Agency on Bay Management Gulfstream Phase IV Expansion

Similar documents
APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS

Dawn Express Pipeline Project

New Brunswick Energy Commission January 14, 2011

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

An Education In Offshore Pipeline Construction. By Allyn Stott

PORT EVERGLADES SAND BYPASS PROJECT

MARITIME. Protect Your Assets. Lay-up seminar MOU - CEFOR. Dec. 2016, Oslo, Ungraded SAFER, SMARTER, GREENER

NEWS RELEASE 8 NOVEMBER Gladstone LNG Project Arrow-AGL Joint Venture Acquires Enertrade s Gas and Pipeline Business

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

Interconnection between the ROMANIAN and the BULGARIAN Gas Transmission Systems Project implemented by TRANSGAZ Romania & BULGARTRANSGAZ - Bulgaria

Technical Design Manual

M I C O P E R I PIPELAYING. Client Project Description Location Completed Services

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Ohio Freight Conference Great Lakes Commercial Navigation

The Wallumbilla Hub: Integrating Queensland s Pipeline Infrastructure to Meet the Changing Demands of the East Coast Gas Grid

Coastal Gas Link Project of Trans Canada Pipelines. Community Profile of Stellat en First Nation

Docket No. PF Draft Resource Report No.10 confirmation of draft reports 5, 11 and 12

Morgan Stanley 2011 Emerging Companies Conference 9 June 2011

Tolling New Capacity An Important Policy Direction for Florida DOT. Ed Regan CDM Smith

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP

Miami Orlando Passenger Rail Project Overview

Shallow IC of 5

Water Resources Update after NCGA Long Session

For personal use only

OPEN SEASON Phase 2 Rules. Project on the development and expansion of Bulgartransgaz EAD gas transmission system (GTS)

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

2005 Eni Field Trip - Libya

Opportunities in Non-Container Trade and the Expanding Cruise Industry

Investor Update - Paris Civil Aerospace Mark King

Brevard County Utility Services Department

Rotterdam, the Netherlands 12 March 2014

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

EON-NTM CR4 Export Cable Installation Update Update. Notice to Mariners

AGENDA ITEM _C2 TAMPA WATER. Completion Date

The View at Bankhead Lake 12 miles off new Interstate Corridor X

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation

Introducing the A4A Energy Council to ACI-NA Keeping Jet Fuel Affordable, Reliable & Safe

IONIAN ADRIATIC PIPELINE IAP

Fittings and valves. Ductile cast iron valves. for water and gas supply

Executive Company Overview. Executive Company Overview, 06.14

Mr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

Harbor Holdings - Seward

Prince William Sound Regional Citizens Advisory Council Board Meeting Marine Services Transition Update May 4, 2017

Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates

FERC Pre-Filing Review Draft Resource Report 1 General Project Description AES Sparrows Point LNG Terminal & Mid-Atlantic Express Pipeline

Port Everglades Master/Vision Plan Update

U.S. Coast Guard - American Waterways Operators Annual Safety Report

Superalloy Market Outlook AMM 6 th Aerospace Materials Conference

Total Discovery Wells

ASTM E 1886 and ASTM E 1996 TEST REPORT. Report No.: A Rendered to: CORAL ARCHITECTURAL PRODUCTS Tuscaloosa, Alabama

Pinellas Tourist Development Council

Through comprehensive medium- and long-term development plans for HKIA, AAHK contributes to Hong Kong s economic growth.

FROM: Donald J. Polmann, Director of Science and Engineering SUBJECT: Emergency Surplus Water Agreement with Hillsborough County - Approve

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

Jill L. Jamieson Senior PPP Advisor, BearingPoint. USAID Workshop on PPP Ain Sokhna, Egypt

Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010

American Institute of Marine Underwriters

Eni Field Trip Libya. October, 2004

VIA E MAIL November 21, 2008

Miami Orlando Passenger Rail Project Overview

INSTALLATION GUIDE INTRODUCTION

Improvements in Podded Thrusters Bollard pull measurements & market response to Azipod DZ thrusters

RIGGING & TRADESHOW SUSPENSION APPLICATIONS

Jason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas

Infrastructure Report Uruguay 2014

Introduction and Company Overview

Propulsion Solutions for Fishing Vessels SERVICES

Progressing towards profitable growth

Erhama bin Jaber Al Jalahma Shipyard

Control Description Sheet 1

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

June 7, Via Electronic Filing

Forward Looking Statements

Restoration History Of Anitra Thorhaug, Phd.

