CHINCHERO INTERNATIONAL AIRPORT CUSCO -PERU. December 2013

Similar documents
CHINCHERO INTERNATIONAL AIRPORT CUSCO -PERU. February 2014

Concession of the International Airport of Chinchero Cusco (AICC)

Updated on November 28, 2016

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN

Rodrigues Regional Assembly Chief Commissioner s Office

Private Investment and Public Works

Progress Report on the Gautrain Rapid Rail Link Portfolio Committee on Transport

LOCAL CONTENT IN MOZAMBIQUE

Current Status of Airport PPP Projects

Short-Haul Operations Route Support Scheme (RSS)

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period)

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS

Endless investment opportunities in public infrastructure and services Carlos Herrera Investors Servicing Director

1 st US - Kosovo Trade Forum New York, New York

Investment Opportunitiesin Public infrastructure and Public Service ProInversion Updated to April 22, 2015

OPERATING HOURS AND FACILITATION PARAMETERS & PRINCIPLES FOR SALZBURG AIRPORT

TRANSPORTATION: Airports and Aviation Services

Potential PPP opportunity for the expansion of the Hosea Kutako International Airport (HKIA), Windhoek, Namibia. London, April 9, 2018

Republic of Kosova Ministry of Economy and Finance. CAPACITY BUILDING CONFERENCE ON PUBLIC PRIVATE PARTNERSHIP (PPPs)

Peru: Investment Opportunities Infrastructure and public services

That Council endorses the attached submission on the Reef 2050 Long-term Sustainability Plan.

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

ENVISIONING AUSTIN s Airport of the Future

A Master Plan is one of the most important documents that can be prepared by an Airport.

CS Peru Commercial Briefing Americas Business Forum

Submission on the Bankstown Airport Preliminary Draft Master Plan

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.

Investment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion (State Initiatives and Unsolicited proposals

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Tourism. Tourism Projects. Nº. Projects Location. Province of. Mass Plan Ex Penitentiary Garcia Moreno and its Province of immediate surroundings

CASE STUDY The New Guayaquil International Airport

Appendix A. Meeting Coordination. Appendix A

Draft Greater Sydney Region Plan

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE

IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax

Yakima Air Terminal/McAllister Field Airport Master Plan Update

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid

Delhi Airport Metro Express A Case of Public Private Partnership Project

PPIAF Assistance in Swaziland

Rebuilding Plan For Mosul International Airport

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

Description of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB

Press Release March 1, Refer to: Anna Salgado

To be in effect from 1 September 2017 to 31 August 2019 CONTENTS

Chapter 1: Introduction Draft

LINCOLNSHIRE PARKING POLICY DRAFT

CUSCO & MACHU PICCHU DELUXE ADVENTURE

15th Global Forum on Tourism Statistics November Cusco, Peru. Travel Information

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Recommendations on Consultation and Transparency

Dallas Fort Worth International Airport Concessions Pre-Proposal Conference

2018 U.S.-Djibouti Trade Mission: Energy and Aviation DECEMBER 2-7, 2018

BRAZIL FEDERAL ROADS GIF Advisory Council Meeting. April 18, 2018

West Midlands Sustainable Urban

MUNICIPALITY OF GUATEMALA

EASYJET INTERIM MANAGEMENT STATEMENT FOR THE QUARTER ENDED 31 DECEMBER 2010

AIRPORT VOLUNTARY COMMITMENT ON AIR PASSENGER SERVICE

AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017

Strategic Airport Management Programme April Airport Economics. presented by. Eileen Poh Assistant Director (ICAO Affairs)

2013 Airport Noise Plan of Action

Chapter 4 Noise. 1. Airport noise

MINING SECTOR IN PERU: THE ROLE OF CANADIAN INVESTMENT. Alan Fairlie Reinoso

INVITATION FOR BID VENDOR: BID OPENING:

NOVEMBER YEAR III LATIN AMERICA&CARIBBEAN MID-MARKETS: OPPORTUNITIES IN THE REGION

Dott.ssa Benedetta Valenti

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Noise Oversight Committee

Module Definition Form (MDF)

TARIFFS FOR Tariff Name

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Why are the underground fuel tanks being removed and replaced with above ground tanks?

OPERATING HOURS AND FACILITATION PARAMETERS & PRINCIPLES FOR SALZBURG AIRPORT

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

Public-Private Partnerships (P3) for Social Infrastructure. Alberta Schools Alternative Procurement (ASAP Team) Alberta Infrastructure

Sustainable Tourism Development for Inclusive Growth and Employment Creation: Peru Experiences

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

ACI-NA Airport Board Members and Commissioners Annual Conference

Airport Privatization:

2006 Preliminary Results. 7 March 2007

AIR NAVIGATION SERVICE PROVIDERS

IAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines

Applewood Heights Community Open House

Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

Overview. Eero Ailio European Commission

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

Collaborative Decision Making at JCAB ATMC

Getting Rural Youth Ready for Work in Burma. (Myanmar) Project No:

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

In the name of God. Association of Iranian Airlines

Transcription:

