NATIONAL HIGHWAYS AUTHORITY OF INDIA

Similar documents
L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

NATIONAL HIGHWAYS AUTHORITY OF INDIA

DETAIL OF THE PROJECT

NATIONAL HIGHWAYS AUTHORITY OF INDIA

Article 13, clause no of the Concession Agreement states that:

MINUTES OF PROJECT REVIEW MEETING HELD ON

Alternatives Study of Alignment

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS.

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

SECTION DESCRPTIONS PAGE NOS.

MONTHLY O & M INSPECTION REPORT DECEMBER

Development of Road Infrastructure in India

MONTHLY O & M INSPECTION REPORT

1. Case Study Area and Character Sections

Traffic Calming Measures

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

First time sewerage scheme from

Group similar facilities together separate dissimilar facilities.

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012

PPP Days 2010 PPPs Lessons from the Last 18 Months

MORGAN CREEK GREENWAY Final Report APPENDICES

GMR Infrastructure Limited, Q1-FY 11 Performance Highlights. Financial Highlights for Q (Rs. Cr.)

HILGAY PARISH COUNCIL

NATIONAL HIGHWAYS AUTHORITY OF INDIA

One year of Olympia Odos

Leicester Square Action Plan Summary

Queen s Circus Roundabout

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Provincial Railway Technical Standards

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

EXPLANATORY STATEMENT

BROUGHTON PARISH COUNCIL. A meeting of the Broughton Parish Council was held in the Village Hall, Little Broughton on Tuesday 24 th January 2012

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

AGENDA LANARK COUNTY MUNICIPAL TRAILS CORPORATION BOARD OF DIRECTORS

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

Tri-Glide Instruction Manual

KANNUR INTERNATIONAL AIRPORT LIMITED (KIAL) Status Report as on 5 May Total land planned for the project acres

G.O.Ms.No.142 Dated:

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

BUNKHOUSE ASSESSMENT REPORT

DRAYCOTT IN THE CLAY PARISH COUNCIL

Chapter Five. Schedule 0.21: Particulars of Slum

NATIONAL HIGHWAYS AUTHORITY OF INDIA

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

11 th Annual Conference Road Development in India Telangana State Initiatives

Advisory Circular CT

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period)

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

Roadside assistance and Concierge Services Terms and Conditions provided by IMC:

S E L E C T I O N. Abdominal Crunch. User manual

Hungarian Public Road Nonprofit PLC

American Avalanche Association Forest Service National Avalanche Center Avalanche Incident Report: Long Form

Culpeper District. Albemarle County Monthly Report. September 2012

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)


same. Thanking you, Yours faithfully Deputy Registrar (P) Dr. S.K. Balasundaram Deputy Registrar (Purchase)

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Connectivity continues to remain one of the biggest concerns for north Chennai residents with thousands of commuters struggling every day

ACORNS PROJECTS LIMITED

PERTH-ADELAIDE CORRIDOR STRATEGY

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

EDINBURGH AIRPORT LTD COACHPARK

CHAPTER 16 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES*

CITY OF MURFREESBORO BOARD OF ZONING APPEALS

Code of Practice for filming in East Lothian

NEIGHBOURHOOD INSPECTIONS. A pictorial guide for neighbourhood inspections

Mason Street Bike/Pedestrian Trail Project

20mph Speed Limit Zones

DATABASE HEALTH INDEX - DASHBOARD

Community Development

Grade Crossing Regulations

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

TMC Monthly Operational Summary

Rhino-Rack FOXWING Awning by OZTENT

Proposal for the Development of Bus Stops

Rangitikei District Council

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche:

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

Appendix 9 Melbourn Greenway Review

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

INSTRUCTION MANUAL ALEKO RETRACTABLE AWNING

Briarhill Neighborhood Polecat Priority List. Exhibit D-4

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

Minutes of the Annual Meeting of the Parish Council held in Torpenhow Village Hall on Wednesday 10 th May, 2017 at 7.15 pm

Roadside Assistance and Concierge Services Terms and Conditions

GREATER ORLANDO AVIATION AUTHORITY

Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation)

