The Coalition s Policy to Fix the Bruce Highway

Similar documents
The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

The Coalition s Policy to Build Melbourne s East West Link

2017 POLICY DOCUMENT. Future-proofing the Bruce. Putting Queenslanders First

INFRASTRUCTURE NORTHERN QUEENSLAND. Bruce Highway. Infrastructure initiatives to enable economic growth DID YOU KNOW

How Safe Are Queensland s Roads? Rating Queensland Highways For Risk

State Budget Comment

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First

South East Traffic Solution

The Coalition s Policy

PERTH-ADELAIDE CORRIDOR STRATEGY

LABOR S INFRASTRUCTURE POLICY

Advocacy. Review of the Queensland State Budget

State Budget Comment

The Coalition s Policy

Queensland State Economy and State Budget

CCIQ SUBMISSION. Strong Choices Investment Program CHAMBER OF COMMERCE AND INDUSTRY QUEENSLAND

State Road Upgrades Southern Region

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

State Road Upgrades Northern Region

Infrastructure Priority List. Infrastructure Priority List Printed as at 28 April

Regional Roadmap Executive Summary. Mackay-Isaac-Whitsunday

RE: SUBMISSION TO THE JOINT SELECT PARLIAMENTARY COMMITTEE INQUIRY ON NORTHERN AUSTRALIA

Launceston and Tamar Valley Traffic Vision

LABOR S TOURISM POLICY

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Number 1 Gross Regional Product per capita in Queensland

Pre-Budget Submission to Queensland Treasury

Roads Australia Industry Presentation 12 March 2015

Queensland infrastructure research

TRANSPORT INFRASTRUCTURE FOR THE SUNSHINE COAST

Policy Transport. Policy highlights. Our plan

Inland Queensland Roads Action Plan

2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining

3 The growth of Western Sydney

Domestic Tourism Snapshot Year ending March 2018

RE: Inquiry into Regional Development and a Global Sydney

Economic Stimulus Plan A progress report. Investing in Australia s Future

Economic Performance of Australia s Cities and Regions Embargoed until Tuesday 5 December 2017

WHERE BUSINESS LEADS MAKE YOUR MARK. A unique opportunity for investors and developers.

Land area 1.73 million km 2 Queensland population (as at 31 December 2017) Brisbane population* (preliminary estimate as at 30 June 2017)

Moving Brisbane is the Newman Liberal team s blueprint for a modern and efficient transport system.

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

Land area 1.73 million km 2 Queensland population (as at December 2016) Brisbane population* (preliminary estimate as at 30 June 2016)

Land area 1.73 million km 2 Queensland population (December 2015) Brisbane population* (June 2015)

Queensland Economic Update

Building a Stronger Australia

INLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au

Roads and Maritime Services Presentation to Local Government NSW Annual Conference October 2014

KANGAROO ISLAND WATERGAP PROJECT

RACQ Red Spot Congestion Survey 2017

SEQ Catalyst Projects

Memorandum of Understanding with ACT Government

LOCAL GOVERNMENT ROADS AND TRANSPORT STRATEGY

For personal use only

Queensland Budget. August 2017

COFFS HARBOUR MARKETSNAPSHOT

Top & Bottom Image: Tourism Australia Cover Image: Tourism Australia Melbourne Food & Wine Festival

South Australian Centre for Economic Studies June 2016 Economic Briefing Report 28 June, 2016

Airport forecasting is used in master planning to guide future development of the Airport.

Brisbane set to host G20 conference in 2014

Queensland Economic Update

Domestic Tourism Snapshot Year ending June 2018

$960 $1,175 $91 OVERVIEW National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY

Holiday visitation grew 8.6% to a record 41.7m visitors, who spent a record $29.6bn, up 8.4% year on year.

Annual Fuel Price Report 2010

Australian Cities Accounts Estimates. December 2011

Distinguished guests, parliamentary colleagues, ladies and gentlemen.

