ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA

Similar documents
For personal use only

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso

LAS OPEÑAS DRILLING COMMENCED

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

Quarterly Activities Report Period Ended 31 March 2018

For personal use only

For personal use only

MARCH 2018 QUARTERLY ACTIVITIES REPORT

Australian Mines increases Marymia ground holding

For personal use only

For personal use only

Haoma Mining NL A.B.N

For personal use only

Quarterly Activities Report Period Ended 31 December 2017

For personal use only

Altera Resources Ltd

QUARTERLY OPERATIONS REPORT 30 JUNE Highlights: BOARD AND MANAGEMENT YAMARNA

For personal use only

Angas Zinc Mine From Prediction to Production

For personal use only

Market Announcement ASX:NTL, NZX:NTL For Immediate Release

Ramelius Resources Limited ASX:RMS

WOOLGAR PROJECT DRILL PROGRAM RESULTS NOVEMBER 2004

December 2017 Quarterly Report

For personal use only

Highlights. Quarterly Activities Report: September Kurnalpi Project. Lindsays project

KEY POINTS. Significant Resource increase at the Tier-1 mines:

DECEMBER 2017 QUARTERLY ACTIVITIES REPORT

HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND Drill Results Include 8.0% ZnEQ and 10.

Recent Exploration of the Olympic Dam

On The Road To Silver Mining In Mexico

For personal use only

Gruyere Project Development Update

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===

Newcrest Mining Limited

For personal use only

For personal use only

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe

Annual Mineral Resources and Ore Reserves Statement - 31 December 2016

For personal use only

For personal use only

QUARTERLY ACTIVITIES REPORT

African Gold Group, Inc.

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

Market Release 11 March 2019

For personal use only

Lorena Gold Project Malachite AGM 29 November 2017

For personal use only

For personal use only

On The Road To Silver & Gold Mining In Mexico

South America Copper Site Visit Non-ferrous overview

Australian Securities Exchange Notice

For personal use only

SEPTEMBER 2015 ASX:CDV

Annual Mineral Resources and Ore Reserves Statement - 31 December 2017

2011 Annual General Meeting. Greg Robinson Managing Director & CEO

Quarterly Activities Report For The Period Ending 30 June 2018

On The Road To Silver Mining In Mexico

JUNE 2012 QUARTERLY REPORT

Quarterly Report for the Period Ending 30 September 2014

Northern Territory. Ark wishes to extend the strike and further define the size of the Golden Honcho deposit, with the

December 2014 Quarterly Report

Market Release Newcrest Mining Limited 10 February 2012

Kidman agrees to acquire 1Moz Mt Holland gold field in WA

For personal use only

For personal use only

FOR THE THREE MONTHS ENDED 31 MARCH 2012

2 September The Manager Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 AURORA TANK PROJECT

ROADSHOW PRESENTATION

ASX ANNOUNCEMENT. Blackwood Coal Announces Intersects with its Initial Drilling Campaign at its Galilee Project

Quarterly Activities Report December 2018

Haoma Mining NL A.B.N

Quarterly Activities Report December 2014

Quarterly Activities Report For The Period Ending 31 March 2018

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

Report for the Quarter Ended 30 June 2007

For personal use only

KEMPFIELD DRILLING COMMENCES, TARGETING Ag, Au, Pb AND Zn

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER October 2017

DECEMBER 2007 QUARTERLY REPORT

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014.

QUARTERLY REPORT. ASX Code JRL HIGHLIGHTS FINANCIAL. Resources Limited ABN for the three months ended 30 June 2016.

