SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management)

Similar documents
PROJECT: GROUND/GROUND COM PROJECT.1 Coordinator: South Africa DOMAIN: IIM (Infrastructure & Information Management)

INTERNATIONAL CIVIL AVIATION ORGANIZATION

METEOROLOGY PROJECT.1. Programme Title of the Project Start End

APPENDIX D IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS. Programme Title of the Project Start End

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

Welcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group

INTERNATIONAL CIVIL AVIATION ORGANIZATION

TWELFTH AIR NAVIGATION CONFERENCE

ATFM/CDM ICAO s Perspective

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

2012 Performance Framework AFI

(Presented by the Secretariat)

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

SAMPLE TEMPLATE APPENDIX 3.5C-1

DESCRIPTION OF THE PEER REVIEW CONCEPT

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN (ESAF) REGIONAL OFFICE MEETINGS, SEMINARS AND WORKSHOPS PROGRAMME FOR 2017

TWELFTH AIR NAVIGATION CONFERENCE

MID Region Air Navigation Strategy

(Presented by United States) EXECUTIVE SUMMARY

Special Africa-Indian Ocean Regional Air Navigation Meeting (Durban, South Africa 24 to 29 November 2008) FOLLOW-UP ON ATM RECOMMENDATIONS

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

ICAO ASBU Implementation/ Surveillance and ATS Automation

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN (ESAF) REGIONAL OFFICE MEETINGS, SEMINARS AND WORKSHOPS PROGRAMME FOR 2017

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

Global Operational Data Link Doc 10037

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

ICAO EUR Region Performance Framework

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

GMA Riyadh Global Ministerial Aviation Summit

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

ICAO provisions on data link implementation

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

ICAO GANP Requirements and Evolution

AFI REGIONAL DATA LINK MONITORING AGENCY (DL/CMRA)

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION

The evolving air navigation system and the impact on avionics

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

TWELFTH AIR NAVIGATION CONFERENCE

Block 0 to Block 1 Vaughn Maiolla

INTERNATIONAL CIVIL AVIATION ORGANIZATION. SIXTH MEETING OF DIRECTORS GENERAL OF CIVIL AVIATION (DGCA/6) (Brazzaville, Congo, 2 4 November 2016)

Russian Federation ATM modernization program

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

Global ATM System ~Interoperability and Harmonization ~

International Civil Aviation Organization (ICAO) (May 2015-April 2016) ICAO s support to the New Partnership for Africa s Development (NEPAD)

MET/SG/12-WP/05 REV2-23/11/14

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING

CNS/ATM Systems Interoperability and Harmonization

Benefits of CNS/ATM Implementation for the Region

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Work Programme of ICAO Panels and Study Groups

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

TWELFTH AIR NAVIGATION CONFERENCE

182ND SESSION OF THE COUNCIL

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

EUR/SAM corridor airspace concept

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

CAPSCA Africa Achievements

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

Providing the Context Air Navigation Integrated Work Programme

ASBU Block 0 Implementation and Regional ANPs

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

The Importance of AIM and the Operational Concept

Regional implementation ASBU Bn-AMET

Packaging Tomorrow s Aviation System

Technology Roadmaps. CNS and IM plus Avionics. Vaughn Maiolla. Dakar, Senegal, September 2017

AFI Air Navigation Services Key Performance Indicators

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

The UN Funded ICAO/WHO Ebola Aviation Action Plan project. Chief Aviation Medecine Section/ANB, ICAO Project Manager ICAO - Montreal

TWELFTH AIR NAVIGATION CONFERENCE

The UN Funded ICAO/WHO Ebola Aviation Action Plan project

Welcome to AVI AFRIQUE 2017

Air Traffic & Navigation Services

Safe Skies for Air Navigation over Africa

TWELFTH AIR NAVIGATION CONFERENCE

NAVISAT Middle East & Africa

Aviation safety in Africa, reality and perception

Terms of Reference for a rulemaking task

TWELFTH AIR NAVIGATION CONFERENCE

International Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

QMS for AIS/MAP Service Implementation Workshop

2018 LSSIP Event. ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring

ANNEX 9: MANDATE, DESCRIPTION & LATEST DEVELOPMENTS: MANDATE

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA

Transcription:

SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management) Sub-domain Title of the Start End Aeronautical Communication (COM) (ICAO Facilitator: WACAF/ESAF ROs/CNS Objectives Scope Surveillance : Implementation of Surveillance systems aimed at improving air traffic situational awareness Team Coordinator: Ghana Team Experts (11): Ghana, South Africa, Cameroon, Ghana, Senegal, Nigeria, Mauritania, Seychelles, IATA, ASECNA, Uganda Month/ Year Month/ Year In the framework of the technologies Roadmap for Surveillance defined in the GANP and the AFI strategy, assist States in the implementation of : a) Secondary Surveillance Radar Mode S (SSR) in accordance with the operational requirements of Annex 11, Air Traffic Service, Doc 4444 Procedures for air Navigation services and the provision of Annex 10 Volume IV and its supporting Documents b) Automatic Dependent Surveillance Contract (ADS-C) c) Automatic Dependent Surveillance Broadcast (ADS-B) ground and space based d) Multilateration (Mlat) The provision of air traffic surveillance will cover all areas of routing and homogeneous traffic flow in the AFI Region and will adress all Centers involved in the provision of air avigation service for international civil aviation. The implementation scheme will be in accordance with the requirements of the provision of Aeronautical surveillance as defined by the AFI Air Navigation Plan (AFI/RAN Abuja 1997).

Sub-domain Title of the Start End a) SSR: Metrics Number of SSR stations installed: X - Average availability of SSR stations : X% b) ADS-C: Number of ADS-C systems installed: X - % of ATS units with ADS-C: X% Number of ADS-C interconnections implemented, - % of ACCs with ADS-C systems interconnection implemented: X c) ADS-B: Number of ADS-B stations installed: X - % of ATS units with ADS-B: X% d) Mlat: Number of Mlat systems installed: X - % of ATS units with Mlat: X% Number of Mlat interconnections implemented, - % of ACCs with Mlat systems interconnection implemented: X Outcome Strategy Justification Surveillance service supporting enhanced aeronautical operational safety, capacity and efficiency All tasks will be carried out by SUR experts nominated by AFI States participating in the project, led by the -Team Coordinator and under the supervision of the Facilitators (ROs/CNS, Dakar and Nairobi) through the IIM SG working methodology. Upon completion of the tasks, the results will be sent to the Facilitators as a final document for submission to, and if necessary approval by the APIRG s Coordination Committee (APCC). For the purpose of collaborative decision-making, meetings will be held with the areas involved. The requirements for surveillance systems (SSR Mode S, ADS-C, ADS-B, Mlat) are contained in the strategy of implementation of the surveillance systems in the AFI Region a) SSR Mode S: In continental airspace the provision of SSR Mode S will give the Air Traffic Centers the capacity to increase the surveillance of air traffic enhancing safety, capacity and efficiency b) ADS-C: The introduction of ADS-C in oceanic and continental remote airspaces will improve air navigation service by enabling the improvement of the space organization, the flexibility of routing. c) ADS-B: The introduction of ADS-B in continental airspace will provide the same level of service as given by SSR with cost effectiveness. ADS-B Space will combine the advantage of both ADS-C and SSR. d) Mlat: The introduction of Mlat will in the terminal areas supplement with cost effectiveness SSR Mode S

Sub-domain Title of the Start End Related s Deliverables Implementation of SSR Mode S Restauration/Improvement of the availability of SSR Systems All APIRG projects specifically related to: PIA3-Increased effectiveness of ground based safety nets (B0-ASUR, B0 SNET, B0-ASEP) PIA4- Efficient Flight Path Through Trajectory-based Operations (B0- TBO) Relationship with the Regional Performance- Objectives (RPOs/PFFs) and ASBU Modules KPI Responsible Secondary Surveillance Radar Mode S (SSR) Team Team Automatic Dependant Surveillance Contract (ADS-C) Status of Implementation 1 Date of Delivery December 2017 December 2017 Comments Implementation of ADS-C Improvement of the availability of ADS-C Systems Team Team Automatic Dependant Surveillance Broadcast (ADS-B)

Sub-domain Title of the Start End Implementation of ADS-B Implementation of Mlat Implement Performance Based Surveillance (PBS) based on the Required Surveillance Performance (RSP) Implementation of Surveillance Data Fusion (data sharing) Teleconferences, Workshops/Seminars, meetings (French and English) on surveillance systems operation and their implementation scheme Assessment/Reporting on the operation of Surveillance systems and operation AFI Multilatération General SUR Team Team Team Team Team AFI COM Team

Sub-domain Title of the Start End Detailed guidance provided to States not complying with the AFI SUR Strategy List of States with Surveillance systems implemented Resources needed AFI AFI Team Team Adequate human ressouces to be appointed by States Funds to conduct meetings, Workshops, Seminars Missions and to translate reports, regional guides and manuals. Likewise, participants must be given facilities to participate in teleconferences and coordination meetings. Funds for meetings with project Team Members in order to assess the results and propose corrective actions. States could use their human resources to conduct the foreseen SUR tests and monitoring, and, if necessary, cover the financial costs, since the experience gained will result in an improvement of their own systems. 1 Grey Task not started yet Green Activity being implemented as scheduled Yellow Activity started with some delay, but will be implemented on time Red Activity not implemented on time; mitigation measures are required