Enhanced Emergency Shelter Kit (EESK)

Transcription:

NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH-45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in the State of Tamil Nadu under BOT basis (Package 2A) CDM SMITH INDIA PRIVATE LIMITED AUGUST-26

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26. LOCATION MAP

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 2. PROJECT DATA 2. PROJECT DETAILS: Project Name : Length : 38.43 Kms. Client : National Highways Authority of India. Independent Engineer : M/s. CDM Smith India Pvt. Ltd. Name of the Concessionaire : M/s. Indu Navayuga Infra Project Pvt.Ltd., Concession Agreement Signed Date : 3th May 26 Appointment Date Contract Commencement Date Financial Closure : 25th November 26 : 8th November 26 Project Cost : Financial Grant : Rs.6 Crores Performance Security : 5% of the total project cost till the financial closure & 3% of the total Project Cost after Financial Closure. Construction Period : 3 Months & Extension approved by NHAI from 24.5.29 to 5.5.2 ( months & days). Completion Date : Provisional Completion Certificate issued on 5.5.2 and completion certificate requested to NHAI after completion of Punch List period on 2.9.2. Completion Certificate is awaited. Concession Period : 25 Years (Including Construction Period). Four laning and Strengthening of Padalur to Trichy Section from 285. to Ch. 325. of NH 45 (VI C) in the State of Tamil Nadu, BOT Basis. Rs. 32 Crores 2

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 3. EXECUTIVE SUMMARY The Government of India through National Highways Authority of India had been contemplating to enhance the traffic capacity and safety of goods and passenger traffic on the selected heavy traffic density corridors in India and had identified one such stretch of Road in Tamil Nadu i.e. existing 2 lane highway of NH-45 between Chennai Dindigul. A joint venture of Indu Projects Ltd., of Hyderabad, Navayuga Engineering Company Ltd of Hyderabad and Abhisekh Developers of Bangalore won the concession through the competitive bidding process of NHAI in February 26. Subsequently the JV formed a SPV in the name of Indu Navayuga Infra Projects Pvt. Ltd., which entered into a Concession agreement with NHAI on 3 th May 26. The Package VI-C between km 287.73 & km 326.58 i.e. between Padalur and Trichy and the project is allotted to Indu Navayuga Infra Projects Private Limited on BOT basis. INIPPL, the Concessionaire Company had broadly divided the project into 2 major packages to simplify the execution process. These 2 packages are framed under separate EPC contracts and these EPC contracts were handed over to Indu Projects Ltd. and Navayuga Engineering Company Ltd. as per the broad scope of works described below. Package-A: Consists of all road works including earth works, pavement works, cross drainage works, road furniture s and bus stops. This package was entrusted to M/s Indu Projects Ltd. Package-B: Consists of all structural works including Major bridges, Minor bridges, flyovers, rail over bridges and road under bridges. It also includes approach filling and reinforced earth walls / retaining walls. This package was entrusted to M/s Navayuga Engineering Company Ltd. PLUS Expressways Berhad, Malaysia took 49% of shares and entered as a partner on 2st January 2. PLUS has also agreed to take 74% of shares after 3 years of COD as per Concession Agreement. 3

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 4. INDEPENDENT ENGINEER DETAILS Name of the Independent Engineer : M/s. CDM Smith India Pvt. Ltd. Date of LOA : 5th February, 23 Contract Agreement Signed Date : 2st March, 23 Date of start of service : 5th April, 23 Contract Period : 36 months Contract Amount : INR 3,6,3,72/- Head Office Address : No.75, 2nd Floor, 4th Cross, st Block, R.T. Nagar, Bangalore - 5632 India. Tel: 8-2354 343 Fax: 8-2354 4265. Site Office Address : No.37, st Floor, Thamirabarani Square, Periyar Nagar, Villupuram 65 4 Tel: 446-259996 4

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 5. CONCESSIONAIRE CONTRACT DETAILS Name of the Concessionaire : M/s. Indu Navayuga Infra Project Pvt.Ltd., Contract Agreement Signed Date : 3th May 26 Commencement Date : 25th November 29 Date of completion as per contract : 24th May 29 Actual Date of Completion : 5th May 2 Original Contract Period : 3 Months Commercial Operation Date : 5th May 2 Site Office Address : 2nd Floor, J.C.Tower Karur Bypass Road, Trichy 62 8. Tel: 43-4683. 5

