Operational implementation of new ATM automated systems and integration of the existing ones FOLLOW-UP ON THE IMPLEMENATION OF AUTOMATED SYSTEMS

Similar documents
Agenda Review to the action plans for the implementation of AIDC interconnection in the NAM/CAR/SAM Regions

AN & FS/3-WP/05 International Civil South Third. (Presented SUMMARY. References. Group May Fourth. of air navigation

Follow-up to the implementation of air navigation priorities FOLLOW-UP TO THE IMPLEMENTATION OF AMHS INTERCONNECTION AND NATIONAL IP NETWORKS

Agenda Follow-up to the performance of AIDC operation and results of the AIDC interconnection trials in the NAM/CAR/SAM Regions

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

(Presented SUMMARY REFERENCES. Group (SAM/IG/18) Lima,

SAM/IG/20-WP/08 South American. (Presented SUMMARY REFERENCES. October 2017).

Agenda Analysis to the availability and errors of flight plans in the NAM/CAR/SAM Regions

Analysis of flight plan availability in the SAM Region ANALYSIS OF FLIGHT PLAN AVAILABILITY. (Presented by the Secretariat) SUMMARY

ICAO regional technical cooperation tools for the implementation of air navigation and safety improvements

LN 3/24.1 LT 2/6B.5-SA371 7 June 2010

FLIGHT PLAN FILING PROCEDURES IN THE SAM REGION

APPENDIX E ACTION PLAN FOR THE IMPLEMENTATION OF ATFM AT SAM AIRPORTS A: AIRPORT. Task description Start End

OPTIMIZATION OF SAM AIRSPACE. (Presented by the Secretariat)

Fieldwork Dates AmericasBarometer

Update of the NOTAM Contingency Plans and deficiencies in the AIM area. (Presented by the Secretariat) SUMMARY

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

FOLLOW-UP TO PBN IMPLEMENTATION. (Presented by the Secretariat)

Proposal for the updating of the FASID ATM Evolution Tables

MARKET REPORT. Argentina: Low-Cost Airlines - the New Protagonists

VI Meeting of the Executive Steering Committee

REVIEW OF THE AIM PROGRAMME (B0-DATM) PROJECTS. (Presented by the Secretariat) SUMMARY. References: B - Air Navigation Capacity and Efficiency

FOLLOW-UP TO PBN IMPLEMENTATION AS RELATES TO THE GOALS OF THE DECLARATION OF BOGOTA AND OTHER IMPLEMENTATIONS RELATED TO AIRSPACE OPTIMISATION

ASSEMBLY 35TH SESSION

Air Traffic Flow Management (ATFM) in the SAM Region METHODOLOGY ADOPTED BY BRAZIL TO CALCULATE THE CONTROL CAPACITY OF ACC OF BRAZILIAN FIR

NAM/CAR AND SAM REGIONAL AIR NAVIGATION PLANS (SURVEILLANCE SYSTEMS)

Landing in South America & Peering Landscape in Argentina

Standards and procedures for performance-based navigation operations approval

Air navigation deficiencies in the CAR/SAM Regions with high risk ( U priority) (Presented by the Secretariat)

Landing in Latin America & Peering Landscape in Argentina

INTERNATIONAL CIVIL AVIATION ORGANIZATION SOUTH AMERICAN REGIONAL OFFICE

Spanish Countries. & Capitals. Map Labeling & Quiz SpanishMadeEasy.net

2.2 Air Navigation Deficiencies ICAO CAR/SAM AIR NAVIGATION DEFICIENCIES DATABASE SIP. (Presented by the Secretariat) SUMMARY

POST-IMPLEMENTATION MONITORING OF THE NEW ICAO MODEL FLIGHT PLAN FORMAT. (Presented by Cuba)

2.1 AVSEC/FAL/RG/3 Meeting ICAO/LACAC NAM/CAR/SAM AVIATION SECURITY AND FACILITATION REGIONAL GROUP (AVSEC/FAL/RG) (Presented by the Secretariat)

