section

AGENCY NAME TRANSPORTATION

Public Information Meetings. October 5, 6, 7, and 15, 2015

Transportation TRANSPORTATION PROJECTS

Silver Line Operating Plan

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

Performance Measure Summary

Fairfax County Transportation Advisory Commission (TAC)

The following items were handed out at the January 4, 2018 NVTC Meeting.

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Fuller Road/Fuller Heights Road Improvements

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015

TRANSPORTATION. Reston Market Profile

Update on Route 1 Efforts

Fairfax County / Washington DC Transit Bus Advertising

Fairfax County Parkway Widening Fairfax County

Proposed Dulles Toll Road Rate Adjustments

Arlington County Board Meeting Project Briefing. October 20, 2015

Transform66: Inside the Beltway

Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report. Appendix D. Existing Transit/TDM Provider Overviews

McLean Citizens Association Transportation Committee Project Briefing

Our Panelists SPEAKERS MODERATOR

Appendix 1: Phase I Strategies

Understanding Your I-66 Trip

Fuller/Fuller Heights Road Improvements

I-95/395 HOV/Bus/HOT Lanes Project Overview

Metropolitan Washington Airports Authority (MWAA)

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES

Design Public Hearing

I-66 Inside the Beltway Feasibility Study

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M

Major Projects Overview

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

ACI LEGAL COMMITTEE MEETING

REAL ESTATE TRANSACTION ADVISORY SERVICES


ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004

2411 Dulles Corner Park Herndon, VA

EXECUTIVE DIRECTOR. The Potomac Rappahannock Transportation Commission is seeking an ABOUT THE ORGANIZATION

Report to the Strategic Development Committee

MMHP INVESTMENT SALES OPPORTUNITY. Investment Highlights. Property Overview. Manassas Mobile Home Park & 9011 Centreville Road Manassas, VA

Capital Metropolitan Transportation Authority. Monthly Performance Report

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Capital Beltway HOT Lanes Project

Report to the Strategic Development Committee

Committee for Dulles. June 9, Jack Potter, MWAA President & CEO

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

NORTHERN VIRGINIA OPPORTUNITIES. Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018

3 ASSESSMENT OF THE CORRIDOR

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

Brentsville Courthouse

EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION

CHAPTER 5: Operations Plan

RELATED SANTA CLARA SANTA CLARA, CALIFORNIA. RELATED SANTA CLARA Santa Clara, CA

AGENDA. Discussion/Information. Adjournment. Next Meeting: May 18, :00pm NVTA Office

Why we re here: For educational purposes only

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

Score. Category. Access Aesthetics Community Resources

Public Informational Meeting

Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities Multimodal Station

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

DEMOGRAPHICS AND EXISTING SERVICE

Table of Contents. List of Tables

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

230 CHURCH AVENUE CHULA VISTA, CA 91910

Multimodal Planning Studies

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

395 Express Lanes Project Update

Transcription:

Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County

Multiple Transportation Improvements Silver Line Status Report Herndon and Innovation Center Garage Adjacent Roadway Improvements Pedestrian and Bicycle Connections Reston Metrorail Assess Group Herndon Metrorail Station Access and Mobility Study Transit Service Adjustments Improvements to Route 28 Reston Area Transportation Projects Innovation Area Transportation Project I-66 Express Lanes I-66 Construction Mitigation Future I-66 Transit Service 2

Phase 1 Punchlist Ongoing Old Meadow Road Realignment at Route 123 completion: End of 2018 Remaining VDOT items being addressed Work underway at Tysons stations Phase 2 Overall Project Status ~ 83% complete Highlights All stations under construction Mechanical/electrical/plumbing Stormwater facilities Pavilions; pedestrian bridges Aerial Guideway at Dulles Airport nearly finished Traction Power Substations in progress Sections of third rail have been energized Rail yard at Dulles Airport ~ 84% complete Herndon and Innovation Center garages under construction Budget - $2.778B Total Contingency - $551 M (Remaining ~$350 M)

Silver Line Phase 2 Garages Herndon Station 2,006 parking spaces; Cost: $44.5 M; 87% Complete Pedestrian and vehicular connections to the existing parking garage Pedestrian and bicycle amenities, including a bike room Road widening and improvements on site and on Sunrise Valley Drive New access road from Sunrise Valley Drive to the existing garage Existing garage modifications to accommodate the bridge connections from the new garage, new pedestrian path to Metro elevator, accessible parking spaces, and addition of revenue collection system Future Transit Oriented Development (TOD) on the west side 4

Herndon Station Garage Bridge erection and precast work completed Ongoing coordination with MWAA for construction interface on garage, Metrorail facilities, road improvements, bus and vehicular operations during construction Completion in Spring 2019 Upgrades to the existing garage follow 5

Silver Line Phase 2 Garages Innovation Center 2,070 spaces; Cost: $52 M; 62% complete Pedestrian and bicycle amenities Real estate exchange and development agreement with Rocks Engineering Integration with the overall site with the private development Shared infrastructure design and construction for the garage, retail, residential and office development The overall partnership project includes the design and construction of roads, stormwater management, plaza, and other amenities for the 15-acre Transit Oriented Development 6

Innovation Center Station Garage Precast erection underway Completion in Spring 2019 Onsite coordination and cooperation continues as MWAA is working on County parcel and Nugget is neighboring parcels and roads 7