INDUSTRIAL / BUSINESS PARK OPPORTUNITY

John S. Quarterman 3338 Country Club Road #L336 Valdosta, GA November 2014

Lake Manitoba Lake St. Martin

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

2017 and Beyond Forecasted Acquisition Strategy- Jacksonville District Updated 17 Mar 2017

PERBADANAN BEKALAN AIR PULAU PINANG (PBAPP) : Twinning Partnership with PDAM Tirta Musi, Kota Palembang A Win Win Experience

Punta Gorda Airport Master Plan Update

Marine Transportation Safety Investigation Report M17P0406

Your Global Emergency Response Partner

Stakeholder Meeting #1. An Introduction to the Blind Pass Inlet Management Study

PORT MORESBY POWER PROJECT - UPDATE PNG Mining & Petroleum Investment Conference. 4 th December 2018

SHIP POWER YOUR SHORTER ROUTE TO BIGGER PROFITS. JAAKKO ESKOLA Group Vice President, Ship Power

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

A New Era. in Offshore Aviation. a SEACOR company

THE STYLE OF OUR COMPANY IS BASED ON SAFETY, RELIABILITY AND QUALITY

MOBILE DISTRICT 2018 DREDGING PROGRAM

Port MacKenzie Rail Extension

The Galveston Seawall

PRO LINE FUSION INTEGRATED AVIONICS SYSTEM. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more.

CALL FOR OFFERS Up to 41 Acres Commercial Land N. John Young Parkway & W. Princeton Street Orlando, FL 32804

Riverine Sand Mining/Scofield Island Restoration (BA-40)

Welcome to Public Information Workshop 1. San Francisco International Airport 14 CFR Part 150 Study Update Noise Compatibility Program Report

Manson Construction Co.

Transcription:

Agency on Bay Management Gulfstream Phase IV Expansion July 13, 2006 Al Taylor Vice President, Operations 1

Company Overview - Introduction Placed into service in May 2002, Gulfstream is a stateof-the-art interstate natural gas transmission system owned 50% by Duke Energy and 50% by Williams The Company is under the joint management of Duke Energy, which provides the business functions, and Williams, which provides the technical functions Gulfstream was specifically designed to serve peninsula Florida (1.1 Bcfd) The Pipeline consists of 692 total miles: onshore in Florida (242 miles), Alabama and Mississippi (15 miles) and offshore in the Gulf of Mexico (435 miles) Compression consists of three Rolls Royce compressors, one of which serves solely as back up (113,700 total horsepower) located in Coden, AL 0605-11265 2

Company Overview: Map of Operations 0605-11265 3

Market Overview: Strong population growth and natural gas demand 2004-2014 Florida s population is growing 2% annually Electric demand is growing 3% annually Natural gas continues as fuel of choice for new generation in the near term Central and Southern Florida accounts for most of the load growth the market Gulfstream was designed to serve Population and power generation growth in Gulfstream s market is expected to drive increased demand for natural gas 0605-11265 4

Recent History Ê 2005 Phase II placed in service: February 2, 2005 Increased delivery points from 17 to 19 Contracted long-term firm transportation service, increased to 753,000 Dth/d Ê 2006 Phase III with FP&L announced March 2006 Phase IV with Progress Energy announced May 31, 2006 Contracted long-term firm transportation service increases to 1,253,000 Dth/d 0605-11265 5

