Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio

Similar documents
San Diego Convention Center Phase III Expansion. SDCCC Presentation to Mayor s Task Force June 2, 2009

Port Everglades Master/Vision Plan Update

2015 TAEKWONDO NATIONAL CHAMPIONSHIPS - HOTEL INFORMATION

San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee

MUSIC CITY CENTER, NASHVILLE KAY BAILEY HUTCHINSON CONVENTION CENTER, DALLAS ALBANY CAPITAL CENTER

Port Everglades Overview

Tropicana Public Workshop August 22, Image: City of St. Petersburg

Port Everglades 2014 Master/Vision Plan Update

Galt Ocean Mile Bar. Last Call Bar & Lounge 3270 NE 33 St Ft Lauderdale, FL Sponsored By:

COCONUT GROVE WATERFRONT MASTER PLAN. ERA / Curtis Rogers / ConsulTech / Paul George Ph.D.

Fort Lauderdale City Commission Transit Presentation. July 21, 2009 CAR

Miami Orlando Passenger Rail Project Overview

2018 TAEKWONDO NATIONAL CHAMPIONSHIPS - HOTEL INFORMATION

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

WHY MOVE YOUR BUSINESS TO HOLLYWOOD?

Port Everglades Master/Vision Plan Update

Miami Orlando Passenger Rail Project Overview

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018

Office Units Available

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

OFFICE SUITES AVAILABLE

TBARTA: 2015 Master Plan and Tampa Bay Express Project

Port Everglades Master/Vision Plan Update

LANDING S PARK CONCEPTUAL PLAN HAMILTON ANDERSON JANUARY City of Novi, Michigan. The Park at 13 Mile and Old Novi Road

Update: Manhattan Community Board 1 Land Use, Economic Development & Zoning committee February 12, 2018

BEACH & DOWNTOWN VisiTOr MAp & GuiDE Revised July 2017

Investor Presentation March, 2008

2016 Regional Transportation Alternatives Program (TAP) Grant Application

Fort Lauderdale Hollywood International Airport

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016

LRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050

Colorado Springs & Pikes Peak Region Destination Master Plan

OFFICE SUITES AVAILABLE

GATEWAY TO THE WHARF. 800 Maine Jones Lang LaSalle. All rights reserved.

OFFICE SUITES AVAILABLE

AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS

FOR SALE N Federal Hwy Fort Lauderdale, FL Verizon Corporate Anchored - NNN Investment

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

Plaza Park, Village Park, and Community Clubhouse

VENTURA PORT DISTRICT

Multimodal Planning Studies

Fort Myers Downtown & Riverfront Redevelopment

FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN

Investing in Brampton s downtown

Brightline Overview THE ONLY PRIVATELY OWNED, OPERATED AND MAINTAINED EXPRESS INTER-CITY TRAIN SERVICE IN THE UNITED STATES

FORWARD LOOKING STATEMENTS

4. Proposed Transit Improvements

Hillsborough MPO Technical Advisory Committee. Monday, February 20, 2017

Office of Economic and Small Business Development. Sandy-Michael McDonald, Director. June 26, 2017

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

Potomac River Commuter Ferry Feasibility Study & RPE Results

MARCO SALVINO, SR. Mayor of Dania Beach

201 E LAS OLAS BLVD DOWNTOWN FORT LAUDERDALE S NEWEST LUXURY OFFICE TOWER

Broward Boulevard Transit Corridor Workshop. February 5, :00 AM 12:30 PM FDOT District IV Auditorium

HEAT UP. your pavement business. Exhibitor Prospectus: Conference + Exhibit Hall + Outdoor Demos. January 8 11, 2014.

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

KING STREET PILOT STUDY PUBLIC MEETING

Florida East Coast Industries has deep roots in rail transportation dating back to the late 1800 s with American pioneer, Henry Flagler.

