To provide the best possible service during the Thameslink construction work at London Bridge;

Similar documents
Southeastern contingency timetable Issue 1

May 2019 Timetable. Highlights and Response to Feedback

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

GTR December 2015 timetable consultation

Peterborough. Bedford. Stevenage. Luton. St Albans. Finsbury Park. Kentish Town. St Pancras International. Farringdon. London Blackfriars

Update on the Thameslink programme

GTR 2018 timetable proposals

Business Forum. 16 March 2016

Focused on partnership

GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017

SOUTHEASTERN ENVIRONMENTAL & SOCIAL REPORT 2007

Summary of questions and discussion

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

Adapting to the future. Southeastern Sustainability Report 2018

London Bridge station opens upgrade works

UNLOCKING THE BRIGHTON MAINLINE

Phase II of The Bread Factory development on the site of the historic Grade II listed former Hovis flour mill is underway; Consisting of 41 new build

DETAILED DESIGN (Business Case Approved) OUTLINE DESIGN (Business Case Approved) FEASIBILITY (Business Case Approved - Scheme deferred until 2017/18)

Dear Member. Treasurer s Note Subscriptions

Kent Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch

Open for business Multi-billion pound modernisation of London Bridge is complete

Cabinet. South Western Railway Timetable Consultation Response. Date of Meeting 6 December 2017

Transport Delivery Committee

The historical Grade II Listed former Hovis Flour Mill in central Ramsgate is being transformed into a mix of contemporary residences.

East Sussex Rail Strategy Shaping Rail in East Sussex and Action Plan

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

London TravelWatch response to the Southeastern franchise extension consultation

Feasibility Study July 2017

Improvements to East Coastway train services from May 2018

eureka park ASHFORD KENT M20 J9

c2c s timetable consultation Passenger Focus report

Delivering a better railway for a better Britain Network Specification 2016 South East Route

Quarterly Progress Report

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

London TravelWatch response to the consultation on the combined Thameslink, Southern and Great Northern franchise

The DfT also offered stakeholders the opportunity to meet with the DfT team and SENRUG confirms it would like such a meeting.

London TravelWatch has commissioned two pieces of research on this issue. These can be found at :-

Strategic Transport Forum 7 th December 2018

School Transport & Travel Guide

Strategic Transport Group

Canterbury. 24 St Margaret s Street, Canterbury, CT1 2TH Prominent South East High Street Retail Investment

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January

Our new Great Western Franchise. Tarka Rail Association AGM June 2015

Part B: General Meeting of Rail North Limited

Response from West Sussex Rail Users Association to the DfT consultation on Thameslink franchise.

Felixstowe Branch Line FAQ

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure

HS11/HS12 Mk2 Route Loadings

EAST WEST RAIL EASTERN SECTION. prospectus for growth

VISITING KENT CANTERBURY CAMPUS 2011/12

Board meeting

The Evergreen 3 Project

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

December 2018 timetable consultation outcome report

Terms of Reference: Introduction

BRENT CROSS THAMESLINK

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes

BARNSLEY METROPOLITAN BOROUGH COUNCIL

Wakatipu Area Strategy Plan

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

4 Transport projects underway in Western Sydney

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Commissioned by: Visit Kent. Economic Impact of Tourism. Thanet Results. Produced by: Destination Research

5 Rail demand in Western Sydney

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Board meeting

FirstGroup plc South Western

CrossCountry Future Timetable Consultation

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London

campaigning by the Railway Development Society Limited

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT

Proposed closure of King s Cross Thameslink station and parts of the railway network at Blackfriars station and London Bridge station.

Industry briefing NOVEMBER 2017

railse no. 111 March 2011

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK

NR is also currently conducting two other studies, those for the Cambridgeshire Corridor and for Ely Area Capacity Enhancements.

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017

THE WEST LONDON LINE GROUP ENTRY TO THE RAILWAY FORUM / MODERN RAILWAYS RAILWAY INDUSTRY INNOVATION AWARDS 2007

National Rail Performance Report - Quarter /16 (January-March 2016)

December 2018 timetable consultation outcome report. Published April 2018

Liberty Park Hoo Road Wainscott Kent

Elizabeth line Services

Introduction Government 6

Sussex Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch

SWR December 2018 Timetable Consultation Response

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009

FROM 1,200 SQ FT+ 8XW

Economic Development Sub- Committee

Transcription:

