Concept of Ops: A Strawman

Similar documents
PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Boeing Air Traffic Management Overview and Status

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

SESAR Solutions. Display Options

CMATS The Civil Military ATM System

Draft PBN Implementation Plan Papua New Guinea

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

PBN Implementation Plan - Fiji Version 1 19 January 2010

Bits to Blocks Aviation System Block Upgrades (ASBU)

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

ATC automation: facts and steps ahead

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

PBN Implementation Plan Tonga

Russian Federation ATM modernization program

Performance Based Navigation Operational End-State 2023

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

Air Navigation Bureau ICAO Headquarters, Montreal

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

Learning Objectives. By the end of this presentation you should understand:

TWELFTH AIR NAVIGATION CONFERENCE

(RN R A N V A V & & RN R P N

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

Data link Implementation in Singapore FIR Kwek Chin Lin

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

The benefits of satcom to airlines. Prepared by Helios for

Block 0 to Block 1 Vaughn Maiolla

APAC PBN UPDATE Slide 1 of xx

NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee

Overview of Worldwide Data Link Equipage Mandates

ICAO Air Navigation Panels/Study Groups Work Programme

Performance Based Navigation Implementation Plan Revised 2017 New Zealand

2012 Performance Framework AFI

ACI-NA Conference NextGen at NAV CANADA. John Crichton President and Chief Executive Officer October 11, 2009

Benefits of CNS/ATM Implementation for the Region

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

NEW FPL Transition Phase & Implementation Stages

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

Next Generation Airspace Developments: Key Operational Trends and Enablers

CNS/ATM Systems Interoperability and Harmonization

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

ICAO provisions on data link implementation

Packaging Tomorrow s Aviation System

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

ORGANISER HOST LEAD SPONSOR

NATA 2018 AGM & CONFERENCE

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Global ATM System ~Interoperability and Harmonization ~

MNPS (HLA), Oceanic, and Contingency Procedures

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Navigation at the. Federal Aviation Administration Crossroads

Single European Sky Awards Submission by the COOPANS Alliance. Short description of the project. (Required for website application)

FIJI s STATE ACTION PLAN FOR THE REDUCTION OF AVIATION GREENHOUSE GAS EMISSIONS

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

Space Based ADS-B. Transforming the Way you See the Sky February, 2015

TWELFTH AIR NAVIGATION CONFERENCE

NextGen Priorities: Multiple Runway Operations & RECAT

PBN and Procedure Design training

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

DRAFT. AND/OR one or more of the following to indicate the serviceable COM/NAV/approach aid equipment and capabilities:

IMPLEMENTATION OF ADS-B BY NAV CANADA

FIJI s STATE ACTION PLAN FOR THE REDUCTION OF AVIATION GREENHOUSE GAS EMISSIONS

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

DMT Report. Overview for Step 1. Maturity Assessment Issue date: (OFA view) 28/01/2015

RNP AR and Air Traffic Management

Disruptive Technologies in Air Traffic Management (ATM) - Example: flight centric operations (sectorless ATM)

Official Journal of the European Union L 186/27

Meeting notes from CAA PBN Industry Forum Date: 18 November 2009 Venue: Club Room Auckland Intl Airport Domestic Terminal. Organisation.

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

Traffic flow in oceanic airspace of Mumbai FIR, evaluation of FLAS and its Review

Surveillance and Broadcast Services

Presented by: Trinidad and Tobago

ORGANISER HOST LEAD SPONSOR

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

Session III Issues for the Future of ATM

PBN and airspace concept

PBN IMPLEMENTATION IN INDONESIA

Asia/Pacific Air Traffic Management Perspectives

GOLD. Global Operational Data Link Document (GOLD) Implementation and Amendments. AFI CNS SG /4, Dakar, Senegal, July 2011

SERVICE DEVELOPMENT ROADMAP

French DSNA approach to CNS rationalization & evolution

(Presented by the United States)

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

EUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Transcription:

Concept of Ops: A Strawman

Presentation Outline Introduction to Concept of Operations Examples for Different Domains Major Drivers for Change Regional Harmonisation of Block changes Development of Block Descriptions

Examples of CONOPS Oceanic Domain - Block 0, 1, 2, 3 Domestic Enroute Domain (Class C, D) Block 0, 1, 2, 3 Other Domains MT Terminal Control Areas Regional Terminal Control Areas MT Control Zones Regional Control Zones Uncontrolled Airports Uncontrolled Airspace (Class G)

Block 1: CONOPS Auckland doceanic Domain Services available 2018-2022 Tasman Sector Comms: CPDLC, HF & Satphone Pacific Sector Comms: CPDLC, HF & Satphone Navigation: RVSM, RNAV 10, RNP4, (30/30 Navigation: RVSM, RNAV 10, RNP4, (30/30 Separation), RNP2 Separation), UPR & (new separation DARP, self-separation standard), UPR for all ADS-B (in) ITP /ADS-C city pairs. CDP procedures. ADS-C, and ADS-B where available. Tasman Pacific ADS-C, and ADS-B where available. Automation (including CPAR & AIDC with all ACC s) Automation (including CPAR & AIDC with all ACC s) Other: Introduce high fidelity MET data exchange Other: Introduce high fidelity MET data exchange Note: The Pacific services described above are only available to those that equip and are not mandatory minimum performance requirements for the airspace. The Tasman services could move to a mandate for RNP2 when the CBA warrants the change otherwise best equipped get priority service.

