March 4, 2014 VIA EMAIL College of Lake County 19351 West Washington Street Grayslake, Illinois 60030 Re: Master Plan Projects Architect s Project umber: 214009.00 Schematic Design Meeting #8 Minutes Summary of the Schematic Design Meeting #8 held at 8:30 am on March 4, 2015 at College of Lake County-Grayslake Campus, Room A261. These notes record our understanding of items discussed and decisions made at this meeting. Please notify us within seven (5) calendar days of any necessary additions or corrections. PERSOS I ATTEDECE David Agazzi, College of Lake County Drew Miller, Project Manager, Cotter Consulting Ted Johnson, College of Lake County Greg Evans, College of Lake County Pat Argoudelis, Manager, College of Lake County Christine Klippert, Operations, College of Lake County Michele Reynolds, College of Lake County Michael Lundeen, Project Manager, Legat Architects ITEMS DISCUSSED 1. The group met as a follow-up to meeting 7 to discuss revised options A and B. These were sent prior to the meeting for staff review. 2. Both options had saw-tooth bay windows facing the central corridor to better allow the offices to function and bay windows allow better display. Dave recommended that the saw-tooth be deleted and a straight curtain wall be incorporated. 3. Option A was preferred. The Web pick-up was moved west adjacent to the elevator with likely less SF. The secure storage closet to south was deleted/moved into other storage. The text book area was enlarged. The kitchen/break-room was removed, simplified, and moved to the office area. Customer service will be a movable desk/counter in lieu of an enclosed area with walls. The front display areas / general merchandize area should be opened up by moving the cashier north and consolidating the offices. 4. The exiting was discussed 5. The lower level was discussed. The east service corridor will be removed. The group reviewed the elevator location, exiting, and access for deliveries. 6. ext steps a. Legat is continuing to develop infrastructure and interiors surrounding the bookstore. b. Legat will update and refine options A and B.3 and forward to CLC for review prior to the next meeting. 7. Meeting adjourned.
College of Lake County - Master Plan Projects SD Meeting Minutes March 4, 2014, Page 2 of 2 Thank you. Sincerely, Legat Architects, Inc. Michael Lundeen, AIA ML/ML ATTACHMETS Agenda CC File: 214009.00 CLC Cafe St Act AB core: B3 Dorothy McCarty, Cotter Consulting Jeffrey Sronkoski, Legat Architects Steven Brubaker, Brubaker Ryan Horsman, Legat Architects Jaclyn Rutter, Legat Architects FILEAME 214009.00 MI Mar 4 2014SD MTG8.docx
Meeting Agenda ORGAIZATIO College of Lake County RE PROJECT TITLE Master Plan Projects PROJECT O. 214009.00 LOCATIO CLC-Grayslake Campus, Room T326 DATE, TIME March 4, 2014, 8:30 am 1. Goals of the Meeting (5min) Confirm Elevator, Stair, Dock Access Receive approval of SD Layout Option A or B Confirm locations of Offices, Cashiers, window display, etc. 2. Lower Level and Dock Access (5min) Review Loading Dock access, Exiting of Basement, Workroom, Storage, Receiving 3. Main Floor (45min) February 18 th meeting summary Review Option A.1 and B.3.1 5. ext step (5min) SD Document Completion for estimating by CM Approval of SD, Start Design Development CC File: 214009.00 CLC FILEAME
