M77/GSO ANNUAL REPORT

Similar documents
A50 ANNUAL REPORT. Year 15 April In partnership with

Annual. report M77 / GSO. Year 10 April Creating and caring for safe, efficient highways

Year 9 April report. Creating and caring for safe, efficient highways M77/GSO

Year 3 April report. Creating and caring for safe, efficient highways CNDR

Year 16 April report. Creating and caring for safe, efficient highways A30/A35

National Park Authority Board Meeting

The Strategic Commercial and Procurement Manager

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

Your Transport Levy Your Transport Future. Sunshine Coast Council Transport Levy Annual Report

Terms of Reference: Introduction

NCAP Application Section E: Continuous Camp Improvement Plan

FEDERATION SQUARE MELBOURNE, AUSTRALIA CORPORATE PLAN

ENVIRONMENT ACTION PLAN

2. Recommendations 2.1 Board members are asked to: i. note the content of the May 2018 Renfrewshire Economic Profile.

Sustainable Procurement Policy for Heathrow Airport Limited

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure and services.

Message from the Managing Director... r...

Performance monitoring report for 2014/15

YHA Green SPIRIT Plan

Clarkston Playgroup and Nursery. Scottish Charity No. SC Annual Report & Financial Statements. For the Year Ended 31 March 2016

W2B Koala Management Case Study

September Standard recognised by Global Sustainable Tourism Council

Agenda item no 7. Strathclyde Bus Alliance - Proposal. Committee. Strategy and Programmes. Date of meeting 20 May 2016 Date of report 25 April 2016

Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am.

POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE. Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority (SPA)

Update on implementation of Taking Revalidation Forward recommendations

Commerce Committee 2010/11 financial review of the New Zealand Tourism Board Additional written questions

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Cold Comfort Scotland 2017

May 2011 to April 2012.

Major Scheme Business Case Summary Report for Programme Entry

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Smart Motorways Programme

SPONSORSHIP PROSPECTUS SPONSORSHIP PROSPECTUS #WTA18. Page 1 of 5

Department for Transport

Health and Safety toolkit 329 Zero carriageway crossings

Alternative service delivery models in place in Scottish local authorities: summary report

Update on the Thameslink programme

May 2011 to April 2012.

HI Sustainability Fund 2018

JOB DESCRIPTION FBO Manager

Appointment of a Non-Executive Director

BASCHURCH PARISH COUNCIL CHAIRMAN S ANNUAL REPORT 2017

The way we run our business The marketplace

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Smarter Travel Sutton

YMCA Camp Falcona YMCA Sudbury Camping Services Spring & Summer Employment Opportunities

Edinburgh Airport Corporate Responsibility Report 2008

Glasgow City Region City Deal Guide to Information Available City Deal Publication Scheme

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal

VisitScotland s International Marketing Activity

A Proposed Framework for the Development of Joint Cooperation On Nature Conservation and Sustainable Tourism At World Heritage Natural sites.

Health and Safety Report 2016

Introduction 3. Part 1: Defining and Measuring a High Quality Planning Service 4. Part 2: Supporting Evidence 34

Draft Strategic Plans for Coillte s eight Business Area Units ( )

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

TOWPATH MOWING GUIDELINES

Managing Director of Transmission. Report for the year 2012

Local Development Scheme

UKPHR Revalidation. Frequently Asked Questions for Employers. What is the value of my employee being registered with UKPHR?

Further Phases of High Quality Bespoke Offices

Committee for Melbourne Briefing Note Victorian State Budget Overview of Key Announcements

QUÉBEC DECLARATION ON ECOTOURISM World Ecotourism Summit Québec City, Canada, 2002

Revalidation: initial consultation

West Kilbride Village Nursery Day Care of Children West Kilbride Community Centre Corse Street West Kilbride KA23 9AX Telephone:

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Criteria for an application for and grant of, or variation to, an ATOL: Financial

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

Land Management Summary

Ecotourism Australia our next few years

A Master Plan is one of the most important documents that can be prepared by an Airport.

