Indian Ocean Strategic Partnership to Reduce Emissions (INSPIRE) Strategic Plan

Similar documents
The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

(Presented by the United States)

Asia Pacific Initiative to Reduce Emission. Brian Bagstad Senior ATO Representative, FAA

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

NextGen and ASPIRE Environmental Initiatives

Asia and Pacific Initiative to Reduce Emissions (ASPIRE)

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ENVIRONMENT ACTION PLAN

Air Navigation Bureau ICAO Headquarters, Montreal

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

The Combined ASIOACG INSPIRE Working Group Meeting

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

The list of action items. UPDATED in ASIOACG/9 INSPIRE/5, Dubai UAE 11 th to 14 th November 2014

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

AIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH AIR NAVIGATION CONFERENCE

European Joint Industry CDA Action Plan

TWELFTH AIR NAVIGATION CONFERENCE

Bits to Blocks Aviation System Block Upgrades (ASBU)

Russian Federation ATM modernization program

FLIGHT OPERATIONS PANEL (FLTOPSP)

The benefits of satcom to airlines. Prepared by Helios for

2012 Performance Framework AFI

PBN Implementation Plan Tonga

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

Making the World A better place to live SFO

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

Atlantic Interoperability Initiative to Reduce Emissions AIRE

TWELFTH AIR NAVIGATION CONFERENCE

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

FIJI s STATE ACTION PLAN FOR THE REDUCTION OF AVIATION GREENHOUSE GAS EMISSIONS

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

Welcome to AVI AFRIQUE 2017

Air Traffic Management Services Plan

A Clear Vision A Conversation With Sean Durfy, Chief Executive Officer, WestJet Airlines, Page 16.

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

RNP AR APCH Approvals: An Operator s Perspective

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/3) Hyderabad, India. 22 nd 24 th October 2013

Trajectory Based Operations

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE. Lisbon, Portugal, 19 to 20 May 2010

Traffic flow in oceanic airspace of Mumbai FIR, evaluation of FLAS and its Review

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

Boeing Air Traffic Management Overview and Status

Benefits of CNS/ATM Implementation for the Region

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

FIJI s STATE ACTION PLAN FOR THE REDUCTION OF AVIATION GREENHOUSE GAS EMISSIONS

Efficiency and Automation

Pacific Project. CPWG/8 - WP/6 Appendix A

Performance Based Navigation (PBN) Implementation Plan. The Gambia

ATFM/CDM ICAO s Perspective

WEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

SEAMLESS SKY IN EUROPE. Carlo Maria Borghini Director Administration and Finance Muscat, OMAN October 2009

EUR/SAM corridor airspace concept

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

Development of Flight Inefficiency Metrics for Environmental Performance Assessment of ATM

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

PBN and airspace concept

TWELFTH AIR NAVIGATION CONFERENCE

1. Background. 2. Summary and conclusion. 3. Flight efficiency parameters. Stockholm 04 May, 2011

Operational Evaluation of a Flight-deck Software Application

TWELFTH AIR NAVIGATION CONFERENCE

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Honeywell.com PBN Concepts Krakow, Poland

Learning Objectives. By the end of this presentation you should understand:

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Services Charter. 2014/15 to 2015/16

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Updates to Procedures at St. John s International Airport

Measurement of environmental benefits from the implementation of operational improvements

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

U.S. India Aviation Cooperation Program. Air Traffic Management Training Program Update March 2009

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Civil and military integration in the same workspace

Asia/Pacific Air Traffic Management Perspectives

RNP AR and Air Traffic Management

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

PBN/TF/7 DRAFT Appendix D to the Report D-1

USE OF RADAR IN THE APPROACH CONTROL SERVICE

(RN R A N V A V & & RN R P N

Why ANSP Management Needs to Drive ATFM Implementation Stuart Ratcliffe, Co-Chair CANSO ATFM Workgroup Metron Aviation

Transcription:

Indian Ocean Strategic Partnership to Reduce Emissions (INSPIRE) Strategic Plan Version 2.1 January 2012

Table of Contents 1 Introduction...3 1.1 THE INSPIRE PARTNERSHIP...3 1.2 PURPOSE...6 2 Document Management...7 2.1 DOCUMENT STRUCTURE...7 2.2 DOCUMENT OWNERS...7 2.3 CHANGE MANAGEMENT...7 3 Organisation & Governance...8 3.1 ORGANISATION...8 3.2 GOVERNANCE OUTLINE...9 4 Recommended ANSP Best Practices in the Arabian Sea and Indian Ocean Region...12 4.1 SURFACE MOVEMENT OPTIMISATION...12 4.2 DEPARTURE OPTIMISATION...12 4.3 ENROUTE FLIGHT...13 4.4 ARRIVALS OPTIMISATION...16 4.5 PERFORMANCE BASED NAVIGATION (PBN) IMPLEMENTATION...17 5 Performance Measurement...18 6 INSPIRE Reporting...19 6.1 ANNUAL REPORT...19 6.2 WORK PROGRAM STATUS REPORT...19 6.3 INSPIRE DAILY...19 7 INSPIRE Work Program...20 1

List of Figures Figure 1 - Arabian Sea and Indian Ocean User Preferred Route geographic zone (ASIO-Z)... 5 Figure 3 - User Preferred Route Example... 13 Figure 4 - Dynamic Airborne Reroute Procedure Example... 14 Figure 5 - Reduced Oceanic Separation Minima... 15 2