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 6. SALIENT FEATURES OF THE PROJECT BC 5 DBM 5 WMM 25 GSB 5 Drainag e layer Sub Grade (CBR %) Varies according to sub grade strength, total required thickness and available Design, Engineering, Construction, Development, Finance, Operation and maintenance of 4 Laning the Existing 2 Lane Section from Km 285 (Near Padalur) to Km 325(Near Trichy) on NH-45 in the State of Tamilnadu on Build Operate Transfer (BOT) basis. Widening of existing carriage way to 4 lane divided into two carriageways of 7.25 m wide with.5m wide paved shoulder adjoining at left extreme divided with a median ranging from.2m to 5m width. Flexible pavement provided new carriageway and for strengthening of existing pavement, flexible over lays are provided as shown below. Layer Composition of New Pavement. As per Concession Agreement Vol. of 3, Page.6, Para7.2, Table B-4 5 Composition of Overlay strengthening of Exist Carriage way (Thickness in mm) ( Thickness In mm) thickness. Pavement composition on service roads will be as under. Pavement Layer As per Concession Agreement Vol. of 3, Page.7, Table B-6 Thickness in mm BC 25 DBM 75 WMM 5 GSB 2 Sub Grade 5 6

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 6..Summary of Structures: Sl.No. Type of Structure Total No of structures. Major Bridges 3 2. Minor Bridges 3. ROB 4 4. RUB 5. Grade Separator 3 6 Pedestrian Underpass 3 7 Pipe Culvert on main carriageway 3 8 Slab Culvert & Box on main carriageway 39 9 Bus Passenger Shelter 3 Rainwater Harvesting Unit 7. Toll Plaza 2. Administrative Building at Toll Plaza Flexible Pavement : 38.427 Kms (Existing & New carriageway) Bypass Candidate :.85 Kms at Samayapuram Toll Plaza : Toll Plaza is located at km.37.24. There are total of 2 [twelve] lanes, 6 lanes for each directions. Out of these 6 lanes 5 lanes have clear width of 3.2m each lane and 5.5m wide lane provided on the 6th lane on each direction. Out of 2 lanes lanes are functioning. 5 in each direction. Service Roads : locations. 8.79 Kms (.95 on LHS + 8.596 on RHS) in town and villages at 4 6.2. Road Safety and Traffic Management 7

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 The road safety has been given due importance for the safe movement of traffic. At areas where the works are in progress, signboards are displayed, safety cones are placed as per IRC codes. Warning sign fixed along the road. Reflective tape is fixed around the working area wherever required. Regular monitoring is carried out in the entire stretch 6.3.Highway Traffic Management System In order to have a better control over the movement of traffic, a state of art HTMS is set up. The components of HTMS are. a. Emergency Call Boxes b. Variable Message Sign Boards c. CCTV d. Automatic Traffic Counter cum Classifier e. Metrological data Station f. Power Supply System Other than this following ground support also provided. a. Ambulance - No. b. Highway Patrol vehicle 2 Nos. with Highway Patrolling team. c. Crane - No. 6.4. Lighting system The following lighting facilities were provided in the entire stretch of Package :VI-C for reducing the frequent accident and help the road users. a. Street Lights 54 Nos. b. Flood lights 4 Nos. c. Tube Lights provided in the PUP 2 Nos. d. Solar Lights erected on the median 26 Nos. e. High mast lights provided in the important junctions 8 locations total 72 fittings. f. Solar Blinkers provided in important median Openings 5 locations fittings. 6.5. Median Plantations, Avenue Plantations & Landscaping We have appointed M/s.AB Construction for maintaining the Median Plantations provided in the entire stretch. They are watering the plants at regular interval with a frequency of alternate day and providing manure to the plantations once in three months. The median plantations help as lighting barrier for opposite moving vehicle in night times and aesthetic look in day time. 6.6. Route Operations 8

