FAQ: HR 799 & S. 403: North Country National Scenic Trail Route Adjustment Act

Similar documents
Continental Divide National Scenic Trail Legislative History and Planning Guidance

Vision Statement. The NCTA will. develop a corridor of consistently and clearly marked treadways, blending with local character acte appropriate.

2014 World Trail Conference. Developing And Administering Cross Boundary Trails. Laura Belleville Director of Conservation

APPENDIX A1. NATIONAL TRAILS SYSTEM

Hermosa Area Preservation The Colorado Trail Foundation 4/11/2008

RUSHMORE CONNECTOR TRAIL PROPOSAL

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

NATIONAL PARK SERVICE CERTIFICATION OF COMPLETED SEGMENTS OF THE NORTH COUNTRY NATIONAL SCENIC TRAIL

Appendix 7 Local Green Spaces - Detailed Evidence

TOURISM SPENDING IN ALGONQUIN PROVINCIAL PARK

Purpose of tonight s presentation. The North Country Trail in ND, MN, and WI: what's new in our neighborhood on the nation's longest hiking trail?

National Wilderness Steering Committee

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

WEKIVA WILD AND SCENIC RIVER ACT OF 2000

Greater Minnesota Regional Parks and Trails Commission Designation Application

communication tower means a tower or structure built to support equipment used to transmit communication signals;

Cascade River State Park Management Plan Amendment

Trails and Towers El Camino Real and the Verde Power Line in Santa Fe County

MEMORANDUM OF UNDERSTANDING for the APPALACHIAN NATIONAL SCENIC TRAIL in the STATE OF NEW JERSEY

A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION

2016 Trails Maintenance and Operating Costs

Environment and Natural Resources Trust Fund (ENRTF) M.L ENRTF Work Plan (Main Document)

Segment 2: La Crescent to Miller s Corner

White Mountain National Forest Saco Ranger District

S Central Coast Heritage Protection Act APRIL 21, 2016

Worksheet: Resolving Trail Use(r) Conflict March 27, 2010

Bridge District Board of Directors Meeting

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

EMERY COUNTY PUBLIC LAND MANAGEMENT ACT OF 2018 S. 2809/H.R. 5727

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET

Securing Permanent Protection for Public Land

Facilitating Long-Distance Travel On the Ice Age National Scenic Trail. (a.k.a. End-to-End Trail Marking)

ADVENTURE PLAN EXPLORE PARK

Environment and Natural Resources Trust Fund 2014 Request for Proposals (RFP)

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP)

Heritage Tourism { Benefits and Challenges for Municipalities

Introducing the Lower Connecticut River Valley Trail

2014 LEGISLATIVE AGENDA

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

1. The purpose of this report is to seek the Works, Traffic and Environment Committee s recommendation for:

Roduner Ranch FOR SALE. 5,878± Acres Potential Development Land. Merced County, California. Offices Serving The Central Valley

Wallace Falls State Park Classification and Management Planning Stage 3 Preliminary Recommendations July 18, 2018 Sultan City Hall

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts

HOW TO OPERATE A PRODUCT DEVELOPMENT FAMILIARIZATION TOUR MANUAL FINAL REPORT FOR DEPARTMENT OF TOURISM & CULTURE

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

AAAE Rates and Charges Workshop Air Service Incentive Programs. Thomas R. Devine KAPLAN KIRSCH & ROCKWELL LLP October 2, 2012

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

H. R IN THE HOUSE OF REPRESENTATIVES

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE

I. PREFACE II. THE PARTNERSHIP

Inholdings within Wilderness: Legal Foundations, Problems, and Solutions

The National Historic Trail System

El Al Israel Airlines announced today its financial results for the second quarter and the first half of 2017.