1 Introduction The air transportation industry is essential for future economic growth and development, trade and commerce, cultural exchange and understanding among peoples and nations. Today it provides approximately 32 million direct and indirect jobs worldwide. Aircraft carry approximately 40% of the value of all world trade. In 2007 more travellers than ever before flew on the world s scheduled air carriers, nearly 2.2 billion people, with predictions of 9 billion passengers by 2025. In the Arabian Sea and Indian Ocean region, the rapid movement of people and materials provided by aviation will be crucial to continued economic growth and development over the next few decades. The aviation sector has a long and distinguished record of environmental achievement. Relative to other industries that emit global green house gases (GHG), aviation s contribution represents only 3% of global greenhouse gas emissions. Technological advancement has significantly reduced aircraft fuel consumption and emissions on a per passenger basis over the last 30 years, and the industry is committed to improving on this record. But we face a real challenge in the Arabian Sea and Indian Ocean region as air transport activity is expected to continue to grow steadily throughout the region. In order to meet the growing regional demand for air transportation, while maintaining the industry s leadership position, it is essential for aviation partners to collaborate on environmental stewardship. 1.1 The INSPIRE Partnership 1.1.1 History On February 18, 2008, a multi-lateral partnership known as the Asia and South Pacific Initiative to Reduce Emissions (ASPIRE) was created in Singapore. The first air navigation service providers (ANSPs) to sign the ASPIRE joint statement were Airservices Australia, Airways New Zealand, and the Federal Aviation Administration. Since then ASPIRE has expanded to include the Japan Civil Aviation Authority (JCAB), the Civil Aviation Authority of Singapore (CAAS), and Aeronautical Radio of Thailand (AEROTHAI) as major partners. To complement this work, the Indian Ocean Strategic Partnership to Reduce Emissions (INSPIRE) was formed. The INSPIRE partnership is intended to be collaborative network of partners and peer organisations across the Arabian Sea and Indian Ocean region dedicated to improving the efficiency and sustainability of aviation. 1.1.2 The INSPIRE Commitment The INSPIRE partners are committed to work closely with airlines and other stakeholders in the region in order to: accelerate the development and implementation of operational procedures to reduce the environmental footprint for all phases of flight on an operation by operation basis, from gate to gate; 3

facilitate world-wide interoperability of environmentally friendly procedures and standards; capitalise on existing technology and best practices; develop shared performance metrics to measure improvements in the environmental performance of the air transport system; provide a systematic approach to ensure appropriate mitigation actions with short, medium and long-term results; and communicate and publicise INSPIRE environmental initiatives, goals, progress and performance to the global aviation community, the press and the general public. 1.1.3 Area of Operations INSPIRE is aimed at supporting all phases of flight from gate-to-gate for operations for four distinct traffic flows: Australia Arabian Gulf Australia Australia Southern Africa Australia Africa South Asia / South East Asia Africa Arabian Gulf South-West Indian Ocean Arabian Gulf Further more the INSPIRE partners have agreed to pursue the realisation of the Arabian Sea and Indian Ocean User Preferred Route geographic zone (ASIO-Z). 1 1 The concept for the ASIO-Z was initially presented by IATA at ASIOACG/6 in Working Paper WP/11 - Southern Arabian Sea & Indian Ocean UPR Zone 4

Figure 1 - Arabian Sea and Indian Ocean User Preferred Route geographic zone (ASIO-Z) 1.1.4 Support of ICAO Objectives The INSPIRE partners will ensure that INSPIRE is in support of the ICAO Strategic Objectives 2011 2012 2013, including: 2 Strategic Objective C: Environmental Protection and Sustainable Development of Air Transport Foster harmonized and economically viable development of international civil aviation that does not unduly harm the environment. 1.1.5 Support of the CANSO Work Program The INSPIRE partners will work to ensure that INSPIRE is consistent with environmental planning under Civil Air Navigation Services Organisation (CANSO) Environmental Work Group which is committed to the following goals for improving aviation sustainability: 1. To develop metrics and targets for the reduction of environmental impact. 2. To define and advance best practice in environmental management for ANSPs and to promote implementation as widely as possible. 3. To influence environmental policy, regulations and legislation to balance capacity, efficiency and the environment, without compromising safety. 4. To enhance understanding of ATM s environmental impact and mitigation measures. 2 ICAO Strategic Objectives 2011 2011 2013 published 10 December 2010 5

1.1.6 INSPIRE and the Future Air Transportation System INSPIRE directly supports the implementation of air traffic management (ATM) modernisation programs on State, regional and global levels to support future projected air traffic levels. INSPIRE is a forward-looking collaborative effort to accelerate the transition from today s operating norms to more advanced, efficient and environmentally friendly concepts. Examples of such concepts are outlined in the Next Generation Air Transportation System (NextGen) in the United States and the Australian ATM Strategic Plan. 1.2 Purpose In consultation with the airline partners and peer organisations, the INSPIRE partners have developed this strategic plan. The strategic plan describes the organisation and governance of the partnership and outlines recommended procedures, applications and technologies that have been demonstrated or have shown the potential to provide efficiencies in fuel and emissions reduction management. These best practices encompass all phases of flight from gate-to-gate, and are designed to reflect the requirements, in particular but not limited to, long haul flights that typically exceed 8 hours in duration. The strategic plan includes a work program of initiatives each of which aims to reduce fuel burn and greenhouse gas emissions, thus reducing aviation s impact on the environment. The work program can be found at section 7. 6

2 Document Management 2.1 Document Structure The INSPIRE Strategic Plan consists of the following parts: Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Appendix A Appendix B Introduction and Document Management Organisation and Governance Recommended Best Practices for Air Navigation Service Providers (ANSPs) Performance and Emissions Measurement Reporting Work Program Coordinators & Points of Contact Table of Acronyms 2.2 Document Owners This document is owned and maintained by the INSPIRE partners. 2.3 Change Management This document will be updated regularly by the INSPIRE partners to reflect the most current considerations regarding regional emissions reductions and efficiencies. Document change proposals shall be sent to the INSPIRE Strategic Plan editor for review and dissemination to the INSPIRE partners. Changes must be approved by all partners through the INSPIRE Coordinators. Minor and routine changes to the INSPIRE Strategic Plan will be distributed as updates to the existing version (e.g. v1.1, v1.2, v1.3). Major updates and modifications to the INSPIRE Strategic Plan will result in a new version number (i.e. v2.0). 7