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 As per concession agreement two patrol vehicles are available in the projects. Their main activities are; a. Patrolling the Highway b. Managing the Incidents/Accidents c. Implementation of lane closure procedure d. Calling for Assistance, Medical or Tow services. e. Co-ordination with the HTMS control center. f. Interacting with the local agencies like Police, Fire Brigade, Trauma care Hospital etc. g. Protecting the assets on the Project Highway h. Reporting of damages on the road/assets i. Encroachment control & removal One tow away crane provided as per concession agreement and stationed at Toll Plaza for removing the accident vehicles & cleaning the carriageway. One Ambulance duly equipped with the first aid medical equipment and a Para Medical Officer is stationed at Toll Plaza. 6.7. Other Amenities a. Truck Parking Facilities : Truck parking facilities with restaurant and toilets at km.32+456. The restaurant has functioning smoothly from April 2. We had provided additional bore well to avoid the scarcity of water in the Truck Lay by. b. Water Kiosk and Dust Bin at Bus Passenger Shelters: 3 Nos. of Bus passenger shelters were provided in the entire stretch. Water kiosk and dustbin also provided in the bus passenger shelters for helping the bus passenger and road user. Pedestrian Facilities : In order to facilitate pedestrian to cross the road without any hindrance, pedestrian crossings have been provided with Zebra crossing painting, marking and lighting/solar lighting provision/solar Blinker. Rumbling strips are made in the important junctions with thermoplastic road marking paint for avoiding the accident as per the instruction of NHAI and District Administration. Solar Road Studs/Ordinary Road Studs: 9

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 Nearly 389 Solar road studs are available in the important curve and accident zone. Ordinary road studs/cat eyes were provided throughout the stretch on the road marking. The solar studs help the road user in the night hours/rainy season/ heavy fog time.

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 7. MAINTENANCE ACTIVITIES CARRIED OUT DURING THE MONTH Maintenance activities like cleaning of carriage way, cleaning of drains, removal of garbage, repairing of sign boards, repairing or replacement of damaged metallic crash barriers, pedestrian guard rails, kerb, etc are in progress. Accident victims have been rescued through ERP (Emergency Response Protocol), intimating to the nearest police and ambulances and in coordination with hospitals. All project facilities like wayside amenities, truck lay byes including attending repairs to illumination, landscaping, water supply, drainage, waste disposal system, litterbins, and toilets have been maintained properly. Round the clock patrolling is being done for surveillance of the ROW in respect of the Project / Project Facilities. Maintenance of illuminations Toll plazas, Truck lay byes, Rest rooms, Bus shelters, Major junctions is in progress. Maintenance of bus bays, truck lay byes, rest rooms, toll plazas, toll plaza buildings, etc is in progress. Replacing of dead / missing plants, watering, manuring, etc. in progress for median / avenue plantation. Repair to the damaged portions of lined drains is in progress. Cleaning of vents of culverts and bridges is in progress. Encroachments are being removed periodically at service roads and ROW areas. Cleaning of lined drains and toe drains are in progress. Guard post fixing and painting is in progress in high embankment. Rectification of earthen shoulder is in progress. Trimming median plants in median is in progress. Replacement of damaged pedestrian grills is in progress. Cutting and trimming of grass and weeds in the median and ROW is in progress. Replacing of missed / damaged cluster boards, sign boards, etc. is in progress. Numbering and replacing of missed / damaged HM / KM stones are in progress.

