Russian Federation ATM modernization program

Similar documents
Packaging Tomorrow s Aviation System

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

TWELFTH AIR NAVIGATION CONFERENCE

Block 0 to Block 1 Vaughn Maiolla

Bits to Blocks Aviation System Block Upgrades (ASBU)

MID Region Air Navigation Strategy

2012 Performance Framework AFI

TWELFTH AIR NAVIGATION CONFERENCE

(Presented by United States) EXECUTIVE SUMMARY

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

ATFM/CDM ICAO s Perspective

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

ART Workshop Airport Capacity

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

SESAR Solutions. Display Options

INTERNATIONAL CIVIL AVIATION ORGANIZATION

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

SAMPLE TEMPLATE APPENDIX 3.5C-1

TWELFTH AIR NAVIGATION CONFERENCE

International Civil Aviation Organization

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

Global ATM System ~Interoperability and Harmonization ~

Work Programme of ICAO Panels and Study Groups

TWELFTH AIR NAVIGATION CONFERENCE

Air Navigation Bureau ICAO Headquarters, Montreal

ICAO ASBU Implementation/ Surveillance and ATS Automation

Aviation System Block Upgrades

CNS/ATM Systems Interoperability and Harmonization

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

The evolving air navigation system and the impact on avionics

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

You and ASBU. Javier Vanegas CANSO

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

Presented by: Trinidad and Tobago

ICAO Air Navigation Panels/Study Groups Work Programme

Module N B1-30: Service Improvement through Integration of all Digital ATM Information 129 Performance Improvement Area 2: Globally Interoperable

TWELFTH AIR NAVIGATION CONFERENCE

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation

ICAO framework for LPV

Next Generation Airspace Developments: Key Operational Trends and Enablers

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

THE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION (DRAFT 2016)

PROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

Aviation System Block Upgrades

MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN

DSNA NAVIGATION STRATEGY

TWELFTH AIR NAVIGATION CONFERENCE

ICAO GANP Requirements and Evolution

ASBU Block 0 Implementation and Regional ANPs

Welcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

ICAO provisions on data link implementation

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

Continuous Improvement of the Global Air Traffic Management System

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

UK Implementation of PBN

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Safety and efficiency performance framework ASBU methodology. H.Sudarshan Air Navigation Bureau, ICAO

ASSEMBLY 39TH SESSION

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

Boeing Air Traffic Management Overview and Status

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Home LIST OF ACRONYMS

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop. ICAO NACC Office

ATC automation: facts and steps ahead

ATM processes automatization for Runway (Airport) Throughput Enhancement

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

French DSNA approach to CNS rationalization & evolution

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

European ATM Development The Big Idea

PBN Implementation Plan Tonga

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

Many thanks to our host

Aviation System Block Upgrades

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

Transcription:

Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow

Main strategic directions of Russian Air Navigation System development Improvement of utilization of airspace of the Russian Federation Providing the air traffic safety CNS/ATM system improvement Improvement of airborne equipment Improvement of meteorological support of the air navigation Improvement of air navigation information Improvement of regulatory and legal framework 2

Correspondence of RF ANP and ANS Concept to GANP and OCD of ICAO GANP (Doc. 9750) GPIs, KPAs EUR ANP (Doc. 7754) GPIs, KPAs ANP RF 2011-2017 KPAs GPIs OCD (Doc. 9854) KPAs RF ANS concept & Implementation Plan Federal Investment Programs (1-4) 3

Correspondence of Federal Investment Programs to RF Implementation Plans RF ANS Concept IP 2006-2025 FIP ATM System Modernization 2009-2015 (1) RF ANS Concept (project) IP 2012-2025 (project) FIP GLONASS 2012-2020 (2) FIP Civil Aviation Equipment Development 2002-2015 (3) RF ANP 2011-2017 FIP Civil Aviation 2010-2015 (4) 4