UNLOCKING THE POTENTIAL OF THE EAST MENZIES GOLDFIELD

NEWS RELEASE Orca Gold Receives Ministerial Approval for the Acquisition of the Kinross Côte d Ivoire Property Portfolio

For personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

Savannah Resources Plc Rio Tinto and Savannah to establish Mutamba/Jangamo Joint Venture HIGHLIGHTS:

Quarterly Activities Report

Quinto Resources Inc. (TSX-V: QIT)

JUNE 2017 QUARTERLY ACTIVITIES REPORT

OZ MINERALS CONTINUED INVESTMENT IN SOUTH AUSTRALIA. TERRY BURGESS - Managing Director & CEO SAREIC - 02 May 2011

SPITFIRE RESOURCES LIMITED SPITFIRE DIVERSIFIES WITH TASMANIAN COAL ACQUISITION

THE NEW HIGH- GRADE AUSTRALIAN GOLD DISCOVERY

Company Update. August 2015

For personal use only

Ramelius Resources Limited ASX:RMS

Bringing Exceptional Management and Exploration Expertise to a Proven Mineral Environment

QUARTERLY REPORT. ASX Code JRL HIGHLIGHTS FINANCIAL. Resources Limited ABN for the three months ended 31 March 2017

Transcription:

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA Zara Joint Venture, Eritrea (Dragon Mining Limited - 20% interest) Koka Gold Deposit Dragon Mining Limited, in conjunction with Sub Sahara Resources NL is pleased to announce an update on its resource drilling program at the Koka gold deposit in Eritrea. Assay results have been received from diamond drilling completed last year, which have returned additional significant high grade gold intercepts such as 6m @ 89.62g/t gold, 4m @ 20.55g/t gold and 3m @ 34.98g/t gold. Further details are outlined in the Sub Sahara announcement which is attached. The Zara Joint Venture comprises a single license covering an area of 196km 2 situated in northern Eritrea, approximately 160km northwest of Asmara city. The project is managed by Sub-Sahara and Dragon Mining has a 20% interest and is free carried through to completion of a bankable feasibility study. For and on behalf of Dragon Mining Limited Peter G Cordin Managing Director

Friday 25th January, 2008 ASX Announcement Sub Sahara buoyed by further high drill intercepts from Zara Gold Project in Eritrea Australian gold exploration company Sub Sahara Resources (ASX: SBS) announces an update on its resource drilling program at the Koka prospect, part of the Zara Project, in Eritrea, Africa (Figure 1). The company has just received assay results from diamond drilling (ZARD85-ZARD096) completed last year, which have returned additional significant high grade gold intercepts such as 6m @ 89.62g/t; 4m @ 20.55g/t and 3m @ 34.98g/t. Drilling Highlights: Hole From To Interval Gold (m) (m) (m) (g/t) ZARD085 10 14 4 20.55 37 47 10 6.45 70 73 3 11.30 ZARD086 141 145 4 5.50 ZARD088 17 22 5 7.75 52 58 6 89.62 ZARD089 18 20 2 13.81 36 39 3 5.88 78 80 2 7.84 ZARD091 22.5 29 6.5 7.81 ZARD092 10 12 2 36.34 29 30 1.00 24.18 ZARD094 43 44 1.00 23.15 ZARD095 0 5.5 5.5 3.02 8.5 11.5 3.00 34.98 The mineralisation at the Koka Prospect (Figure 2) has been defined on a 20 metre x 40 metre basis and extends for over 600 metres and remains open along strike. Drill holes ZARD085-96 were infill drill holes from within the 40mx20m grid and were collared in the footwall rocks (Figure 3).

