AFI REGIONAL DATA LINK MONITORING AGENCY (DL/CMRA)

Similar documents
Excerpts from ICAO PBCS Manual

GOLD / PBCS Operational Approval (Compliance)

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018

PBCS Flight Plan RCP RSP Codes

Global Operational Data Link Doc 10037

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

Advisory Circular. Special Authorization (SA) for Required Communications Performance (RCP) 240 and Required Surveillance Performance (RSP) 180

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima

(Presented by the Secretariat)

ICAO provisions on data link implementation

PBCS Charter Concept

2012 Performance Framework AFI

GOLD. Global Operational Data Link Document. Introduction to RCP and RSP

TWELFTH AIR NAVIGATION CONFERENCE

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)

North Atlantic Initiatives

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

Federal Aviation Administration. PBCS: Operator Approvals UNITED STATES. NAT PBCS Workshop/ February 2018 Paris, France

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

U.S. Domestic CPDLC-DCL Users Guide. DATA COMMUNICATIONS INTEGRATED SERVICES (DCIS) Harris Corporation

Amendment 7 to PANS-ATM, Doc 4444

Overview of Worldwide Data Link Equipage Mandates

TWELFTH AIR NAVIGATION CONFERENCE

SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management)

Global Operational Data Link Document (GOLD) 1-1

AERONAUTICAL INFORMATION CIRCULAR 33/17

INTERNATIONAL CIVIL AVIATION ORGANIZATION

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING

INTERNATIONAL CIVIL AVIATION ORGANIZATION. AFRICA - INDIAN OCEAN REGION REDUCED VERTICAL SEPARATION MINIMUM SEMINAR: (LAGOS, July 2004)

TWELFTH AIR NAVIGATION CONFERENCE

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

RLatSM. Reduced Lateral Separation Trial. FAQs. 4 September 15

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

PENS Symposium How to join PENS

ICAO Air Navigation Panels/Study Groups Work Programme

GOLD. Global Operational Data Link Document (GOLD) Implementation and Amendments. AFI CNS SG /4, Dakar, Senegal, July 2011

AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION. NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, April 2016)

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/3) Hyderabad, India. 22 nd 24 th October 2013

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

Official Journal of the European Union L 186/27

Work Programme of ICAO Panels and Study Groups

Performance Based Navigation (PBN) Implementation Plan. The Gambia

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ICAO Changes to the Present Flight Plan Form. Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ

DESCRIPTION OF THE PEER REVIEW CONCEPT

Performance Based Communication and Surveillance

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

LARGE HEIGHT DEVIATION ANALYSIS FOR THE WESTERN ATLANTIC ROUTE SYSTEM (WATRS) AIRSPACE CALENDAR YEAR 2016

SAT/FIT/11 South American Office Eleventh Meeting of FANS 1/A Interoperability Team SAT/FIT/11

CPDLC-DCL U.S. Airports

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

Flight Operations Inspector Manual

Twenty First Meeting of the Africa-Indian Ocean Planning and Implementation Regional Group (APIRG/21) (Nairobi, Kenya, 9 11 October 2017)

Air Traffic Management

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

First Review Meeting of AFI VSAT Network Managers (AFI VSAT Review/1) (Dakar, Senegal, 3 to 5 October 2011) SUMMARY

EUR/SAM corridor airspace concept

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

CNS/ATM Systems Interoperability and Harmonization

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

RNP AR APCH Approvals: An Operator s Perspective

Russian Federation ATM modernization program

Learning Objectives. By the end of this presentation you should understand:

Consider problems and make specific recommendations concerning the provision of ATS/AIS/SAR in the Asia Pacific Region LOST COMMUNICATION PROCEDURES

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

PBN and Flight Planning

TWELFTH AIR NAVIGATION CONFERENCE

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.

RUNWAY SAFETY GO-TEAM METHODOLOGY

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

Agenda Item 1: Use of VSAT technology in the AFI Region

Inmarsat GADSS Solutions Global Aeronautical Distress and Safety System

Entry of Flight Identity

NEW FPL Transition Phase & Implementation Stages

This Advisory Circular provides guidance to facilitate compliance with the requirements for a Flight Radiotelephone Operator rating.