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 8. INSPECTION REMARKS AND COMPLIANCE REPORT (Padalur to Trichy section of NH 45 (VI-C) Km 285/ to 325/) BY TEAM LEADER Chief of Operation & Maintenance INIPPL has promised to engage Road Expert from IIT to study the road surface and to suggest remedial measures. The concessionaire has been instructed to engage the expert and submit the report at the earliest. Necessary field test conducted and the opinion of the road experts will be obtained and action taken accordingly. The concessionaire is instructed to submit the report not later than 3.8.24. BBD and Roughness test were conducted in July-23 and renewal of riding surface was done for 3.3 Km. Similar BBD test have been completed in September 24 and roughness test will be conducted in before 3.9.24. Based on the test results, remedial measures will be taken up. Hence separate field study is not found necessary. Report on remedial measures may be submitted. A professor of Civil Engineering from IIT Chennai along with Engineers of M/s. Velcity Consulting Engineers are expected to inspect the bridge on..24. On receipt of their Technical opinion the report will be sent. Report not yet submitted. The concessionaire has instructed to obtain and submit the report of the consulting engineer before 2.2.24 For all the major, minor bridge and culverts, close inspection has to be carried out. Though inspection has to be carried out for following.. Stage of bearing 2. stage of expansion joint Action is being taken to study the condition of bearing. Ms. Bainyas, Bangalore the consulting specialists for bridge has been addressed to visit the bridge and given their opinion. The concessionaire is instructed to submit the report not later than 3.8.24. M/s. Velcity Engineers have been requested to depute an expert to study the bearing position and offer technical opinion. Action will be taken on receipt of the technical opinion. Report may be submitted. Report not yet submitted. The concessionaire has instructed to obtain and submit the report of the consulting engineer before 2.2.24 2

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 INSPECTION NOTES FOR CHIEF GENERAL MANAGER(T) & REGIONAL OFFICER, NHAI, CHENNAI ON 7.5.25.. Display Boards: Display boards with safety messages and speed limits as per Motor Vehicles Act and Rules to be provided at every 5 km intervals / Toll plazas / Rest areas. Work is in progress. 2. Overall cleaning has to be improved. Periodic cleaning is in progress. 3. Median / Avenue plantation: Avenue plantation and median plantation in gaps have to be taken up. Nursery saplings order placed and the work will be started onset monsoon Work is in progress. 3

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 9. LANE AVAILABILITY REPORT 4

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 ACCIDENT REPORT 5

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 6

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in S.No TYPE of ACCIDENT (Injuries) No. of Persons Affected Minor 22 2 Major 5 3 Fatal 5 TOTAL 32 S.No TYPE of ANIMALS (Injuries) No. of Animals Affected Dog 2 Total 2 August- 26 7

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26. STAFFING INDEPENDENT ENIGINEERS STAFF Sl. No 2 Name K.G. Rajasekharan R. Krishnamurthy 3 R.Suresh Babu 4 P.Manimaran 5 6 7 K.Kannan P.Gopi K. Kurinchiselvan Designation Team Leader Road Safety Expert Asst. Highway cum Maintenance Engineer- Asst. Highway cum Maintenance Engineer-2 Asst. Quality cum Material Engineer Horticulture Office Manager Contact Number 944358987 934285387 995293775 8873356 98427598 97637349 9976974436 8

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 2. WEATHER REPORT 3. MONTHLY FEE STATEMENT. Name of work: Four laning and strengthening of Padalur to Trichy section from Km 285/ to 325/ of NH 45 on BOT Basis. 2 Date of Commencement of fee collection: 6/5/2. 3. Report for the month ending: August -26. 4. Fee rates (in. ): Vehicle Type Fee rates on commenc ement 6.5.2 Hrs Rates during the year applied w.e.f 2.9.2 Hrs Rates during the year applied w.e.f.9.2 Hrs Present rates applied w.e.f.9.22 Hrs Present Rate applied w.e.f.9.24 Hrs Present Rate applied w.e.f.9.25 Hrs 25 3 35 35 4 4 45 5 55 6 7 7 95 5 5 25 4 35 5 65 85 2 22 25 Car, Passenger Van or Jeep Light commercial Vehicle (LMV) including minibus Trucks/Bus Multi Axle Vehicle (>2 axle) 9