LIFETIME SERVICE AWARD NOMINEE SAM H. POWELL

Snowmobile Connectors Are Disconnected

National Park Service U.S. Department of the Interior

Restore and implement protected status that is equivalent, or better than what was lost during the mid-1990 s

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

April 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark,

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Wilderness Areas Designated by the White Pine County bill

13.1 REGIONAL TOURISM ISSUES AND SUMMARY OF FINDINGS

Florida National Scenic Trail 5-Year Strategic Plan. Barbara Bowen

PROTECT Outlines Vision for Forest Preserve Classification of 69,000 Acres of former Finch/TNC Lands to be Purchased by the State

AN ACT (S. B. 1437) (No ) (Approved December 1, 2010)

Crystal Spring SNA. Washington County N W N W N W N W N W92 45.

Draft Executive Summary

Tracy Ridge Shared Use Trails and Plan Amendment Project

Adventure Tourism Management Plan. Adventure Tourism Intensive Use Sites MANAGEMENT PLAN

HUNTLY MULTI SPORTS HUB: FEASIBILITY STUDY

Northeast Quadrant Distinctive Features

Tabor Mountain Recreation Society Who We Are What We Do Regional Park The Ask. Photo by Ken Hodges

Pacific Northwest National Scenic Trail. USDA-Forest Service Pacific Northwest and Northern Regions April 2014

Non-motorized Trail Plan & Proposal. August 8, 2014

AIRPORT SPONSORSHIP POLICY

TONGASS NATIONAL FOREST

Agreement Between the West Somerset Railway PLC and the West Somerset Steam Railway Trust Ltd

INFORMATION NOTICE 15-2 Limited & Excluded Lands

Establishing a National Urban Park in the Rouge Valley

Decision Memo Ice Age Trail Improvement (CRAC 37)

Half Year F1 Results. November 4, 2015

LOCAL PLAN FOR THE MANAGEMENT OF THE APPALACHIAN TRAIL IN MAINE. (GRAFTON NOTCH TO KATAHDIN) 1 January 2013 (Revised 5 February 2014)

OMINEACA PROVINCIAL PARK

Scenes from the Border Route Trail. Where is the BRT?

Steps in the Management Planning Process

Proposed National Marine Conservation Area Reserve Southern Strait of Georgia PROJECT UPDATE Spring 2012

Opportunities for additional ownership would also be available for the future phases of the resort development.

Chapter 2: Summary of Existing Open Space System

Introduction To Ecotourism

Exploring State Water Trail Programs

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council January 26, 2016

MIRAMAR, Fla., April 29, 2015 (GLOBE NEWSWIRE) -- Spirit Airlines, Inc. (Nasdaq:SAVE) today reported first quarter 2015 financial results.

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

Volunteer Trail Builders on NC s Mountains-to-Sea Trail. Kate Dixon Executive Director Friends of the Mountains-to-Sea Trail

El Al Israel Airlines announced today its financial results for the year 2016 and the fourth quarter of the year:

The Adventures of the Appalachian Trail. Specific Purpose: To inform my audience about thru hiking the Appalachian Trail.

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES

Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015

Classifications, Inventory and Level of Service

Transcription:

FAQ: HR 799 & S. 403: North Country National Scenic Trail Route Adjustment Act Exactly what does HR 799/S. 403 call for? These bills simply amend the National Trails System Act (16 U.S.C. 1244(a)(8)) by: (1) Substituting new language delineating the North Country National Scenic Trail s total length (from 3200 to 4600 miles); (2) Re-defining the eastern terminus as the Appalachian National Scenic Trail in Vermont; and (3) Substituting a new map reference for the original, showing the Minnesota Arrowhead and the eastern terminus extension. So what does this accomplish? H.R. 799/S. 403 completes the original vision for the North Country National Scenic Trail (NCNST) by extending the eastern terminus to link with the Appalachian Trail in Vermont. And, this legislation legitimizes the de-facto route of the NCNST in Minnesota since 2005, with the formal inclusion of Minnesota s Superior Hiking, Border Route and Kekekabic Trails as officially part of the North Country National Scenic Trail (NCNST). Wait--going from 3200 to 4600 miles sounds like a lot more than that! The original 1980 authorizing legislation contains the language a trail of approximately 3200 miles. This was clearly an estimate, since almost none of the NCNST had been built when the 1970 s feasibility studies estimated its length. Since then much of the NCNST has been constructed and the route identified; the trail is on the ground and we have more sophisticated tools for measuring it. As it turns out, in order to carry out Congress intent for the original NCNST the actual mileage is closer to 4100 miles, even without the Minnesota Arrowhead or the eastern terminus extension into Vermont (which add another 500 miles).