CHINCHERO INTERNATIONAL AIRPORT CUSCO -PERU December 2013

BACKGROUND AND STRATEGIC STUDIES Entrusted to PROINVERSION At the beginning of 2010, the Ministry of Transport and Communications commissioned PROINVERSION to start the private investment promotion process to transfer to the private sector, through a Public - Private Partnership (PPP) the construction and operation to the New International Airport of Chinchero Cusco(AICC). Project Feasibility PROINVERSION hired the services of an international company specialist in airport matters: Initial strategic studies of the project were prepares articulating and validating existing reports from the 1980s. Studies concluded that the construction and operation of the AICC are completely feasible from a technical and operational point of view and that some operational improvements could be achieved compare to the airport currently operated. Due to the change in the funding scheme to a co-financing by the State concession, in 2013, the consulting firm has developed the feasibility studies according to the Peruvian legislation, which were approved by the Ministry of TransportandCommunicationsatSeptember 30 th,2013. 2

CURRENT SITUATION The International Airport Alejandro Velasco Astete (AIVA) is the second major airport in Peru. It served 2.1 million passengers from January to November 2013. The entrance of tourist to Cusco has grown significantly over the last 10 years. Tourists arrivals to lodgings in Cusco (Mpax) Source: MINCETUR Domestic Foreign 3

CURRENT SITUATION Orographic and meteorological restrictions of the AIVA airport limit its technical capacity. Operations(landings and departures) are performed by a single threshold. The AIVA airport is surrounded by commercial and residential buildings. Residents constantly complain about airport noise. 4

CURRENT SITUATION Therefore, with the official announcement, the State seeks to address: Sustainted growth expectation of traffic in Peru and in Cusco. Thetourismpotential to bedevelop, which is at risk of not being addressed by the limitations of the AIVA airport The difficult inclusion of the AIVA airport in the urban zone of Cusco, which involves operational, safety complications and compatibility with the citizens demandas.

CHINCHERO INTERNATIONAL AIRPORT CONTEST CALL Play Lobitos Location: Chinchero and Huayllabamba districts, Urubamba province, Cusco region. Description: Design, build, finance, operate and transfer (DBFOT) of the new Chinchero Internacional Airport. Estimated investment (VAT not includes): Total investment amount (includes future interventions): US$ 658 Million Necessary investment to start operations: US$ 538 Million Concession period: 40 years. Contest type: Integral Projects Contest Financing scheme: Co-financing by the State AwardDate:February28 th,2014

AIRPORT SITE LOCATION Chinchero is a mid-way stop between Cusco city and the Sacred Valley. O N E S Touristic Route Driving distance from Cusco to Chinchero: 29 km,equivalent to30-45minutesbycarorbus. 7

PASSENGER TRAFFIC FORECAST FOR CUSCO Pasajeros Foreign Passengers rutas internacionales Pasajeros Domesticrutas Passengers domésticas CAGR Internacional: 30.2% Doméstico: 4.8% Total: 5.6% 2.7 2.9 3.0 3.2 3.3 0.2 3.5 3.6 3.8 0.3 0.3 0.4 0.4 4.0 4.2 4.3 4.4 4.4 4.5 0.4 0.5 0.5 0.5 0.5 2.5 2.4 1.9 2.0 2.2 2.3 2.5 2.7 2.9 3.0 3.2 3.1 3.2 3.3 3.4 3.6 3.7 3.9 3.9 4.0 4.0 4.2 4.3 4.5 4.7 4.9 5.1 1.9 2.1 2.2 4.6 0.5 CAGR Internacional: 0.8% Doméstico: 0.8% Total: 0.8% 4.8 0.5 5.0 0.5 5.2 0.6 5.4 0.6 5.7 0.6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2035 2040 2045 2050 2055 2060 Passenger Traffic Forecast of the AICC by type of flight 8

MINIMUM TECHNICAL REQUIREMENTS 40,000 m 2 passenger terminal with IATA Level of Service B (eco-friendly design) 16.8 Million m3 of earth moving works 4,000 x 45 m ILS CAT 1 RWY 16-34 (ICAO ref. code 4-E) 4,000 m parallel TWY 13 positions initial aircraft parking capacity (140,000 m2) 4.5 Mpax initial airport capacity 9

SCHEDULE OF THE CONTEST ACTIVITY Last day for the submission of Envelope N 1 CommentstoEnvelopeN 1 AmendmentstoEnvelopeN 1 Communication of the Bidder's Shortlisting Delivery of the Final ContractVersion to the Comptroller General's Office and Shortlisted Bidders. Submission of Envelopes N 2 and N 3 Play Lobitos DATE Up to01/31/2014 Up to two (2) Working Days after the submission of Envelope N 1 Up to three (3) Working Days after the delivery of comments to Envelope N 1 As from the seven (7) Working Days from the submission of Envelope N 1 02/06/2014 Three(3) WorkingDaysafterreceivingthe Previous Report of the Comptroller without comments, or having corrected these 02/28/2014 Publications of Results of the Evaluation of Envelope N 2 Opening of Envelope N 3 and Award 02/28/2014 Closing Date Shall be informed by Circular Letter 10

SHORT-LISTING REQUIREMENTS TECHNICAL -OPERATIONAL FINANCIAL AIRPORT MANAGEMENT AND OPERATION CAPACITY MINIMUM EQUITY US$ 140 MILLION OR INFRASTRUCTURE CONSTRUCTION CAPACITY + AIRPORT MANAGEMENT AND OPERATION CAPACITY + MINIMUM ANUAL TURNOVER US$ 48 MILLIONS

3-D VIEW OF THE FUTURE AIRPORT 12

CONTAC INFORMATION Giancarlo Villafranqui Head of Airport Projectss Teléfono (51-1) 200-1200 extensión 1206 E-mail gvillafranqui@proinversion.gob.pe

www.proinversion.gob.pe contact@proinversion.gob.pe