FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010

Similar documents
DEPARTMENT OFTHE NAVY BASE REAWGNMENT AND CLOSURE PROGRAM MANAGEMENT OFFICE WEST 1455 FRAZEE RD. SUITE 900 SAN DIEGO, CA

List of Environmental Reports and Documents Regarding Hazardous Materials. August 10, 2017

PCBS DELINEATION WORK PLAN

M E M O R A N D U M. Status of the Environmental Cleanup of the Shipyard

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

HOSE ASSEMBLY CLEANLINESS

Cleaning Inactive Ships

FIGURES. Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City. CSI Job No C

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

MINUTES NAVAL WEAPONS STATION (NAVWPNSTA) SEAL BEACH RESTORATION ADVISORY BOARD (RAB) AND COMMUNITY MEETING March 8, 2005

RACER Properties in Saginaw Area

INTERNATIONAL RULES AND INDUSTRY _ ISSUES OF OHS

FORMER PLUM BROOK ORDNANCE WORKS Sandusky, Ohio (Currently NASA Plum Brook Station)

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:

Location. waterfront property. Peninsula. ! Short ferry ferry ride ride (30 (30 minute passenger ferry, ferry, minute vehicle) from from Seattle

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

I INTRODUCTION AND BACKGROUND

FINAL NAVAL AIR STATION ALAMEDA RESTORATION ADVISORY BOARD MEETING SUMMARY.

San Francisco, California Hunters Point Shipyard. Design for Development

HARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York

Permittees under Sector S are primarily engaged in the following types of activities:

the foss seattle shipyard helping you succeed in a competitive market

The rezoning application is recommended for consideration of approval.

WASTE + WATER MANAGEMENT AUSTRALIA OCTOBER 2015 V42.3 ENVIRONMENT SUSTAINABILITY PUBLIC HEALTH SINCE 1973 PRINT POST APPROVED

FIRST AMENDMENT AIRLINE OPERATING AGREEMENT AND TERMINAL BUILDING LEASE. between. City Of Manchester, New Hampshire Department Of Aviation.

IESI Bethlehem Landfill Committee Meeting Minutes

FIRE REGULATIONS FOR OUTDOOR FESTIVALS CONCESSION BOOTHS (See Tents and Canopies Information Bulletin)

BELFAST MUNICIPAL AIRPORT OVERVIEW

APPENDIX F List of Commitments

[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

Construction Staging Area Blue Jays Way (357 King Street West)

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

Southwind Marina Sinton Drive Pensacola, Florida Unique Opportunity to Acquire a 90 Slip Marina With Excellent Investment Potential

Contamination Sources in Kangerlussuaq, Greenland

Cooking Booth Construction and Location (See Figure 1 and 2 for diagrams):

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. March 14, 2006

REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox

AQ8.1 NOTE that a fire permit is also required for all fires in rural areas (contact the Waimea rural fire authority)

Lake Erie Commerce Center Traffic Analysis

Abandoned Mine Sites Policy

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

ADEQ - Water Division Spill/Incident Report

The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also,

Devils Lake Planning Commission

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Alternative Highest & Best Use Analysis Boutique Hotel

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

Chapter 12 Protective Clothing

Pollution Incident Response Management Plan

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

SUTTER COUNTY. General Plan Update Technical Background Report

SOLICITATION ADDENDUM NO. 1 RFP MOBILE ONSITE AND CARD OR KEY-LOCK FUEL AND LUBRICANT PRODUCTS

Finn Creek Park. Management Direction Statement Amendment

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. April 23, 2008

Foam Systems Engineering Design Manual

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

EB300. Ethanol Burner. User s Manual Installation Instructions

Computer graphics, image processing and environmental data representation"

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

Activity 1: Solar Cookers

EPPERSON INDUSTRIAL PARK

Planning Board Regular Meeting March 16, 2009

Thomas Scientific Swedesboro, NJ U.S.A.

