Minnesota Power Renewable Energy (& Engineering) for the 21 st Century

Similar documents
Lake Chelan Operations

Colorado Springs Utilities Spring 2016 Update. CEO Jerry Forte Leon Young Service Center, April 13, 2016

Carbon Adder and Cost Allocation

Leaders in independent airworthiness management services. flyertech.com

WÄRTSILÄ. Dan Johnson

John Hart Generating Station Replacement Project. October 2018 Community Construction Update Report #64

FINAL APPLICATION FOR LICENSE OF MAJOR UNCONSTRUCTED PROJECT. NHC Meeting Notes

SCOPE Chapter 2D shall Apply to Any Road or

Get a higher Return On Investment with Wärtsilä

presented by DENISE ARANA General Manager, Direct Client Relationships Unit Facilitating Economic Growth and Development

Guide to the L. F. Manis Photographs

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office

Guide to the L. F. Manis Photographs

CONTACT 2 Golgotha Str. Oasi Varipetrou GR Chania, GREECE Tel.: , Fax: Web:

BOARD OF AIRPORT COMMISSIONERS -

An Example of Small Scale Geothermal Energy Sustainability: Chena Hot Springs, Alaska. Mink, Leland; Karl, Bernie; and Karl, Connie

WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-MARCH April 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy

A Brief Overview of the Rio Grande Compact 04/26/06

For personal use only

STATE LAND OFFICE: An Inventory of Its Approved Lists for Congressional Railroad Land Grants:

MASSACHUSETTS PORT AUTHORITY REQUEST FOR LETTERS OF INTEREST DEVELOPMENT OF THE MASSPORT MARINE TERMINAL

ASSET MANAGEMENT AND AUTOMATION: ANDRITZ DIGITAL SOLUTIONS AND CASE STUDIES

Pumped Storage Schemes & imported hydroelectricity

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT

TT : TREE TENT TT 1.00: TT (TREE TENT) LOW IMPACT SHELTER CREATIVE ENGINEERING

MONTHLY REPORT Issue No. R02-18 February 2018

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT

Creating Short Sea Opportunities - The Terminal s Role

Current Status of Daily Fantasy Sports (DFS) in the United States

Community Forum 17 August Resort Management Update

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

Bill S-5: An Act to amend the Canada National Parks Act (Nááts ihch oh National Park Reserve of Canada)

AVISTA CORPORATION SPOKANE RIVER AND POST FALLS HYDROELECTRIC DEVELOPMENTS RECREATION PLAN. Spokane River Hydroelectric Project FERC Project No.

Smart Networks Smart Islands. Nikos Chatziargyriou Chairman and CEO

Long water shutdown scheduled for Tuesday, September 18

South West Scotland Developer Forum

Exhibition Place Service Level Review

CATHAY PACIFIC AIRWAYS LIMITED (Incorporated in Hong Kong with limited liability) (Stock Code: 293) Announcement

Pumped storage hydroelectric power plants: Issues and applications BIH Case Study

TORONTO TRANSIT COMMISSION REPORT NO.

Outlook: FY13 EBITDA guidance $28M - $29M. Pursuing contracted 300MW in 2013 growth strategy. FY13 maiden franked dividend payment expected

East Midlands Airport Company no: EAST MIDLANDS AIRPORT INDEPENDENT CONSULTATIVE COMMITTEE GENERAL MEETING

1 st Half FY17/18 FY17/18

Smart Networks Smart Islands. Nikos Chatziargyrio u Chairman and CEO

TOWN OF NIAGARA COUNTY OF NIAGARA, STATE OF NEW YORK NIAGARA FALLS, N.Y.

Perspectives on Partnerships and Opportunities in the North

Joan Stemler. Water Control. St. Louis District. November US Army Corps of Engineers BUILDING STRONG

ICAO PLAN OF ACTION FOR KAZAKHSTAN

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

Nov 21, 2014: The crash heard around the region

WÄRTSILÄ CORPORATION JP MORGAN CAZENOVE EUROPEAN CAPITAL GOODS CEO CONFERENCE

Community Forum 24 October Resort Management Update

Little Limestone Lake Provincial Park. Draft Management Plan

POWER PLANTS FOCUS ON GAS

** DETERMINATION OF NO HAZARD TO AIR NAVIGATION **

Tonopah Irrigation District

Love Field Modernization Program Update: Master Planning Recommendations

2013 GLOBAL PARKING SURVEY

TEMPE BEACH PARK - RECOMMENDATIONS

SCRUBBERS FOR THE BALTIC SEA AREA SHIPS FUEL AND TECHNOLOGY TOOLBOX SEMINAR

Appalachian Power Company Smith Mountain Hydroelectric Project FERC No Debris Management Plan

DRAFT RECREATION RESOURCE MANAGEMENT PLAN

ROSIE BARR, VICE PRESIDENT OF LANDS AND NATURAL RESOURCES

Sasagiu Rapids Provincial Park. Draft Management Plan

Copa Holdings Reports Fourth Quarter and Full Year 2007 Results

Green Building Day. Sponsorship Proposal 2014 EVENT TYPE: LEADING GREEN THINKERS

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

HENACT: : Caribbean Hotel Energy Efficiency Action project

PBCS Charter Concept

License Application Gas Trading License

the United States Overview verview of Foreign Bank Supervision in

PICTURE STORY. Balkan energy and the future of Bosnia December 2007

Managing Director of Transmission. Report for the year 2012

Current Status of Daily Fantasy Sports (DFS) in the United States. As Of October 18, 2016

Handelsbanken Nordic Large Cap Seminar

ACCESS STATEMENT LAKE VYRNWY HOTEL & SPA

July 1, Pottawatomie County Free Fair c/o Fair Manager P.O. Box 5 Tecumseh, OK Potential Exhibitors

AIR CANADA REPORTS THIRD QUARTER RESULTS

Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018

Dallas Executive Airport: Past, Present and Future. Economic Development Committee November 3, 2014

A new global concept...