(Presented by Secretariat) EXECUTIVE SUMMARY

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

Annex III to ED Decision 2017/023/R. AMC and GM to Part-CAT Issue 2, Amendment 13

COMMISSION IMPLEMENTING REGULATION (EU)

REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

Trajectory Based Operations

ICAO NAT Region updates

Problem Reporting and System Performance Analysis

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Transcription:

AFI REGIONAL DATA LINK MONITORING AGENCY (DL/CMRA) APIRG Infrastructure and Information Management Sub-Group (IIM/SG) 27-30 June 2017 Nairobi Josiah BACKOBI Regional Manager Safety & Flight Operations 1 2016

AGENDA Introduction Automatic Transfer - Illustration State, ANSP and Operator Responsibilities in the PBCS Local PBCS implementation programmes Regional PBCS implementation Programme CMRA/DL Recommendations for CRMA/DL implementation 2 2016

Objectives Continuous Efforts to address persistent Challenges Comply with the Implementation Process and involving users at early stage Set up Post-Implementation programmes Implementation of APIRG Conclusion on the Establishment of a Project Team for the implementation of a data link central monitoring and reporting agency (DL/CMRA) 3 2016

Introduction Performance-based CNS/ATM model No enabler can be developed in isolation, i.e. communications, ATS surveillance and navigation enablers should form a cohesive whole. PBS 4 2016

Introduction Support CPDLC as the primary means of communication in oceanic and remote airspace where the quality of voice communications is often poor. 5 2016

Automatic Transfer Illustration Data link services include: Data link initiation capability (DLIC), Connection establishment (CE), Connection termination (CT), Transfer of communication (TC), Clearance request and delivery (CRD), Information exchange and reporting (IER); Position reporting (PR), DLIC provides the capability for the aircraft to indicate to the ground that it is available for data communication, and provide information to allow the ground ATS systems to compare the aircraft against filed flight plans to validate that communication is being established with the correct information.. 6 2016

Implementation Process The CDA sends a message to the aircraft containing the ICAO code for the NDA. Aircraft CDA The CDA sends a message to the next ATSU via Address Forwarding or AIDC. NDA Aircraft The NDA sends a CPDLC connect request message to the aircraft. The aircraft system checks to see if the received message ICAO code matches the previously announced NDA address. 7 2016

Automatic Transfer Illustration Notification (01) Coordination (07) Transfer (08) Messages Transfer Initiate Messages Transfer Control Messages Transfer Control Assume. AIDC Messages General (02) Free Text (02) Application(02) The requirements with regard to the selection of AIDC messages and the associated procedures should be established on the basis of regional air navigation agreements in order to facilitate the harmonization of ATS in adjacent airspaces. 8 2016

State/ANSP/Operator Responsibilities 9 2016

The following horizontal separation minima require PBCS and CPDLC RCP240 and ADS-C RSP180, in accordance with ICAO PANS-ATM (Doc 4444) 10 2016

State/ANSP/Operator Responsibilities Current specifications RCP240, RCP400, RSP180, RSP400 RCP/RSP specifications include allocated criteria to the communication service provider (CSP).These criteria are applied to the CSP through service agreements with the ANSP and/or operator 11 2016

State/ANSP/Operator Responsibilities Inclusion of PBCS capability in the filed FPL means that the relevant a/c is approved and serviceable, and that the operator is eligible (e.g. flight crew training and qualification) for PBCS operations. If these conditions are not met then PBCS capability should not be included in the flight plan. 12 2016

13 2016

Local PBCS Monitoring Programme Monitor communications transactions and surveillance data delivery Define formats and intervals of monitored data and reports to be delivered Develop and establish means of collecting and maintain operational performance data in the standardized format defined/agreed. Perform local analysis for identifying problems and taking corrective action. Report to RPMP any problem that may have regional or global impact. 14 2016

Regional PBCS Monitoring Programme/ CMRA/DL Ensures centralized support to accommodate specific local, regional and global needs. Manages resources and any contracts, fund and recover costs and secure access to the services and information. Validates submitted data before importing it into a secure centralized database; Maintains relational data, such as related to the ANSP, CSP, aircraft type and aircraft operator, Supports participating ANSPs in the analysis and reporting of the operational data, including ACP, ASP and availability data, at the regional level. coordinate, as necessary, with other regional monitoring programmes such as those established for monitoring RVSM ( e.g. ARMA & SATMA); provide means to receive, track, manage problem reports (e.g. web-based service); provide a diagnosis of the problem and recommend resolutions; and Notify appropriate parties when the operational system does not meet the RCP/RSP specification; 15 2016

16 2016

Recommendations for CRMA/DL ANSPs should establish local PBCS Monitoring Programmes (LPMP) to manage local problems for those who have already implemented CPDLC/ADS-C; DL/CMRA Project Team should develop the Terms of Reference defining the main functions of the AFI DL/CMRA including information technology, supporting tools and security policies; DL/CMRA Project Team should study and identify regional funding solutions for the implementation of the DL/CMRA; The ICAO Regional Director, WACAF and ESAF, circulate by e-mail correspondence the outcome of the DL/CMRA Project Team for next APIRG/21 for approval. 17 2016

Thank you backobij@iata.org sfoafi@iata.org 18 2016