Progress and strategy. Derek Rees, CLOCS Project Director

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

Decision Strategic Plan Commission Paper 5/ th May 2017

2009 divisional activity

Revalidation of UKPHR s registrants: Guidance

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3

Global Sustainable Tourism Destinations Criteria

GTSS Summary Presentation. 21 February 2012

Frequently Asked Questions

? 0-? WA", ilp. Y ON 1Z Cond 1 0 AIRPORT COMMISSIONERS BOARD REPORT TO THE Los Angeles World Airports 0*1-

Go Safe Scotland. Delivering Road Safety Education. Road Safety in Glasgow

PROJECTS & TECHNICAL SERVICES

1.1. The purpose of this report is to seek approval for the adoption and publication of the Sports Pitches Strategy for East Dunbartonshire.

COMMUNITY SAFETY UPDATE

MINUTE of a MEETING of the Board of Directors of Culture and Sport Glasgow held at the Mitchell Library, Glasgow on 31 March 2010 at 10.30am.

Congestion Charging The history, planning and implementation

East West Rail Consortium

TAKING THE NORTH FURTHER

PERTH ZOO S RECONCILIATION

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

Parish Councils Briefing October 2013

Riverside Heights, Norwich. Travel Plan

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Welcome to the September 2018 edition of my highways newsletter.

Scotland Sustainable Tourism

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

Transcription:

C r e a t i n g a n d c a r i n g f o r s a f e, e f f i c i e n t h i g h w a y s M77/GSO ANNUAL REPORT Year 8 April 2011

Welcome to our eighth annual report About us We are pleased to report another successful year where we continue to work closely with our partners to enhance the performance of the route. Should you have any comments about this report or wish to discuss other issues, please do not hesitate to contact us at the address found on the back cover. We hope you enjoy the read. Mark Mageean, General Manager Connect Roads operates and maintains the M77 motorway between Malletsheugh and Fenwick and the Glasgow Southern Orbital (GSO) between the M77 and East Kilbride, as well as part of the existing A726 within East Kilbride. In partnership with our Maintaining Agent Contractor, Balfour Beatty Regional Civil Engineering, Connect Roads undertakes all the operation and maintenance requirements along the route. The contract was let by East Renfrewshire Council on behalf of East Renfrewshire Council, the Scottish Government and South Lanarkshire Council. In partnership with

Continuous improvement BS OHSAS 18001 is an internationally recognised assessment specification which addresses a wide range of health and safety management. Ensuring our systems are accredited to BS OHSAS 18001 is an important objective for Connect Roads. We have therefore worked hard with the British Standards Institution (BSI) to ensure that we are BS OHSAS 18001 compliant and accreditation was awarded in late 2010. This is a great accomplishment for all those involved. Last year, one of the many objectives that Connect Roads set for the forthcoming year was to implement a Road Safety Awareness Campaign. This campaign took place during November 2010 (22 nd -26 th ) and Connect Roads worked with clients and suppliers across all concessions to spread the road safety message and raise awareness of the campaign. Road Safety Week At the M77/GSO we set up a stand at the Sainsbury s store at Darley, Glasgow. It was steadily busy all day with the main demographic being parents doing their weekly shop. The general public enjoyed reading our roadworker information boards, and made pledges about how they could contribute to road safety themselves. The snow was just starting to fall in Scotland so the Connect Roads ice scrapers that were brought along were very popular, as were the Connect Roads snow domes with the children! Road Safety Week 2010 Our Road Safety Week team travelled the country to encourage the general public to make a pledge to safe driving, as part of the Brake charity road safety initiative. The team received a total number of 642 pledges over the course of a week, demonstrating a real commitment from the local community. Each event held during Road Safety Week was delivered by a great variety of people. The active participation of several operatives added real value to each event, as they were able to share first-hand experiences with the general public of what it s like working on the roads.

