HMS SCOTT Newsletter

Similar documents
Update from Rear Admiral Henry Parker, Director Ships Acquistion (MoD)

EX USS SHADWELL Disposal Wreck in Place

Cutty Sark Facts Pack

Royal Navy Ice Patrol Ship coated with Ecospeed

Aratere Briefing BACKGROUND THE INTERISLANDER FLEET 2011 ARATERE EXTENSION PROPELLER FAILURE

1. Per reference (a), enclosures (1) through (4) are submitted.

Wooden Model kit by Artesania Latina

What Price an Ice Patrol Ship? Brian Tanner Independent Consultant

R/V Maurice Ewing Replacement

Accident Report. Crane Failure Global Wind. 16-November-2006 Class B

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

From: Commanding Officer, USS ELROD (FFG 55) To: Commanding Officer, Naval Historical Center Bldg. 57, Washington Navy Yard, Washington, DC

406 landing on having recovered the survivors from the Wessex 5's that crashed on Fortuna Glacier 22nd April Lieutenant K.P. White RN.

Commanding Officer, USS GLADIATOR (MCM-11) Chief of Naval Operations (N09BH) (1) Command History for Calendar Year 1999.

HMS Unicorn. Unique Ship / Remarkable History. Access Guide for HMS Unicorn HMS Unicorn Victoria Dock Dundee DD1 3BP

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

TANJONG PAGAR/KEPPEL/BRANI TERMINALS. DEPTH A/S (m)

PRIMARY EDUCATION PACK CLOZE PROCEDURE

ACA Monthly News The. Not your average laundry day. The art of constructing an aircraft carrier. August 2016

DOCKING AND ROUTING PLAN

Heliflight UK Ltd TRIAL HELICOPTER LESSON

Full Steam Ahead. Vectis Eagle. New Game GREEN MACHINE WASTE HEAT RECOVERY STANDARD HOPPERS. SBI 2012 volume 6 ISSue 1

Finding the Next Generation of Marine Pilots

Casualty Incident Report

Davie s 717th ship is a DPIII Subsea Construction Vessel - launched in October 2013.

FIG Congress 2010 Facing the Challenges Building the Capacity Sydney, Australia, April

Civil Approach Procedural Controller Military Terminal Radar Controller

Stories from Maritime America

Corroded pipe causing oil spill

Summary Report. Contact with Wharf General Villa. 5 March 2006

GIBRALTAR PORT: POWERHOUSE OF THE ECONOMY

AKTOBE CANTIERI DI FIUMICINO

102' (31.09m) Cantiere delle Marche

SHIPPING OPERATIONAL PROCEDURES

TECHNICAL & TACTICAL INFORMATION

Director of Naval History (OP-09B9), Washington Navy Yard, Washington, DC

Why Did the Clipper Clip It?

YEARS FERRY FIELD GUIDE. The Alaska Marine Highway System. An All-American Road

Forth Ports Limited. Ruling Depths & Under Keel Clearances

Marine Transportation Safety Investigation Report M17P0406

REPORT OF THE INVESTIGATION INTO THE GROUNDING OF THE M.F.V. "ELSINOR" AT FOILNABOE, IRELAND ON THE 15TH SEPTEMBER, 2001.

UK Port Infrastructure Project Pipeline Analysis Report

Big jump in progress. The final piece of the HM Queen Elizabeth hull is lowered into place

Part 63 CAA Consolidation 22 June 2006 Flight Engineer Licences and Ratings

Bonne Shipyard (Belgium) Pictures showing the application of Zinga by roller to the blasted hull of a typical fishing vessel.

5000 Ser 690/ Subj: COMMAND HISTORY FOR CY Ref: (a) OPNAVINST J. Encl: (1) Command History for USS PHILADELPHIA (SSN 690)

SCOTLAND TO THE FAR EAST SAILS 11TH SEPTEMBER 1956

Number 162. Underwater bow thruster replacement in harsh conditions Fast underwater hull repairs save time and money for ship owners..

