Regional implementation ASBU Bn-AMET Christopher Keohan Regional Officer Air Navigation Systems Meteorology EUR/NAT ICAO RO Vienna/13 October 2015
Global Air Navigation Plan Aviation System Block Upgrade methodology Programmatic and flexible global systems engineering approach that allows all Member States to advance their air navigation capacities based on their specific operational requirements. The Block Upgrades will enable aviation to realize the global harmonization, increased capacity, and improved environmental efficiency that modern air traffic growth now demands in every region around the world.
Global Air Navigation Plan ASBU Performance improvement areas Airport operations Globally interoperable systems and data Optimum capacity and flexible flights Efficient flight paths
Global Air Navigation Plan ASBU timelines B0 2013 (current provisions) B1 2018 (MET info supporting auto decision processes) B2 2023 (to be developed by WG-MRI) B3 2028 (MET info supporting both air & ground auto decision support aids for implementing weather mitigation strategies)
GANP role of PIRGs
ICAO MET Panel and WGs Regional implementation of global provisions Such as space weather centres; regional hazardous weather advisory centres; MET services for ATM
Role of METG of EANPG Parent Group Task Who When WG-MRI Activate EUR MET/ATM TF to address regional implementation of provisions (Annex 3, PANS-MET) for MET support to selected ASBU Block 1 modules (e.g. support to trajectory based operations, terminal area operations) that would become applicable in 2018. COG (METG recomm.) Late 2016
Role of METG of EANPG Parent Group Task Who When WG-MISD Provide WG-MISD input on gaps identified in the nuclear exercise called NUCLEAR14 conducted by the EUROCONTROL Network Manager (NM) with support of the European Aviation Crisis Coordination Cell (EACCC) from 19 to 20 November 2014. Provide WG-MISD input on recommendations developed at the EUROCONTROL workshop to identify short term improvements to support aviation crisis management decision making to be held 22 or 28 September 2015. ICAO RO ICAO RO EUR/NAT EUR/NAT July 2015 Oct 2015
Role of METG of EANPG Parent Group Task Who When Monitor global developments that may assist in the development of EUR/NAT contingency plan for nuclear emergency (COG Conclusion 50/07 and NAT SPG Conclusion 47/07 refers). Proposals for Amendment of ICAO Annex 3 with respect to release of radioactive material into the atmosphere for endorsement by the MET Panel expected in September 2016. Monitor developments associated with Regional Hazardous Weather Advisory Centres, and where applicable, an implementation strategy needed by EANPG in 2019 for 2020 applicability date. METG, COG, NAT SPG METG, EANPG COG, Sep 2016 2018-2019
Role of METG of EANPG Parent Group Task Who When Monitor developments associated with space weather information and space weather selection criteria. An implementation strategy needed by EANPG in 2016 or 2017 is needed for 2018 applicability date. Monitor developments associated with volcanic ash information in ASBU Block 1 (2018-2023) since two VAACs reside in the EUR Region and States may have to assist in implementation (e.g. providing VAACs information from sensors located within their State). Monitor developments associated with World Area Forecast System, particularly ASBU Block 1 (2018-2023). METG, COG, 2016-2017 EANPG METG 2018 METG 2018
Role of METG of EANPG Parent Group Task Who When WG-MIE Monitor developments related to testing of the ATS message handling system (AMHS) in relation to the exchange of digital aeronautical meteorological information (global OPMET information and WAFS forecasts). Results may have an impact on implementation and these results may be considered at the proposed workshop on IWXXM for implementation by ROCs in 2016 as well as the proposed inter-regional workshop, Service Improvement through integration of Digital AIM, MET and ATM information in 2017. Monitor developments related to MET-in- SWIM DMG, METG in coordination with AFSG METG in coordination with AFSG 2016-2017 2018+
Role of METG of EANPG Parent Group Task Who When WG-MOG Assure SADIS 2G users acquire Secure SADIS FTP before termination of SADIS Satellite Broadcast in July 2016. Provide first draft WMO abbreviated header lines for SIGMET and advisories developed by the EUR DMG. METG April 2016 DMG, METG Sep 2015
Role of METG of EANPG Parent Group Task Who When Monitor feasibility study on making area forecasts for low-level flights issued in graphical form available on Secure SADIS FTP as this may impact exchange of information in this regard by States. Monitor developments related to IAVWOPSG tasks still open (e.g. improving dissemination of aircraft reports on volcanic ash to VAACs that could be included in regional guidance material). DMG, METG 2015-2016 DMG, METG 2015-2016
Ex. of expected implementation Responses represented by the map below are provided for question six Do you plan to provide your national OPMET data (METAR) in IWXXM format? - IWXXM METAR planned to be available by end of 2016 - IWXXM METAR planned to be available by end of 2017 - IWXXM METAR planned to be available by end of 2018 - No - No date provided
Ex. of expected implementation