LT 2/8.23 SA186 Lima, 17April 2013

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

ARGENTINA MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES

(Presented by Secretariat) EXECUTIVE SUMMARY

Agenda Item 2: Review of the Implementation of the Regional Air Navigation Plan. (Presented by the Secretariat) Summary

Participant Presentations (Topics of Interest to the Meeting)

Second Seminar on RVSM Implementation in the CARS/SAM Regions

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

Meeting of. Rio de. Janeiro, Brazil. the Integration. System (CMS) Continuous. 3, 4 and 5. obstacles and

ICELANDAIR NICE-REYKJAVIK SURVEY. OPPORTUNITIES SURVEY SOUTH & CENTRAL AMERICA / CARRIBEAN FROM/TO NICE AIRPORT Routes Online 2012

INTERNATIONAL CIVIL AVIATION ORGANIZATION South American Office. Regional Project RLA/06/901

International Civil Aviation Organization UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions

SOUTH AMERICA. Country Police Medical Embassy/Consulate. The U.S. Embassy is located at:

CIVIL RLA/06/901. Third (ATS in. (Lima, FINAL

ASSEMBLY 39TH SESSION

LACNIC REPORT. ARIN XI - Memphis, USA. Raúl Echeberría LACNIC CEO < > ARIN XI

INTERNATIONAL CIVIL AVIATION ORGANIZATION South American Office. Regional Project RLA/06/901

LT 2/6B.43-SA September 2013

Agenda Item 3: Review Conclusions from the E/CAR/DCA/24, RASG-PA/6 and GREPECAS PPRC/2 Meetings

(Presented by the Secretariat) SUMMARY. This Working Paper presents for the Meeting s consideration, the Draft Agenda and suggested schedule

LACNIC REPORT. Ricardo Patara RSG Manager lacnic.net. RIPE 49 September 2004 Manchester

I have the honour to inform you that the following meetings have been scheduled to be held in Lima, Peru, from 2 to 6 August 2016:

ASBU IMPLEMENTATION. ASBU industry consideration. Date 16/08/2017. Edson Fagundes Gomes

January 2018 Air Traffic Activity Summary

INTERNATIONAL CIVIL AVIATION ORGANIZATION PROJECT DOCUMENT

South American Countries. Capital Location Population Terrain Climate

Agenda Item 2: ATS route structure optimisation - Phase 3 Version 2

Inter-American Defense College

Ref.: LN3/ SA5097 Lima, 12 February 2015 LT2/6B.61

Geographic Qualities of South America

for HUB MSMEs IX Meeting of the Executive Steering Committee of IX Meeting of the Executive Steering Committee of IIRSA

Comprehension Questions:

Geography. Continents. Preview. For Middle Primary

SUMMARY. of the North. Reference: A B

Regional air navigation planning and implementation performance framework: Review of programmes and projects

Ref.: LT 2/6B.49-SA121 Lima, 26 March 2014 LT 11/49

3.6 Surveillance Data Exchange Activities. (Presented by the United States of America) SUMMARY

International economic context and regional impact

LN 3/24.1-SA5508 Lima, 04 September 2017 LT 2/6B.93

NZQA registered unit standard version 2 Page 1 of 5

Economic climate in Latin America improved slightly, despite worsening in Brazil

Chapter 19 Test on South America

Call Center Industry in Colombia

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

REGIONAL AVIATION MEDICAL TEAM LIMA PERÚ April 2009

Ref.: LT 2/7.3.7/SA275 4 May 2006

Status and outlook of the Regional Safety Oversight Cooperation System (SRVSOP) (Presented by the Secretariat) SUMMARY

HIGH-LEVEL SAFETY CONFERENCE

Argentina Control of unregistered work in the construction industry. An experience based on social dialogue and active involvement of stakeholders

LACNIC REPORT. RIPE 46 Amsterdam Netherlands. Raúl Echeberría CEO RIPE 46

Annex Multilateral Conventions 1. SUBJECT Where and When Signed Multilateral Organization Vienna Convention on Vienna, April 24, 1963