3 Organisation & Governance 3.1 Organisation 3.1.1 Partners INSPIRE is a partnership of like minded Air Navigation Service Providers (ANSPs). The partnership structure of INSPIRE is not reflective of a hierarchy of contributing organisations. Rather the partners are those ANSPs that have the capacity and capability to provide leadership to the work program and contribute resources to the administration of INSPIRE. The INSPIRE partners are: Airports Authority India (AAI) Airservices Australia, and Air Traffic and Navigation Services of South Africa (ATNS) 3.1.2 Airline Partners The INSPIRE partnership is supported by a number of Airline partners. The Airline partners provide input from an Airspace User point of view ensuring the INSPIRE work program is properly aligned with their operations. Furthermore the Airline partners provide direct support to the work program and the ongoing administration of the partnership. The Airline partners are: Emirates Airline, Etihad Airways, Qantas Airways, South African Airways, and Virgin Australia Other Airlines are encouraged to contribute to INSPIRE as Airline Partners. 3.1.3 Peer Organisations The following peer organisations are contributing to the INSPIRE partnership: Abu Dhabi Department of Transport Abu Dhabi Airports Company (ADAC) Airport and Aviation Services Sri Lanka Limited (AASL) Dubai Air Navigation Services (DANS) Maldives Airports Company Limited (MACL) 8

UAE General Civil Aviation Authority (UAE GCAA) Other ANSP organisations are encouraged to contribute to INSPIRE as peer organisations. 3.2 Governance Outline This section details the principles applicable to the governance of the INSPIRE partnership. 3.2.1 Communications Periodically, the INSPIRE partners will issue, individually or collectively, media releases to coincide with significant events such as demonstrations or implementations of new services that contribute to the reduction of greenhouse gases. Copies or links to all INSPIRE related media (e.g. news articles, magazine items) will be forwarded to the Chair for distribution to the Partners, Airline Partners, and Peer organisations. Each Partner will nominate an INSPIRE coordinator who will represent the partner organisation and act as their point of contact. Also each peer organisation will nominate a point of contact for INSPIRE related communications and activities. Details of the Coordinator and Points of Contact for each organisation can be found at Appendix A. The Chair will act as the point of contact for all external groups wishing to contact INSPIRE. Content for the INSPIRE-GREEN.com website will be coordinated by the Chair. The Chair will alert the Partners, Airline Partners, and Peer organisations, at the time of each update. 3.2.2 Annual Meeting The INSPIRE partners, Airlines, and peer organisations will meet annually to review progress in the preceding twelve months and plan for the next 12 months. The following points apply to the Annual meeting: Hosting of the INSPIRE annual meeting will be rotated among the partners; To remain productive the number of participants to the annual INSPIRE meeting will be held to under 30 attendees; Each partner will identify 2-3 delegates to keep the meeting a manageable working size with the exception of the host, who may require administrative support; The meetings should include key airline and industry partners where appropriate; and 9

The meetings should arrange for aviation environmental experts from bodies such as CANSO, IATA, and ICAO to speak on relevant issues such as the state of aviation and the environment. In order to achieve efficiencies with the cost of travel it is anticipated that the INSPIRE annual meetings will be hosted immediately before and at the same location as the Annual ASIOACG meeting. 3.2.3 Chairmanship Chairmanship of the Annual meeting, and the de-facto INSPIRE lead will be delegated to representative of the organisation which is hosting the next annual meeting. The handover of Chair between organisations will occur after the publication of the annual report each calendar year. The current chair for the INSPIRE partnership is: Airports Authority of India INSPIRE Chair: Address: Mr M.C. Dangi ATS Complex, CSI Airport, Mumbai 400099, India Phone: +91 98 3392 6869 +91 22 2682 8010 E-mail: mcdangi@aai.aero The chair has a series of administrative responsibilities, including; Acting as the point of contact for all external groups wishing to contact INSPIRE (e.g. media, other ANSPs, Airlines, Educational Institutions, Environmental Groups); Publication of Annual updates to the Strategic Plan (June of each year); Hosting the Annual Meeting (November of each Year); Hosting the quarterly teleconference; Publication of the Annual Report (February of each year); Maintenance of the INSPIRE-GREEN website (www.inspire-green.com) ; and Management of the INSPIRE email account (info@inspire-green.com). 3.2.4 Annual Report The partners will publish a report each calendar year which will summarise the progress of the partnership in the preceding 12 months. See Section 6 for more detail. 10

3.2.5 Quarterly Teleconference The Chair will host quarterly teleconferences where coordinators will discuss progress and update plans. 3.2.6 Role of ASIOACG Progress of the INSPIRE work program is likely to require significant technical input and coordination between affected Air Navigation Service Providers. It is recognised that the Arabian Sea / Indian Ocean ATS Coordination Group (ASIOACG) plays a key role in supporting and expediting the goals and objectives of ICAO, especially in regard to CNS/ATM initiatives within the Oceanic airspace of the Arabian Sea and Indian Ocean. The INSPIRE partnership recognises that ASIOACG is complementary to the objectives of INSPIRE and intends that a portion of the works identified in the INSPIRE work program will be progressed through ASIOACG. 11