College of Lake County STUDET ACTIVITIES Enter address here DISPLAY WIDOWS PROPOSED EW ETRACE DISPLAY WIDOWS CLEAR SOTRY ABOVE QUEUE LIE CLOTHIG STUDET STREET CASHIER'S WORKSTATIO 100 SF 12+ LF CADY SACKS BAG GEERAL MERCHADISE 2,234 SF REQUESTED: 2,392 DAYLIGHTIG OPERATIOS CLERK'S AD ACCOUTS PAYABLE OFFICE 177 SF RUSH PERIOD CASHIER'S STATIO CLOTHIG GIFTS SCHOOL SPLIES 112 LF SCHOOL SPLIES 72 LFT ELECTROIC'S DISPLAY COUTER WITH SHELVES 2 HIGH PASS THROUGH WIDOW GM & TB BUYER'S OFFICES 388 SF MAAGER OFFICE 131 SF CUSTOMER SERVICE 141 SF CORECE AREA 118 SF RELOCATE DOOR EXISTIG MECHAICAL TO REMAI BACK GM 270 SF EXISTIG MECHAICAL CHASE TO REMAI COVERTED TO CHASE PART OF EXISTIG MECHAICAL CHASE TO REMAI TEXTBOOK STACKS 1,330 SF REQUESTED: 2,000 SF 1,450 LF REQUESTED: 2,403 LF Legat Architects 651 W Washington Blvd. Suite One Chicago, IL 60661 P. 312.258.9595 F. 312.258.1555 www.legat.com ART AD PHOTO CULIARY, URSIG, BACKPACK CARDS EW ELEV. 100 SF BREAK 85 SF SECURE 68 SF WEB PICK- 213 SF 1/16" = 1'-0" PASS THROUGH WIDOW QUEUE LIE Option A 1 First Floor Option A 1/16" = 1'-0" B-COURT 214009.00 02/10/2014 A200 A PROJECT UMBER DATE OF ISSUE
College of Lake County STUDET ACTIVITIES DAYLIGHTIG MAAGER OFFICE 120 SF Enter address here STUDET STREET Legat Architects PROPOSED EW ETRACE DISPLAY WIDOWS RUSH PERIOD CASHIER'S STATIO 6 LF CLOTHIG QUEUE LIE DISPLAY WIDOWS ART AD PHOTO SCHOOL SPLIES 112 LF SCHOOL SPLIES - GEERAL MERCHADISE 2,520 SF REQUESTED: 2,392 CARDS GIFTS BAG STACKED 5 SHELVES 12+ LF CADY SACKS 72 LFT ELECTROIC'S DISPLAY COUTER WITH SHELVES 2 HIGH CULIARY, URSIG, BACKPACK GIFTS PASS THROUGH WIDOW TRADE BOOKS 2 SHELVES GM & TB BUYER'S OFFICES 342 SF CUSTOMER SERVICE 141 SF CORECE AREA 106 SF 2' - 0" 4' - 21/2" 1' - 3" RELOCATE DOOR EXISTIG MECHAICAL TO REMAI BACK GM 270 SF EXISTIG MECHAICAL CHASE TO REMAI COVERTED TO CHASE PART OF EXISTIG MECHAICAL CHASE TO REMAI TEXTBOOK STACKS 1,339 SF REQUESTED: 2,000 SF 1,450 LF REQUESTED: 2,403 LF 651 W Washington Blvd. Suite One Chicago, IL 60661 P. 312.258.9595 F. 312.258.1555 www.legat.com EW CATERIA CASHIER'S STATIO 400 SF CASHIER'S WORKSTATIO 100 SF OPERATIOS CLERK'S AD ACCOUTS PAYABLE OFFICE 160 SF EW ELEV. 100 SF BREAK 85 SF SECURE 73 SF WEB PICK- 228 SF PASS THROUGH WIDOW QUEUE LIE 1/16" = 1'-0" Option B.3 1 First Floor-Option B.3 1/16" = 1'-0" B-COURT 214009.00 02/10/2014 A200 B.3 PROJECT UMBER DATE OF ISSUE