The Committee for Gippsland Inc

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

Queensland Reconstruction Authority Rebuilding a stronger, more resilient Queensland

Growing Regional Victoria 2018 Victorian Election Priorities GROWING REGIONAL VICTORIA 2018 VICTORIAN ELECTION PRIORITIES

BEACHSIDE ON THE PARK

Politics, Finance and Transport: Megaprojects in Australia. Scott Elaurant and Jennie Louise Infrastructure Symposium, Brisbane 2015

Australia s. The Northern Territory is experiencing solid growth in visitor numbers driven by a strong economy. Northern Territory

BUILDING INDUSTRY OUTLOOK 2018

Sunshine Coast: Kawana Health Campus. December 2013

investment ProSPeCTuS 2016 SuMMary

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

Committee for Melbourne Briefing Note Victorian State Budget Overview of Key Announcements

Paul Fletcher Minister for Urban Infrastructure and Cities Launch of Infrastructure Australia Future Cities Paper. Fri 23 February 2018

Location Report. Coffs Harbour U Retire ( ) Retire with Property

BENCHMARKING THE PERFORMANCE OF THE NATIONAL ROAD SAFETY STRATEGY

Monthly Fuel Price Report October 2014

Let's get moving with the affordable medium-speed alternatives to the old dream of high-speed rail

Policy Communications. Policy highlights. Our plan. National is committed to connecting New Zealanders to each other and to the world.

MAINFREIGHT LIMITED FULL YEAR RESULT TO MARCH 2015

SEQ Catalyst Projects

THE CONSTRUCTION INDUSTRY OUTLOOK

TRANSURBAN QUEENSLAND S $512M LOGAN ENHANCEMENT PROJECT APPROVED

ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL

AUSTRALIAN AIRPORTS ASSOCIATION AUSTRALIAN AIRPORTS DRIVING TOURISM GROWTH

STATISTICAL REPORT. Aviation. Domestic airline on time performance

Home About us Contact

August The Coalition s Policy for Aviation

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

BETTER INFRASTRUCTURE FOR QUEENSLAND. The LNP s Plan to Build the Roads, Bridges and Dams Queensland Needs

State Budget Breakfast

Department of State Development, Infrastructure and Planning. SEQ Economic Development Forum

BUSINESS CASE EXECUTIVE SUMMARY CHANNEL CAPACITY UPGRADE

Significant expenditure in Wide Bay: Health. $2.5B for the Wide Bay, Darling Downs, Sunshine Coast Hospital and Health Services.

Transcription:

1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Fix the Bruce Highway July 2013 Our Plan s Real Solution ns for all Australia n, values and The directio s of the next policy prioritie ment. Coalition Govern The Coalition s Policy to Fix the Bruce Highway

2 Key Points The Coalition is determined to fix the Bruce Highway. We will provide an investment of $6.7 billion to partner with the Queensland Government in an $8.5 billion package of works. Including the Gateway Motorway North upgrade, total capital expenditure will be nearly $10 billion. Our commitment will provide $2.6 billion more toward the Bruce Highway upgrade than the Rudd-Gillard Government has committed. We will put an end to the unproductive and politically-driven disputes between the various levels of government when it comes to funding the Bruce Highway. The Coalition will enter an 80:20 funding agreement with the Queensland Government for the Bruce Highway upgrade. This is the Commonwealth s fair share and anything less than an 80:20 split makes fixing the Bruce Highway vulnerable to delay or a failure to fix it at all. The Coalition is committed to the ten-year upgrade plan for the Bruce Highway as first proposed by the Queensland Government and we will get this upgrade finished. It is vital that the Bruce Highway is made safe, reliable and capable of handling future traffic volumes.

3 Introduction Infrastructure is key to Australia s competitiveness. Better infrastructure underpins services, such as transport and logistics, water and energy. Inefficient infrastructure networks are one of the key reasons why Australia s productivity has declined and are also a key driver of the cost of living pressures affecting Australian households. The Coalition understands the many benefits of providing an efficient and reliable integrated transport network across our nation. We have a clear plan for delivering the infrastructure our cities and country needs. Under the Coalition, vital transport projects will be underway across the country within twelve months of an election. We have already committed: $1.5 billion to get the East-West Link going in Melbourne; $1.5 billion to ensure the Westconnex project gets underway in Sydney; $1 billion to support the Gateway Motorway upgrade in Brisbane; $500 million to support the continuing upgrade of the North-South Road Corridor in Adelaide; $400 million to support the duplication of the Midland Highway in Tasmania; and $5.6 billion to complete the duplication of the Pacific Highway from Newcastle to the Queensland border, including $2.1 billion in new money. In addition, the Coalition will: work with the NSW Government to get Sydney s F3 to M2 started by late 2014; complete the Perth Gateway project; get the Toowoomba Second Range Crossing underway; and build the National Broadband Network sooner and for tens of billions less than Labor s NBN.