4 Recommended ANSP Best Practices in the Arabian Sea and Indian Ocean Region In consultation with stakeholders, the INSPIRE partners have compiled a series of recommended procedures, practices and services that have been demonstrated or have shown the potential to provide efficiencies in fuel and emissions reduction management. They encompass all phases of flight from gate-to-gate, and are designed to reflect the requirements, in particular but not limited to, long haul flights that typically exceed 8 hours in duration. The recommendations contained below are for procedures, practices and services that are fully developed or that have reached a state of demonstrable maturity. New and conceptual applications will be added as they reach a proven state of readiness. 4.1 Surface Movement Optimisation Surface Movement Optimisation procedures and surface and runway movement monitoring technologies have the potential to substantially improve the fuel and emissions efficiency of aircraft by reducing taxi times through improved planning of surface movements. Surface movement optimisation procedures will be aimed at minimising the delay from start request to approval, and the time/fuel burn from start approval to take off, The INSPIRE partners recognise the potential benefit of surface and runway movement monitoring capabilities at congested airports using surveillance via radar and/or automatic dependent surveillance broadcast (ADS-B), often enhanced by multilateration. While these surface movement systems are principally designed to enhance safety and reduce the potential for runway incursion, they also serve as the foundation for future systems that will optimise surface and runway movement. 4.2 Departure Optimisation Optimisation for departure profiles is a developing ANS enhancement. Procedures for the fuel and emissions optimisation of departures have yet to be defined within INSPIRE. Procedures are expected to include optimise departure to facilitate unconstrained climb to cruise level and track to route start point, and manipulate taxi and departure time to optimise oceanic entry altitude and position in the enroute sequence. Departure optimisation procedures are expected to substantially improve the fuel and emissions efficiency of aircraft during the climb-to-cruise portion of flight by minimising low altitude vectoring and the need to level-off at interim altitudes. These optimised departure procedures are generally referred to by ICAO as Continuous Climb Departures (CCD). 12

4.3 Enroute Flight 4.3.1 User Preferred Routes A User Preferred Route (UPR) during the oceanic phase of flight is defined as a lateral profile developed for each individual flight by the flight operator. These lateral profiles are customised in order to meet the specific needs of the aircraft operator for that flight, such as fuel optimisation, cost-index performance, or specific mission requirements. Figure 2 - User Preferred Route Example Typically a UPR will be calculated by an aircraft operator s flight dispatch based on factors such as forecasted winds, aircraft type and performance, convective weather and scheduling requirements. UPRs are a favoured enhancement to oceanic operations where air traffic control (ATC) limitations previously required that aircraft fly on fixed air traffic services (ATS) routes, or published flexible track systems. This enhancement is directly attributable to the implementation of ground and airborne improvements such as automated conflict prediction, conformance monitoring and automatic dependent surveillance (ADS). When UPRs are created based on fuel optimisation considerations, the corresponding savings in greenhouse gas emissions can be substantial. 4.3.2 Dynamic Airborne Reroute Procedures Dynamic Airborne Reroute Procedures (DARP) refers to an oceanic in-flight procedure whereby the lateral profile of a flight can be modified periodically in order to take advantage atmospheric conditions and updated forecasts. Typically, flight operators file flight plans some hours prior to a flight estimate time of departure. Often, revised upper wind forecasts are available after the flight plan is filed or the aircraft departs. 13

Figure 3 - Dynamic Airborne Reroute Procedure Example DARP allows aircraft operators to calculate revised profiles from the aircraft s present position to any subsequent point in the cleared route of flight in order to realise savings in fuel or time. This update profile is coordinated by the Airline Operations Centre (AOC) with the flight crew, and sent to ATC as a reroute request from the aircraft. Initially demonstrated in the South Pacific in 1999, recent enhancements to conflict prediction, conformance monitoring and inter-facility coordination in Air Traffic Management automation systems have enabled the wider implementation of the DARP. Participating ANSPs can accommodate multiple in-flight reroute requests across airspace boundaries. The DARP can provide significant savings in fuel and emissions. A recent Air New Zealand analysis concluded that 58% of all flights from Auckland to North America assessed during the analysis sample would achieve fuel savings from the DARP procedure, resulting in an average fuel burn reduction of 453kg per flight, or roughly 1431kg of CO 2 emissions. 3 4.3.3 Flexible Track Systems In an oceanic environment where the use of UPRs is not feasible, flexible track systems can provide an alternative vastly more efficient than fixed ATS routes. A flexible track is typically calculated so that all flights flying a specific city-pair route will utilise a single lateral profile or track. This track is calculated based on forecasted meteorological data and a representative aircraft performance model and published via NOTAM. A flexible 3 ISPACG/22 IP-16 14

track system is a series of flexible tracks designed to provide a generic optimised route between nominated city pairs. Flexible tracks provide greater efficiencies than fixed ATS routes, because they are optimised to take advantage of favourable winds. Flexible tracks do not provide the same level of efficiencies to individual aircraft that can be achieved in a UPR system. However in circumstances where implementation of UPRs is not yet feasible a flexible track system provides a notable improvement in efficiency and reduction in emissions. In a recent trial, 592 Emirates Airlines flights from Dubai to Melbourne and Sydney were selected to examine the benefits of the flexible track system. For eastbound flights alone Emirates Airlines saved 628 tonnes of fuel and 57 hours in trip time 4. Analysing a trajectory between Dubai and Sydney, using this optimal air traffic management, Emirates Airlines saved 8408kg of fuel and 43 minutes of flight time. This equates to more than 26,900 kgs of C02 saved. The average saving per flight was six minutes of flight time and one tonne of fuel. 4.3.4 Oceanic Separation Minima (50/50 & 30/30) The capacity of oceanic airspace is severely constrained when legacy oceanic separation standards are in use. Improvements in navigation capabilities have enabled reduction in the Oceanic separation minima to 50NM longitudinally and 50NM laterally. When coupled with direct controller pilot communications via data-link and automatic dependent surveillance, aircraft meeting certain navigation performance requirements can be safely separated at as little as 30NM longitudinally and 30NM laterally. The reduced separation minima for use in the oceanic environment are published in the ICAO Procedures for Air Navigation Services Air Traffic Management (Doc 4444) and the ICAO Annex 11 - Air Traffic Services. RNP10 Aircraft RNP4 Aircraft 50nm longitudinal, 50nm lateral 30nm longitudinal, 30nm lateral Figure 4 - Reduced Oceanic Separation Minima Qualified aircraft navigating in airspace where these reduced separation minima have been implemented achieve significantly greater efficiencies than aircraft that cannot 4 Each minute of flying-time saved reduces fuel consumption by an average of 62 litres and reduces C02 emissions by 160 kilograms. 15