College of Lake County REMOVE STAIR RELOCATE EW Enter address here RECEIVIG DESK RECEIVIG DESK ABOVE & BELOW S/ WEB ORDER DESK PROPOSED EW SERVICE CORRIDOR STACKED 5 HIGH 60 LF 6 RUSH PERIOD PALLETS PALLET PALLET PALLET PALLET PALLET PALLET RECEIVIG SPLIES PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET Legat Architects 651 W Washington Blvd. Suite One Chicago, IL 60661 P. 312.258.9595 F. 312.258.1555 www.legat.com OVERHEAD TRASH RECYCLE ABOVE & BELOW RECEIVIG WORK DESK STACKED 5-6 HIGH TOTAL ALL BOOK SHELVES: 300 LF DOUBLE SIDED BOOK SHELVES WORK/ / RECEIVIG AREA 1,464 SF BACK REQUESTED: 815 SF EW PROPOSED / WORK REQUESTED: 400 SF 34 PALLETS ACCOMMODATED PROCESSIG 20 SF SHRIK WRAP MACHIE STACKED 5-6 HIGH BOOK SHELVES PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET OVERHEAD TO EW CATERIA 3/32" = 1'-0" Lower Level 1 Lower Level - Option 3/32" = 1'-0" 214009.00 02/10/2014 A200 LL PROJECT UMBER DATE OF ISSUE
10 13 CHAIRS-PERMAET WATER HEATER S-002 ELEV. EQUIP. S-001 CORRIDOR S-004 S-003 MECHAICAL S-005 CLOSETS E-1 R CHILLER CHILLER CHP CHP HRP BOILER BOILER FD 10,000 GAL. TAK SEE MECH. AIJ 10,000 GAL. TAK SEE MECH. SIM. OPE TO ABOVE V.T. S.C. LIFT COTROLS OPE TO PIT BELOW AD THEATRE ABOVE PIT SUMP @-6'-2" Stair #4 T001D Janitor T007A Closet T006A Elevator Machine Room T030 T002 Air Compressor T028B Stair #5 T001E Water Service Room T029 T027 T028 Refrigeration Room M002A Edu Affairs Space Holder M002 Student Dev Space Holder STAIRS PASSAGE P102 M003 Rigging P001 P002 M001 Mechanical P003Room Elevator Service Room L012 HOLDIG -AV DEPT. L011 MULTI-PURPOSE STUDIO Orchestra Lift Pit P004 RAMP B008 rage S T O R A G E L035-1 Ceramics L035 Lab L038 L039 L034B PDC Office L034 Office L034A PDC Classroom L032 Faculty Lounge 15 Storage SERV. AV Service Desk L002 SET L013 16 LO03 DARK- L001 L004 L015 L005 L007 L006 PDC L014 Photo Lab L008 L010 RECORDIG STUDIO L009 VIDEO/ TAPE ew Stair From Above Elevator to Kitchen ew Exit Further B010 Kitchen and Storage Extend Culinary B012 B011 B004 B009 Tele. Room B006A B006 Student Lounge B007 Cooler B005 Lancers B003 ew Elevator to P005 Shaft P010 Rigging P007 Machine Room P006 Storage / Textbook Buy Back Storage B013 Text Book Buyer Office B014 B001 Willow Room / Kitchen B002 FIRE WALL STOVE PREP TABLE Dry Food Storage CoolerFreezer Men's LEVEL 6 5 ROWS OF 14 CHAIRS(EA. ROW)-PERMAET 13 CHAIRS-PERMAET LEVEL 1 Auditorium C005 C005 AUDITORIUM Women's Men's StorageStorage Maintenance Storage C009 Conference Room Storage Storage Crib C010 C011 C009A Storage Crib STAGE 5 C8-1 3 Women's Foyer C002-1 Prep Room Delivery Through Service C-Wing Atrium/Lounge Willow Room C001 C003 C002 Reconfigure Conference Room Storage Service Options @ Science Core 0' 40' 80' KEY 1. Renovations at existing space: c. Related above ceiling HVAC work. 2. Renovations at existing Lancers food service and student lounge: a. Remove existing walls. Maintenance Department C013 C025 C015 Break Room / Storage Conference Room C021 Facilities C014 C016 C020 d. Related above ceiling HVAC work. 3. Renovate for new Storage/Receiving/Overstock Room: a. Remove existing walls. Pump Pit C018 Mail Room Loading Dock c. Related HVAC work. 4. ew elevator to Level 1 as part of the Food Service Addition. 5. Install new monumental open stair to access Level 1; excavate to provide new stair opening. 6. HVAC above ceiling work: a. Existing systems replacement. b. Tie-in with new geothermal loop. c. ew ceilings and lighting. d. ew technology Cabling Cooling Tower Biology Storage C3-1 6 C2-1 6 f. Protection of existing space (below ceiling) not being remodeled. COLLEGE OF LAKE COUTY Cafeteria Lower Level Plan College of Lake County 0 40 80 160 240 Core A/B + Cafeteria Basement Long Term 1 March 2014 0' 40' 80' 160' 240'