Timescales of RF Implementation Plans and ICAO ASBU RF ANP (2011-2017) FIP ATM System Modernization (2009-2015) FIP GLONASS 2012-2020 FIP Civil Aviation Equipment Development (2002-2015) FIP Civil Aviation (2010-2015) IP RF ANS Concept (2007-2025) IP RF ANS Concept (2012-2025, project) ASBU Block 0 Block 1 Block 2 Block 3 2008 2013 2018 2023 2028 5

Implementation of Global Air Navigation Plan Initiatives in Russian Federation GPI GPI-1 Flexible use of Airspace GPI-2 Reduced Vertical Separation Minima GPI-3 Harmonization of Level Systems GPI-4 Alignment of Upper Airspace Classification GPI-5 RNAV and RNP (Performance Based Navigation) GPI-6 Air Traffic Flow Management GPI-7 Dynamic and Flexible ATS Route Management GPI-8 Collaborative Airspace Design and Management GPI-9 Situational Awareness GPI-10 Terminal Area Design and Management GPI-11 RNP and RNAV SIDs and STARs GPI-12 Functional Integration of Ground Systems with Airborne Systems GPI-13 Aerodrome Design and Management GPI-14 Runway Operations GPI-15 Match IMC and VMC Operations Capacity GPI-16 Decision Support Systems and Alerting Systems GPI-17 Data Link Applications GPI-18 Aeronautical Information GPI-19 Meteorological Systems GPI-20 WGS-84 GPI-21 Navigation Systems GPI-22 Communication Infrastructure GPI-23 Aeronautical Radio Spectrum GPI Implementation in RF Ongoing and will be improved Implemented Done, differences exist Being done Being done in accordance with PBN implementation plan in RF Ongoing Ongoing and will be improved Coordination is going on in Airspace Design and Management Implementation of advanced technologies is planned Implementation of advanced technologies is planned Ongoing and will be improved Implementation of advanced technologies is planned Ongoing and will be improved Ongoing and will be improved Ongoing and will be improved Implementation of advanced technologies is planned Implementation is planned Implementation of advanced technologies is planned Implementation of advanced technologies is planned In Russian Federation ПЗ-90.02 is applicable There are plans to use both satellite and ground systems Exists, and is being improved RF activities are in compliance with GPI-23 6

Main activities of National Operational Concept (NOC) on improvement of ATM system stipulated for implementation by Air Navigation Plan (2011 2017) Measures to improve ATM 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 1 Improvement of structure and management of airspace 1.1 Introduction of ICAO airspace classification 1.2 1.3 Implementation of the principles of flexible airspace utilization Implementation of the system of RNAV/RNP routes 1.4 Implementation of RVSM in the upper airspace 1.5 Implementation of SID/STAR 1.6 Implementation of UACC 2 Improvement of aerodrome operations 2.1 Implementation of GNSS-based non-precision approach 2.2 Implementation of GNSS with GBAS-based precision approach 2.3 Automation of arrival and departure procedures management 2.4 Integration of arrival, departure and surface operations management 2.5 Improvement of traffic management on the aerodrome surface area 7

Main activities of National Operational Concept (NOC) on improvement of ATM system (continuation) Measures to improve ATM 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 3 Improvement of air traffic flow management 4 Improvement of traffic synchronization 4.1 Improvement of inter-center interaction 4.2 Utilization of air -ground data link 4.3 4.4 Increasing of surveillance capabilities, ADS implementation Providing aircraft with air traffic situational awareness 5 Improvement of airspace users operations 6 Improvement of conflict management Implementation of ground and airborne 6.1 systems providing safe separation 6.2 Automation of conflict resolution 7 Improvement of service management Planned in IP ANS 2012-2025 8 Improvement of information services 8.1 8.2 Improvement of air navigation information provision Improvement of meteorological support of the flights 8

Federal Investment Programs FIP RF ATM System Modernization (2009-2015) (1) Main goal: Increasing of flight safety and effectiveness of airspace utilization. Main activities: Creation of united ATM control centers; Improving of air navigation services in aerodrome and en-route areas ; Modernization of aviation communication networks and data links implementation; Modernization of SSR means at radar sites; Implementation of a unified system of airspace utilization planning; Transition to the modern technologies of ATM, based on implementation of CNS/ATM aids and systems; Implementation of integrated military civilian automated ATC systems; Technical upgrade and automation of systems of meteorological support for the air navigation; Improving of airspace search and rescue system. 9