meet these standards. This is due to the vastly increased access to optimum flight profiles associated with the tighter spacing of the aircraft. This enhanced efficiency is reflected in lower fuel burn and reduced emissions as more aircraft can fly closer to optimal tracks and altitudes. 4.3.5 Reduced Vertical Separation Minima (RVSM) Oceanic RVSM increases airspace capacity and allows aircraft to fly closer to fuel efficient altitudes. 4.3.6 Cruise Climb (Block levels) A cruise climb allows pilots to execute a gradual climb from one cruise altitude to another, which when properly configured enables the optimum altitude to be sustained for reduce fuel burn and emissions. In circumstances where cruise climb is not permitted, block levels provide an efficient alternative. In a block level clearance a pilot is cleared to operate between two altitudes. As with the cruise climb the pilot is able to configure the aircraft for the optimum altitude to reduce fuel burn and emissions. 4.3.7 Time Based Arrivals Management To reduce the environmental impact of delays caused by congestion at airports ANSP s have introduced traffic flow management procedures and automated decision support automation to reduce the need for fuel techniques such as low altitude vectoring and aircraft holding, and improve fuel and emissions efficiency by shifting delays to the enroute phase of flight. 4.4 Arrivals Optimisation 4.4.1 Overview Arrivals Optimisation includes any one of several procedures available to aircraft operators and air navigation service providers to improve the fuel efficiency for aircraft during final descent phase of a flight. Qualifying arrivals optimisation procedures include, continuous descent arrivals, continuous descent approaches, optimised profile descents, tailored arrivals, and are generally referred to by ICAO as Continuous Descent Operations. 4.4.2 Optimum Profile Descents An Optimum Profile Descent (OPD) is a cockpit-based flight technique where the vertical profile of an arrival is optimised to minimise undesired level flight segments so that the aircraft can be flown with engines at idle thrust from a high altitude, potentially from cruise, until touch down on the runway. Aircraft executing an OPD realise a far more efficient fuel burn profile and reduced emissions during the descent and arrival phases of flight, as compared to a traditional arrival path. A variety of OPD applications have been analysed and developed for fuel and emission efficiency improvements. 16

4.4.2.1 OPD via RNAV and RNP-AR Approaches Where conditions will allow, arrival, departure and en route traffic flows will allow, descent profiles and airspace restrictions on published Area Navigation (RNAV) and Required Navigation Performance Authorisation Required (RNP-AR) approaches are modified to provide more optimum arrival profiles. This optimisation reduces fuel burn and carbon emissions by taking advantage of the sophisticated navigational capability of modern aircraft that can fly closer to optimal tracks and altitudes. For example, RNP-AR approaches are conducted using idle power, continuous descent from an optimally chosen top of descent point. In Australian RNP-AR implementations, this has typically saved around 200Kg of fuel per approach. This results in a reduction of 620Kg of CO2 emission per approach. During the first 18 months of implementing RNP-AR OPD, Airservices Australia estimates that 33 B737-800 aircraft have conducted more than 10,000 RNP-AR approaches. The estimated cumulative savings in jet fuel is 345,240 kg with estimated carbon dioxide emissions reductions of 1,151,280 kg. 4.4.2.2 OPD via Tailored Arrivals Another application of OPD procedures, known as a Tailored Arrival (TA), is a procedure where trajectories are dynamically optimised for each aircraft to permit a fuelefficient, low-noise descent profile that has imbedded compliance with arrival sequencing requirements and other airspace constraints. Operational trials in Australia, New Zealand, and the United States have demonstrated that both types of OPD described above provide significant fuel and emissions savings. Although the successful execution of an uninterrupted OPD is greater during periods of light traffic. 4.5 Performance Based Navigation (PBN) Implementation PBN is a framework for defining navigation performance requirements that can be applied to an air traffic route, instrument procedure, or defined airspace. PBN includes both Area Navigation (RNAV) and Required Navigation Performance (RNP) specifications. PBN provides a basis for the numerous Air Traffic Services enhancements such as oceanic RNP separation reductions, Optimum Profile Descents, the development of aircraft, and the development of future concepts for trajectory based operations. These PBN enabled enhancements are a cornerstone of ANSP efforts to improve fuel and emission efficiencies ANSP guidance for the implementation of PBN and associated ATS applications are contained in the ICAO Performance Based Navigation Manual, Doc 9613. 17

5 Performance Measurement The INSPIRE partnership recognises that the measurement of success through the credible tracking of the reduction of emissions as a result of initiatives in the INSPIRE program is essential to establish and maintain the credibility of the partnership. There is a significant amount of work being undertaken by other groups and organisations to develop metrics and methodologies for the measurement of emissions attributable to aviation. The INSPIRE partners have agreed to take a pragmatic approach to measuring success. For each initiative in the work program the partners, with the direct support of the Airline partners, will establish the current fuel burn/emissions for the part of trajectory that will be affected by the initiative. At the completion of the initiative or at the end of specific stages of the related works the airline partner will report the new fuel burn/emissions. The savings associated with the success of each initiative will be reported in weight of fuel (kg) and CO2 (kg) to IATA (New Delhi). The partners have engaged IATA for the assessment and validation of the fuell and emissions savings. Results will be submitted to IATA for review and independent validation. 18

6 INSPIRE Reporting The INSPIRE partners will communicate progress and performance through three primary means: An Annual Report; The work program status report; and INSPIRE Daily. 6.1 Annual Report The Annual Report will be developed by the INSPIRE coordinators in the second quarter of each calendar year to provide status updates on work program initiatives and demonstrations, performance measurements and future plans for the INSPIRE partnership. The report will be distributed to appropriate members of the aviation community, including industry, media and global forums. 6.2 Work Program Status Report A graphic presentation of the status of the work program will be maintained on the INSPIRE-Green.com website. The graphic status report is intended as a simple means of communicating the status of each initiative including the expected completion date and the benefits outcome. 6.3 INSPIRE Daily INSPIRE Daily highlights the environmental best practice that are being delivered everyday, and provides a means alerting the partners if best practice is interrupted. The objective of INSPIRE Daily is to increase awareness and utilisation of Air Traffic Management environmental best practice on a daily basis in the Arabian Sea and Indian Ocean area The goals of the INSPIRE Daily program include: Identify and publish INSPIRE Daily City Pairs where 3 or more fuel-saving Best Practices are available. Certify INSPIRE Daily City Pairs with a star rating system in consultation with the International Air Transportation Association (IATA). Enable and encourage reporting by airlines of their successful utilisation of INSPIRE Daily City Pair routes and index this information. Actively promote and advertise the availability and usage statistics of new and existing INSPIRE Daily City Pairs though industry forums, web distribution and the INSPIRE Annual Report. More detail on INSPIRE daily can be found on the INSPIRE-Green.com website. 19