PROJECT: GROUND/GROUND COM PROJECT.1 Coordinator: South Africa DOMAIN: IIM (Infrastructure & Information Management)

International Civil Aviation Organization. Seventh Meeting of CNS/MET Sub-Group of APANPIRG and Tenth Meeting of CNS/ATM IC Sub-Group of APANPIRG

AVIATION SECURITY (AVSEC) AND FACILITATION (FAL) TRAINING AND ASSISTANCE ACTIVITIES IN THE NAM/CAR REGIONS. (Presented by the Secretariat)

Summer Work Travel Season Program Dates by Country

Regional Activities. 25 June Carlos Vogeler Director Executive Secretary for Members Relations and Regional Director for the Americas UNWTO

LT 2/4.36-SA714 9 November 2010

Citi Annual Latin America Conference New York March 24-26, 2010

LatinAmericaand the Caribbean

ANI/WG/2 WP/11 22/05/15 Second NAM/CAR Air Navigation Implementation Working Group Meeting (ANI/WG/2) Puntarenas, Costa Rica, 1 to 4 June 2015

INTERNATIONAL CIVIL AVIATION ORGANIZATION PRELIMINARY REPORT SEVENTEENTH MEETING OF THE GREPECAS SCRUTINY WORKING GROUP (GTE/17)

ORGANISER HOST LEAD SPONSOR

FOURTEENTH MEETING OF CIVIL AVIATION AUTHORITIES OF THE SAM REGION RAAC/14 DRAFT REPORT

International Civil Aviation Organization. UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions

EUROPEAN COMMISSION DIRECTORATE-GENERAL HUMANITARIAN AID AND CIVIL PROTECTION - ECHO

Transcription:

International Civil Aviation Organization SAM/IG/12-WP/12 South American Regional Office 26/09/13 Twelfth Workshop/Meeting of the SAM Implementation Group (SAM/IG/12) - Regional Project RLA/06/901 (Lima, Peru, 14 to 18 October 2013) Agenda Item 6: Operational implementation of new ATM automated systems and integration of the existing ones FOLLOW-UP ON THE IMPLEMENATION OF AUTOMATED SYSTEMS (Presented by the Secretariat) SUMMARY This working paper presents information on the status of the interconnection of automated systems in the SAM Region, and the goals of the operational implementation of the interconnection in the short term. References Report of the Eleventh workshop/meeting of the SAM Implementation Group (SAM/IG/11) (Lima, Peru, 13-17 May 2013); and Report of automation missions (5-9 August 2013) ICAO Strategic Objectives A Safety; and C Environmental protection and sustainable development of air transport 1. Introduction 1.1 The tenth workshop/meeting of the SAM Implementation Group (Lima, Peru, 1-5 October 2012), when analysing the status of implementation of the interconnection of automated systems (exchange of radar data and automatic transfer of flight plans), established some actions in addition to the regional plan for the interconnection of automated systems between adjacent ACCs. 1.2 The additional actions are intended to foster the interconnection of automated systems contemplated in the memoranda of understanding (MoUs) prepared and signed by some States of the Region. 1.3 The MoUs associated to these actions are the following: a) Argentina-Brazil; b) Argentina-Chile; c) Argentina-Uruguay; d) Brazil-Peru; e) Brazil-Uruguay; and f) Brazil-Venezuela.

