THE TOBU KYURYO LINE (POPULAR NAME:LINIMO) A MAGNETIC LEVITATION SYSTEM

Similar documents
TRANSPORT INFRASTRUCTURE

2008 OCEA Award (Outstanding Civil Engineering Achievement Award)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Quality Transport - Key to enhance Connectivity and Sustainability -

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Aims and Developments in Osaka World Expo Bid. Contents

Parallel Deployment of Superconducting Maglev on the Chuo Shinkansen and the Northeast Corridor

Working Across political Boundaries to Realize Quality Infrastructure Investment -Case of Japan-

Guidelines for Evaluation of Quality Control for Manufacturing

Construction of Ueno Tokyo Line

Construction Staging Adelaide Street West

The 2005 World Exposition, Aichi, Japan Observations and Analysis By Gordon Linden

TRANSPORTATION PLANNING AND LOCAL RESIDENTS' EXPECTATIONS IN LESS DEVELOPED AREAS IN JAPAN

San yo main line. Sannomiya. Boeki Center Port Terminal. Japan Railway & Transport Review 46 Dec

First Half of FY2009 ended September 30, 2008 Financial Results Presentation. -- Keihan Group in Recent Months --

Daily Estimation of Passenger Flow in Large and Complicated Urban Railway Network. Shuichi Myojo. Railway Technical Research Institute, Tokyo, Japan

G September 27, 2005

9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE

Railway Master Plan in Tokyo (2016)

Phoenix Sky Harbor transit guideway bridge

An Incentives Guide to BUSINESS IN NAGOYA

Background of the project

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

Guidance for Usage of Issue Papers

Japan Railways Successful Financing Models

Sino-European Sustainable Urbanisation Park (SUP)

MAGAGINE [CONTENTS, FEBRUARY 2017]

Concrete Visions for a Multi-Level Governance, 7-8 December Paper for the Workshop Local Governance in a Global Era In Search of

Planning and development of urban transportation system Experience from Tokyo

BNA Master Plan Update Public Meeting No. 2

RESTORATIONS AND SYSTEM INTERACTIONS OF LIFELINES IN THE GREAT EAST JAPAN EARTHQUAKE DISASTER, 2011

Feature: Priority Initiative 01 Railway Network Expansion

Basic Idea Regarding the Selection of Cruise Ship Liners. to have a Partnership with the Naha Port Authority on a

Comparison of Bangkok & Kuala Lumpur

5.7 Local road upgrades

Toward More Competitive Economy and Society

West Nagoya Walking Tour

Mitsubishi Estate Announces Participation in Melbourne Quarter East Tower Development Project in Australia

Financing for Regional Economic Integration in NEA: Infrastruct ure, Resources and Capital Mobilization Nihon Univ, Tokyo May 11-12, 2011

High Speed Rail & SHINKANSEN Nobukazu NAGAI Railway Bureau, MLIT May 11, 2015

Main Features of the Development. landmark. Directly accessible from Bashamichi Station, just one minute away on foot.

Toward Japan-US Infrastructure Cooperation

50th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS, Bangkok, Thailand, 1 4 July 2013

Additional Economic Development Strategy submissions- Klickitat County

Inside Government Conference Case Study: Norwich Northern Distributor Road

Yosuke TAKADA. Institution for Transport Policy Studies High Speed Rail Seminar in India, Jan. 13, 2012

Japan Society of Civil Engineers

SAPPORO: CAPITAL OF TEXAS?

Financial Status of Aichi Prefecture

INTER-MOBILITY AS A ROLL FOR URBAN (RE) DEVELOPMENT OF BELGRADE PUBLIC SPACE AREAS - BETWEEN MOBILITY AND SUSTAINABILLITY IN CASE OF BELGRADE

Hospital Link Project Project Update September 2015

Response to the London Heathrow Airport Expansion Public Consultation

Coming to Osaka JAPANAN. Pocket Guide for International Students and Scholars OSAKA UNIVERSITY

Shopping Mall Business in Japan

International Symposium

TERMINAL DEVELOPMENT PLAN

Financial Status of Aichi Prefecture

Quality Infrastructure Investment

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

ANA Reports Record Profits for FY2012

Sale of Ten Hotel Assets to Ichigo Hotel REIT

Project Advisory Group. May 23, 2013

The City of Hiroshima

SUMMER TRAINING PROGRAM AT NAGOYA UNIVERSITY. Frequently Asked Questions

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Welcome. Green Line in Your Community