So, really, how many more miles are being added to the National Trails System by H.R. 799/S. 403? Doing the math, H.R. 799/S. 403 would designate a net gain of approximately 500 new miles as National Scenic Trail. The Minnesota Arrowhead section contains about 540 miles 400 of which is already constructed in the Superior Hiking, Border Route and Kekekabic Trails. In Vermont there s a roughly 60 mile gap between the current terminus at Crown Point, N.Y. and the Appalachian Trail. Subtract the originally designated 100 miles of Minnesota wetlands to get 500 newly designated additional miles of NST. That s 500 more miles of trail to be built? Fortunately no! Factoring in the already volunteer-constructed (and world-class!) trail in the Minnesota Arrowhead plus the existing Trails Around Middlebury and the Long Trail in Vermont leaves about 100 miles of new trail needing to be built and at a far less cost than it would have taken to construct the boardwalk and bridges through the original Minnesota route. What about eminent domain? Won t the NPS start taking private land? No federal agency, including the National Park Service, has ever had the authority to use eminent domain for the North Country National Scenic Trail (NCNST). Less than 50 of the 4600 miles of NCNST are actually owned or leased by the NPS, and all of that was already in the Pictured Rocks National Lakeshore or the St. Croix National Scenic Riverway by the 1980 authorization of the NCNST. The only land acquisition authority for the NPS on the NCNST was granted by Congress in 2009, and enables the NPS to acquire land only with the consent of the owner of the land or interest in the land. (Section 5(a)(8)) of the National Trails System Act (P.L. 90-543, as amended through P.L. 111-11). Currently there are relationships being built with willing sellers to enable access to a handful of privately held parcels. Wait Section 7(g) says the NPS can condemn land The generic condemnation language in 7(g) has always been trumped by Section 10(c), which authorizes appropriations for the trail, and states that notwithstanding other sections of the Act, no federal funds can be expended to purchase lands or easement interests for the trail except for one interpretive site. Section 10 (c) was replaced in 2009 by Section 5 (a)(8), the willing seller clause quoted above, which clearly does not permit use of condemnation.

Each National Scenic Trail, while authorized under the National Trails System Act, has a separately stated nature and purpose and set of authorities. While a number of NST s do have eminent domain authority, the NCNST has never had eminent domain authority, nor does it seek it now or in the future. How has the NCNST developed the nearly 3000 miles already on the ground? Much of the existing trail uses public lands national forests, state forests and parks, as well as available routes through lands held by land trusts. In addition NCTA s local volunteers, as well as those belonging to affiliate groups like the Finger Lakes Trail Conference, Superior Hiking Trail Association, Buckeye Trail Association and others, work hard in building relationships with local landowners to enable the trail to be located on their land. In many cases this involves simple handshake agreements, but in the interest of protecting the perpetuity of the trail these agreements are being formalized through easements, or occasionally purchased, as opportunity arises. Almost none of these agreements are with the NPS. Well then, what is the NPS s role? The NPS is the designated administrator for the NCNST, as well as 5 other national scenic trails. As such it carries out Congressional intent regarding the nature and purpose of the trail, use of the trail emblem and approval of the route of the trail. There are 3.5 FTE s assigned by the NPS to administer the NCNST. Management of the trail is primarily accomplished via a cooperative agreement with North Country Trail Association. This partnership enables a force multiplier effect that mobilizes volunteer trail builders and maintainers along the entire 4600 miles. The NPS thus leverages its 3.5 FTE s into a volunteer force numbering in the thousands, which in 2015 returned $5.17 for every federal dollar invested. This offers a textbook example of a public/private partnership that accomplishes tangible benefits for Americans both today and for future generations. How will the NCNST complete the trail without eminent domain? The key is in building local relationships with landowners. Remaining trail to be completed will need access to private lands, which requires willing landowners recognizing the value of dedicating access to some of their land in the public trust. This takes time, and investment in the local relationships thus built. It will not complete the trail anytime soon, but it will complete the trail eventually and in a manner that creates local support and investment. This is one way that the NCNST is different from some other NST s.