7 INSPIRE Work Program The work program consists of a series of initiatives which, as they re completed, will allow the INSPIRE partnership to progress towards their goal of improving the efficiency and sustainability of aviation. For each initiative one INSPIRE partner is identified as the lead. It is the leads responsibility to track the progress of the initiative and coordinate and facilitate the other stakeholders to encourage success of the initiative. List of current initiatives Initiative Abu Dhabi 1 RNP-AR...21 Initiative Abu Dhabi 2 SIDS & STARS review...22 Initiative Australia 1 Colombo, Male, Melbourne boundary waypoints...23 Initiative Australia 2 Amendment of the IORRA...24 Initiative Australia 3 Introduction of updated ALOFT...25 Initiative Australia 4 Additional connector routes for Melbourne FIR Oceanic UPRs...26 Initiative Dubai 1 SIDS & STARS Review...27 Initiative Dubai 2 Limited dual stream arrivals mode...28 Initiative Dubai 3 Reduced Final Approach Spacing Trials...29 Initiative IATA 1 User Preferred Routes South East Asia & Africa...30 Initiative India 1 Integration of National Radar Coverage...31 Initiative India 2 Reduction of longitudinal separation to 50NM...32 Initiative India 3 Mumbai Connector Routes (Male Muscat)...33 Initiative India 4 Mumbai FIR Connector Routes (Seychelles)...34 Initiative India 5 PBN-RNAV 1 SIDs & STARS for Bangalore & Trivandrum and RNP Approach for Cochin...35 Initiative India 6 Flexible Use of Restricted Airspace...36 Initiative South Africa 1 INSPIRE Daily (Perth - Johannesburg)...37 Initiative South Africa 2 Extension of Class A to 80S in Johannesburg FIR...39 Initiative Sri Lanka 1 Updated Automation System (incl. CPDLC/ADS-C)...40 Initiative UAE 1 UAE Airspace Review (proposed)...41 Initiative UAE 2 UAE Flow Management Capability...42 20

Initiative Abu Dhabi 1 RNP-AR Initiative Summary ADAC and Etihad Airways are working together to develop RNP AR procedures for Abu Dhabi International Airport and Al Bateen Executive Airport. Initiative Lead Abu Dhabi Airports Company (ADAC) Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations OMAA (Abu Dhabi) Strategic Goals Etihad Airways Affected Flight Information Regions ADAC 1. Reduce Track miles by using curved approaches 2. Deconflict Abu Dhabi and Al Bateen Airport operations where possible Benefits 1. Fuel savings and reduction in carbon emissions 2. Reduced noise levels for Al Bateen Airport operations over downtown Abu Dhabi Milestone Targets Activity Responsible Estimated Date for completion 1. Establish current fuel and emissions Etihad Airways August 2011 (Done) 2. Project Kickoff and preliminary concept design 3. Finalize Detailed Design and Conduct Simulations 4. Achieve regulatory approval Quovadis and Stakeholders October 2011 (Done) Quovadis January 2012 Quovadis/ADAC/Etihad March 2012 5. Publish AR procedures ADAC July 2012 21

Initiative Abu Dhabi 2 SIDS & STARS review Initiative Summary Update ADIA SIDs and STARs to incorporate constant descent approaches and constant climb departures concepts where possible. Initiative Lead Abu Dhabi Airports Company (ADAC) Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Etihad Airways Affected Flight Information Regions ADAC OMAA (Abu Dhabi) OMAE (Emirates) Strategic Goals 1. To achieve constant descent approaches from top of descent 2. Unrestricted departures to cruise altitudes 3. Maintain RNP1 STARs for use with conventional approaches 4. Change closed STARs to open STARs Benefits 1. Fuel savings and reduction in carbon emissions 2. Reduced noise levels for Al Bateen Airport operations over downtown Abu Dhabi Milestone Targets Activity Responsible Estimated Date for completion 1. Establish current fuel and emissions Etihad Airways August 2011 (Done) 2. Project Kickoff and preliminary concept design 3. Finalize Detailed Design and Conduct Simulations 4. Achieve regulatory approval 5. Publish new SIDs and STARS Quovadis and Stakeholders October 2011 (Done) Quovadis January 2012 Quovadis/ADAC/Etihad March 2012 ADAC July 2012 22

Initiative Australia 1 Colombo, Male, Melbourne boundary waypoints Initiative Summary Airports and Aviation Services Sri Lanka, the Maldives Airport Company and Airservices Australia will introduce new waypoints on their FIR boundaries to allow a greater range of options for flight planning. Initiative Lead Airservices Australia Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Airservices Australia Etihad Airways Emirates Airline Affected Flight Information Regions Airport and Aviation Services (Sri Lanka) Ltd. Maldives Airports Company Limited (MACL) YMMM (Melbourne) VCCC (Colombo) VRMF (Male) Strategic Goals 1. Allow airspace users better access to their preferred trajectory Benefits 1. More efficient operations and reduced emissions. Milestone Targets Activity Responsible Estimated Date for completion Propose new waypoints Airline Partners August 2011 Review and agree waypoints Sri Lanka, MACL, and Airservices Australia September 2011 Establish current fuel and emissions Publish new waypoints Airline Partners September 2011 Sri Lanka, MACL, and Airservices Australia October 2011 Publish results Airline Partners & IATA January 2012 23