JCAB Circular No

Date: 11/6/15. Total Passengers

Announcing the Box Hill Project (provisional name) First Large-Scale Residential Housing Joint Development Project in New South Wales, Australia

Airport Planning Area

Makoto Watabe Professor of Environment and Information, Keio University, 'L-25-5 Tokiwadai Itabashi-Ku, Tokyo, Japan

Setting the Stage for an Independent and Vibrant Life

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

Outline of Proposal for Program A (No Program B currently)

The Asian evolution of high speed rail

Provincial Railway Technical Standards

Efforts and Inter-City Partnership of FutureCity Yokohama

MARQUEE IN THE NEW RAILWAY STATION OF MALAGA

TORONTO TRANSIT COMMISSION REPORT NO.

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Ministry of Land, Infrastructure, Transport and Tourism. Civil Aviation Bureau. Improvements in Business Aviation in Japan

THE WORLD BANK Washington, DC

Downtown Office Building for Sale Owner/user Opportunity - Reduced Price $2,700, E Street Santa Rosa CA

Att. A, AI 46, 11/9/17

Diverging Technologies Aiming for Zero Environmental Impact

Update on the Thameslink programme

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

Improvements for Business Aviation in Japan

Research on Flight Operational Efficiency for Fuel and Noise

SCOPING INFORMATION PACKET

Ministry of Transportation

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010

Technical Explanation Introduction

Spadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue.

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

Transcription:

THE TOBU KYURYO LINE (POPULAR NAME:LINIMO) A MAGNETIC LEVITATION SYSTEM Yoshio YUYAMA Executive Director, Road Construction Composition of Department of Construction Aichi Prefecture Government 3-1-2, Sannomaru, Naka-ku, Nagoya, 460-8501, Japan Telephone: +81-52-961-2111(Ext.2713) / Fax: +81-52-972-6417 e-mail: dourokensetsu@pref.aichi.lg.jp Abstract The Tobu Kyuryo Line will be Japan s first railway service that adopts a normal conductive system levitated by the attractive power of magnets and propelled by a linear induction motor. This paper describes the background, linear planning, methods and structures and potential effects of the Tobu Kyuryo Line as well as the outline of the 2005 World Exposition, Aichi, Japan. 1 Introduction Nagoya Eastern Hill Region of Aichi Prefecture, where the line is being planned and constructed, was designated as the Aichi Academic Research and Development Zone, featuring ongoing residential areas as well as other cultural and recreational facilities. The area adjacent to Prefectural Highway Chikaraishi-Nagoya Line including the City of Toyota and Nagakute Town, hosts a great number of public and private universities, research institutes and recreational facilities. Overall, the area is being planned to play a key role to the entire zone. The Tobu Kyuryo Line contributes a great deal to vitalization of its adjacent areas as well as serves as an arterial transportation system to the areas. Moreover, the Tobu Kyuryo Line is projected as a transportation artery for visitors to the 2005 World Exposition, Aichi, Japan since the Youth Park Area, a main ground for the Expo, is near the line. The line is also expected to promote global exchanges through its state-of-art magnetic levitation technology for the first practical application in Japan. Figure 1.1: Vehicle 307

2 Aichi Prefecture Aichi Prefecture is located in the center of the Japanese archipelago. It extends 94km from north to south and 106km from east to west. It accounts for about 1.4% of the country or 5,154km 2. It hosts the country s fourth largest population, about 7.13 million, followed by Tokyo, Osaka and Kanagawa Prefecture. Figure 2.1: Location map of Aichi Prefecture Nagoya Urban Area (prefecture capital: City of Nagoya) has contributed a great deal to our economic and social development as one of three main metropolitan areas including Tokyo and Osaka Urban Areas. The prefecture has the headquarters of world s famous Toyota Motor Corporation and has contributed as a core area of industry and technology. In 2005 the prefecture will hold a Japanese international exposition and will open an international hub airport, Chubu International Airport. 3 Nagoya eastern hill region The region is located east of the City of Nagoya and abounds in natural environment. It has hilly terrain, sloping from northeast to southwest. Although in the past it was a sparsely populated farming area, the region has developed as a satellite city for Nagoya Urban Area with ongoing extensive housing development since Japan s high-growth era. This is because it is within 10-15km from the City of Nagoya. The region s population has increased by 14.9% during the past 10 years though the population of entire Nagoya area remains unchanged. Designated as a core district of the Aichi Academic Research and Development Zone of Aichi Prefecture, the region also features many academic institutes including Aichi Prefectural University and public and private research institutes such as Aichi-ken Agricultural Research Center, Toyota Central R & D Labs, etc. as well as recreational facilities including the Aichi Youth Park and Toyota Automobile Museum. In the near future this region will plan to build the Science and Technology Exchange Center. 308

