A structuring public transport project for Cape Town Inner City

Similar documents
Airport Planning Area

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

Magnetic Heart of Queensland

Public Informational Meeting

Lansdowne Wetton BRT Public Transport Corridor Trunk Route: Planning Analysis

5 Rail demand in Western Sydney

3 The growth of Western Sydney

Sharing the Way with Sustainable Transport Options

PCAL Case Study Retail Areas: Rouse Hill Town Centre

CONNECT WORKSHOP MANCHESTER NOVEMBER 9, 2005

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY


AirRail Africa 2016 Conference Planning for Rail Connections to CTIA and KSIA

Bus Corridor Service Options

284,557 inhabitants + 23% 60,000 vehicles during peak periods Growing need in terms of moving people public transit Saturation of the road network

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

COMMUTING MASS TRANSPORT CALCULATOR GUIDE Version 1.0

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017

Jess Linn Principal Planner, Development Services Division Miami-Dade Regulatory and Economic Resources

Figure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct.

ESPACE DES ONG / NGO SPACE 39 e session de la Conférence générale / 39 th session of the General Conference

CRITICAL FACTORS FOR THE DEVELOPMENT OF AIRPORT CITIES. Mauro Peneda, Prof. Rosário Macário AIRDEV Seminar IST, 20 October 2011

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

Community Transit Solutions for the Suburbs CTAA Expo June 2014

This report recommends two new TTC transit services in southwest Toronto.

Driving Ridership Strategic Partnerships

RW Bruhn Bridge and Approaches Project

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

TERMINAL DEVELOPMENT PLAN

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN APRIL 25, 2018

4. Proposed Transit Improvements

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building

Tourism Satellite Accounts : The Demand Perspective

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

Corridor Analysis. Corridor Objectives and Strategies Express Local Limited Stop Overlay on Local Service 1 Deadhead

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Union Station Queens Quay Transit Link Study

1 Introduction 2 2 Acknowledgements 2 3 Differences between Green Star SA rating tools 2 4 About the Calculator 2 5 How to Use the Calculator 2

THE ECONOMIC IMPACTS OF AIRPORTS

Auckland Port and the Unitary Plan Dr Douglas Fairgray

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

Draft City Centre Transport Proposals

Khon Kaen Light Rail Transit

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

Northern Beaches Transport Action Plan

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

3. Proposed Midwest Regional Rail System

Australian Journal of Basic and Applied Sciences. Why to Introduce Flat Fare System in Janmarg, Ahmedabad, Gujarat A Case Study

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

Northwest Corridor Transit Study

Ridership Growth Strategy (RGS) Status Update

Sustainable Urban Development. Presentation to WVCC 1 December 2010

Western Sydney Australia's development site

The Coalition s Policy

VICTORIA IN FUTURE Population 5.5 million Population 10 million. Deaths 2 million. Births 3.8 million. Natural increase 1.

DEMOGRAPHICS AND EXISTING SERVICE

Transit Fare Review Phase 2 Discussion Guide

Why the. Building for growth. West Metro. is vital

Caroline County / King George County Transit Studies. Meeting November 1, 2017

Penzance Heliport Ltd.

SAMTRANS TITLE VI STANDARDS AND POLICIES

The Atlanta Streetcar: Laying the Tracks for a Better Future

Public Transit Services on NH 120 Claremont - Lebanon

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

TOURISM DEVELOPMENT PROJECTS. CARIBBEAN COAST Ministry of Tourism

Westbrook Station. Transit Oriented Development Opportunity

PERTH CITY SWAN PERTH AIRPORT CURTIN UNIVERSITY WESTFIELD CAROUSEL TANGNEY CITY OF CANNING JANDAKOT AIRPORT SWAN TANGNEY

2016 Regional Transportation Alternatives Program (TAP) Grant Application

Borders Railway - Scottish Borders Work Plan

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

DRT Performance Measurement: the U.S. Experience

2.0 Miami-Dade Transit System Overview

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards

Household Travel Survey Overview

Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld

1. Acting Deputy City Manager s report, Planning and Infrastructure, dated 23 June 2015 (ACS2015-PAI-INF-0003).

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

CORPORATE ACCOMMODATION SOLUTIONS

INFORMATION ONLY. Subject: Metrolinx Presentation Date: June 22, 2015

Recreational Services Plan. Gatineau Park. Phase 1: Planning Framework

Olivier Badard Senior Vice-President, Asia, Middle East & North Africa, Urban Mobility Forum- Cairo

IMPACT HOMES Introducing The Meadows Estate 3

CANNING CITY CENTRE. the new energy of the southeast

V&A Waterfront Economic Contribution. HEADLINE FINDINGS: January 2015 for the period April 2012 to March 2014

This report recommends routing changes resulting from the Junction Area Study.