Approve, subject to conditions, and with a County Board review in one (1) year. (June 2003)

Rochester Genesee Regional Transportation Authority

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Jess Linn Principal Planner, Development Services Division Miami-Dade Regulatory and Economic Resources

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)

±700,000 sf. 3 Building Campus AVAILABLE FOR LEASE. KEVIN CUNNINGHAM SARAH BOHANNON

DOWNTOWN HISTORIC HOMESTEAD RETAIL PROPERTY ON WASHINGTON AVE

Chapter 1: Introduction Draft

STUDY WORK GROUP MEETING No. 4. July 12, 2017

Port Everglades 2014 Master/Vision Plan Update

Welcomes you Harbour Towne Marina

SAN DIEGO CONVENTION CENTER VISITSANDIEGO.COM

Cape Harbour Cape Coral, FL

REAL ESTATE TRANSACTION ADVISORY SERVICES

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

SOUTH FLORIDA HOTEL MARKET REPORT

Regional Planning for Tri-Rail Coastal Link

Port Everglades Master Plan Update Tenant Workshop. July 12, Port Everglades Master Plan Update 2006

Waukee Trailhead Public Art and Amenities Project

Now Leasing for Nov. 1, 2017 Grand Opening

CD-1 Rezoning: 777 Pacific Blvd (NEFC Sub-area 10C)

Think housing general info

TORONTO TRANSIT COMMISSION REPORT NO.

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

1.5 Facilities Inventory

4,800 sf. for lease. FARNSWORTH StreeT SEAPORT - FORT POINT DISTRICT BOSTON, MA. CORNER retail space

Fronting. The Hollywood Design and Commerce Center Under New Progressive Ownership - Extensive Upgrades and Improvements Underway GRIFFIN RD.

DEVELOPMENT OPPORTUNITY 630 Central Park Yonkers, NY 10704

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017

Project Kickoff. Agenda. Pete Sechler AECOM. Randy Goers City of Tampa

WCNA 30 NEWS REGISTRATION A NOTE ABOUT WEDNESDAY, 2 JULY 2003

2850 GREEN STREET HOLLYWOOD, FLORIDA 33020

Daylight Saving Time Begins Sunday, March 13, 2016

Modern Streetcar Vehicles Mixed Traffic Operations 14 Stations Scalability North and West

MAXIMIZING INVESTMENT AND UTILIZATION

TREASURE ISLAND AND YERBA BUENA ISLAND Treasure Island Development Authority Board. April 8, 2015

Location, Location, Location

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

A DISTINCTIVE EVENTS CENTER

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD MEETING CALENDAR

2008 Oceanside to Annapolis

Transcription:

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL 04.01.14 HKS I Urban Design Studio

Summary of Outreach

Purpose of Stakeholder Outreach Identify and engage key stakeholders Obtain and document meaningful input Apply stakeholder feedback to master plan

Multi-Faceted Stakeholder Engagement

Stakeholder Meetings COMPLETED PENDING County Commissioners County Department Directors Port Everglades Convention & Visitors Bureau Broward County Cultural Division Florida Restaurant & Lodging Association Portside/IAG SMG Convention Center Operators Harbordale HOA Balleria Ferry Operator Portside Yacht Club Condo Association City of Fort Lauderdale Poinciana HOA Port Everglades Association South Florida Regional Planning Council Relevant Regulatory Agencies Phase II Public Forums

Key Comments from 15 Meetings 1. Waterfront Access and Views 2. Iconic Destination 3. Entertainment 4. Connection to surrounding hotels and retails 5. Outdoor Space 6. Iconic Building 7. Pedestrian Oriented Environment 8. Access to Boats (Water Taxi/Ferry/Marina/Transient Boats) 9. Traffic Improvement 10. Incorporate Cruise Passengers 11. Utilize the whole site 12. Transit Alternatives 13. Sustainability 10/15 8/15 8/15 7/15 5/15 4/15 4/15 4/15 4/15 4/15 3/15 3/15 3/15

Analysis

Downtown Fort Lauderdale Amtrak Station Broward Blvd. I-95 Fort Lauderdale/ Hollywood Airport Port Everglades Expy. Federal Highway 1 17 th St. 24 th St. Trucks Buses Taxis Eisenhower Blvd. 2 miles Beach Prominent Location

How People Get Here 17 th Street Car Eisenhower 24 th Street Bus/Track/Taxi Northport Entrance Channel South Beach Park Midport

US - 1 Convention Beach Renaissance Hilton 236 Rms 589 Rms Hyatt Regency 384 Rms Embassy Suite 361 Rms Extended Stay 117 Rms Holiday Inn 78 Rms Hotels Restaurants Beach 17 th Street is the Front Door

Arrival Experience Where is the Convention Center?