Contrary to these developments, the region has a severe traffic situation although railway services connecting to Nagoya City Center - Nagoya Railway Seto Line in the north and Nagoya Railway Toyota Line in the south - are available. The region lacks a high-speed surface transport system because the previously mentioned railways are over 10km apart. Under these circumstances, the region s main modes of transportation are cars or buses, which cause heavy traffic congestion in main highways including Prefectural Highway Chikaraishi-Nagoya Line, and near Fujigaoka Station of Nagoya City Subway Higashiyama Line. Therefore, it is very important to secure a smooth transportation system to alleviate this traffic congestion and to reinforce the link between the region and Nagoya City Center. A new high-speed surface transport system, connecting between Fujigaoka Subway Station and Banpaku-Yakusa Station of Aichi Loop Railway, is being constructed. Figure 3.1: Transportation network around the Tobu Kyuryo Line 4 Project planning of the Tobu Kyuryo Line 4.1 Background In January 1992 the Council of Transportation Policy projected the Tobu Kyuryo Line to be built as a medium-capacity transport system by target year 2008. Later, the Government of Japan conducted various studies on the line and as these results decided the project as state-subsidized in April 1999. As for a model to select, new transport system, straddle-type monorail and magnetic levitation system were examined in view of their cost performance and adaptability for the concept of the region s development, environment, etc. From the evaluation results, magnetic levitation system was selected as the most suitable. In February 2000, Aichi Rapid Transit Co., Ltd., the operating body of system infrastructures and the Tobu Kyuryo Line, was founded. They started project procedures in line with City-Planning and Zoning Law, Traffic Law and environmental assessment, and completed the procedures by the end of March 2002. The construction work started in 2003. 309

Table 4.1: Background of the Tobu Kyuryo Line 1989-1992 A study was conducted on Technical Evaluation Methods for Magnetic Levitation Railway (Ministry of Transport). The results revealed that HSST-100 system with a maximum operating speed of 100km/h would be safe and reliable enough as a city public transport means. January 1992 The Council of Transportation Policy projected the Tobu Kyuryo Line to be built as a medium-quantity transport system by target year 2008. 1999 The Government of Japan decided the project as state-subsidized. Magnetic levitation system was selected. February 2000 Aichi Rapid Transit Co., Ltd., the operating body of system infrastructure and the Tobu Kyuryo Line, was founded. February 2000 through March 2002 April 2002 March 25 through September 25, 2005 4.2 Outline of the project Aichi Rapid Transit Co., Ltd. conducted various studies and did administrative procedures. Started construction for the entire line. The 2005 World Exposition, Aichi, Japan will be held. Name Tobu Kyuryo Line (Popular Name: Linimo) Route From Fujigaoka (eastern terminal of Nagoya Subway No. 1) to Banpaku-Yakusa (Aichi Loop Railway) Operation length [Construction length] 8.9km [9.15km] Number of stations 9 stations (underground: 1; ground: 1; elevation: 7) Structure Double-track line and elevated (underground) Running method Normal Conductive Magnetic Levitation System Linear induction motor propulsion Maximum Operating Speed 100km/h Capacity 244 /unit (1 unit 3-car) Operation number About 220 units round trip/day (About 20 units round trip/hour at peak) Opening target March 2005 Aichi Prefecture Infrastructure Operating City of Nagoya Body System Infrastructure Aichi Rapid Transit Co., Ltd. (Quasi-public sector) Total About 90 billion yen Project Cost Infrastructure System Infrastructure About 54 billion yen About 36 billion yen 4.3 Linear plan Plane linear is set as a route, which will be built along Prefectural Highway Chikaraishi-Nagoya Line (30m wide; 4-lane) to fit to the road alignment with high-level piers on medians, provided that a curve radius is over 75m. Due to difficulty in securing an introductory space, it will be of underground structure at the starting point. 310