TOURISM DEVELOPMENT PROJECTS CARIBBEAN COAST. Ministry of Tourism

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

EXECUTIVE DIRECTOR. The Potomac Rappahannock Transportation Commission is seeking an ABOUT THE ORGANIZATION

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

GENERAL PRESENTATION Corporate & Project

Attachment 1 PARK & RIDE GUIDELINES

INTER-MOBILITY AS A ROLL FOR URBAN (RE) DEVELOPMENT OF BELGRADE PUBLIC SPACE AREAS - BETWEEN MOBILITY AND SUSTAINABILLITY IN CASE OF BELGRADE

investment ProSPeCTuS 2016 SuMMary

Transcription:

A structuring public transport project for Cape Town Inner City Dave EADIE Transport, Roads & Storm Water Directorate / City of Cape Town South Africa Pierre LABORDE Thales Engineering & Consulting France ABSTRACT : A structuring public transport project is considered for the Inner City of Cape Town, with a fixed track system (as an LRT), street running and linking along.5 km CBD the Historical centre, the Central Business District (CBD) to the V & A Waterfront, where offices, retails and entertainment installations are currently under development. It will be a vital trunk line for the CBD activities, coherent with the «Moving South Africa» recommendations, elaborated at the national, regional and local level. It may be the first stage of a the main Inner City public transport network, extending services particularly to new housing zones as District Six and Culemborg. This new LRT line will complement the metropolitan network (railways, buses and minibuses) offering good transboarding conditions at Cape Town Central Station. The lay-out, the stations location and the served areas give to the project a great number Waterfront of transport functionalities interesting a wide range of potential users: commuters mainly during peak hours, employees and business men near midday, tourists and conference delegates all along the day. Considering the commercial and operational perspectives, it seems convenient to implement the project in a Triple P scheme. RESUME : Un Transport Collectif structurant de surface est envisagé pour la Ville - Centre du Cap (Afrique du Sud). En site propre sur.5 km, il reliera le centre historique, le Central Business District (CBD) au V & A Waterfront, zone de bureaux, commerces, restaurants et point fort d attraction touristique en front de mer. En accord avec les orientations «Moving South Africa», élaborées au niveau national, régional et local, il trace un axe vital pour les activités du CBD. Il constituera le premier maillon d un réseau principal de transport de la Ville Centre du Cap qui permettrait à terme d atteindre de nouveaux quartiers d habitat (District Six et Culemborg). Cette ligne nouvelle assurera de plus un relais local pour le réseau métropolitain (Chemin de fer, Bus et Minibus) qui aboutit au pôle intermodal «Central Station». Le tracé, les stations, et les secteurs desservis apportent à la ligne de nombreuses fonctionnalités transport intéressant un grand éventail d usagers: commuters voyageant aux pointes, hommes d affaires et employés en mi-journée, touristes et congressistes à tout moment. Vu les perspectives commerciales d exploitation, le projet peut s envisager dans le cadre d un Partenariat Public Privé. FRAMEWORK OF THE PROJECT The Inner City of Cape Town represents 0% of the Cape Metropolitan territory, % of its population, and 0% of total job opportunities are located here leading to large daily flows of commuters. About 9 000 inhabitants currently live in the Inner City of Cape Town that provides more than 00 000 jobs. The Central Business District is only dedicated to offices and commercial areas; it concentrates almost half of the employment opportunities of the Inner City. Cape Town Inner City: from Sea to Mountain Along seaside: Harbour, V & A Waterfront, Green Point and Sea Point In Mountain side: Woodstock, District Six, Central Business District (CBD) and City Bowl For the short term, numerous urban development operations will be realised within the Inner City, bringing a total of 45 000 sq. meters of floor area for offices and retails activities, 00 new accommodation rooms and more than 600 residential units.