Initiative Australia 2 Amendment of the IORRA Initiative Summary Airservices Australia will propose an amendment to the IORRA to incorporate procedures currently incorporated in a series of bi-lateral agreements with airspace users and improve overall operator flight planning flexibility Initiative Lead Airservices Australia Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Airservices Australia ATNS SA YMMM (Melbourne) Strategic Goals Emirates Airlines Etihad Airways Virgin Australia Affected Flight Information Regions 1. Increase availability of User Preferred Routes 2. Reduce customers workload associated with Off Air Routes flight planning Benefits The proposed creation of the Off Air Routes flight planning manual and removal of IORRA in Australian airspace offers the following advantages: 1. Reduced complexity of flight planning procedures, making better use of flight planning system capabilities; 2. UPR s will become available to a wider range of operations within Australian airspace, for example, between South East Asia and Africa; 3. Flight planning rules will be able to be better tailored to specific trajectories; and 4. Documentation will be simplified by combining multiple Off Air Routes planning procedures into one document. Milestone Targets Activity Responsible Estimated Date for completion Present proposed change to the ASIOACG Airservices Australia November 2011 Implement proposed changes Airservices Australia March 2012 24

Initiative Australia 3 Introduction of updated ALOFT Initiative Summary Introduce an updated ATM Long-range Optimal Flow Tool (ALOFT) which accounts for airlines Cost Index operational requirements and addresses other issues found with previous ALOFT implementations. Initiative Lead Airservices Australia Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Airservices Australia YMMM (Melbourne) Strategic Goals Emirates Airline Etihad Airways Qantas Airways Singapore Airlines Virgin Australia Affected Flight Information Regions YBBB (Brisbane) 1. Efficient application of delay due Airport capacity constraints Benefits 1. Reduced fuel use Milestone Targets Activity Responsible Estimated Date for completion Provide education pack on Cost Index operational requirements Qantas Airways January 2012 Draft updated proposal for ALOFT program Airservices Australia March 2012 ALOFT proposal Review Airline Partners April 2012 Implement updated ALOFT program Airservices Australia July 2012 25

Initiative Australia 4 Additional connector routes for Melbourne FIR Oceanic UPRs Initiative Summary Additional connector routes for Melbourne FIR Oceanic UPRs Initiative Lead Airservices Australia Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Airservices Australia Emirates Airline Etihad Airways YMMM (Melbourne) Strategic Goals Virgin Australia Affected Flight Information Regions 1. Allow airspace users better access to their preferred trajectory Benefits 1. Airspace users able to plan more efficient flight paths Milestone Targets Activity Responsible Estimated Date for completion Examine flex track history to determine most effective connector routes & develop proposed route structure changes Airservices Australia February 2012 Review proposed route structure changes with customer Promulgate amended route structure Airservices Australia Emirates Airline Etihad Airways Virgin Australia March 2012 Airservices Australia May 2012 26

Initiative Dubai 1 SIDS & STARS Review Initiative Summary Design and implementation of new SIDS/STARS (ADP 1 project)for OMDB and OMSJ, to enhance current capacity, and provide improved route planning. Initiative Lead Dubai Air Navigation Services (DANS) Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Emirates Airlines Fly Dubai Air Arabia DANS Affected Flight Information Regions OMDB (Dubai) OMAE (Emirates) Strategic Goals 1. Implementation of RNP 1 SIDS/STARS Benefits 1. Enhance current operations to provide more efficient traffic management 2. More structured capacity management within the OMDB CTA Milestone Targets Activity Responsible Estimated Date for completion Establish current fuel and emissions Emirates Airline Completed Publish new SIDS and STARS Dubai Air Navigation Services (DANS) December 2012 27

Initiative Dubai 2 Limited dual stream arrivals mode Initiative Summary Implementation of dual stream arrivals, for specific daily time periods Initiative Lead Dubai Air Navigation Services (DANS) Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Emirates Airlines Fly Dubai DANS Affected Flight Information Regions OMDB (Dubai) OMAE (Emirates) Strategic Goals To achieve optimum runway utilisation for arrivals during specified low departure periods Benefits To maximise available runway capacity for arrivals Shorter taxi routes, by aligning arrivals relative to the allocated parking bays Reduced airborne delays Milestone Targets Activity Responsible Estimated Date for completion Project planning and implementation Dubai Air Navigation Services (DANS) December 2012 28

Initiative Dubai 3 Reduced Final Approach Spacing Trials Initiative Summary Implementation of reduced final approach spacing trials Initiative Lead Dubai Air Navigation Services (DANS) Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Emirates Airlines Fly Dubai DANS Affected Flight Information Regions OMDB (Dubai) OMAE (Emirates) Strategic Goals To maximise arrival capacity by refining current resources / procedures Benefits Enhanced arrival capacity, without a reduction in the required safety and regulatory requirements Milestone Targets Activity Responsible Estimated Date for completion Implementation of trials Dubai Air Navigation Services (DANS) December 2012 29

Initiative IATA 1 User Preferred Routes South East Asia & Africa Initiative Summary The purpose of this initiative is to introduce User Preferred Routes for sections of the flight between ports in South East Asia and Africa. Initiative Lead IATA Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Airservices Australia ATNS SA YMMM (Melbourne) Strategic Goals South African Airways Affected Flight Information Regions FAJO (Johannesburg Oceanic) 1. Allow airspace users better access to their preferred trajectory FIMM (Mauritius) Benefits 1. More efficient operations and reduced emissions. Milestone Targets Activity Responsible Estimated Date for completion Discuss the proposed changes at the ASIOACG/6 Group November 2011 Identify Airline partner for conduct of UPR trial Establish current fuel and emissions IATA December 2012 Airline Partners February 2012 Conduct paper trial of UPR IATA February 2012 Conduct operational trial Group April 2012 Publish procedures and commence UPRs for sections of the flight between ports in South East Asia and Africa ANSP July 2012 30