SAM/IG/12-WP/12-2- 1.4 The following actions were considered: a) Prepare a questionnaire on requirements for the interconnection of automated systems; b) Circulate the questionnaire to all the States of the Region that have established an MoU for the interconnection of automated systems, for its completion; c) Carry out missions to the States that have signed MoUs for the interconnection of automated systems in order to identify obstacles to the completion of interconnection tasks and, as a result of these missions, present a detailed plan for the start-up of the interconnection; and d) Missions will be conducted by two experts in ATM and CNS automation, accompanied by the industry and ICAO (South American Regional Office). 1.5 Missions to the States started on 5 August 2013 and were completed on 16 August 2013. The following States were visited: Argentina, Chile, Peru, and Uruguay. 2. Discussion Results of the automation missions Brazil-Peru interconnection 2.1 As a result of the revision of the questionnaire, the analysis of the collected documentation, and local trials conducted by the Automation Group, the implementation of the exchange of radar data and the transfer of flight plans under the MoU between Brazil and Peru has been rescheduled until the end of the first quarter of 2014. The main reason for the delay is that the new automated system to be installed at the Manaus ACC (Sagitario) will be commissioned at the end of 2013. 2.2 Before the operational implementation foreseen for the end of the first quarter of 2014, it has been deemed advisable to test the ASTERIX 62 and 63 protocols recommended for the exchange of radar data in the regional plan for the interconnection of automated systems. 2.3 For the exchange of radar data between Brazil and Peru, Brazil can only send radar data to Peru using the ASTERIX 62 and 63 protocols, and can receive radar information from Peru using the ASTERIX 62 and 63 protocols, and also with the ASTERIX 1, 2, 34, and 48 protocols. 2.4 The ASTERIX 62 and 63 protocols are recommended for full automation between automated centres in accordance with the regional action plan for the interconnection of automated systems, which is posted on the SAM Regional Office website, together with other important information on automation: http://www.icao.int/sam/pages/es/edocumentsdisplay_es.aspx?area=cns. 2.5 During the mission of the Automation Group to Peru (CORPAC facilities, Lima- Callao/Jorge Chávez airport), it was noted that the automated system installed at the new ACC of Lima (INDRA AIRCON 2100) is capable of receiving and processing the ASTERIX 62 and 63 protocols. Transmission to another ACC using the 62 and 63 protocols is not allowed.

-3- SAM/IG/12-WP/12 2.6 In order to verify the capability of the AIRCON 2100 system installed in Peru to receive and process the ASTERIX 62 and 63 protocols, trials between the ACCs of Lima and Manaus were scheduled for the week of 2-6 September 2013. In this sense, points of contact were established in Peru and Brazil to coordinate the trials. The trials could not be completed because a router had to be installed in Lima and a circuit had to be established through the REDDIG. It is expected that the States concerned will inform the Meeting on progress with the trials. Ecuador-Peru and Chile-Peru interconnection 2.7 According to the regional plan for the interconnection of automated systems, the Lima ACC would require an interconnection with the Guayaquil ACC (Ecuador) and the Santiago ACC (Chile). Following the teleconference held with the aeronautical administrations of Chile and Peru, it was felt that the interconnection between Chile and Peru would be analysed next year because of the modernisation process being carried out in Chile. Consequently, it was agreed that this issue would be analysed upon completion of the modernisation process in Chile. 2.8 As to the interconnection of automated systems between Ecuador and Peru, a teleconference via web was held to coordinate the establishment of an MoU, to be presented at the SAM IG/12 meeting. 2.9 The first activity contemplated in the MoU to be carried out would be the AIDC trials between the Guayaquil and Lima ACCs. The trials will be easier to conduct because the automated systems are of the same make and model. It was felt that these trials could be carried out in November 2013. 2.10 For this trial, AIDC information would be sent through the AMHS link that exists between Ecuador and Peru. To support AIDC trials, the States could follow the provisions of the AIDC Guide presented at the SAM/IG/11 meeting and approved for the Region (the AIDC Guide was sent to all the States of the Region through letter LT 12/3.54 SA302 dated 10 June 2013). No comments were received from the States, so the Guide was considered as approved, and is posted on the website of the ICAO South American Regional Office: http://www.lima.icao.int/edocuments/edoc_contents.asp?wlanguage=s&warea=cns# Argentina-Chile interconnection 2.11 Regarding the MoU between Chile and Argentina, Chile informed that it would first start interconnecting the Puerto Montt radar and would subsequently exchange the remaining radars contemplated in the MoU. 2.12 Before sending radar data from Puerto Montt to Argentina, Chile would first convert the radar data to the ASTERIX protocol and filter the radar information. To this end, Chile will acquire a convertor, which is foreseen to be installed in early 2014. 2.13 On the side of Argentina, the radars contemplated in the MoU were ready to send to Chile. For the interconnection of automated systems between the Comodoro Rivadavia and Puerto Montt ACCs, Argentina would have the Bariloche radar available, as contemplated in the MoU, in addition to two secondary radars in Esquel and Rio Gallegos, which are not contemplated in the MoU. 2.14 In order to view the Puerto Montt radars in Comodoro Rivadavia, a screen would be installed, since the Comodoro ACC does not have an automated system installed.