New developments between CBD & Waterfront 5 4 6 Culemborg Clock Tower V&A Waterfront new area Roggebaï Canal, 4 Convention Centre 5 Power Station, 6 Naspers The medium term planned developments are mainly localised on the east side of the Inner City, at District Six and Woodstock (Culemborg), with a foreseen housing program that will deeply impact the urban structure. About 00 000 sq. meters are considered for the year 05 including residential units, offices, retails and public facilities. It is assumed that by the year 05 the Inner City will have a population of 50 000 inhabitants and will provide more than 60 000 jobs. Studies carried out on behalf of the City of Cape Town have indicated that there is a need to improve the public transport system within the Central Business District (CBD). The Inner City Transport Study, commissioned in 996, recommended the installation of a high-quality bus system or a light rail transport system. It also recommended that the public transport system should provide a link between the CBD and the V&A Waterfront. In 00 00 a feasibility and preliminary design study leaded to define a priority public transport route serving the CBD and the V&A Waterfront, and secondly allowed to prepare the major basic specifications of the transport system and infrastructure which would serve such a public transport route: This project is in concordance with a wider transport plan for the whole area and is conceived in relation to those services that link the CBD to the outer regions. It is forming part of a global scheme that will take in private vehicles, all forms of public transport and parking (a global transport plan with an associated traffic management plan). CBD V & A Waterfront link Sea Point CBD Corridor Culemborg & District Six Corridor This project will serve as the embryo of a public transport program for the City. The potential need to expand the system in order to serve districts adjacent to the CBD, bearing in mind the increasing flow of traffic to and from the CBD, has been borne in mind when designing the system. PROJECT DESCRIPTION The Priority Public Transport Project will provide a structured transport system that improves travel within the CBD. The project has been defined in the context of a general consideration of travel needs in the short and medium-terms (transfers between transport systems and the traffic management plan associated with the project). After a multi criteria evaluation a provisional reference route has been selected, including some possible options of itinerary and terminal points. It is envisaged that the priority public transport route will run from the Cape Town historical centre (Gardens station) to the Clock Tower precinct in the Waterfront, via Central railway station in the CBD and the International Convention Centre to be established on Cape Town's Foreshore. The new system will need to be affordable and will need to meet the specific requirements of the site. The route will serve the needs of workers, the general public, business people, tourists and conference delegates. The lay - out of the LRT Project Inner City Public Transport network Medium term scheme

Passengers alighting per period, per catego 4 5 6 7 Clock Tower, Dock Roggebaï Canal, 4 Convention Centre 5 Hans Strijdom, 6 Central Station 7 Gardens Station The pre-selection of the appropriate transport system range has been done comparing: No-guided Transit systems, Light Rail Transit systems Potential trip demand along the corridor, Attractiveness of the feasible route and stations location, Accessibility for users (including for park & ride or kiss & ride), Quality of service, in terms of commercial speed, punctuality, comfort Interconnection possibilities (existing or future) for passengers riding in all the public transport routes running in the Inner City and stopping at the terminals, Impacts along the transport corridor to be served (buildings and constructions), traffic management plan, road intersections, townscaping, System performance, concerning Safety, Maintainability, Availability, Reliability, Testability (SMART) Investment per kilometre and operating cost per passenger transported The Base Case Project will run, with priority on traffic, on.5 km between the City centre and Clock Tower precinct. It will offer: a great accessibility, at-grade with an average interstation distance of 40 m approximately, a short headway (5 minutes between two successive vehicles) a very efficient and attractive commercial speed (estimated at kph). Rubber-tyred and Guided Transit systems SPECIFICITY OF THE LRT LINE Fully segregated Transit systems Due to the traffic demand level, the necessary accessibility and availability of the vehicle at stations, and the economical constraints for the profitability of the investment, the selected system has been an at - grade light transit system. An at - grade light transit system is proposed with fixed track and electrical power supply A fixed track transport system, electrically propelled, which may be on rails or with rubber-tyred vehicle, results to be the appropriate solution along the corridor. This proposal, based on a preliminary design of all the components of the project, is coherent with the main issues of the transport system: The priority public link between the CBD and the Waterfront area will serve the needs of workers, the general public, business people, tourists and conference delegates. In that way it will be a very multifunctional and structuring public transport route. 50 000 750 500 50 000 750 500 50 000 During a weekday: Commuters and No - Commuters 750 500 50 0 LRT Ridership along the day: Base Case Project, Central prediction - 004 0 to 5 5 to 7 7 8 9 0 4 5 6 7 8 9 to 4 Hours and Periods Commuters No-Commuters Total Ridership will use the future LRT line :Commuters :No-commuters :Total ridership