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Sterile Technique TEACHER S MANUAL AND STUDENT GUIDE

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

AN ARCHAEOLOGICAL ASSESSMENT OF BOERNE CITY PARK, KENDALL COUNTY, TEXAS. Thomas C. Kelly and Thomas R. Hester

Elsinboro Township News and 2018 Trash Calendar A Clean Community

SCHOOL CAMPUS FOR SALE

4096 S. River Road. St. George, UT Southern Utah Distribution Center. For more information: FOR SALE SALE PRICE $4,000,000

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management

MEMORANDUM. June 7, 2007

Industrial Investment Property

YMA TRAINING CATALOG 2017

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018

Potomac River Commuter Ferry Feasibility Study & RPE Results

Mather Restoration Advisory Board (RAB) Meeting Draft Summary Meeting Minutes. Mather, California. 11 March 2009

Work in 2015 and Annual Mobility- Management Plan

The date, site name, report author, report recipient, and report number are presented above.

Aviation & Rail Development Opportunities With Telkite Enterprises LLC

4096 S. River Road. St. George, UT Southern Utah Distribution Center. For more information: FOR SALE SALE PRICE $4,000,000

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

Excellent Freeway Oriented, Big Box, Shopping Center or Hotel site

Premier Airport Park Airport Haul Road, Fort Myers, FL , ,890 SF FOR LEASE ALL OR PART

Waukegan Public Library Reference Document Repository Catalogue

Plans and Design Calculations for the Alder Creek Diversion Fish Screen

Map 2. Industrial Parks, Cass County

Airport Planning Area

FINAL Water Year 2012 Bacteria Sampling Report for the Klamath River Estuary

HOTEL Riverside, CA.

November Attention: Airport Operators. Dear Sir/Madame: Re: Final Rates and Fees Adjustments January 1, 2013

SHIP RECYCLING. Your guide to compliance. Move Forward with Confidence

Transcription:

FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010 Shoreline Hot Spot Area Central Portion - View North October 2009 This fact sheet provides information about a PCB TimeCritical Removal Action in Parcel E-2 at Hunters Point Shipyard. This fact sheet also summarizes the Action Memorandum for this work. It is located on the BRAC PMO website at:. A Brief History of Hunters Point Shipyard H unters Point Shipyard is located in southeast San Francisco on a peninsula extending east into San Francisco Bay. The Shipyard was used as a commercial dry dock Hunters Point Shipyard facility from 1869 until late 1939, when the Navy began operations at the property. From 1945 until 1974, the Navy used the Shipyard primarily as a repair facility. The Naval Radiological Defense Laboratory operated at the Shipyard from 1948 to 1969. In 1974, Navy operations at the Shipyard were stopped and Triple A Machine Shop, Inc. leased most of Hunters Point Shipyard to operate as a commercial ship repair facility until 1986. History of Parcel E-2 Parcel E-2 is located in the southwest portion of Hunters Point Shipyard, and makes up about 48 of the 929 acres. Parcel E-2 is divided into four primary areas for study purposes. Landfill Area, which includes the entire Parcel E-2 Landfill and its immediate perimeter. Panhandle Area located west and southwest of the Landfill Area. East Adjacent Area located to the east of the Landfill Area. Shoreline Area located at the interface with San Francisco Bay. Page 1 Click on BRAC 2005, then select Former NSY Hunters Point from the Prior BRAC Installations drop down menu.

PCB Hot Spot Time-Critical Removal Action: 2010 HPS Fact Sheet No. 2, October 2009 Parcel E-2 Site Detail Some parts of the Shipyard, including most of Parcel E-2, were created by filling in the bay with artificial fill material. equipment, and many other products. The PCBs in soil have been identified in isolated Hot Spots within Parcel E-2. Additionally, radiological material was generated during various shipyard operations. Throughout this fact sheet radiological material will be referred to as Rad. Before the late 1960s, there were no regulations on how to dispose of Rad material, and some may have been deposited in parts of Parcel E-2. Parcel E-2 also has areas where motor oil, lubricating fluids and fuels (gasoline and diesel) have been found in soil and sediment. Typically areas with PCBs also have high concentrations of spilled fuels. Areas of Parcel E-2 have soil and sediment containing polychlorinated biphenyls, more commonly known as PCBs. PCBs are chemicals that were widely used as an insulating fluid in electrical transformers and capacitors until 1979, after which the manufacturing of PCBs was banned in the United States. PCBs were also used in paints, plastics, hydraulic oils for heavy Page 2 2005 PCB Hot Spot Time-Critical Removal Action In 2005, a Time-Critical Removal Action was conducted at Parcel E-2 to address PCBs and fuels. Approximately 3,000 truckloads of soil and sediment containing PCBs were removed. While excavating, oil-stained soil and floating oil were observed along the bayside of the excavation; however, further excavation in these areas was