Longitudinal linear is set to fit to road longitude, provided that filling necessary for underground sections and clearance limit under the high-level road are secured, and the maximum slope of the main line is under 6%. Because the region is hilly, the difference in elevation of the rail surface is about 130m. Figure 4.1: Route map of the Tobu Kyuryo Line 4.4 About structures and works of infrastructure 4.4.1 Underground structure Because in the section between Fujigaoka Station and Hanamizuki-dori Station, roads have only a 16m width and are already aligned along adjacent land, underground structure is to be adopted due to difficulty in widening of roads and building of structures. Fujigaoka Station section and crossing sections are to be excavated by the open work. For other sections, tunnel structure of double-circle sections of 6.5m in diameter is to be constructed using double-circle shield tunneling (Figure 4.2). 4.4.2 Gate-shape pier structure An elevated structure, crossing road shoulders, is adopted partly because in the section between Hanamizuki-dori Station and Irigaike-Koen Station, roads has only 20m width and 3.6m by 3.6m rain pipes are buried under the center of the road; and partly because building of piers at the center of roads is difficult. Since shops, offices and hospitals are built along the line, RC floor compound steel rigid-frame box girder structure, using steel gate-shape (Figure 4.3) bridge piers with a 40-50m interval, is adopted taking into consideration surrounding environment, landscape and cost performance. This section also features the adoption of PC well foundation work to the pier foundation. Using this method, cylindrical PC well blocks (3.5m in diameter; 2.5m in height) are pressed for excavation. This method is selected in order to minimize road traffic constraints, noise and vibration because of heavy traffic in the section. 311

Figure4.2 :Cross-section view of underground structure Figure 4.3:Cross-section view of gate-shape pier structure 4.4.3 T-shape bridge pier structure (basic structure) An elevated structure with T-shape (Figure 4.4) pier is mainly adopted between the section from Irigaike-Koen Station to Banpaku-Yakusa Station. Out of the substructure work, cast-in place piles with the All-Caisson work are adopted for foundation work. And for stable ground sites direct foundation work is used. Bridge piers consists mainly of RC structure. However, for sites with piers of about 15-20m height (i.e. the section between Science and Technology Exchange Center Station and Banpaku-Yakusa Station), SRC structure, combining bars and beams, is adopted to make pillar sections slim. Also, pillar section shape is octagonal, considering its visibility and landscape. As for the superstructure work, PC midair floor girder bridges with a 30m span are adopted in normal sites. And RC floor compound steel with a 40-50m span is adopted on special sites, i.e. crossings. 4.4.4 Stations The Tobu Kyuryo Line will have 9 stations, of which can be categorized into underground (Fujigaoka Station), ground (Hanamizuki-dori Station) and elevated (other 7 stations). Of the elevated stations, those built on mediums (Irigaike-Koen, Nagakute-Kosenjou and Science and Toji-Shiryokan-Minami Stations) adopt steel bridge piers of a racket-shape section of the main structure. Geidai-dori, Koen-Nishi, Youth Park and Banpaku-Yakusa Stations are to be built on the south side of Prefectural Highway Chikaraishi-Nagoya Line, and will have RC rigid-frame structure. Also, station squares are to be provided for Nagakute-Kosenjou, Banpaku-Kaijo and Banpaku-Yakusa Stations, considering the region s convenience. There shuttle buses arrives and departs, and spaces for park and ride are provided. 312