Commenting on these further encouraging results, Sub Sahara Managing Director Mike Griffiths said: This latest batch of drill results has added additional confidence to our gold resource and although these results will not be incorporated in the resource update expected in February, we consider these latest results significant as they clearly indicate the nature of the high grade mineralisation anticipated in the deposit. The strong results received to-date from our exploration drilling of the Zara project coupled with the news late last year that the Eritrean government approved its first mining application, are all tangible signs that point to Eritrea becoming a gold producer in the near future. We are therefore very confident this project will eventually achieve the board s long term objective of reaching production. Table 1: Significant Koka Prospect Diamond Drill Assay Intercepts: Hole Depth North East Azimuth Dip From To Interval Gold (m) (UTM) (UTM) ( ) ( ) (m) (m) (m) (g/t) ZARD085 129.00 1,824,310 390,255 102-50 10 14 4 20.55 21 23 2 8.69 37 47 10 6.45 53 54 1 4.06 70 73 3 11.30 ZARD086 247.50 1,824,449 390158 102-52 141 145 4 5.50 177 180 3 1.90 ZARD088 105.00 1,824,229 390,240 102-50 9 12 3 1.31 17 22 5 7.75 33 34 1 4.55 41 42 1 4.55 52 58 6 89.62 81 83 2 2.66 88 89 1 16.01 ZARD089 117.50 1,824,266 390,244 102-50 14 15 1 4.24 18 20 2 13.81 24 25 1 3.17 36 39 3 5.88 45 46 1 3.77 56 57 1 11.33 78 80 2 7.84 86 87 1 2.36 92 93 1 2.90 ZARD090 17.00 1,824,386 390,268 102-50 0 3 3 1.38 ZARD091 30.00 1,824,384 390,272 102-50 22.5 29 6.5 7.81 ZARD092 129.60 1,824,347 390,268 102-50 10 12 2 36.34 29 30 1.00 24.18 ZARD094 90.60 1,824,381 390,287 102-50 43 44 1.00 23.15 ZARD095 122.75 1,824,384 390,265 102-50 0 5.5 5.5 3.02 8.5 11.5 3.00 34.98 41 42 1.00 7.5 2

Note: The metres quoted are down hole metres and gold grades are uncut with up to 2 metres of internal dilution (<0.25g/t gold). All samples are prepared at the Africa Horn Laboratory in Asmara, Eritrea and then analysed by Genalysis Laboratories in Perth, Western Australia. There were no assays >1.00g/t in drill hole ZARD087. Drill hole ZARD093 and ZARD096 were abandoned due to excessive deviations and were not sampled. Drill holes ZARD90 and ZARD091, (collared at the same location) were abandoned due to poor ground conditions and were successfully re-drilled as ZARD095. Further drill results will be released as they are received by the company. About the Zara Gold Project The Zara Joint Venture comprises a single license covering an area of 196km2 situated in northern Eritrea, approximately 160km northwest of Asmara city (Figure 1). Sub- Sahara has earned a 69% interest in the project. The Koka Gold deposit within the project contains an inferred resource of 760,000 ozs gold from 7million tonnes of ore, grading 3.4g/t gold, and current drilling continues to expand and enhance this resource. Initial metallurgical test work indicates +95% recovery after 24 hours gravity/cyanidation. On application for a mining license, the Eritrean Government is entitled to a 10% free carried interest. Furthermore, the Government has the right, by agreement, to a 30% equity participation interest in any mining project and up to a 5% royalty on mined precious metals. For and on behalf of Sub-Sahara Resources NL Web site: www.subsahara.com.au M.R. Griffiths Managing Director About Sub-Sahara Sub-Sahara Resources is an ASX listed company (ASX: SBS) with interests in a number of highly prospective and rapidly expanding African projects, including the Nyanzaga joint venture with Barrick Gold, Lake Victoria joint venture with Currie Rose Resources and the Nyakufuru joint venture with Resolute Mining (all in Tanzania) and the Zara joint venture in Eritrea. FOR FURTHER INFORMATION: Michael Griffiths, Managing Director Sub-Sahara Resources enquiries@subsahara.com.au Ph: +61 8 9227 3260 Jill Thomas Professional Public Relations (WA) jthomas@pprwa.com.au Ph: +61 8 9388 0944 Competent person statement The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr M R Griffiths, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Griffiths is a full-time employee of Sub-Sahara Resources NL. Mr Griffiths has 3

sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Griffiths consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Figure 1: Zara Project Location Map 4

Figure 2: Koka Drill Hole Location Plan 5

Figure 3: Koka Cross-Section - 6