London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009

Similar documents
Summary of questions and discussion

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

UNLOCKING THE BRIGHTON MAINLINE

98 Manor Way, Beckenham, Kent BR3 3LR

East West Rail Consortium

Sussex Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch

RAIL HUB FOR HEATHROW?

GTR 2018 timetable proposals

THE WEST LONDON LINE GROUP ENTRY TO THE RAILWAY FORUM / MODERN RAILWAYS RAILWAY INDUSTRY INNOVATION AWARDS 2007

Alton Line Users' Association

East Sussex Rail Strategy Shaping Rail in East Sussex and Action Plan

Kent Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch

Submission by Heathrow Southern Railway Ltd.

Response from West Sussex Rail Users Association to the DfT consultation on Thameslink franchise.

The Brighton mainline Route Utilisation Strategy. Making it work for passengers. A paper by London TravelWatch and Passenger Focus

Crossrail / Elizabeth Line An Update

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

4 Transport projects underway in Western Sydney

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

London and Crossrail 2. Chris Moores Transport for London

Response to Consultation on the re-planning of Network Rail s Investment Programme

London TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation

Delivering a better railway for a better Britain Route Specifications 2016 Wessex

GTR December 2015 timetable consultation

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

The Evergreen 3 Project

Delivering a better railway for a better Britain Network Specification 2016 Wessex

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017

Feasibility Study July 2017

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement

Images Revealed: Proposed HS4Air will create new transport hubs boosting regional economies and slash journey times beyond London.

About 2M. For more information visit JOINING UP BRITAIN

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results

Road Traffic Implications of a second runway at Gatwick Airport. Gatwick in perspective I. Prepared by a Senior Highway Engineer NUMBER 8

HSR the creation of a mega-project

Delivering a better railway for a better Britain Network Specification 2016 South East Route

Elizabeth line Services

Strategic Transport Forum 21 st September 2018

A new approach to rail passenger services in London and the South East. Working in partnership to improve services and support growth MAYOR OF LONDON

TfL Planning. 1. Question 1

5 Rail demand in Western Sydney

EAST WEST RAIL EASTERN SECTION. prospectus for growth

WEST LONDON LINE GROUP 98 Manor Way, Beckenham, Kent BR3 3LR

Why build a third runway, when you can build a longer runway?

GB Railways Group Plc

Connecting People, Connecting Business

CROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE

Emerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London

South Western Franchise consultation by the Department for Transport. A response by London TravelWatch (assisted by The Railway Consultancy)

GATWICK AND WANDSWORTH

Anglia Winter Key Route Strategy (KRS) 2017/18

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Still waiting for a ticket? Ticket queuing times at large regional rail stations. Foreword

Rail Sta s cs Compendium Great Britain Annual

Campaigning by the Railway Development Society Ltd.

London Bridge station opens upgrade works

WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT

Response to Network Rail s Sussex Route Utilisation Strategy Draft for Consultation

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Potential future transport projects for London October 2016

Peterborough. Bedford. Stevenage. Luton. St Albans. Finsbury Park. Kentish Town. St Pancras International. Farringdon. London Blackfriars

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Transport Infrastructure Construction and RMI Market Report - UK Analysis

Spending round 2013: The case for investment in transport. Mayor s Office, May 2013

Watford-Gatwick Passenger Surveys FINAL REPORT

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Road Investment Strategy A1 East of England Strategic Road Study

campaigning by the Railway Development Society Limited

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January

UK Airport Operators Association

TRANSPORT UPDATE. September/October 2018

RAILFUTURE LONDON AND SOUTH EAST BRANCH

Update on the Thameslink programme

ASLEF s Response to the East Anglia Rail Franchise Consultation

Airport Operators Association National Needs Assessment: Call for evidence

Appendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Meeting the capacity challenge: The case for new lines

National Rail Passenger Survey: User Guidance Report

High Speed Rail London to the West Midlands and Beyond. A Report to Government by High Speed Two Limited. PART 4 of 11

Policy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015)

PLANNING THE SUNBURY GROWTH CORRIDOR

Submission to the Airports Commission

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

Thames Valley Branch Lines Notes of Meeting

356,500 people commuted to jobs in the City of London. 40 per cent from inner London, 29 per cent from outer London, 31 per cent from outside London

3. Coach Supporting Statement

The case for a local rail station. At Great Blakenham, Suffolk.