Adjacent Roadway Improvements As part of the Silver Line project numerous intersections and roadways will be improved: Reston Town Center Station Sunrise Valley Drive and Reston Parkway Sunrise Valley Drive and Edmund Halley Drive Sunset Hills Road and the future Reston Town Center Station, Herndon Station Sunrise Valley Drive and Fairfax County Parkway, and Sunrise Valley Drive and the Herndon-Monroe Park-and-Ride Lot/Herndon Metrorail Station Innovation Center Station Innovation Avenue Sunrise Valley Drive Carta Way Extension 8

Pedestrian and Bicycle Connections Reston Metrorail Access Group Recommendation Prepared in 2 Phases Phase I (Wiehle-Reston East Station) - $20 M allocated 25 Phase I recommendations: 19 complete 1 in utility relocation and construction 1 in design 1 will be completed with Phase II 3 under discussion with developers Includes W&OD Bridge over Wiehle 9

Pedestrian and Bicycle Connections Reston Metrorail Access Group Phase II (Reston Town Center Station) - $25 M allocated 22 Phase II recommendations, 1 in utility relocation and construction, 5 in land acquisition, 9 in design, and 7 in project initiation or on hold, due to adjacent land development activity. https://www.fairfaxcounty.gov/transportation/projects/silver-line/restonimp 10

Pedestrian and Bicycle Connections Herndon Metrorail Station Access Management Study Area around Herndon and Innovation Center Metrorail Stations Multimodal challenges and possibilities around stations identified Missing links and needed pedestrian and bicycle connections $21 M allocated 14 priority projects approved 6 projects in design 2 projects being studied 6 project being initiated https://www.fairfaxcounty.gov/transportation/projects/silver-line/herndonimp 11

Transit Service Adjustments Fairfax Connector service reconfigured as part the Silver Phase 1 implementation. Tysons Circulator service implemented; RIBS revised Service reoriented to feed Wiehle-Reston East Station $4 million in new service (annually) added Increased frequencies Service to new areas Additional late night and weekend service Additional service changes will be implemented with Phase 2 Outreach efforts beginning in Fall 2018 Service concepts to be refined during 2019 Herndon bus garage renovation nearly complete Anticipate new service and more frequent service to all three new Fairfax County stations 12

Improvements to Route 28 Northern Virginia Transportation Authority allocated funding to multiple projects in the Route 28 corridor with HB 2313 revenues FY 2014 priorities included two construction projects on Route 28 Widen from 6 to 8 Lanes SB (Dulles Toll Road to Route 50) completed Widen from 6 to 8 Lanes NB (McLearen Road to Dulles Toll Road) completed FY 2015-16 priorities included design funds for widening Route 28 from the Prince William line to New Braddock Road. Design, environmental and traffic work underway Additional funding approved on 6/14 Design build procurement to begin in late 2018 Other projects in Loudoun and Prince William Cos. 13

Improvements to Route 28 Remaining segment in Fairfax County north of Route 50. NVTA did not allocate funding to this project in their FY 2018 to FY 2023 program County staff will be submitting the project to the Commonwealth s SmartScale funding competition on August 1, 2018 14

Reston Transportation Projects Since February 2014: Network analysis/prioritization completed Board adopted Funding Plan Board adopted a Comprehensive Plan realignment of Sunset Hills Road Route 7 widening (Reston to Tysons) design-build contract scheduled to be awarded on July 17 Soapstone Connector (Sunset Hills to Sunrise Valley Drive) Preliminary engineering underway Environment document nearly complete Historical assessment underway Board approved $500,000 for Sunrise Valley/Fairfax County Parkway intersection improvements - W&OD Bridge over Wiehle advancing to land acquisition by end of 2018 15

Innovation Transportation Project Davis Drive/Rock Hill Road Extension New crossing of the Dulles Toll Road from Center for Innovative Technology to Sunrise Valley Drive 4 lanes + bike and pedestrian facilities Estimated cost: $100 M Fairfax and Loudoun have each approved $500,000 for preliminary engineering VDOT advancing preliminary engineering NVTA approved an additional $20 M for this project on June 14 Fairfax County requesting an additional $30 M through Smart Scale 16

I-66 Express Lanes VDOT awarded a design-build contract to Express Mobility Partners Two express lanes in each direction (Gainesville to Beltway) Construction Underway Early Deliverable: I-66/Route 28 Interchange Eliminate four traffic signals on Route 28 north of Route 29 Significantly enhance access to Dulles Airport from the south Target Date: 2020 Remainder of the project due to be completed in 2022. 17

I-66 Construction Mitigation Inside the Beltway and Outside the Beltway Route 699 (Government Center to Foggy Bottom) Implemented in December 2017 Ridership has grown from 130 per day to 305 per day, continues to increase NVTC has approved funding for Route 698 (Vienna Metrorail Station to Pentagon) Implementation plan and timing being developed Outside the Beltway Fairfax Connector Bus Fare Buy Down began May 5, 2018 All feeder routes to the Vienna Metrorail Station now $1 VDOT offering vanpool and telework incentives; County providing commuter assistance. 18

Future I-66 Transit Service A portion of tolls collected will support future transit service in the I- 66 corridor. Funding for additional transit service during construction Upfront capital funding for on-going service: $36.5 million On-going annual operating funding beginning in 2023 Inflationary increases; Funding continuing through 2046 Both PRTC and Fairfax Connector will be adding service Fairfax Connector service additions planned: Centreville - Tysons Centreville - Wahington DC Fairfax Center - Washington DC Westfields - Vienna Stringfellow - Vienna Stringfellow - Mark Center via Pentagon 19

Questions?