4 The Coalition has a clear and definitive plan to build the nationally significant infrastructure our cities and country needs. Our infrastructure plan will mean that people spend less time in traffic and more time with family, that businesses can get their goods and services to market faster, and that our export industries can be more competitive. The Importance of the Bruce Highway The importance of the Bruce Highway cannot be overstated. The Bruce Highway covers approximately 1,700 kilometres and is the main road between Cairns and Brisbane. It is the major arterial connecting Queensland s seaboard communities and economic centres. The Bruce Highway covers major regional centres, including: Cairns, Townsville, Mackay, Rockhampton, Gladstone, Maryborough and the Sunshine Coast. The economic importance of the Bruce Highway is widely recognised. Infrastructure Australia notes that: The [Bruce] Highway plays a significant role in freight and passenger transport and its safe and efficient operation is important nationally. Regional Development Australia notes that the Bruce Highway:...is critically important for the efficient, reliable and safe movement of people and freight throughout the state, and is the most significant single piece of transport infrastructure used by residents, visitors, business and industry all year round. The North Queensland Roads Alliance estimates that the Bruce Highway contributes $11.5 billion per annum to the Queensland economy and supports 60,000 jobs in North Queensland. Queensland Premier Campbell Newman has committed $1 billion extra over ten years for the Bruce Highway upgrade. The Premier has said: The LNP team committed to making safety and flood immunity the fundamental priorities of our ten year Crisis Action Plan for the Bruce Highway.

5 We have already committed $1 billion of State funds for the Bruce Highway on the condition the Federal Government urgently brings forward expenditure to fix this link within ten years, so now they need to step up to the plate. The Federal Coalition shares Premier Newman s concerns for the Bruce Highway and we accept the Commonwealth must play a significant role to get the upgrade finished. Queensland, and our nation, cannot exploit our economic potential without a safe, reliable and efficient Bruce Highway. The Need for Safety Improvements The Bruce Highway accounts for approximately seven per cent of the national highway network, but it accounts for 17 per cent of national road fatalities. Between 2008 and 2011, there were 170 deaths and 1,620 hospitalisations resulting from crashes on the Bruce Highway. The Australian Automobile Association has called the Bruce Highway one of the most dangerous roads in Australia and the Bruce Highway upgrade is one of the Association s top national priorities. The Royal Automobile Club of Queensland estimates that 60 per cent of road deaths in Queensland occur on the Bruce Highway. The RACQ also estimates that, without further action to upgrade the Highway, an additional 350 people will die and 5,000 will be injured on the Highway over the next decade. The RACQ stated in 2012: a general lack of capital investment on the Bruce Highway over many years means that there is a backlog of safety, flood immunity and capacity projects needed to raise the standard of the Highway. The most recent report under the Australian Roads Assessment Programme found that the Highway had the highest level of road trauma on the Queensland national network, accounting for 50 per cent of casualty crashes and 61 per cent of deaths between 2005 and 2009. The report states that: the Bruce Highway is medium-high and high risk along much of its length This makes the Bruce Highway one of the more risky roads identified in this report

6 Significant investment is required for infrastructure improvements along the Bruce Highway to address safety deficiencies and to cater for increasing traffic demand. The Australian Road Assessment Programme rated the stretch of Bruce Highway between Mackay and Sarina as the third most dangerous road in Australia. The section is only 25 kilometres, but it recorded 108 motorists injured and six killed between 2005 and 2009. These are unacceptable statistics. An upgrade of the Bruce Highway is urgently needed to make the road safer and to help prevent unnecessary deaths and injuries. The Need to Address Flood Mitigation An unacceptably large component of the Bruce Highway is prone to flooding and subsequent road closure. The Bruce Highway Ten Year Action Plan produced by the Queensland Government estimates that, on average, every year nine locations along the Highway are closed for more than 48 hours and six locations are closed for more than five days a year due to flooding. The Queensland Government found that: Significant flooding is an annual reality along the coastal plain traversed by the Bruce Highway between Brisbane and Cairns. Flooding of the highway occurs at a large number of creek and river crossings. In addition, highway flooding causes destruction of road pavements and structures, resulting in poor and unsafe driving conditions on damaged surfaces. Reconstruction then results in further delays to traffic. The Bruce Highway is routinely cut-off due to flooding at up to 33 sites, which economically paralyses North Queensland. One area particularly prone to flooding is Sandy Gully. Closure of the Bruce Highway at Sandy Gully cuts off Abbot Point from the workforce living in Bowen. Periodic closure due to flooding also occurs at Goorganga Plains, Yellow Gin Creek, and Haughton River Bridge. At Rockhampton alone, critical supplies to and from Central and North Queensland can be stalled for two to three weeks at a time, isolating over 700,000 Queenslanders.