Initiative India 1 Integration of National Radar Coverage Initiative Summary Airports Authority of India is implementing new ground systems which will allow the integration of radars across India. This will provide Air Traffic Controllers with improved surveillance of their airspace and shared surveillance picture between ATC units. Radar separation standards will become available across the domestic airspace. Initiative Lead Airports Authority of India Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Airports Authority of India Etihad Airways Emirates Airlines Affected Flight Information Regions VABF (Mumbai) VOMF (Chennai) Strategic Goals 1. Benefits 1. This change will allow will allow radar separation across entire CTA (India) which will allow airspace users with improved access to preferred cruise level Milestone Targets Activity Responsible Estimated Date for completion Establish current fuel and emissions As mentioned in executive summary Airports Authority of India The pilot project in Chennai FIR is likely to be commissioned in August 2011. The work in other FIRs has already started. 31

Initiative India 2 Reduction of longitudinal separation to 50NM Initiative Summary Airports Authority of India will implement distance based reduced horizontal separation of 50 NM, on ATS Routes L510, N571, P628, and P762 with effect from AIRAC date 30 th June 2011 as Phase 1of the ICAO Regional Implementation Plan. In Phase 2, the 50 NM separations shall be implemented on ATS routes L301, L759, M300, N563, N877, P570 and P574. In the later Phases, RHS minima will be introduced on all other RNAV routes also. Initiative Lead Airports Authority of India Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Airports Authority of India Emirates Airlines Etihad Airways Affected Flight Information Regions AASL VABF (Mumbai) VCCC (Colombo) Strategic Goals 1. Improved fuel efficiency through greater access to more efficient cruise levels Benefits 1. Reduced separation minima available as a result of these changes will allow airspace users better access to their preferred trajectory resulting in more efficient operations and reduced emissions. Milestone Targets Activity Responsible Estimated Date for completion Implementation of 50 NM RHS Minimum Airports Authority of India On ATS Routes L510, N571, P628, and P762 wef 30 th June 2011. 32

Initiative India 3 Mumbai Connector Routes (Male Muscat) Initiative Summary New routes will be introduced across the southern portion of the Mumbai FIR to allow crossing traffic to transit from points on the boundary of the Muscat FIR to a wider range of waypoints on the Male FIR. Initiative Lead Airports Authority of India Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Airports Authority of India Emirates Airlines Etihad Airways Virgin Australia Affected Flight Information Regions VABF (Mumbai) VRMF (Male) Strategic Goals 1. Allow airspace users better access to their preferred trajectory Benefits 1. More efficient operations and reduced emissions. Milestone Targets Activity Responsible Estimated Date for completion Publish new waypoints AAI and MACL AIRAC date in July/August 2011 33

Initiative India 4 Mumbai FIR Connector Routes (Seychelles) Initiative Summary New routes will be introduced across the southern portion of the Mumbai FIR to provide shorter flight paths to traffic from Africa to East Asia. Initiative Lead Airports Authority of India Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Airports Authority of India Affected Flight Information Regions VABF (Mumbai) Seychelles FIR Strategic Goals 1. To establish connector routes UT383 and UT387 as proposed by IATA in Mumbai FIR. Benefits 1. The airlines will be able to utilise any of the connector routes for shortening flight paths. Milestone Targets Activity Responsible Estimated Date for completion As mentioned in executive summary above AAI AIRAC date in July/August 2011 34

Initiative India 5 PBN-RNAV 1 SIDs & STARS for Bangalore & Trivandrum and RNP Approach for Cochin Initiative Summary PBN-RNAV 1 SIDs and STARS for Bangalore and Trivandrum and RNP approach for Cochin are being developed. Initiative Lead Airports Authority of India Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Airports Authority of India VOMF (Chennai) Strategic Goals Affected Flight Information Regions 1. To establish PBN-RNAV 1 SIDs and STARS for Bangalore and Trivandrum and RNP approach for Cochin. Benefits 1. The PBN-RNAV 1 SIDs and STARs and RNP approach will provide for fuel efficient flight profiles, shorter paths and approaches resulting in reduced emissions. Milestone Targets Activity Responsible Estimated Date for completion As mentioned in executive summary above AAI July 2011. 35

Initiative India 6 Flexible Use of Restricted Airspace Initiative Summary Procedures are being further developed for flexible use of restricted airspace to provide for shorter ATS routes within continental airspace. Initiative Lead Airports Authority of India Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Airports Authority of India Defence Authorities Affected Flight Information Regions All Indian FIRs Strategic Goals 1. To provide for shortest possible flight paths by flexible use of restricted airspace. Benefits 1. Optimum utilisation of airspace, shorter flight paths resulting in reduced emissions. Milestone Targets Activity Responsible Estimated Date for completion As mentioned in executive summary above AAI Ongoing activity. Results are encouraging. 36

Initiative South Africa 1 INSPIRE Daily (Perth - Johannesburg) Initiative Summary Following the success of the PER JNB SAA demonstration flight, ATNS SA and Airservices Australia proposed that the availability of Best Practices and the associated fuel/emissions savings be tracked on a daily basis in a similar way to the ASPIRE Daily method established by the ASPIRE partnership. Initiative Lead ATNS SA Contributing Stakeholders INSPIRE Partners Airline Partners Peer Organisations Airservices Australia ATNS SA South African Airways Affected Flight Information Regions YMMM (Melbourne) FAJO (Johannesburg Oceanic) Strategic Goals The goals of the INSPIRE Daily program include: 1. Identify and publish INSPIRE Daily City Pairs where 3 or more fuel-saving Best Practices are available. 2. Certify INSPIRE Daily City Pairs with a star rating system in consultation with the International Air Transportation Association (IATA). 3. Enable and encourage reporting by airlines of their successful utilization of INSPIRE Daily City Pair routes and index this information. 4. Actively promote and advertise the availability and usage statistics of new and existing INSPIRE Daily City Pairs Benefits 1. The objective of INSPIRE Daily is to increase awareness and utilisation of Air Traffic Management environmental best practice on a daily basis in the Arabian Sea and Indian Ocean area. 37