Network developments Proactive management Since the opening of the M77/GSO in April 2005, Connect Roads has worked with all parties involved in the project to ensure that the landscape on the route is successfully managed, enabling the new and existing landscape planting along the route to establish. Since completion of the M77/GSO in April 2005, the landscape (including grass-cutting) has been maintained by the contractor responsible for construction of the route, Balfour Beatty Civil Engineering Limited, with Connect Roads and the other project parties monitoring performance and ensuring the objectives for the landscape are met. This initial establishment period has recently ended, with responsibility for the landscape maintenance and management of the route transferring to Connect Roads Operator, Balfour Beatty Regional Civil Engineering Limited. The establishment period is a period of five years during which the performance of each section of the landscape, known as a plot, is closely monitored to ensure it is developing and functioning as initially intended. Correct functioning can be to provide screening, for example on the south-east facing slopes of the M77, or to link hedges severed by the construction of the road, thereby creating wildlife corridors and maintaining the character with the surrounding landscape. The maintenance regime can then be altered, if required, to ensure a plot develops according to its design. Over the course of the past five years, there have been a number of issues to overcome, with poor soil conditions or waterlogged ground resulting in high failure rates for some plantings. However, the ongoing monitoring and review of the performance of each plot by Connect Roads, East Renfrewshire Council and their respective consultants and contractors, ensured that action was taken to rectify any poor performance. This included revising the type or species of plant in some plots, ensuring that a more appropriate species was used whilst maintaining the function of the plot and its character. For example, in a waterlogged area adjacent to the Humbie Road balancing pond, a wildlife habitat in itself, willow saplings were planted to help take up the ground-water. Once these willow saplings were established, and the ground water conditions improved, other native plants were able to develop and flourish. With the establishment period now at an end, Connect Roads will continue to work with East Renfrewshire Council, Transport Scotland and its Operator to ensure that the landscape continues to develop and be managed in a sustainable manner. Last winter the UK experienced the coldest weather, reportedly by some, for a century. The much greater than predicted intensity of snowfall challenged us all in keeping the roads safe and open. To some the winter treatment of roads may appear to be a straightforward task, but ensuring that a road is kept safe for our users during the winter months is technically complex as well as a significant responsibility for all those individuals involved. Pro-active planning for managing the M77/GSO during winter season starts almost as soon as the previous winter season ends. Winter Maintenance Plans from the previous winter are reviewed and amended, equipment is maintained and upgraded, and salt (grit) stocks are replenished. Firstly our Operator, Balfour Beatty Regional Civil Engineering produces a Winter Out-turn Report whereby it reviews, with Connect Roads, Transport Scotland and East Renfrewshire Council the winter season just finished, analysing any trends identified and the adequacy of its operations in maintaining a safe network. Thereafter, the Winter Maintenance Plan is updated and communicated to all interested parties (Transport Scotland, local Highway Authorities, Police and other Service Providers) by the end of August, in readiness for the commencement of the Winter Season on 1 st October. Other amendments and improvements instigated prior to the commencement of last winter which contributed to success in maintaining an operational road during the severe weather included; 1. Maintenance and safety improvements to winter maintenance vehicles with demountable snow-ploughs. 2. Updated training for staff and operatives, including on the interpretation of weather forecasts, role of Duty Officer and Winter Maintenance Vehicle/Plant. 3. Increased salt (grit) stock at the commencement of the Winter Season. 4. Maintenance to the weather stations and ice sensors located on the M77/GSO network. So with an excellent response to the last winter weather behind us and plaudits received from some road users, attention turns to updating and refining our plan for next winter. However, we all have our part to play and road users should ensure they have prepared their vehicles for winter weather.

Zero Harm Sustainability We are committed to leading and developing best practice in health and safety throughout our Operations and Maintenance activities. Since its launch in 2009, our Zero Harm initiative has gained momentum, and has been embedded into all of our systems. This positive safety culture has assisted us in achieving the BS OHSAS 18001 accreditation in less than 12 months. Zero Harm has also led to the birth of Ron the roadworker! Ron is being used by Connect Roads to focus on driver behaviour and teaching drivers to learn to respect their local roadworker. So, watch this space and see how Ron the roadworker is going to reinforce the safety message along this route! It s a tough job, but we know Ron can do it! Traffic Management Vehicle As part of the process of procuring a new traffic management vehicle for the M77/GSO, Balfour Beatty Regional Civil Engineering undertook consultation with the operatives who will use the vehicle to ensure that the design and investment in a new vehicle addressed any concerns they might have, and incorporated lessons learnt from their experience. Mock-up A full scale timber mock-up of the cone well (the area on the back of the vehicle where the operative stands to deploy and retrieve traffic cones) was constructed and amended to various configurations for operatives to determine which layout best suited their requirements whilst complying with any regulations or codes of practice. The various configurations incorporated amendments to the safety gate, level of platform, etc. and a final design was confirmed and is now in manufacture. Please drive safely, and watch out for my workmates! Although an investment of time and resource was required to determine the most appropriate design for elements of the vehicle, the return will be delivered in plant and equipment better suited to the operatives who will be using it and should contribute to us achieving Zero Harm by re-thinking. We recognise the increasing importance of ensuring sustainability is at the core of all our activities. The 2020 Vision is a long-term sustainability strategy for Balfour Beatty companies and as a shareholder in Connect Roads, the strategy has been adopted on the M77/GSO. By 2020, Balfour Beatty aims to deliver, manage and own sustainable infrastructure that helps communities and individuals live within environmental limits. More detail on how Connect Roads will be supporting and implementing the initiative will follow in future reports and on our website, www.connectroads.com Roadmap and action plan Although 2020 may seem a long way off, it is important to make progress and take significant steps along the way. To achieve this Connect Roads has developed a strategy for its five roads concessions (M77/GSO, M1-A1, A50, A30/A35 and CNDR) across the UK, benchmarking where each concession currently is in terms of sustainability and setting realistic but challenging targets for the coming years. These have been incorporated into an action plan and Roadmap to track progress. Carbon and biodiversity Working with Balfour Beatty Regional Civil Engineering (Operator) and East Renfrewshire Council/Transport Scotland, Connect Roads will be investigating and implement changes to enhance the sustainability of the route, improving biodiversity and reducing carbon emissions associated with maintaining the network wherever possible. Connect Roads, and Balfour Beatty Regional Civil Engineering, its Operator on the M77/GSO, will be supporting and implementing the 2020 Vision strategy, with more details to follow in future reports and on our website, www.connectroads.com Connect Roads will continue to work closely with the various stakeholders along the route to help raise awareness and promote road safety.