San Diego Convention Center

The17 th Street Bridge A Gateway?

Bridge as a Gateway - Sydney Darling Harbour

1. 1. 3. 3. 2. 2. 1. 2. 3. 17 th St. Lack of Identity Eisenhower Blvd. Security Barrier CC Drop-off Interior: Isolated 1. 17 th St. Multi-modal Identity 2. 3. Eisenhower Blvd. Reclaim Formal Entry CC Drop-off Connect to the City Arrival Strategy

40 The Wave The Sun Trolley The Breeze WT The Wave The Sun Trolley Downtown Water Taxi Stop WT WT WT 40 Beach Broward Transit Bus WT Convention Breeze Bus Ft. Lauderdale/ Hollywood International Airport Water Taxi Traffic Strategy Existing modes of transportation

17 th Street 10% 100% 90% Cars Taxi/Bus/Truck (From 24 th Street) Modes of Transportation on17th and 24 th Streets

Cars Today (Estimated) 75% Future (Goal) 40% (Reduce by 35%) Buses Sun Trolley 20% 45% UP Taxis The Wave Water Taxi Bike Share People Mover 5% 0% 15% UP (10%) (Long Term Goal) Traffic Strategy Control modes of transportation

Existing Parking Portside East Lot West Lot Garage Parking Provided 2,500 Garage West Lot East Lot Sub Total Portside Total 2,500 sp 250 sp 270 sp 3,020 sp 176 sp 3,196sp 3,020 spaces without Portside

Existing Development Program Convention Center Visitors Convention Center Staff (say) Port of Everglades Sub-total 610,000 sf **Parking Demand 2,050 sp 250 sp 450 sp 2,750 sp Additional Development Program Convention Center Expansion Headquarter Hotel (750 rms) Entertainment/Retail Sub Total Project Total *224,000 sf 750,000 sf 100,000 sf 1,684,000 sf ***450 sp ****900 sp 500 sp 1,850 sp 4,600 sp * From contract document 70,000sf multi-purpose space 15,000sf junior ballroom 27,000sf(3x9,000sf) meeting rooms ** Previous Master Plan *** Proportional assumption from previous Master Plan **** 1.2 sp/rm Proposed Development and Parking

Shared and Discounted Parking Convention and Cruise Convention Only Weekend and Weeknight Convention Center Visitors 2,500 sp 1,600 sp 1,600 sp 0 sp Convention Center Staff 250 sp 250 sp 250 sp 50 sp Port of Everglades 450 sp 450 sp 0 sp 0 sp Headquarter Hotel 900 sp 900 sp 900 sp 600 sp Entertainment/Retail 500 sp 200 sp 200 sp 500 sp Sub-total 3,400 sp 2,950 sp 1,150 sp 35% Transit Discount 2,250 sp 1,950 sp

200 By the Bridge By the Bridge 200 600 300 300 300 2,500 2,500 1,300 Existing 3,020 Spaces Option 1 2,250-3,020 Spaces 800 Port Option 2 2,250-3,020 Spaces Parking Strategy Reduce Parking Spaces

EL. 14 Ground Floor EL. 12 FEMA EL. 4 Water table Parking Potential Below grade Parking

Fence Pedestrian Access

Pedestrian Environment outside of our Boundary

Incomplete Pedestrian Access

What other places do to the waterfront

1 ac Open Space (2.5%) Existing Open Space Not enough

And hidden

Connect the Community to the Water

It s All About the Water

Our Prominent Waterfront Location 17 th St. (A1A) Northport South Beach Park Eisenower Ave Entrance Channel Midport

Water Taxi Cruise Ship 3.7MM Passengers/year *2012 Port of Everglades Web Insufficient Access to Water Activities

The Water Taxi Network does not come here today

Entertainment Water Restaurant Taxi Stop Marina Taxi Stop Ferry Cruise Ship Working Water Cruise Ship Cargo Water Strategy Utilize existing water assets

Portside 4.7 ac Convention Center 33.2 ac Water 2.1 Ac Garage Water Portside Site Area Total 2.1 ac 4.7 ac 33.2 ac 40.0 ac The Site Expansion Opportunity