Federal Investment Programs FIP RF ATM System Modernization (2009-2015) (1) Planned results of the Program implementation: 1,5 times increase of air traffic safety level by 2015; 1,8 times increase of airspace capacity; More than 2,5 billion USD decrease of operation costs during the Program implementation period; Increasing of predictability of aviation weather forecasts for Russian Federation aerodromes up to the level of 91%; Increasing of state territory coverage with the aviation search and rescue capabilities up to 100%; Integration of air navigation system of Russia into the unified regional European air navigation system basing on the transition to the advanced CNS/ATM systems, technologies and procedures of ICAO. 10

Federal Investment Programs FIP GLONASS 2012-2020 (2) Main FIP activities playing major role for the development of ANS of Russia: Support, control and management of GNSS orbital group ; Development of ICAO international standards for GNSS system including GBAS and SBAS; Establishment of a center for collecting and dynamically informing Russian Federation airspace users about the monitoring of GNSS and GPS orbital groups data; Creation and installation of GBAS and ADS-B stations; Creation and implementation of integrated airborne and ground systems for navigation and approach, including GNSS-based ICAO CAT II/III approach capabilities; Creation and implementation of integrated multichannel navigation facility for aircraft GNSS consumers with a capability of operating in international systems SBAS и GBAS; Creation of a data base of air navigation information (ANI) and its implementation in electronic format. 11

Federal Investment Programs FIP Civil Aviation Equipment Development 2002-2015 (3) FIP main tasks and targets: Aircraft fleet upgrade to enhance reliability of the systems and units and to improve operating performance in accordance with current ICAO requirements; Overcoming of Russian aviation industry technological gap and providing its effective participation in international technological integration process; Creation of a scientific technical base in the field of airborne vehicles, engines, avionics, aviation units and assemblies for competitive national aviation industry after 2015; Creation of a modern scientific research infrastructure of the Russian aviation industry enterprises to provide the advanced level of scientific development and technologies including those delivered to the global market. 12

Federal Investment Programs FIP main tasks and targets: FIP Civil Aviation 2010-2015 (4) Construction and redevelopment of big international hub airports; Construction and redevelopment of Russian internal airports; Construction and redevelopment of airports, which provide coherence of basic aerodrome network; Construction and redevelopment of socially important local airports; Realization of transit potential of the Russian Federation. 13

Compliance of plans of Russian ANS development with ICAO strategy of aviation system block upgrades (ASBU) 14

Performance Improvement Area 1: Greener Airports ASBU ICAO module Relevancy Domain Applicability RF ANP IP ANS (project) FIP Stage Times Standards B0-65 Optimization of approach procedures including vertical guidance High TMA Main airports Yes Yes 1,2 Development 2012+ ICAO B1-65 Optimised Airport Accessibility High TMA Main airports Yes Yes 1,2 Development 2012+ ICAO B0-70 Increased Runway Throughput through Wake Vortex Separation Low TMA Largest airports No No No IAW ICAO 2013+ ICAO B1-70 Increased Runway Throughput through Dynamic Wake Vortex Separation Low TMA Largest airports No No No IAW ICAO 2018+ ICAO B0-75 Improved Runway Safety (A-SMGCS) Medium APT Largest airports Yes Yes 1 Development 2012+ ICAO B1-75 Enhanced Safety and Efficiency of Surface Operations (A-SMGCS / ATSA-SURF) Medium APT Largest airports No Yes No Development 2015+ ICAO B0-80 Improved Airport Operations through Airport-CDM High APT Largest airports No Yes No Development 2015+ Local B1-80 Optimised Airport Operations through A-CDM Total Airport Management High APT Largest airports No Yes No Planned 2018+ ICAO (TBC) B1-81 Remotely Operated Aerodrome Control Medium n/a TBD No No No Study TBD ICAO (TBC) B0-15 Improve traffic flow through runway sequencing High TMA Largest airports Yes Yes 1 Development 2015+ ICAO (TBC) B1-15 Improved Airport operations through Departure, Surface and Arrival Management High TMA, APT Largest airports No Yes No Planned 2018+ ICAO (TBC) 15