7 Road closure due to flooding is as much a safety issue as an impediment to major industry and economic development. A 2011 study by the Centre for Environmental Management at the Central Queensland University estimated that the cost of road disruptions in Rockhampton due to flooding is $5.41 million per day. The study found that closures during the January 2011 floods cost the Rockhampton economy $35 million and the wider Queensland economy $45.7 million. The tragedy and aftermath of Cyclone Yasi illustrated to all Australians the imperative for fixing the Bruce Highway. That such a vital highway is allowed to simply shut down due to weather and poses a danger to all who use it is a disgrace. Making the Bruce Highway less flood-prone and creating more passing lanes are two of the biggest issues in North Queensland economically and in terms of driver safety. An upgrade of the Bruce Highway is urgently needed to ensure it is not subject to widespread closure and is both reliable and safer in all weather conditions. Congestion and Capacity Constraints The Bruce Highway is the major arterial road connecting Queensland s seaboard communities and economic centres between Cairns and Brisbane. As a major road of economic and social importance, it is vital that the Bruce Highway has the capacity to deal with growing traffic volumes. It is apparent that an increasing proportion of the Bruce Highway is subject to congestion and capacity constraints. The Queensland Chamber of Commerce and Industry has estimated that: Traffic volumes on the Bruce Highway are expected to grow by more than three per cent per year to 2025, driven by population growth, a booming resource sector and strong agricultural and tourism sectors. This will further exacerbate delays when travelling. The Queensland Government recently found that: Traffic volumes along the whole length of the highway continue to increase rapidly as a result of the economic activity associated with the resources boom throughout the State. This traffic growth is manifest in both rural and urban areas...

8...severe congestion is occurring on roads within and approaching regional cities for example south of Rockhampton, Sarina to Mackay, the northern beach suburbs of Townsville and Gordonvale to Cairns. Congestion on the Bruce Highway is a problem because it means more time spent in traffic and less time spent with families or being engaged in productive activities. It means more costs for business and more frustration for motorists, families and businesses. Capacity constraints on the Bruce Highway also make the road less safe. The Coalition is committed to upgrading the Bruce Highway so that it has the capacity to safely deal with growing traffic volumes. Ensuring the Bruce Highway has sufficient capacity to deal with current and future traffic volumes will mean that the road will have the ability to fully act as the important economic lifeblood it is to the Queensland and national economies. The Plan 1. The Coalition s $6.7 Billion Commitment to the Bruce Highway The Coalition will provide $6.7 billion to ensure there are sufficient resources and momentum to get vital safety, flood mitigation and congestion-busting work well underway on the Bruce Highway in coming years. The Coalition will allocate $2.1 billion to the Bruce Highway for a range of projects over the forward estimates (2013-14 to 2016-17). A list is detailed at Attachment A and includes priority projects such as the Yeppen South Floodplain upgrade, flood upgrades at Sandy Gully and Yellow Gin Creek, funding to start the Mackay Ring Road and Section C of the Cooroy to Curra project. We believe it is vital that local communities, motorists, transport companies and private sector construction companies have certainty to get upgrade and safety-enhancement projects along the Bruce Highway underway. The Coalition will ensure all of these projects are underway and completed on schedule. All projects currently under construction along the Bruce Highway will be honoured by the Coalition and completed on schedule.