PCB Hot Spot Time-Critical Removal Action: 2010 HPS Fact Sheet No. 2, October 2009 Memorandum. Field work is currently planned to begin in late 2009 and to be completed in late 2010. PCB Hot Spot Time-Critical Removal Action Amended Action Memorandum 2005 Excavation Debris not possible because of their proximity to San Francisco Bay. It was decided that additional information was necessary to define the extent and volume of the remaining Hot Spots. The Navy assessed the area and determined how much more soil and sediment would have to be removed in the Draft Final Remedial Investigation/ Feasibility Study (RI/FS), which was completed in February 2009. The above document describes the follow-up action that the Navy has selected to remove the PCB Hot Spots from Parcel E-2. To do this, the Navy will remove soil and sediment that are adjacent to San Francisco Bay. The City of San Francisco Redevelopment Plan is for these areas to be open space. This project will help meet this goal. This document is located on the BRAC PMO website and also in the Information Repositories, please see Page 7 of this fact sheet for more information. 2010 PCB Hot Spot Time-Critical Removal Action The Navy was able to use the information and data from the 2005 project to plan follow-up work in order to remove the remaining Hot Spots. The current removal action will address the PCB Hot Spots along the Shoreline Area as well as Lead and PCB Hot Spots in the East Adjacent Area that were identified in the Remedial Investigation/Feasibility Study. The current project is described in the Parcel E-2 PCB Hot Spot TCRA Amended Action Shoreline Area Central and Southern Portion - View South Removing the Hot Spots from Parcel E-2 The Navy plans to collect about 755 samples before excavation begins to get more exact locations of the Hot Spots. PCB and fuel containing soil and sediment will be removed to depths up to 10 feet along about 1,200 feet of the Parcel E-2 Shoreline Area. Lead and PCB contaminated soil will be removed to depths up to about 10 feet in the East Adjacent Area. Shoreline Area Northern Portion - View South Page 3 The Navy plans to remove about 2,000 truckloads of soil and sediment containing PCBs, fuels, and lead.

PCB Hot Spot Time-Critical Removal Action: 2010 HPS Fact Sheet No. 2, October 2009 Protecting Public Safety East Adjacent Area, Eastern Portion The Navy will take many safety measures to protect its workers on site and the surrounding community members during this Time-Critical Removal Action. The Navy has submitted an official dust control plan to the state and federal regulators. This document describes the steps that will be taken during clean up work to help control dust. Once excavation is complete, the Navy will install clean backfill and temporary shoreline protection. Waste Disposal All waste material from Parcel E-2 will be scanned for Rad before it is loaded onto trucks for disposal. The waste material will be separated into Rad containing and non-rad containing material before it is loaded onto trucks for appropriate disposal. Rad waste is sealed and packaged in watertight, steel bins for storage and transportation to disposal sites in Utah and Idaho that are licensed to accept Rad waste. Disposal trucks shipping Rad-screened materials will be brushed off and covered; the trucks will be screened once again for Rad before leaving the work site. Other waste material will be taken to disposal facilities that are licensed to accept chemical or construction waste. Dust Control The Navy will use a misting system to wet down work areas and roadways. Stockpiles of soil will be coated with a substance that works like a glue to control windblown dust. Trucks carrying loads will be covered before leaving the Shipyard. A 15 mile per hour speed limit is required for all vehicles on site at the Shipyard and a 5 mile per hour speed limit is required in work areas. Rumble strips at the exits of the work areas will help shake excess dust from truck tires as they leave the site. The Navy will continuously monitor the air around the work site during the Time-Critical Removal Action. Green fabric will be installed to fencing around the excavation area to help control windblown dust. Shoreline Area, Central Portion - View North Page 4