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure

JRC. Beyond the Elephant

Transcription:

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009 Appendix 1 Flip chart notes from Breakout Groups Groups were asked to consider what gaps and issues the London and South East RUS needs to address, what potential solutions to the problems might be and suggest the top three priorities for action. Group 1 Everyone seems obsessed to forcing people into overcrowded centre of London: Increasingly uncomfortable journeys People don t necessarily want to go there. Orbital routes (especially in West London sector) are not made full use of Buses feed into tube (overcrowded) not walk Therefore orbital routes take pressure off road (M25), busses and tube. Need for better links. Northern home counties South East by-passing zone 1 Anticipating future areas for growth, for example, Watford/Milton Keynes - South East Need for minimum 4 trains per hour radial routes and 4 trains per hour orbital routes Growth of Gatwick Airport and Luton Airport will increase demand for orbital needs Difficult choice 1. New links for new traffic or; 2. Relieving pressure on existing corridors? London Rail services need to be dealt with in a London/Greater London specific strategy framework. For example, London RUS covering 50 mile radius and incorporating: 1. Future pressure on radial travel to Zone 1 (Tube congestion) 2. Orbital needs for inner-suburban travel to take pressure off buses 3. Using longer distance regional rail line to also, along the way, provide good orbital London links (for example, Birmingham Brighton via West London links) 4. Provide minimum of 4 Zone 1 trains plus 4 orbital trains 5. No sufficient studies for passenger journeys to ascertain strategy 6. Addressing balance for North to South London services and surroundings to take pressure off Tube 7. Off peak commuting 8. Use orbital rail to tap into M25 traffic and encourage modal shift. Three Priorities: 1. Gaps are in lack of sufficient orbital rail links to take pressure off tube and mainline rail termini, this would enable capacity at Central London rail termini for more radial services. Within London a lot of inner suburban journeys require long bus journeys 2. For radial: Taking pressure off tube and bus by having a 4 train per hour (turn up and go) to central London (Zone 1) For orbital: Boosting long distance regional rail services (for example, Birmingham to Brighton) via orbital London corridors (for example, West London Line), tapping into demand hubs, for example, airports (Luton, Gatwick) and motorways 3. Identifying growing markets (for example, Watford) and new developments.

So: 3.1 Study of long term passenger and freight journeys, peak and off peak, orbital and radial 3.2 New services and infrastructure including electrification. Long distance/high speed extension via West London line to relieve capacity at London rail termini in order to provide more metro services. Redhill fly over to take pressure off freight through London 3.3 Plan to give a turn up and go minimum 4 trains per hour radial service to central London (so taking pressure off Tube) and 4 trains an hour orbital for all inner London rail station giving each a 4 total minimum departing takes heat off Tube and bus and all stations to be capable of accommodating minimum 6 car trains. Group 2: 1. Capacity of Network Caused by flat junctions, in other words, not grade separated Fast and slow trains on same tracks Platform space at mainline stations. Also at outer ends of routes. 2. Freight Look at flyover at Redhill as part of network by-passing London Capacity to handle freight destined for London. 3. Off Peak rules for calling a service Metro Better services could encourage passengers to switch travel plans from busier times 4 trains per hour is not the same as every 15 minutes 4. New Tracks/Lines/Improvements As with CTRL, fast lines in tunnels Double deck trains - develop networks Central London: Access to central London 17/21 Tube stations on either Central/Piccadilly lines both lines have poor connections to South London Bakerloo line several options looked at. Solutions: 1. Grade separated Junctions Balham Lewisham 2. Extend Bakerloo/DLR 3. Run round loop Victoria/Marble Arch. 4. - 10/15 Minute routes - 06.00-01.00 like the underground look at 24hrs. 5. More stopping of fast services, e.g. Thameslink at Norwood Junction