10 13 CHAIRS-PERMAET WATER HEATER S-002 ELEV. EQUIP. S-001 CORRIDOR S-004 S-003 MECHAICAL S-005 CLOSETS E-1 R CHILLER CHILLER CHP CHP HRP BOILER BOILER FD 10,000 GAL. TAK SEE MECH. AIJ 10,000 GAL. TAK SEE MECH. SIM. OPE TO ABOVE V.T. S.C. LIFT COTROLS OPE TO PIT BELOW AD THEATRE ABOVE PIT SUMP @-6'-2" Stair #4 T001D Janitor T007A Closet T006A Elevator Machine Room T030 T002 Air Compressor T028B Stair #5 T001E Water Service Room T029 T027 T028 Refrigeration Room M002A Edu Affairs Space Holder M002 Student Dev Space Holder STAIRS PASSAGE P102 M003 Rigging P001 P002 M001 Mechanical P003Room Elevator Service Room L012 HOLDIG -AV DEPT. L011 MULTI-PURPOSE STUDIO Orchestra Lift Pit P004 RAMP B008 rage S T O R A G E L035-1 Ceramics L035 Lab L038 L039 L034B PDC Office L034 Office L034A PDC Classroom L032 Faculty Lounge 15 Storage SERV. AV Service Desk L002 SET L013 16 LO03 DARK- L001 L004 L015 L005 L007 L006 PDC L014 Photo Lab L008 L010 RECORDIG STUDIO L009 VIDEO/ TAPE ew Stair From Above Elevator to Kitchen B009 Tele. Room B006A B006 Student Lounge B007 Cooler B005 ew Elevator to P005 Shaft P010 Rigging P007 Machine Room P006 ew Exit B010 Kitchen and Storage B004 Lancers B003 B012 B011 Storage / Textbook Buy Back Storage B013 Text Book Buyer Office B014 B001 Willow Room / Kitchen B002 FIRE WALL STOVE PREP TABLE Dry Food Storage CoolerFreezer Men's 5 C8-1 Foyer 3 Women's C002-1 Prep Room C-Wing Atrium/Lounge Willow Room C001 LEVEL 6 5 ROWS OF 14 CHAIRS(EA. ROW)-PERMAET Auditorium C005 C002 C005 AUDITORIUM 13 CHAIRS-PERMAET LEVEL 1 STAGE Women's C003 Storage Men's StorageStorage Maintenance Storage C009 Storage Crib Conference Room Storage Storage Crib C010 C011 C009A 0' 40' 80' KEY 1. Renovations at existing space: c. Related above ceiling HVAC work. 2. Renovations at existing Lancers food service and student lounge: a. Remove existing walls. Maintenance Department C013 C025 C015 Break Room / Storage Conference Room C021 Facilities C014 C016 C020 d. Related above ceiling HVAC work. 3. Renovate for new Storage/Receiving/Overstock Room: a. Remove existing walls. Pump Pit C018 Mail Room Loading Dock c. Related HVAC work. 4. ew elevator to Level 1 as part of the Food Service Addition. 5. Install new monumental open stair to access Level 1; excavate to provide new stair opening. 6. HVAC above ceiling work: a. Existing systems replacement. b. Tie-in with new geothermal loop. c. ew ceilings and lighting. d. ew technology Cabling Cooling Tower Biology Storage C3-1 6 C2-1 6 f. Protection of existing space (below ceiling) not being remodeled. COLLEGE OF LAKE COUTY Cafeteria Lower Level Plan College of Lake County 0 40 80 160 240 Core A/B + Cafeteria Basement Short Term 1 March 2014 0' 40' 80' 160' 240'