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 2

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 2

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 22

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in Vehicle Type Type of Journey Rates during previous year applied w.e.f. Sep 2 SJ 3 DP SJ Car, Passenger Van or Jeep Light Commercial Vehicle Truck Multi Axle Vehicle ( > 2 Axle) Rates during previous year applied w.e.f..sep.22 Rates during previous year applied w.e.f..sep.23 Rates during previous year applied w.e.f..sep.24 Present Rates applied w.e.f..sep.25 35 35 35 4 4 45 5 55 55 6 6 5 55 6 65 7 7 DP 8 85 95 5 SJ 5 5 25 3 4 35 DP 55 7 85 95 25 25 SJ 65 85 2 2 22 25 DP 25 275 3 35 335 325 5. Collection during Month Under Report Vehicle Type Type of Journey Fee Rates (in Rs) Rates during previous year applied w.e.f. Sep 2 ( Amount in Rs. Laks) Corresponding Month during Previous Year Previous Month Nos Amount Nos Amount 35 53992 65968 5694 62776 6568 66672 5 DP 55 6 8895 4937 75398 452388 8523 48338 L C - Pass 5 588 882 647 975 6 9 L C -2 Pass 3 94 582 6 48 224 672 General pass 985 6 2 237 85 55 SJ 7 924 2255 48785 2228 5496 238 4266 85 95 527 4984 4774 4984 52 52 72 85 955 83 275 225 8 6 SJ 5 General pass 9635 7 DP 2 55 65 Truck Nos 4 Light Commercial Vehicle Current Month Amount 3 SJ Car, Passenger Van or Jeep August- 26 6 324 4 3 675 5 25 23

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in 3 4 35 DP 346 Concession Pass SJ 27736 568588 25585 5244925 2878 58999 344 375 395 5475 365 45 467 8935 34 385 53 53 54 58 58 54 85 2 9727 2 4662 4485 233 4858 4337 275 3 35 45885 325 5678 433 84535 563 824225 5525 5955 629 6665 65 76 Gross Total 37,426,79 TNSTC/SETC Without Smartcard Grand Total 4559895 95 335 General pass 33777 85 25 DP 22 Multi Axle Vehicle ( > 2 Axle) 4598235 52756 45 Bus/School Bus 37679 7 25 General pass August- 26 2 333 3 953 36,24,24 49,8 Gross Total TNSTC/SETC Without Smartcard 37,7,385 356,4 Gross Total TNSTC Without Smartcard 37,783,9 Grand Total 36,74,4 G.Total 38,8,285 396,9 24

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 25

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 26

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 27

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 28

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in Description VISUAL INSPECTION Side Slope - Turfing - Pitching/Masonry Location Comment Poor August- 26 Severity Fair Good Generally good Generally good Generally good Generally good Remark CLOSE INSPECTION Pavement Potholes formed in few locations due to recent rain Rut Generally good Cracks Generally good Shoving Generally good Bleeding / Ravelling Generally good Edge Deformation None Depression None Roughness Foot path & Median Damaged / Crack Side Slope Retaining Wall Roughness and deflection are found in certain stretches Generally good Nil Generally good Small portion of drainage wall damaged at g corner due to heavy flow of rain water BC patch work will be attended. Renewal work completed for 3.3Km in May 24 Renewal work completed for 3.3Km in May 24 Renewal work completed for 3.3Km in May 24 The affected stretches milled and BC relaid in May 24 Roughness & BBD test conducted Renewal of wearing coat will be done in January 25 Reconstruction work completed 29

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in Description Location Comment Poor August- 26 Severity Fair Good Remark CLOSE INSPECTION Other Facilities Unwanted Vegetation Obstruction Landscape Damaged/ Missing Truck Lay by Facilities Damaged/Missing Public Amenities Facilities Bus Shelter Base Camp Facilities THOUGH INSPECTION Traffic Operation Facilities Damaged /Missing Signs Faded Sign Painting Dirty Sign Face Damaged Gantry Sign Damaged/Missing temporary sign vegetation grown up in the berms Some of the plants dead and dried New plants to be planted in gaps Removed periodically 29 Nos. of new sapling planted for avenues in the place of dead plants in December 24. 295 Nos. of palmyrah palm nuts planted in the avenue so far None None None None Nil Sign board post painting faded Dirty sign faces to be cleaned None Nil The faded posts of sign boards painted to the entire length Cleaned periodically Other accessories CLOSE INSPECTION drainage Side /Toe drain Gullies and catch pit Bridge/Overpass Damaged/faded Handrail Generally good Generally good Generally good Generally good Silt and vegetation in toe drain and median drain removed periodically Repainting of handrail at 3