PCB Hot Spot Time-Critical Removal Action: 2010 HPS Fact Sheet No. 2, October 2009 Notes: Page 5

PCB Hot Spot Time-Critical Removal Action: 2010 HPS Fact Sheet No. 2, October 2009 Notes: Page 6

PCB Hot Spot Time-Critical Removal Action: 2010 HPS Fact Sheet No. 2, October 2009 Page 7 For more information, please contact: Mr. Keith Forman Navy Base Realignment and Closure Environmental Coordinator 1455 Frazee Road, Suite 900, San Diego, CA 92108-4310 Local telephone number: (415) 308-1458 Office telephone number: (619) 532-0913 Fax number: (619) 532-0995 E-mail: keith.s.forman@navy.mil Where do I get more information about the Hunters Point Shipyard Cleanup? Navy documents and reference materials about Hunters Point Shipyard are available to the public at City of San Francisco Main Library and at the Bayview Anna E. Waden Branch Library. The downtown San Francisco library contains a nearly complete record of all documents related to the investigation and cleanup actions under way at Hunters Point Shipyard. The Bayview Anna E. Waden Branch Library houses a smaller collection of documents and copies of current investigation reports. Information is also available on the Navy s Hunters Point Shipyard website: http:// City of San Francisco Main Library Government Information Center, 5th Floor 100 Larkin Street San Francisco, CA 94102 (415) 557-4500 Hours of Operation: Mondays: 10:00 a.m. to 6:00 p.m. Tuesdays through Thursdays: 9:00 a.m. to 8:00 p.m. Fridays: 12:00 p.m. to 6:00 p.m. Saturdays: 10:00 a.m. to 6:00 p.m. Sundays: 12:00 p.m. to 5:00 p.m. Bayview Anna E. Waden Branch Library 5075 Third Street San Francisco, CA 94124 (415) 355-5757 Hours of Operation: Mondays and Tuesdays: 10:00 a.m. to 6:00 p.m. Wednesdays: 1:00 p.m. to 8:00 p.m. Thursdays: 1:00 p.m. to 8:00 p.m. Fridays: 1:00 p.m. to 6:00 p.m. Saturdays: 10:00 a.m. to 6:00 p.m. Sundays: 1:00 p.m. to 5:00 p.m. The complete Administrative Record for Hunters Point Shipyard is maintained at the Naval Facilities Engineering Command (NAVFAC) offices in San Diego, California. Because of the volume of documents required for the Administrative Record, all documents may not be in the local Information Repositories. However, a copy of the complete Administrative Record index and pertinent documents are available for public review at the Information Repository located at the San Francisco Main Public Library. Copies of documents located at the Administrative Record are available for review by appointment only by contacting: Diane Silva Code EVR-FISC Bldg. 1, 3rd Floor NAVFAC Southwest 1220 Pacific Highway, San Diego, CA 92312 Phone: (619) 532-3676 Fax: (619) 532-3546 diane.silva@navy.mil Administrative hours are 8:00 a.m. to 5:00 p.m. Monday through Friday. Documents may not be removed from the facility; however, they may be photocopied.

Hunters point naval shipyard Mailing Coupon If you would like to be added to the Hunters Point Naval Shipyard mailing list and receive copies of future newsletters and fact sheets, please fill out the coupon below and mail it to: Mr. Keith Forman Navy Base Realignment and Closure Environmental Coordinator 1455 Frazee Road, Suite 900 San Diego, CA 92108-4310 Name Address City State Zip E-mail Address ADD MY NAME TO THE MAILING LIST DELETE MY NAME FROM THE MAILING LIST Mr. Keith Forman Navy Base Realignment and Closure Environmental Coordinator 1455 Frazee Road, Suite 900 San Diego, CA 92108-4310