SAM/IG/12-WP/12-4- 2.15 On the side of Argentina, the automated systems that have been installed (Ezeiza and Córdoba ACCs) still cannot transmit the ASTERIX 62 and 63 protocols. Consequently, for the exchange of radar data in the short term, the ASTERIX 1 and 2 or 34 and 48 protocols would be used. 2.16 The automated system installed in Puerto Montt (radar data processor) is capable of accepting additional radars. 2.17 The transmission of radar data from Argentina to Chile will take place in early October 2013, since Chile is currently moving the REDDIG station, a task that is expected to be completed by the end of September 2013. 2.18 Chile would initially transmit from the Puerto Montt radar to Argentina, once the installation of the convertor has been completed, foreseen for early 2014. The installation and operation of new automated systems in the ACCs of Puerto Montt, Comodoro Rivadavia, and Mendoza is foreseen for the end of the first half of 2014. Radar data interconnection between the ACCs of Comodoro Rivadavia and Puerto Montt, and between the ACCs of Santiago and Mendoza, would initially take place using the ASTERIX 62 protocol. 2.19 The automated systems in the Santiago and Ezeiza ACCs have AIDC, so trials were scheduled between these systems. For the time being, trials cannot be carried out between the Comodoro and Puerto Montt ACCs since the Comodoro Rivadavia ACC does not have an automated system. 2.20 It was felt that, in order to verify the compatibility of the Santiago and Ezeiza AIDCs, trials would be carried out between the operational parties through the exchange of selected AIDC messages. The AIDC information would be sent through the AMHS. 2.21 It is expected that the delegates of Argentina and Chile will inform the Meeting about the progress made in the activities coordinated as a result of the mission. Argentina-Brazil interconnection 2.22 Regarding the interconnection of automated systems between Argentina-Brazil (Curitiba ACC in Brazil, Resistencia ACC in Argentina), it was felt that the operational interconnection for the exchange of radar data using protocols 62 and 63 and the automatic transfer of flight plans using AIDC would be operational on the first months of the second semester of 2014. 2.23 This new delay in the interconnection of automated systems between the Curitiba and Resistencia ACCs is mainly due to the fact that the Resistencia ACC does not have an automated system installed, which is foreseen for mid 2014. Likewise, the Curitiba ACC will have a new automated system (Sagitario) by the end of 2013, with ASTERIX 62 and 63, and AIDC capability. 2.24 In order to proceed with the activities foreseen for the interconnection between Argentina and Brazil, Argentina informed that it had the secondary radars of Corrientes, Posadas, and Sáenz Peña. In this regard, Argentina was ready to send information from the aforementioned radars to Brazil. Brazil stated that it would have no problem to receive the radar information for analysis and integration into the current radar data processing system in Curitiba. 2.25 It is expected that the delegates of Argentina and Brazil will inform the Meeting about the status of implementation of the interconnection.