CARIBEX, INC. AIRCRAFT MANAGEMENT PROGRAM

7. Services Navigation and Operation

Report of the International Association of Antarctica Tour Operators

Fleet Improvement Committee 7/12/2012

ECOSPEED for ICE. Maximum protection and savings for ice-going vessels

748 Ramirez Avenue Phone: Florida 32159

Background / Refit Overview

Ice Navigation MIWB Wibbo Hofman MIWB 28/09/2017

HMSECHO AUTUMN 2018 NEWSLETTER PROTECTING OURNATION S INTERESTS

3 Pilbara ports provide gateways

COMMANDING OFFICER USS MEMPHIS (SSN 691) FPO AE

What Is The 29Palms Training Land Acquisition and Airspace Establishment Project Frequently Asked Questions Airspace Related July 2015

AIRCRAFT CHARTERS FOR THE OIL AND GAS INDUSTRY

TECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB

Old warships for sale

CURRICULUM VITAE TONY GRAINGER Marine Engineer

TECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB

7 Instructor Certificates

Safer Skies Through Avionics Maintenance Training and Certification

London City Airport. 43 years

Bye-Laws for the Port of of Gothenburg

WARRENPOINT HARBOUR AUTHORITY PORT OF WARRENPOINT SCHEDULE OF CHARGES

Annual Summary of Marine Safety Reports

HISTORICAL AND SOCIAL SIGNIFICANCE PHOTOGRAPH : SIMON DAISLEY, 2013

Shell Cove. The Waterfront Retail Precinct Stage 1: Construction commencing in 2017 SUMMER 2016

DEPARTMENT OF TRANSPORT

ALMARE DE VRIES. LOA: 60' 9" (18.50m) Builder: DE VRIES. Beam: 16' 9" (5.10m) Year Built: Max Draft: 5' 2" (1.55m) Model: Motor Yacht

replacement SONNE status report

A Frigate vs A Ship-of-the-Line: What s the difference?

GUIDELINES FOR THE AWARD OF MAAA WINGS MOP027

New innovations and possibilities an extension to old traditions

Airworthiness considerations for UAVs

Viking Vanquish, a high-capacity 3D seismic survey vessel operated for CGG, underwent a 21-day program of works at Gibdock. Work involved tailshaft

Your Global Emergency Response Partner

State of South Africa s Maritime Industry Transport Portfolio Committee. 08 May 2012 Commander Tsietsi Mokhele Chief Executive Officer

Introduction & Admin. Online UAS Training Courses. Virtual Meet & Greet

Oil and Gas Capabilities

DEPARTMENT OF THE NAVY USS ELROD (FFG 55) FLEET POST OFFICE MIAMI SO9

Harbours department Quarterly and Year End Review

ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD

MARITIME. Protect Your Assets. Lay-up seminar MOU - CEFOR. Dec. 2016, Oslo, Ungraded SAFER, SMARTER, GREENER

Command Ship. USS WRIGHT (CC-2)

TSAKOS INDUSTRIAS NAVALES S.A.

00- Was One Person Responsible for the Titanic Disaster- Preview of Tim

INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND

Hydrex Rotterdam ready to assist you

HERMAN EIJKELENBOOM. Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, P.R. China

INFORMATION BULLETIN No. 73

December 2012 Newsletter

HUT POINT, ROSS ISLAND

Commanding Officer, USS HALYBURTON (FFG-40) Director of Naval History, (OP-09BH), Washington Navy Yard, Washington, DC 20374

%"""! 1. Per reference (a), enclosure (1) is submitted as USS CHAMPION'S Command History for Calendar Year 1993.

Transcription:

HMS SCOTT Newsletter 2017-2018 Following a catastrophic engine failure in June 2017 HMS SCOTT returned to base port, Plymouth. There she undertook some of the initial stages of repair and maintenance she would require to return to sea. The force of the blast buckled the deck plates between the engines. The piston connecting rod can be seen lying between the two engines.

Left: The blast door from the engine lying on the deck. Right: Part of an inlet to the engine split in two. The period alongside base port also allowed Ship s company to focus on training and maintenance of currency. This included practicing our emergency fire and flood procedures.

Left: Personnel attempt a re-entry into a compartment. Right: Training with smoke to simulate realistic conditions during a main machinery space fire. The beginning of 2018 marked the decision point for the Ship to sail to Rosyth, Scotland, on a single engine to enable the repair to be conducted on the Starboard Main Engine. The training period in Plymouth culminated in a rigorous Flag Officer Sea Training (FOST) exercise to ensure HMS SCOTT was safe to sail on one engine north for repair. FOST exercised the full range of emergency procedures as well as examining routine functions such as navigation safety and engineering serials such as machinery breakdowns etc. The beginning of May saw HMS SCOTT complete the 703 mile transit from Plymouth to Rosyth, ready for the installation of a new engine. The lack of redundancy operating with only one engine available through very busy shipping lanes presented challenges for the Command team. A Finnings engineer, the original engine manufacturer, sailed with the ship on the 4 day transit which proved to be the first opportunity for many of the new ship s company to experience time at sea in