9.15 11.20 14.45 4.75 Existing 9.15 ac Partial Garage 11.2 ac Integrate Portside 19.2 ac Keep Portside Keep Full-Garage Keep Portside Relocate Partial Garage Integrate Portside Relocate Partial Garage Expansion Strategy

Elev. +0 Exhibition Up to 35 Ceiling Elev. +20 Pre-function Up to 15 Ceiling Elev. +40 Ballroom/ Meeting Unlimited Ceiling Expand Existing Three Levels

Portside Hotel Portside Convention Convention Hotel Portside Full-Garage Partial-Garage 1 2 New Port Garage Hotel Plaza Hotel Convention Convention Partial-Garage Partial-Garage New Port Garage New Port Garage 3 4 Four Expansion Strategy

Design Principles

Create an Iconic Waterfront Destination

Integrate existing community assets and business

Explore building design that creates the sense of place

Promote multi-modal transportation

Encourage sustainable development

Initial Ideas

1 Convention Plaza

Portside Hotel Plaza Future Expansion Convention Garage 1 Convention Plaza

Hotel Special Feature Portside Plaza Convention 1 Convention Plaza Garage

Add the Fourth Level ICA Boston

1 Convention Plaza PROS No Portside acquisition needed No garage demolition needed No Shoreline Modification Needed Save future expansion site for exhibition space No operational interruption to existing convention center Waterfront convention center expansion CONS Insignificant Outdoor Space Insignificant Water Access

2 Waterfront Park

Portside Convention Waterfront Park Plaza Commercial Harbor Pier Future Expansion Hotel Partial Garage 2 Waterfront Garage Park

Convention Hotel Waterfront Park 1 ac Commercial Harbor 2 Waterfront Park Pier Waterfront Plaza

Waterfront Park - Hoboken

1 ac The Lawn 1 ac Option 3 Plan Bryant Park Plan Bryant Park Summer Film Festival Event Park Bryant Park, NY

Expanding the Waterfront Fell s Point

Option 3 Plan South Street Seaport South Street Seaport Pier and Commercial Harbor South Street Seaport

East vs West Expansion Entertainment Convention Hotel Hotel Convention

2 Waterfront Park PROS No Portside acquisition needed No Shoreline Modification Needed Save future expansion site for exhibition space No operational interruption to existing convention center Waterfront convention center expansion Provide significant outdoor space Commercial Harbor opportunity CONS Require partial garage demolition Remote Convention Center Expansion Additional time and cost anticipated for pier construction

3 Entertainment Harbor

Portside Hotel Commercial Harbor Plaza Future Expansion Convention Garage 3 Entertainment Garage Harbor

Annapolis Annapolis Expand the Waterfront - Annapolis

Portside Hotel Plaza Convention Commercial Harbor Garage Pier 3 Entertainment Harbor

Entertainment Harbor Baltimore s Inner Harbor

+40 +20 +0 +40 +20 +0 +40 +20 +0 Terraces maximize the view to the water

Waterfront Terraces

Harbor Plaza Marina Park Entertainment Open Space Variations

3 Entertainment Harbor PROS No Portside acquisition needed Purposeful Waterfront Save future expansion site for exhibition space No operational interruption to existing convention center Waterfront convention center expansion Provide good outdoor space Expand waterfront Proximate convention center expansion CONS Require partial garage demolition Require Shoreline Modification

4 Grand Plaza

Grand Plaza Hotel Convention Water Summer Garden Future Expansion Convention Garage 4 Grand Plaza Garage

Grand Plaza Hotel Summer Garden Convention Commercial Harbor Partial Garage Pier 4 Grand Plaza

Summer Garden Winter Garden Battery Park City

Grand Plaza Union Station LA

4 Grand Plaza PROS Iconic Front Door Purposeful Waterfront Save future expansion site for exhibition space No operational interruption to existing convention center Waterfront convention center expansion Provide significant outdoor space Expand waterfront Proximate convention center expansion CONS Require partial garage demolition Require Portside Require shoreline modification

Restaurant Taxi Stop Marina. Taxi Stop Ferry Cruise Ship Cruise Ship Cargo