Figure 4.4 :Cross-section view of T-shape bridge pier structure Figure 4.5 : Image of Irigaike-Koen Station 5 Project effects The following effects can be achieved through the project of the Tobu Kyuryo Line: Time saving: In Nagoya Eastern Hill Region, introducing the Tobu Kyuryo Line, there is only one bus service available for the region s public transport system. Currently, about 740 Meitetsu buses run roundtrip all day from Fujigaoka Station, the end of Subway Higasiyama Line, to the Tobu Kyuryo Line. Due to traffic congestion in Fujigaoka area, however, it decreases its service quality including punctuality each year. After its opening to traffic, the Tobu Kyuruo Line will shorten a peak travel time of about 40 minutes (from Fujigaoka to Banpaku-Yakusa) down to about 15 minutes. Curbing road congestion: Prefectural Highway Chikaraishi-Nagoya Line is the only arterial highway in the east and west, and has traffic congestion problem with cars from the City of Toyota, the City of Seto, Fujioka Town and the Tomei-Nagoya Interchange. Also, there is traffic congestion all day with buses around Fujigaoka Station. These road congestions are expected to be reduced. Responding to development plans: Although development plan of the region includes land readjustment and transfer of universities, there is only one bus service available for the region s mass transport system. The bus service will not serve for increasing public demands in the near future. A rapid and punctual transport system will be secured to respond to local demands and is expected as an indispensable infrastructure to serve as a central district for the development of the Aichi Academic Research and Development Zone. Alleviating environmental concerns: In view of improvement for global environment and energy resources savings, the line can use clean energy and has an energy saving effect. Also the line is a city transport magnetic levitation linear motor car and has small noise and vibration, which minimize pollution. 313

Transporting visitors for the 2005 World Exposition, Aichi, Japan: As a railway transport artery, the line is projected to transport about 33% of the total projected visitors: 15 million for the 2005 World Exposition, Aichi, Japan. Also, the line is expected as one of the Expo s attractions since it adopts a new system, magnetic levitation. 6 The 2005 World Exposition, Aichi, Japan 6.1 Outline of the 2005 World Exposition, Aichi, Japan On the 15th day of December 2000, the 2005 World Exposition, Aichi, Japan was officially approved and registered by the BIE (the Bureau of International Expositions) to be held in the City of Seto, Nagakute Town and the City of Toyota. In Aichi Prefecture the 2005 World Exposition, Aichi, Japan will be held with its theme, Nature s Wisdom, during a six-month period starting from March 2005. Using all of the experiences, knowledge and wisdoms that the human race has so far acquired, the Exposition of Global Harmony aims at realization of a new form of culture and civilization. This is based on Nature s Wisdom (splendid mechanism and life force in nature). And a 21st century social model will be created through various opinion exchanges with all over the world. Nagakute Town is planned as the main ground for the Exposition of Global Harmony in the Youth Park Area, and the City of Seto will serve as its sub-ground in Seto Area. The Youth Park Area is to be developed as a zone where visitors can experience a grand intercultural symphony from all the participating countries, international organizations, private companies and citizens. An attractive central zone, composed of Global Common, Global House and Global Harmony Concourse, is to be built to enhance the exposition and meet visitors satisfaction. The Youth Park Area accommodates large-scale exhibition sites for various BIE official events and national days of participating countries and a state guesthouse for VIPs from abroad. Title: Official: The 2005 World Exposition, Aichi, Japan Abbreviated: EXPO 2005 Aichi, Japan Theme: Nature s Wisdom Sub-themes: 1) Nature s Matrix 2) Art of Life 3) Development for Eco-Communities Duration: March 25 through September 25, 2005 (185 days) Location: Nagoya Eastern Hills (Nagakute Town, Toyota City, and Seto City) Project cost: Construction cost: 13.5 billion yen Operation expense: 5.5 billion yen Projected number of visitors: 15 million 314

6.2 Access to the Expo 2005 Aichi site JR/Aichi Loop Banpaku Yakusa Sta. 5.4 million 36% Shuttle buses Linimo Railways 8.8 million 59% Cars 6.2 million 41% Subway Nagoya/Sakae Owariseto/Kroza Sta. 1.1 million 8 Passenger cars Chartered buses Fujigaoka Sta. 2.3 million 15% P 3.9 million Linimo Shuttle buses Shuttle buses P 2.3 million EXPO Site 15 million 100% 7 Concluding remarks The Tobu Kyuryo Line of about 9km in total length is being constructed to open to traffic by the opening of the 2005 World Exposition, Aichi, Japan in a three-year construction period. Since the start of the construction, two and a half years have passed safe and sound in cooperation with the Government of Japan, local municipalities and relevant government ministries and agencies. Because the line adopts a new system, enough time for its trial runs is needed and a shorter construction period is expected. The author sincerely hopes that during the 2005 World Exposition, Aichi, Japan, starting from March 25th 2005, visitors will enjoy using the Tobu Kyuryo Line. He would like to acknowledge the assistance, support and efforts of the staff of Aichi Prefecture Government as well as others, and will be glad if this paper is any help to the concerned. 315