Group 3: Brighton Line issues: 1. Look at whole line! (A network) metro, outer London/ Surrey, Sussex, West and East Cost (Tonbridge Reigate), Branches & Gatwick 2. Peak and off peak connectivity 3. Coordination of Gatwick service into and with other services. A Gatwick Brighton express 4. coordination with other services SE/FCC; GWR WLL(tfl), SWT Epsom Southampton & airport. Havant, London Bridge. Tonbridge, Clapham Junction, East Croydon, Sutton 5. Sunday services same as week day off peak 6. Electrification: Redhill Reading Ashford Hastings Oxted Uckfield 7. DfT influence not in line with passenger needs. Group 4: Radical doc for CP5 7 needed. Demographic changes Population Regional plans conclusion houses/jobs and work at home. Medway East Thames corridor. 1. Hubs all transport Decline of domestic air travel (Copenhagen talks) Finance new sources. Gaps: 2. Electrification gaps Salisbury to Basingstoke and Salisbury to Southampton Reading/Gatwick and extend electrification Hastings/Ashford Reading/Oxford/Birmingham Norwich/Liverpool Non London travel Oxford/Cambridge Outer loops to hubs. 3. Freight network Containers (Dedicated network) Do we need to re-open great central? Gauge problems (Redo to European Standards) Extend cross rail to Reading Hub Heathrow all transport. Hub (inc rail) Redhill issue to solve (Gatwick/Medway) and freight Waterloo o Double decking platforms o Redoing and assessing transport links. Flat junctions to grade Seperate eg Woking, Swanley, Redhill, Herne Hill. Speed inc needs: Directional signalling need Tube line extension planned and transport for London takeover of defined heavy rail

Lewes/uckfield and re openings (ref ATOC report, in other words, Guildford/Horsham, Bentley/Bordon. Group 5: 1. Assumption all travel into London and return 2. Virtually no thought regarding avoiding lines (avoiding London) for example, freight and E-W Rail 3. How does anyone get a new line on the agenda? Or reopen a closed line assuming the track bed has been protected? 4. Is there a plan B if disruption occurs? 5. Capacity constraint of freight 6. Flat junctions 7. Access to London Heathrow from West and South West London 1. Do not assume re-establishment of rail heads, e.g. Watford Jnc Luton, Bedford coordinate with other RUS s. 2. Re-instate orbital routes with regard to railheads. In order to ease capacity at London Termini. Can create new travel oportunities. 3. Through strategic thinking. 4. Longer & fewer long-distance trains, more freight loops, reinstatement of lifted track e.g. Kettering to Sharnbrook?. 5. Create grade separated junctions 6. New Lines Heathrow T5 Colnbrook Iver, Bourne End High Wycombe, Waterloo Airtrack Staines to Heathrow T4.. Priorities: 1. Reinstatement of track Grade separated junctions 2. Orbital Routes 3. Heathrow Airport. Group 6: Great Eastern & West Anglia Lines Lack of capacity. Volume of passengers: Liverpool Street and Stratford Changing passengers. How much charging at Stratford 20% Guess. Growth around Stratford uncertainty over stats. Station counts often show official stats not accurate Station date usage ORR figures not accurate. Need to look at trends GAP identify growth trends look at origin and destination Oyster PAYG will increase demand. How much? How is count carried out electronic measuring? Great Eastern / West Anglia cross London link with Sussex NE/SW Further consideration for Cross London Routes GAP: capacity to handle freight growth =

GAP: improving Radial Linkages by orbital connections o Access to Stanstead from East o Reopen Sudbury to Cambridge and electrify GAP signalling to boost route capacity o Some schemes lowest capacity o Line capacity by improving track and structures o Identify and monitor four/three tracking and bi-directional working. Regional Orbital Links. o Passengers and Freight o East West Route Electrification? o Round London Conundrum when? o 3 or 4 Tracking o Dynamic loops All radial Routes Cross London Links o Scope to review service patterns. East beyond Shenfield Abbeywood West to Maidenhead. o How might NE/SW route develop linkages? Station design and layout o Dispersal of passengers to ease dwell time? Access? Public Transport or car park? o Capacity at stations handling growing capacity