-5- SAM/IG/12-WP/12 Argentina-Uruguay interconnection 2.26 Regarding the interconnection of automated systems between Argentina-Uruguay (Montevideo ACC and Ezeiza ACC), it was felt that this implementation could take place in the short term and operations could start in late 2013, or the first quarter of 2014 at the latest. 2.27 To date, the radar data of Durazno (Uruguay) is available at the Ezeiza ACC (Argentina) and the radar data of Quilmes (Argentina) is available in Montevideo (Uruguay), but it is not integrated into the radar data processing system, since it did not offer any useful operational information to the Montevideo ACC despite being contemplated in the MoU signed between Argentina and Chile for the interconnection of automated systems. 2.28 In this regard, following coordination between the aeronautical administrations of Argentina and Uruguay, it was felt that the Paraná radar in Argentina was useful for the Montevideo ACC. 2.29 During the mission, Argentina informed that the radar in Paraná was ready to sent data in IP format to Uruguay through the REDDIG. 2.30 Uruguay is in the process of installing a new radar in Carrasco, which is expected to be operational by the end of 2013. Therefore, information from this radar would be sent to Argentina through the REDDIG by the first semester of 2014. 2.31 Regarding the implementation of AIDC, it could take place any time, since both the Montevideo and the Ezeiza ACCs have the same automated system (AIRCON 2100) and their flight plan processors are capable of processing AIDC. 2.32 It is expected that the delegates of Argentina and Uruguay will inform the SAM/IG Meeting about the progress made with the interconnection. Brazil-Uruguay interconnection 2.33 The interconnection of automated systems between Brazil and Uruguay was initially contemplated in September 2009, and an MoU was established for the interconnection of radar data starting in June 2010 and AIDC operation starting in June 2011. 2.34 The process of modernisation of automated systems in the Curitiba and Montevideo ACCs delayed the implementation of the exchange of radar data and the automated transfer of flight plans. 2.35 The modernisation and commissioning of the automated system at the Montevideo ACC took place in late 2012, and the operation of the new automated system at the Curitiba ACC (replacement of the ATECH X 4000 system with the ATECH Sagitario) is foreseen for late 2013. 2.36 In this regard, the new date for completing the interconnection of automated systems between Brazil and Uruguay has been set for the first half of 2014. For the exchange of radar data, Brazil will use the ASTERIX 62 and 63 protocols (as foreseen in the regional plan for the interconnection of automated systems). Therefore, the automated system of the Montevideo ACC must be capable of receiving and accepting the ASTERIX 62 and 63 protocols. In case the automated system at the Montevideo ACC cannot transmit the ASTERIX 62 and 63 protocols, the radar data to be exchanged with Brazil (radars of Carrasco and Durazno) can be exchanged using the ASTERIX 1, 2 34 or 48 protocols.

SAM/IG/12-WP/12-6- 2.37 The technical personnel of Uruguay asked INDRA about the capability of the AIRCON 2100 to receive, process, and transmit radar data using the ASTERIX 62 and 63 protocols. In this regard, INDRA will provide an answer by the end of the first week of October 2013. 2.38 Since both systems will contain the AIDC, the automated exchange of flight plans will be carried out using that application. It is expected that the delegates of Brazil and Uruguay will report on the status of implementation to the Meeting. Brazil-Venezuela 2.39 Operational trials were conducted on 29 July to 2 August 2013 between the Maiquetía and Manaus ACCs. The trials were successful, and it was possible to exchange radar data and flight plans between the two ACCs. In this sense, Brazil and Venezuela will start coordinating the commissioning of the interconnection. It is expected that the delegates of Brazil and Venezuela will inform the Meeting on the status of operational implementation. AIDC course for controllers and database managers 2.40 Following the automation missions and the requirement of the controllers, it was felt that an AIDC course should be provided for controllers and automated system database managers. In this regard, since Argentina had had a good experience with the AIDC interconnection between automated centres, consideration was given to holding a 5-day course on automation in Montevideo, Uruguay, conducted by an automation expert from Argentina. 2.41 Project RLA/06/01 would cover travel expenses to Uruguay and per diems for the instructor. The course will be conducted in Montevideo, on 4-8 November 2013. Through letter LN 3/24.1-SA466 dated 17 September 2013, the ICAO Regional Office invited all member States of Project RLA/06/901 to participate in the course. Training events scheduled for 2014 2.42 In order to assist States in the implementation of automation activities, two events have been scheduled for 2014, one course on the interconnection of automated systems using the ASTERIX protocols and AIDC for technical and operational personnel, and a seminar/workshop on automated systems for ATS personnel. 2.43 The course on the interconnection of automated systems would be held in San Jose Dos Campos, Brazil, during the last week of February 2014, with the support of ATECH. The seminar/workshop on automation for ATS personnel would be held in Lima, Peru, in mid July 2014. 2.44 If the Meeting agrees to conduct these events, they will be submitted to the consideration of the seventh meeting of the Coordination Committee of Project RLA/03/901 (Lima, Peru, 27-29 November 2013) for its approval. Status of implementation of the remaining interconnections foreseen in the SAM Region 2.45 Appendix A to this working paper contains a table showing the interconnection requirements for the SAM Region. It shows that the goal for the end of 2015 is the implementation of 15 interconnections. The implementation breakdown for the 2013-2015 period is as follows: 1 in 2013, 8 in 2014, and 6 in 2015.