What about jobs? Economic impacts? Quality of life in rural areas? It s actually quite dramatic how a simple hiking trail, with its gentle environmental impact, can have such a mobilizing effect on rural communities. People living in areas of Minnesota and Vermont affected by this legislation are looking forward to its benefits, as seen elsewhere along the NCNST with the popularity of Trail Towns, and in providing services and markets for trail users a sustainable source of local revenues. What about working landscapes? Another way the NCNST is different is that it tells the story of northern peoples both recreating in as well as eking a living out of the resource-rich Great North Woods. The NCNST passes through and interprets working landscapes places that support farming, ranching, forest management, mining, commercial fishing, oil and gas drilling and helps trail users better understand what it takes to make a living with the land. People who live, work and recreate in these northern heartlands of America are united under the banner of the Red Plaid Nation, the community built for and sustained by the NCNST. The NCNST is their trail. So, why didn t the NCNST connect with Vermont in the first place? In the late 1970 s concerns were expressed by the Green Mountain Club (GMC) that connecting the NCNST with the Appalachian Trail as envisioned might lead to over-use of the Long Trail, Vermont s premier long distance hiking pathway maintained by the GMC. Vermont s governor asked that the 1980 legislation not include Vermont. In the time since, the Green Mountain Club has reversed its position and Vermonters have enthusiastically endorsed the notion of becoming one of only a handful of states hosting more than one national scenic trail. What s wrong with the original route in Minnesota? The original route passes through significant wetlands and tamarack/black spruce swamp. Building trail there requires extensive structures, bridges, puncheon, etc. which are not only expensive but need constant maintenance with the freeze/thaw climate conditions in the area. Environmental sensitivities exist over potential wetlands impacts. The original route assumed, as with the rest of the NCNST, that a local cadre of volunteers would be mobilized to build and maintain the NCNST. None have surfaced for this particular segment since the 1980 authorization of the NCNST. Instead, some 400-plus miles of world-class hiking trails have been built and paid for (by volunteers) along the north shore of Lake Superior, along the Canadian border and in the Boundary Waters Canoe Area Wilderness. Since 2005, hikers using the NCNST have adopted this Minnesota Arrowhead as part of the NCNST. There is widespread

local support. The only things missing are the official signs, and the opportunity for local communities to derive tourism benefits from the official designation. What about cost? Who pays? Despite the relative simplicity of natural-surfaced hiking trails, there are still costs involved in their construction. Costs vary depending on the terrain. In wetlands areas such as the originally designated route in Minnesota, the cost per mile of trail construction (involving elevated structures) is easily a dozen times that of trail built in the dryer landscapes anticipated for completing the trail in Minnesota under H.R. 799/S. 403. Costs associated with trail building will be absorbed in the existing NPS budget or covered by partner fund-raising and the sweat equity of the volunteers, as already occurs throughout the NCNST. What about the Sea-to-Sea Route? Nothing in this legislation permits or promotes any trail expansion beyond that expressly indicated on the map the extension into Vermont and the addition of the trails in the Minnesota Arrowhead. No western states are affected, either directly or indirectly by H.R. 799/S. 403.