CORNWALL WATERFRONT PLAN 2007

Fostering Long Term Initiatives in Ports

Assisted self-reconstruction work in Chile: Valparaiso Case study. London, 27/01/2017

Single Occupancy HOV Lane

Makivik Corporation. The Nunavik Region. Adam Lewis, Director of Economic Development, Economic Development Department, Makivik Corporation

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

VISITSCOTLAND ICENTRE UPDATE EXECUTIVE COMMITTEE. 5 December Report by Executive Director

General Issues Committee Item Transit Operating Budget Ten Year Local Transit Strategy

H1 FY2015/16 Performance Review

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: Minnesota Council of Airports

Surveillance and Broadcast Services

NIGHT VISION. Requirements, Approvals, Maintenance. Federal Aviation Administration IMAGING (NVIS)

CEET Course Schedule 2017 preliminary as of 11/1/16

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

AIXM/WXXM CONFERENCE 2010

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

DISCLOSEABLE TRANSACTION IN RELATION TO ACQUISITION OF AIRCRAFT

Boral Limited Build something great TM. Investor Presentation Acquisition Sunshine Coast Quarries (19 July 2011)

Transcription:

Minnesota Power Renewable Energy (& Engineering) for the 21 st Century

The Prairie River Project Some background info about me Attended UMD EE (2000 grad) Started with MP as intern supporting hydro and steam Control systems my interest and study focus Worked for MP more than 15 yrs now job responsibilities include Electrical Engineering, Project Management and Student Outreach Today s topics Hydro Engineering & Electricity

Minnesota Power - Hydro System Overview 11 Hydro Stations, 34 turbine-generator sets 16 Reservoirs St. Louis, Kawishiwi, Mississippi River Watersheds 120 MW 560,000 MWh Avg. Annual Production MP Hydro = Largest Hydro Producer in State Hydro = 7-8% of MP Generation

Rising from the Ashes: Redeveloping the Prairie River Project

The Prairie River Project A little project background Prairie River Hydro Built in 1920 by Blandin Paper Company Total capacity 1084 kw Operator s residence upper level MP Purchased in 1982 Partially automated run from Thomson Hydro Routine maintenance until 2008 when

The Prairie River Project A little project background Prairie River Hydro Built in 1920 by Blandin Paper Company Total capacity 1084 kw Operator s residence upper level MP Purchased in 1982 Partially automated run from Thomson Hydro Routine maintenance until 2008 when Fire destroyed the powerhouse

The Prairie River Project Rebuild Study Original Project Background Selected HDR Engineering Study included 4 Options Option 1 Rebuild like-kind no T1 work Only for insurance settlement negotiation Option 2 Rebuild same generation, least cost structure & crane including T1 overhaul Additional generation with turbine efficiency improvements, approximately 10% more MWh Option 3 Rebuild at most efficient generation for watershed Not practical licensing, reconstruction, lower generation Option 4 Decommission/Sell Non-rate base, shareholder responsibility, negative public relations

The Prairie River Project Rebuild Study Recommendation and Decision - Rebuild the facility Least cost powerhouse with overhead crane Improved Safe Work Practices Overhaul Turbine 1 Arc Flash Compliance Modern Equipment/Automation/PDM/Reliability Security Enhancements Benefits Increased renewable generation over as was condition Positive impact on shareholders, ratepayers maintain renewable energy diversity Lower ongoing operational costs Positive public relations Local Construction jobs

The Prairie River Project Powerhouse Expanded Least Cost Structure - Design & Engineering SHPO Exterior Aesthetics Security - Access Crane Truck Bay Switchgear, Generator & Mezzanine Levels

The Prairie River Project Out of the Ashes Rebuilding the Powerhouse

The Prairie River Project Out of the Ashes Rebuilding the Powerhouse

The Prairie River Project Out of the Ashes Rebuilding the Powerhouse

The Prairie River Project - Out of the Ashes Rebuilding the Powerhouse

The Prairie River Project Out of the Ashes Rebuilding the Powerhouse

The Prairie River Project - Out of the Ashes Rebuilding the Powerhouse

The Prairie River Project - Out of the Ashes Rebuilding the Powerhouse

The Prairie River Project Out of the Ashes Rebuilding the Powerhouse

The Prairie River Project Out of the Ashes Rebuilding the Powerhouse

The Prairie River Project Out of the Ashes Rebuilding the Powerhouse

The Prairie River Project Out of the Ashes Rebuilding the Powerhouse

Manitoba Hydro Purchase Long term power purchase agreement with Manitoba Hydro for carbon free hydroelectric energy Leading the industry with a wind storage provision 28

Minnesota Power Energy & Engineering Engineering - Problem Solvers -Experts? - Responsibility -Team - Knowledge & Information Seekers - Continuous Improvement - Black Box Thinkers? Main Ingredient to be successful??