. A feeder line for many commuters During peak hours, many commuters living in peripheral areas out of the Inner City and working in the CBD need connection with a local public transport network. The light rail line, with one of its stations close to Cape Town Central railway station, will offer good possibilities of connection. Most of the commuters interested by the project will be those travelling from (or to) zones located out of the CBD, and in many cases out of the Inner City: they will travel either in trains, or in buses and minibuses, paying for that a specific long distance fare. The service quality of the LRT line with exclusive priority all along the route will be very above the service quality of the current bus line between Waterfront and Central station. During peak hours, many commuters. A structuring line for local transport flows The priority public transport link between the CBD and the Waterfront has a lot of winning cards for attracting a maximum of users all along the day: It will serve different points of the City centre and CBD with four stations (including the International Convention Centre station) and link them to the new Waterfront developments with the Roggebaï canal area and finally the Clock Tower precinct; The route is offering also many possibilities of connection with public transport terminals, routes and also with a great number of car parking areas or buildings; It will run, in the CBD, along major streets and avenues where there are a lot of points of interest generating pedestrian flows all the day, Many other users will board the LRT line, will use the future LRT line Paying additionally an average fare estimated at R.50 per trip (in January 00, Euro = 0 rands), it will be possible for many of the commuters to board on the light rail vehicle and go on that future feeding line. This may be the opportunity for the public transport network to start the development of a fare integration system: at present there is not any policy allowing such the implementation of such integration. Currently very important pedestrian flows are observed on the morning and at afternoon peak hours between Central Railway station and the Dock and Waterfront areas. A lot of commuting passengers are also boarding during the same periods the bus line and the minibus services linking Waterfront to CBD: the fare paid by one commuter is varying between R.80 per trip (Golden Arrows bus line) and R.5 per trip (minibus fare for short distance). as business people, tourists and conference delegates After the morning peak hour, and until the evening hours, the no commuting users will be interested by the LRT service for secondary trips. The price paid will be associated to shopping, business, tourism and entertainment. The no commuters will use the LRT in place of walking, riding on metered taxi, or using their private car for very short distance. Government avenue

4 IMPLEMENTATION SCHEME The characteristics of the project, particularly the commercial viability of the LRT operation on this corridor, make it possible to develop it via a Public Private - Partnership: this will be probably a Triple P project. Public Authority Concessionnaire Gardens Station will be at 00 m Lenders These trips will be occasional trips for which the trip time value is similar to time value of private car users. Considering these characteristics and the performances of the LRT line, an average price between R5.00 and R6.00 per trip is considered as very acceptable for these users. By using the LRT line, some private car users that want to go at midday from the CBD to the Clock Tower precinct and to Waterfront area will have the opportunity to save time and energies. Two main indicators may resume the commercial viability: The forecasted rate of passengers alighting per LRT km. is.4: this high level is corresponding to the location of the route in the centre of the Inner City, and to the intense trips demand market between the Historical Centre, the CBD, the Foreshore and the Waterfront area.. Public Transport for Saturdays and Sundays The service will be operated on Saturdays and Sundays, all the stations along the route offering during these days a lot of attractive activities for all type of people. The ridership estimated for the line has been estimated conservatively at 67% of a weekday ridership for Saturday and at 5% for Sunday. Ridership (004) Monday Friday Saturday Sunday Commuters 979 45 6 No-commuters 9 45 78 9 897 Ridership 404 5 07 59 The estimated relation between the annual income and a weekday income (Monday to Friday) is a rate of 0. This elevated rate is explained by the fact that during Saturdays and Sundays the proportion of no commuters is high and there is a lot of activities for shopping, entertainment in the Waterfront and Foreshore areas.

Adderley Street in the City Centre of Cape Town: before 940 and in 00