Market Projects Phase III: Florida Power & Light Ê Ê The project will sell out Gulfstream s initial mainline capacity Project summary: 35 mile, 30 diameter pipeline extension to FP&L s new greenfield 2200 MW West County Energy Center in west Palm Beach County Completion of facilities in 2008 Phase IV: Progress Energy Ê Ê Project expands mainline capacity to 1,253,000 Dth/d Project summary: 18 miles; 20 diameter pipeline extension to Progress Energy s repowered Bartow power plant in Pinellas County 45,000 h.p. compression addition to existing Gulfstream sites near Coden, Alabama, and in Manatee County, Florida Completion of facilities in 2008 0605-11265 6

Gulfstream Market Area 0605-11265 7

Company Overview: Summer Operations 2004 & 2005 Gulfstream experienced seven storms directly impacting its market area and/or making landfall near Coden, Alabama Ê Ê Ê Bonnie, Arlene and Dennis crossed our offshore pipeline Charlie, Frances, and Jeanne crossed our market system Ivan made landfall near Mobile Bay and our compressor operations Gulfstream s pipeline facilities sustained no material damage Required surveys indicate offshore pipeline has not moved Post 2004 Gulfstream purchased & installed additional emergency generation at key communication points Gulfstream s electric generation at Coden, AL and Gas Treating Facilities were critical components of reliable service June 1, 2006 fuel retention reduced from 1.53% to 1.34% 0605-11265 8

Operations Safety 24-hour monitoring Hydro test to 150% of MAOP Integrity Management Plan Remote control of critical system valves Patrols by air & ground Coordination with ER officials Participation in Florida One Call No Lost Time Accidents since Commissioning 0605-11265 9

Phase IV Overview Progress Energy Bartow Plant Tampa Bay Proposed 20 Lateral Existing Gulfstream 36 Natural Gas Pipeline 0605-11265 10

Preferred and Alternative Routes 0 1 2 Miles 0605-11265 11

Field Surveys - Conducted To Date 0 1 2 Miles 0605-11265 12

Field Surveys - Findings To Date 0 1 2 Miles 0605-11265 13

Field Surveys - Findings To Date 0 2,000 Feet 0605-11265 14

Route Variations 0 1 2 Miles 0605-11265 15

Field Surveys - Pending To Date 0 1 2 Miles 0605-11265 16

Preliminary Construction Plan Interconnect Hot tap to pipeline 0 1 2 Miles 0605-11265 17

Preliminary Construction Plan HDD installation Channel Crossings Drilling support barge Channel Transition pipe ditch Enlarged exit pit Pipe pre-laid on bottom Direction of pull Dredged Entrance Pit Drill string Drilling support barges Not to scale 0605-11265 18

Preliminary Construction Plan HDD installation Shoreline Crossing Drilling rig exit site limits Shoreline Pipeline Water Direction of pull Dredged entrance pit Drill string R.O.W. limit Drilling support barges Not to scale 0605-11265 19

Preliminary Construction Plan Pre-Pipelay Dredging R.O.W. limit Not to scale Dredge barge Direction of Travel Pipe Spuds Spoil Spoil R.O.W. limit Pipe trench Note: Spoil mounds will alternate sides of the trench as necessary to prevent currents from re-filling trench 0605-11265 20

Preliminary Construction Plan Conventional Pipe lay (Shallow Water) Spuds for Station Keeping R.O.W. limit Not to scale Tug Boat Pipeline R.O.W. limit Spoil (Side Cast to Either Side) Dredged Trench 0605-11265 21

Tampa Bay Ship Channel Channel Profile Cut C 0 500 1,000 feet 0605-11265 22

Gulfstream Phase IV Schedule 0605-11265 23

Contact Information Gulfstream Natural Gas System, L.L.C.: Al Taylor, Vice President Operations, 941-723-7101, al.taylor@williams.com 1-888-GAS-4-FLA www.gulfstreamgas.com FERC Certificate Process: FERC pre-filing Docket No. PF06-29-000 Office of External Affairs, 1-866-208-3372 www.ferc.gov/ for-citizens/my-rights/ process.asp 0605-11265 24