Block 2: CONOPS Auckland Oceanic Domain Services available 2023-2027 Tasman Sector Comms: CPDLC, HF & Satphone Navigation: RVSM, RNAV 10, RNP4, (30/30 Separation), RNP2 (new separation standard), UPR for all city pairs. Pacific Sector Comms: CPDLC, HF & Satphone Navigation: RVSM, RNAV 10, RNP4, (30/30 Separation), UPR & DARP, selfseparation ADS-B (in) ITP /ADS-C CDP procedures. ADS-C, and ADS-B where available. Tasman Pacific ADS-C, and ADS-B where available. Automation (including CPAR & AIDC with all ACC s) Automation (including CPAR & AIDC with all ACC s). Other: Trial monitored self-separation using ADS-B with conflict detection & resolution Note: The Pacific services described above are only available to those that equip and are not mandatory minimum performance requirements for the airspace. The Tasman services should move to a mandate for RNP2 when the CBA warrants the change otherwise best equipped get priority service. The merged FANS1A / ATN (B1) system will provide support to 4DT management in OCA and the transition to Continental enroute airspace.

Tasman Sector Comms: CPDLC, HF & Satphone Navigation: RVSM, RNAV 10, RNP4, (30/30 Separation), RNP2 (new separation standard), UPR for all city pairs. Block 3: CONOPS Auckland Oceanic Domain Services available 2028-2032 Pacific Sector Comms: CPDLC, HF & Satphone Navigation: RVSM, RNAV 10, RNP4, (30/30 Separation), UPR & DARP, selfseparation ADS-B (in) ITP /ADS-C CDP. ADS-C, ADS-C, and ADS-B where and ADS-B where Pacific available. available. Tasman Automation (including Automation (including CPAR & AIDC with all CPAR & AIDC with all ACC s). ACC s) Other: TBA Other: monitored selfseparation using ADS- B with conflict detection & resolution

Now Comms: VHF Voice & introduce PDC / DCL. Navigation: RVSM, terrestrial navigation infrastructure Numerous generic RNAV routes Numerous GNSS approach and departure procedures Mode S capable MSSR network and Terminal PSR s. WAM Systems for ZQN, DUN & INV region. ADS-B implementation is underway. CAM AKL, WLG & CHC (other airports can be added) STCA Safety Net warnings for SUA and dterrain Block 0: CONOPS Domestic Enroute Domain Services available now till 2017 Comms: Nil Navigation: Near Term Changes Commission National RNAV route structure and complete supplementary Type Certifications for RNAV 1 / 2 & Basic RNP1. Commence removal of redundant terrestrial Nav aids. Expand WAM Surveillance across Southern NZ. Commissioning ADS-B Surveillance network. Integrate new surveillance data into ATM System. ATM: Commission AMAN for AKL Introduce PDC / DCL Commission AMHS Commission i AIXM Other: Align portions of NZZC Class G with NZZO Class A above F245.

2018 Comms: VHF Voice, PDC / DCL. Navigation: RVSM, national RNAV Route Structure (RNAV1 / 2) A limited terrestrial contingency Nav network Mode S capable MSSR network & WAM Systems Full national ADS-B network commissioned. AMAN / CAM for all MT airports STCA, Safety Net warnings for SUA and Terrain. Block 1: CONOPS Domestic Enroute Domain Services available 2018-2022 Near Term Changes Comms: Expand PDC / DCL and integrate the merged FANS1A / ATN (B1) CPDLC system with Controller Working Positions (CWP). Navigation: Incorporate high fidelity MET data exchange for improved trajectory management. Commence removal of redundant enroute MSSR (2021) ATM: MTCD Other:

2023 Comms: VHF Voice, limited PDC / DCL and use of merged FANS1A/ ATN (B1) for CPDLC. Navigation: RVSM, national RNAV Route Structure (RNAV1 / 2) A limited terrestrial contingency Nav network Limited WAM coverage and National ADS-B network AMAN / CAM for all MT airports and selected regional airports STCA, Safety Net warnings for SUA and Terrain. Block 2: CONOPS Domestic Enroute Domain Services available 2023-2027 Near Term Changes Comms: Expand PDC / DCL and merged FANS1A / ATN (B1) CPDLC system Navigation: Trial active trajectory management via data link for improved arrival sequence management (4DT). Complete the removal of redundant MSSR facilities. ATM: MTCD ATC monitored trial of self-separation between ADS-B (in) equipped flights, with detection and resolution advisory facility. Other:

2028 Comms: VHF Voice, full PDC / DCL and use of merged FANS1A/ ATN (B1) for CPDLC. Navigation: RVSM, national RNAV Route Structure (RNAV1 / 2) A limited terrestrial contingency Nav network Active trajectory management via data link for improved arrival sequence management (4DT). Expanded WAM coverage and National ADS-B network Block 3: CONOPS Domestic Enroute Domain Services available 2028-2032 Near Term Changes Comms: Expand PDC / DCL and merged FANS1A / ATN (B1) CPDLC system Navigation: TBA Increased use of ADS-B (in) for situational awareness, assisted visual separation and self-separation tool. ATM: ATC initiated offer of self-separation separation between ADS-B (in) equipped flights, with detection and resolution advisory facility. Other: AMAN / CAM for all MT airports and selected regional airports STCA, Safety Net warnings for SUA and Terrain.

Major Drivers for Change Improving Operational efficiency Reducing Fuel Burn Improving on time performance (OTP) Improving schedule reliability [e.g. RNP AR & Cat III (b) ILS] Reducing Impact on the Environment GHG Noise Avoiding Premature Capital Investment Airports or Runway infrastructure Technology (Airframe or Ground Infrastructure Removing Redundant Technology Reduces drag on operational costs and capital investment programme Other?

Regional Harmonisation A consultation process is needed d to negotiate timing for Block changes Possible use of transition periods? Harmonisation Issues How do we balance the domestic needs with those of adjacent States? Who manages this process? When does this need to be completed?