9 The Coalition will also provide $4.6 billion for projects set for construction and completion over the next ten years. These projects are detailed at Attachment B and include the Mackay Northern access upgrade, the Cairns Southern Access Corridor (Stage 2), Caloundra Road to Sunshine Motorway (Stage 1), Haughton River Bridge and Pink Lily Lagoon construction and the Cattle and Frances Creeks upgrade. 2. Funding Certainty for the Bruce Highway The Coalition will enter an 80:20 funding agreement for the Bruce Highway with the Queensland Government. Under the Howard Government, roads of national significance and national priority were funded 80 per cent by the Commonwealth and 20 per cent by the States or Territories. This approach provided an understood and certain approach to road funding that ended unproductive and politically-driven disputes between the various levels of government when it came to nationally significant road projects. The Coalition will ensure an 80:20 funding agreement is adopted when it comes to nationally significant roads outside the capital cities, including the Bruce Highway. This is the Commonwealth s fair share and anything less than an 80:20 split makes fixing the Bruce Highway vulnerable to delay or a failure to fix it at all. While all levels of government benefit from well-functioning roads, it is the Commonwealth that should provide the majority of funding for such roads. It is the Commonwealth that is responsible for ensuring interstate and freight road networks are efficient and it is the Commonwealth that reaps a large part of the gains from efficient road networks (such as through the higher taxation revenues that accrue through increased domestic trade and the greater investment and jobs growth this spurs). The economic benefits of the Bruce Highway are clear. The Coalition recognises the Bruce Highway as a nationally significant road and we will enter an 80:20 funding agreement with the Queensland Government so that the upgrade is not subject to funding disputes and is completed as quickly as possible.

10 The Choice Labor promised $4.1 billion to the Bruce Highway over the next ten years. But nearly three-quarters of this promise is either re-announced money or money that will not be available until 2019 or two elections away. Of the $4.1 billion promised by Labor, $1.7 billion is for previously announced projects and $1.1 billion will not be available until after 2019. It was Kevin Rudd who borrowed $100 million every single day and turned the $70 billion of government assets left by the Howard Government into a total gross debt set to breach the $300 billion debt ceiling in coming years. It is because of Kevin Rudd that we are now spending $8 billion a year on interest payments on Labor s debt money that could be far better spent on national infrastructure to boost our economy and productivity. The Coalition has a better plan for our country. We will stop government waste, fix the Budget, provide confident and stable government, and we will deliver the infrastructure our nation needs. Under the Coalition, vital transport projects will be underway across the country within twelve months of an election. The Coalition will fix the Bruce Highway. Cost The Coalition s Policy to Fix the Bruce Highway will involve an investment of $6.7 billion over ten years, which is $2.6 billion more than Labor s inadequate commitment to this essential piece of national infrastructure.

11 Attachment A Bruce Highway projects (2013-14 to 2016-17) Total capital expenditure over forward estimates ($m) Federal contribution in forward estimates ($m) Cooroy to Curra project (Section A) 696 301 Black spots, rest areas and other targeted safety improvements 268 268 Yeppen Floodplain upgrade 246 186 Caloundra Rd to Sunshine Motorway - Stage 1 part construction Mackay Ring Road - Stage 1 part construction 200 160 180 140 Townsville Ring Road - Stage 4 175.2 135.2 Upgrade of Caboolture to Caloundra 122.06 122.06 Cooroy to Curra (Section C) - part construction 140 112 Overtaking lanes 110 110 Duplication from Vantassel St to Flinders Hwy 113 85.5 Calliope Crossroads 53.03 53.03 Cooroy to Curra project 49.39 49.39 Sandy Gully Bridge upgrade 57 46

12 Total capital expenditure over forward estimates ($m) Federal contribution in forward estimates ($m) Cabbage Tree Creek to Carman Rd and Back Creek Range section upgrade Realign and raise Highway from Sandy Corner to Collinsons Lagoon Upgrade the southern approach to Cairns 62.75 42.75 23.84 23.84 21.91 21.91 Pavement Widening (various) 50 40 Caloundra Road to Sunshine Motorway - Stage 2 planning and design Improved flood immunity at Gairloch floodway Haughton River and Pink Lily Lagoon upgrade - planning and design 50 40 40 40 50 40 Yellow Gin Creek upgrade 45 36 Mackay Ring Road - plan and preserve corridor 25 20 Upgrade Burdekin River Bridge 10.85 10.85 Upgrading of southern approaches to Gin Gin Upgrade the southern approach to Mackay Pine River to Caloundra interchange upgrades - planning 10.64 10.64 3.48 3.48 8 6.4 Burdekin Road Safety Audit projects 0.3 0.3 Total 2,811.45 2,104.35