-7- SAM/IG/12-WP/12 2.46 For the States that have not yet implemented automated systems in their ACCs (La Paz, Bolivia), no date has been estimated for the interconnection of automated systems. Likewise, there are countries in the Region that need to analyse the requirement for the implementation of automated systems, and review the operational requirement. 3. Suggested action 3.1 The Meeting is invited to: a) take note of the information presented herein; b) analyse the information contained in section 2 and in Appendix A to this working paper, present the status of implementation, and review implementation goals; and c) discuss any other issue related to this topic. - - - - - - -

SAM/IG/12-WP/12 NE/12 APPENDIX A / APENDICE A INTERCONNECTION OF AUTOMATED SYSTEMS / INTERCONEXIÓN SISTEMAS AUTOMATIZADOS State/ Estado Argentina Bolivia Brazil/Brasil Chile AIDC and Radar Data Interconnection Requirements/ Requerimientos de Interconexión AIDC y Datos Radar MoU Date of Implementation/ Fecha Implantación MoU AIDC and Radar Data Interconnection Date/ Fecha Interconexión AIDC y Datos Radar Bolivia TBD TBD Brasil 2009 Aug 2014 Chile 2010 Jul 2014 Paraguay May 2014 Dec 2014 Uruguay 2009 Jun 2014 Argentina TBD TBD Brasil TBD TBD Chile TBD TBD Paraguay TBD TBD Peru TBD TBD Argentina 2009 Aug 2014 Bolivia TBD TBD Colombia Oct 2014 Jul 2015 Guyana TBD TBD French Guiana (France) TBD TBD Paraguay Oct 2014 Mar 2015 Remarks/ Observaciones Peru 2012 Sep 2014 Suriname TBD TBD Uruguay 2009 Aug 2014 Venezuela 2011 Dic 2013 Argentina 2010 Jul 2014 Peru Jun 2014 Mar 2015

SAM/IG/12-WP/12 NE/12 -A2- State/ Estado Colombia Ecuador French Guiana (France)/ Guyana Francesa (Francia) Guyana AIDC and Radar Data Interconnection Requirements/ Requerimientos de Interconexión AIDC y Datos Radar MoU Date of Implementation/ Fecha Implantación MoU AIDC and Radar Data Interconnection Date/ Fecha Interconexión AIDC y Datos Radar Brazil Oct 2014 Jul 2015 Ecuador May 2014 Dic 2014 Panamá May 2014 Dic 2014 Peru Oct 2014 Jul 2015 Venezuela Dec 2014 Dic 2015 Colombia May 2014 Dic 2014 Peru Oct 2013 Jun 2014 Brasil TBD TBD Surinam TBD TBD Brazil TBD TBD Surinam TBD TBD Venezuela TBD TBD Panama Colombia May 2014 Dec 2014 Paraguay Peru Surinam Uruguay Venezuela Argentina May 2014 Dec 2014 Bolivia TBD TBD Brasil Oct 2014 Mar 2015 Bolivia TBD TBD Colombia Oct 2014 Jul 2015 Chile Jun 2014 Mar 2015 Ecuador Oct 2013 Jun 2014 Brasil TBD TBD French Guiana (France) TBD TBD Guyana TBD TBD Argentina 2009 Jun 2014 Brasil 2009 Aug 2014 Brasil 2011 Dec 2013 Colombia Dec 2014 Dec 2015 Remarks/ Observaciones - END / FIN-