Performance Improvement Area 2: Globally Interoperable Systems and Data Through Globally Interoperable System Wide Information Management ASBU ICAO module Relevancy Domain Applicability RF ANP IP ANS (project) FIP Stage Times Standards B0-25 Increased Interoperability, Efficiency and Capacity through Ground-Ground Integration Medium n/a UACC Yes Yes 1 Development 2012+ ICAO B1-25 Increased Interoperability, Efficiency and Capacity though FF- ICE/1 application before Departure Medium n/a ANS No Yes No Planned 2013+ ICAO B0-30 Service Improvement through Digital Aeronautical Information Management Medium n/a ANS Yes Yes No Planned 2012+ ICAO B1-30 Service Improvement through Integration of all Digital ATM Information Medium n/a ANS No Yes No Planned 2012+ ICAO B1-31 Performance Improvement through the application of System Wide Information Management (SWIM) High n/a ANS No Yes No Planned 2012+ ICAO 16

Performance Improvement Area 3: Optimum Capacity and Flexible Flights Through Global Collaborative ATM ASBU ICAO module Relevancy Domain Applicability RF ANP IP ANS (project) FIP Stage Times Standards B0-10 Improved Operations through Enhanced En-Route Trajectories B1-10 Improved Operations through Dynamic ATS Routing Medium Medium ENR, TMA, ORP n/a Yes Yes No Development/ Implemented 2012+ ICAO ENR, TMA, ORP n/a Yes Yes No Planned 2016+ ICAO B0-35 Improved Flow Performance through Planning based on a Network-Wide view High ALL CFMU/UACC Yes Yes 1 Development 2012+ ICAO B1-35 Enhanced Flow Performance through Network Operational Planning High ALL CFMU/UACC Yes Yes No Planned 2015+ ICAO B1-105 Better Operational Decisions through Integrated Weather Information (Strategic >40 Minutes) Medium n/a B0-85 Air Traffic Situational Awareness (ATSA) Low ENR, TMA UACC / main airports No Yes No Planned 2018+ ICAO CA, GA, Helicopters No Yes No Development/ Trials 2012+ ICAO B1-85 Increased Capacity and Flexibility through Interval Management Medium ENR, TMA TBD No No No Study TBD ICAO (TBC) B0-86 Improved access to Optimum Flight Levels through Climb/Descent Procedures using ADS-B Low ORP CA/Oceanic UACC Yes Yes No Planned 2016+ ICAO B0-101 ACAS Improvements High ENR, TMA CA No Yes No Planned 2012+ ICAO 17

Performance Improvement Area 4: Efficient Flight Path Through Trajectory-based Operations ASBU ICAO module Relevancy Domain Applicability RF ANP IP ANS (project) FIP Stage Times Standards B0-05 Improved Flexibility and Efficiency in Descent Profiles (CDOs) High TMA Main airports Yes Yes 1,2 Development 2012+ ICAO B1-05 Improved Flexibility and Efficiency in Descent Profiles (OPDs) High TMA Main airports Yes Yes 1,2 Development 2012+ ICAO B0-40 Element 1: ADS-C over Oceanic and Remote Areas Medium ORP ORP UACC Yes Yes No Implemented/ Planned 2014+ AEEC/ICAO B0-40 Element 2: Continental CPDLC Medium ENR UACC Yes Yes 1 Development 2012+ ICAO (TBC) B1-40 Improved Traffic Synchronisation and Initial Trajectory- Based Operation Medium ALL TBD No Yes No Planned 2013+ ICAO (TBC) B0-20 Improved Flexibility and Efficiency in Departure Profiles (CCOs) TBD ENR, TMA Main airports Yes Yes No Study TBD ICAO (TBC) 18

THANK YOU