13 Attachment B Bruce Highway funded beyond the forward estimates over the next ten years Total ($m) Federal Contribution ($m) Cooroy to Curra (Section C) - final construction 808 646.4 Caloundra Road to Sunshine Motorway - Stage 2 743 594.4 Edmonton to Gordonvale duplication 481 384.8 Haughton River and Pink Lily Lagoon - construction 465 372 Bruce Highway safety package 400 320 Mackay Ring Road - Stage 1 final construction 360 288 Additional funding for black spots, rest areas & safety upgrades 175.2 175.2 Additional funding for overtaking lanes 165 165 Maroochydore Road interchange upgrade - Stage 1 187 149.6 Cattle and Frances Creeks upgrade 174 139.2 Additional targeted safety improvements 161 128.8 Caloundra Road to Sunshine Motorway - Stage 1 final construction 141 112.8 Cairns Southern Access Corridor - Stage 3 135 108 Rockhampton Northern access upgrade - Stage 1 121 96.8 Tiaro flood immunity upgrade 107 85.6 Managed Motorways - Gateway Motorway to Caboolture 105 84 Saltwater Creek upgrade 103 82.4 Pavement widening: Caboolture to St Lawrence 98 78.4 Mackay Northern access upgrade 80 64 Townsville Northern Access intersections upgrade 72 57.6

14 Total ($m) Federal Contribution ($m) Rockhampton bypass - plan and preserve 65 52 Cairns Southern Access Corridor - Stage 2 58 46.4 Road operations improvement projects 56 44.8 Cooroy to Curra (Section D) - planning and design 50 40 Ingham to Cardwell range deviation - plan and preserve corridor 48 38.4 Burdekin Deviation - plan and preserve corridor 48 38.4 Pavement widening: St Lawrence to Bowen 40 32 Tinana Interchange 38 30.4 Pavement widening: South Home Hill to North Ingham 25 20 Pavement widening: Ingham to Cairns 40 32 Jumper Creek upgrade 23 18.4 Goorganga Plains upgrade - plan and preserve corridor 15 12 Dallachy Road flood immunity upgrade 11 8.8 Sarina Northern Access upgrade 11 8.8 Innisfail bypass - plan and preserve corridor 9 7.2 Mackay intersection upgrade - Stage 2 9 7.2 Childers bypass - plan and preserve 8 6.4 Knobels Road intersection upgrade 7 5.6 Ash and Pine Streets intersection upgrade 7 5.6 Babinda intersection upgrade 4 3.2 Total 5,653 4,590.60

15 Attachment C The Coalition s Policy to Fix the Bruce Highway Coalition Labor Total funding $6.7 billion $4.1 billion Enough funding to get the job done An end to disputes over road funding an 80:20 funding agreement A toll free Gateway Motorway for Brisbane Jumper Creek upgrade funded Full construction of Cooroy to Curra Section C Dallachy Road flood immunity upgrade Mackay intersection upgrade Caloundra Road to Sunshine Motorway Stage 2 planning and design Pine River to Caloundra interchange upgrades planning Caloundra Road to Sunshine Motorway Stage 2 construction Edmonton to Gordonvale duplication Maroochydore Road interchange upgrade Stage 1 Cairns Southern Access Corridor Stage 3 Saltwater Creek upgrade Tiaro flood immunity upgrade

16 Coalition Labor Pavement widening: Caboolture to St Lawrence Townsville Northern Access intersections upgrade Rockhampton bypass plan and preserve Ingham to Cardwell range deviation plan and preserve corridor Burdekin Deviation plan and preserve corridor Tinana interchange Pavement widening: Ingham to Cairns Goorganga Plains upgrade plan and preserve corridor Sarina Northern Access upgrade Innisfail bypass plan and preserve corridor Mackay intersection upgrade Stage 2 Childers bypass plan and preserve Knobels Road intersection upgrade Ash and Pine Streets intersection upgrade Babinda intersection upgrade

5 For further details of the Coalition s Plan go to www.realsolutions.org.au Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy for a Green Army Authorised and printed by Brian Loughnane, cnr Blackall and Macquarie Sts, Barton ACT 2600. July 2013.