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in Description Location Comment Poor August- 26 Severity Fair Good Remark cauvery, kollidam,upper and all minor bridges were completed Rain water harvesting Unit Vent pipe and cover slab damaged in certain locations to replaced. The structures are generally good condition Median Openings Damaged metal beam crash barrier The vegetation around RWHU removed and cleaned. 44 Damaged cover slab with new slab in September & October 24 Bull nose and object markers provided in all median openings Metal Beam Crash barrier damaged at Km.296.2 &Km.33.8 44 of New metal beam crash barrier were fixed at Various lacations including Km.296.2 and Km 33.8 Good Road studs closely fixed in all median openings and edge of road in curve portion. CLOSE INSPECTION Traffic operating Facilities Road Marking good Faded marking Kerb painting Damaged missing delineator THROUGH INSPECTION good Road marking done center line and pedestrian crossing, speed breaker to the entire stretch Kerb painting done to the entire stretch Object marker fixed in all median openings. Traffic condition good Traffic Flow smooth Stalled Vehicle none T.V Kovil Junction, Accident prone Area Transverse bar, Accident prone 3

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in Description Location Comment Poor August- 26 Severity Fair Good Remark zone board fixed, solar blinkers fixed to reduce the accident. The metal beam crash barrier between LCW and left Service road is opened to avoid opposite driving near to ABT median opening ABT median opening, YJunction and Km.39/6 RHS (Sharp curve) encroachment Illegal settlement Damaged/missing Highway property Nil Nil Illegal construction Public Complaint Environmental watch nil Debris & garbage dumped in the berm at some locations. Service road none Encroachment Road Bus Bay Reply sent to road users. Nil Debris and garbages are removed periodically Action taken for encroachment Cleaning attended regularly 32

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 8. WORK PHOTOGRAPHS Month of August 26 Apply of Tack coat Progress of BC laying provided road marking and studs 33

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 COMPLAINTS RECEIVED FROM ROAD USER & REPLY 34

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 35

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 36

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 Incident Management Data Aug-6 Reference is made to NHAI HQ letter No. NHAI/CM/Inc.Man/2 dated 24.5.2 Genaral Information 2 3 PIU NH Nos. Stretch 4 Location of Incident management vehicle Trichy 45 287.73326.58 Registration No. 7 8 9 Total number of accidents reported Number of accident cases attended Number of injured shifted to hospital Number of other help provided by Route Patrol (other than acidents) Number of help provided by Tow Away Vehicle (Other than 2 287+73 to 37.24 37.24 to 326+58 37.24 5 6 Route Patrol Vehicle 3 22 29 94 5 Ambulance 3 4 2 RO: Chennai Tow Away Crane 3 4 37.24 37.24 TN 48 AD 533 TN 48 AD 5285 TN 45 AU 6994 TN2 AL 489 8 5 9 6 26 6 2 24 5 2 52 42 2 3 Total Remarks/ reasons for non-compliance 4 3 22 29 94 5 5 37

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 accidents) 2 3 4 5 6 7 8 9 No. of vehicles painted in stripes as per approved colour scheme No. of vehicles with requisite T & P and accessories as per contract No. of vehicles as per approved illuminated boards on top No. of vehicles with Requisite man power as per contract No. of vehicles fitted with GPS/VTS No. of reflective signages showing emergency contact no. No. of plazas where emergency contact details boards are installed No. of plaza where information is being printed on back of toll tickets 4 4 4 4 4 5 5 Date of last inspection by PD/RO 38

of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 SR.NO DATE/TIME EVENTS 2.5.23 Bi-Monthly review meeting by The Project Director, NHAI, Trichy.. AM 2 28.6.23 Site Inspected by Chief General Manager, Regional Office, NHAI,Chennai. 3 4 5 6 7 8 23..23 5..24 9.2.24 22.4.24 6.5.24 7.5.25 Shri. N.Jayaprakash, Member, National Road Safety Council. Chief General Manager, RO Chennai. Chief General Manager, RO Chennai. Chief General Manager, RO Chennai. Chief General Manager, RO Chennai Chief General Manager, RO Chennai 39