HMS SCOTT. For some of the junior Able Seaman HMs, this represented their first time at sea in the Navy. Left: The three Forth Bridges ahead of SCOTT. Right: Clearing the Queensferry Crossing. SCOTT successfully reached her new temporary port of Rosyth, berthing in Dry Dock 3 with an excellent view of HMS PRINCE of WALES, the RN s second aircraft carrier. Just prior to entry into Rosyth, SCOTT sailed under the impressive Forth Bridge with only a 3 metre clearance above her main mast. As well as addressing the defective Starboard main engine, the period of repair in Scotland has also included extensive maintenance to many of the ships systems with the objective of resuming Survey Operations in 2019. The new engine viewed through the Ship s Hull The Ship docked down in May this year to commence the repair plan owned by CSS (Commercially Supported Ships) and contracted to Babcock. The process has proven challenging for Ship s Company who have remained onboard throughout the contract work to retain care and protection of the Ship. The engine repair required the removal of a large 23.7 metre section of the Ship s hull in order to provide access to remove the damaged block and fleet the new block into position. Similarly wider essential maintenance work has been conducted across all the ship s system so that she s in great condition when she emerges. As a measure of the level of wider

work conducted on the ship, OOD s have issued 1,200 permits to work within a 5 month period and this is expected to reach 1,500 by the time the ship sails. Left: The old engine removed. Right: The piece of Ship s Hull suspended as it is removed. The repair package has had some memorable moments including the craning of the new engine in. The engine block alone weighed a mighty 35 tonnes! The impressive multibeam sonar array has also had a complete overhaul in preparation for the return to the Atlantic survey season. SCOTT still has hurdles to overcome such as impending Harbour Acceptance Trials followed by Sea Acceptance Trials under the watchful eye of SCOTT s Engineering Officer, Lt Sam Fayers.

HMS SCOTT in dry dock. Right: The rudder being reattached. With the Ship reaching the culmination of repairs the focus is now shifting to training the Ship s Company for taking the Ship back to sea. They will have to prove to the FOST staff they are ready for transit back to Plymouth and base port.

Aerial view of HMS SCOTT, Rosyth The surveyors on HMS SCOTT have had an opportunity to refresh and test their survey skills by conducting a harbour training survey of Port Edgar, South Queensferry. The survey has been supported by the Sea Cadet Training Centre, Caledonia, who have allowed SCOTT to use one of the boats and their facilities. Left: The surveyors setting up the portable survey equipment. Right: Collecting single beam data at Port Edgar. The surveyors have been practicing deploying their portable survey system, a mobile transducer set that can be attached to small vessels of opportunity to collect soundings across the berths. The system is flexible offering the opportunity to gather either single beam or multibeam data and in practice has been used previously for short notice tasks in regions struck by extreme weather events including hurricanes or tsunamis. Part of the Port Edgar survey has also included

traditional skills including installation of a tide pole in the harbour and the pleasure of completing 24 hour tidal observations and re-establishing geodetic marks. Installation of the tide pole at Port Edgar PO(SR) Banjo West, lead surveyor, said This has been a valuable experience, particularly for our junior surveyors, who have had limited opportunity to practice their skills for harbour survey. It has developed others in their ability to lead small aspects of the survey plan, normally entrusted to a higher rank. In return for their support, the harbour survey will be delivered to the Sea Cadet unit so they have an overview of the depths whilst operating their boats within the marina. Similarly whilst in Scotland, Ship s Company have taken the opportunity to establish links with the trust operating the Royal Research Ship Discovery, which is in dock in Dundee. The RRS Discovery was the last of the three-masted sailing research ships to be built in Britain and designed specifically for Antarctic Research, with ice breaking capability. Its first mission was Captain Robert Falcon Scott s first British National Antarctic Expedition carrying Ernest Shackleton as one of his Officers for his first trip to the Antarctic.

Left: The coal bunker on RRS Discovery. Right: Ship s Company in the Wardroom HMS SCOTT had previously visited RSS Discovery in 2012 for the centenary of Captain Scott s death. The organiser of the tour, Leading Seaman (HM) Saunders, said This is a fantastic opportunity for Ship s Company to learn about the Ship s name sake and particularly for the surveyors to understand the first origins of Antarctic survey. Weather was particularly challenging and for those 16 personnel braving the 102mph winds recorded in Dundee that afternoon, chin straps were needed for caps on the upper deck. A tour of the ship was kindly delivered by Ali Gellatly, the Education Officer at the Dundee Heritage Trust, which is keen to strengthen the bonds between SCOTT and the RRS Discovery. Ship s Company with the RRS Discovery