M77/GSO Performance Monitoring/Achievements Maintenance Reactive maintenance Target Actual Communications Target Actual Target Actual Percentage of Planned Works carried out during Peak Periods/Public Holidays 0% 0% Percentage of Safety Inspections and Safety Patrols completed on time No. of Communications received from all Roads Authorities 8 Percentage of Winter Maintenance Salting completed within 2 hours Percentage of Street lighting on the network functioning correctly 97% 98.6% No. of Communications received from all other sources 37 Average completion time for Precautionary Salting <2 hours 1 hour 30 minutes Percentage of Category 1 defect repaired not exceeding the requirements No. of Communications received, requiring a response 19 No. of Communications within 5 day limit 0 Percentage of Emergency Responses completed on time Amenity Index for Road Network 9 9.62 Number of Nightly Winter Patrols 256 Number of Salting Runs 122 Tonnage of Salt Used 1,984 No. of Communications outwith 5 day limit 0 No. of Communications within 7 day limit 19 No. of Communications outwith the 7 day limit 0 Average response times for communications 2.5 days Percentage of Planning Applications completed on time Average response time for Planning Applications <5 days 2 days Percentage of reports completed on time Percentage of Weekly Programmes sent out on time

Spotlight on... Dave Allen Dave is Assistant Project Manager for the M77/GSO DBFO project Having spent much of his life travelling the world (even as a child) and working globally, Dave has settled in the West of Scotland. Dave has been involved with the maintenance of the M77/GSO DBFO since May 2005 and was also part of the construction phase. What is the most rewarding aspect of your role? I get a great deal of satisfaction from the level of safety we endeavour to achieve and provide for both the public and the team that maintain the route. What is the most challenging aspect of your role? I have had the fortune to mentor Engineering students who have worked with me whilst they were on placement. My role, which I find fascinating, involves educating the students; educating them to understand the ethos of engineering, along with the importance of HS&E, practical engineering, report writing and keeping accurate records. Getting the student to carry out good report writing and maintaining good records is of a particular challenge. A challenge that often requires a different solution for each individual. It has given me a great deal of satisfaction to receive positive feedback from students, once they are in full time employment. If you could give your local road user a message, what would it be? We strive to ensure that journeys for all users are as safe and pleasant as possible. More consideration towards the safety of roadworkers would be greatly appreciated. In particular, not depositing litter on the route as operatives have to then pick it up an unnecessary risk to operatives and damage to environment. What are your hobbies outside of work? My hobbies include photography, film editing, travelling and opera. Connect M77/GSO plc Connect Roads Operation Centre Maidenhill Interchange Ayr Road Glasgow G77 6RT Telephone: 0141 639 8638 Fax: 0141 639 2267 Email: connect@connectroads.com Freephone: 0800 783 0379 Cert no. XXX-XXX-XXXX Printed on Revive 100 Offset, produced with post consumer recovered fibre. The Zero Harm logo (including the gold disc) is a registered trademark of Balfour Beatty plc, 130 Wilton Road, London SW1V 1LQ.