Dear stakeholder Re: Southeastern December 2014 timetable The 6 billion government-funded Thameslink Programme has entered the final construction phase. This involves a complete rebuild of London Bridge station, as well as new track layout and signalling. This is the most complex part of the programme and from January 2015 there will be significant changes to the Southeastern network. To provide a service throughout and beyond this major programme of work we have developed a new draft timetable which we d like to share with you to seek your views. The final decision will be made by the Department for Transport, but we need your feedback before we finalise our proposals and look forward to hearing from you by close of business on 7 February 2014. Our proposals have been influenced by four factors: To provide the best possible service during the Thameslink construction work at London Bridge; To try to meet your requests for service improvements put to us during stakeholder meetings and our Meet the Manager sessions; For the timetable to deliver the same level of performance as today s timetable, despite the reduction in infrastructure capacity associated with the Thameslink Programme; The need to work within Government affordability constraints while still offering the best possible service to our passengers. No timetable will please everybody, but we ve done our best to meet as many of your aspirations, put to us as part of the Direct Award Consultation and stakeholder meetings, as possible and maintain performance at a time when the Southeastern network is seeing the most sustained period of investment, engineering and construction work for many years. Timing: The proposed new timetable will commence in January 2015 to coincide with the Thameslink Programme schedule of work. To ensure a smooth transition, we will extend the May December 2014 timetable by a month to January 2015 when the new timetable will take effect. This consultation will cover the timetable in operation across the Southeastern network from January 2015 to August 2016; during which time Charing Cross services will no longer be able to call at London Bridge due to platform closures associated with the station rebuild. From August 2016, Charing Cross services will again be able to call at London Bridge, however Cannon Street services will not. The implications of this are to be worked through in greater detail; therefore we intend to consult separately with respect to the period from August 2016 to December 2017 and the subsequent timetable from January 2018 in due course. We will also consult a detailed timetable story, in the usual manner for significant timetable changes, next year once further modelling has taken place. 1

Proposed benefits: Improvements to high speed services via Ashford; An off-peak all day high speed service from Deal, Sandwich, Martin Mill and Walmer as part of a circular service connecting Faversham, Ramsgate and Dover Priory. This gives faster journey times to London, direct services via Faversham and Dover to London and gives Birchington, Herne Bay and Whitstable an all-day high speed service; Direct services between Maidstone East and Canterbury West; Wider choice of London terminal destinations from East Kent stations; Additional later services between Dartford and Victoria via Peckham Rye and Denmark Hill; We have also listened to stakeholder representations and confirm we have no proposals to reduce the number of stops at Meopham and Longfield. Summary: 1. Services via London Bridge As a result of the Thameslink construction work, from January 2015 the seven lines through London Bridge will reduce to four, and platforms 4, 5 and 6 at London Bridge will close until the end of August 2016. Therefore Charing Cross services will not be able to stop at London Bridge during this period. Only Cannon Street trains will be able to stop at London Bridge. Line speeds will need to be reduced for safety reasons while work is undertaken on adjacent lines, adding around two minutes to journey times. Furthermore, as part of the new Thameslink Programme track layout, the Spa Road Junction crossover will be removed, meaning, unfortunately, that we can no longer run services from New Cross and the Greenwich line to Charing Cross. The existing services from the North Kent Line via Greenwich operating to/from Charing Cross in the peaks, via the Spa Road Junction, are very busy and must continue to operate albeit diverted into Cannon Street as an alternative. Cannon Street operates at full capacity and therefore other trains which operate to that station must be diverted to Charing Cross using the pathways freed up by the above diversions. In planning for those diversions it became obvious that a gap was being created in the service provision between the Southeastern Mainline (services via Tonbridge and Sevenoaks) and Cannon Street. Likewise for London Bridge as the diversion to Charing Cross removes the opportunity to call there due to the platform closures. We are therefore proposing to free up capacity at Cannon Street for some direct services from the Southeastern Mainline by diverting some existing Cannon Street bound services to Blackfriars. Blackfriars provides the best alternative to Cannon Street in that it is the nearest alternative mainline station (approximately 10 minutes walk), it is situated on the Circle/District line (with step free interchange possible) and only two stops from Cannon Street. Blackfriars also has spare peak capacity since the recent station rebuild. This approach creates a little space in the Charing Cross timetable which is important with the greater loss of track capacity between New Cross and Metropolitan Junction (two tracks 2

throughout) compared with a section of three tracks at London Bridge station on the Cannon Street side. We will also look to open Cannon Street station seven days a week, working in partnership with London Underground and TfL to keep underground and bus operations aligned with the extended opening of the station. This is to maximise capacity and meet demand for services into London. We also intend to maximise the use of our fleet to provide longer trains in the off peak into Cannon Street. Where possible, additional dwell time will be added at Waterloo East to allow for an expected increase in passengers interchanging at the station. Detailed alternations: Below are the proposed diversions to manage the service during the London Bridge rebuild from January 2015 August 2016. Please note these services are subject to change and DfT approval. Start Up Some early morning services currently booked to Charing Cross are diverted to Cannon Street to serve St John s, New Cross and London Bridge AM Peak 06.56 / 07.20 / 07.40 / 08.00 / 08.18 / 08.40 Slade Green services are diverted to Cannon Street 07.00 / 08.00 Tunbridge Wells services are diverted to Cannon Street 07.12 Gillingham service is diverted to Cannon Street 05.49 Dover service is diverted to Blackfriars 07.42 / 08.02 Orpington services are diverted to Blackfriars 07.19 Ramsgate service is diverted to Blackfriars 06.10 Ramsgate service is diverted to Charing Cross 06.39 Ore service is diverted to Charing Cross 07.57 Sevenoaks service is diverted to Charing Cross 06.59 Ramsgate service is diverted to Charing Cross 07.12 Folkestone Central service is diverted to Charing Cross Daytime off peak The Tunbridge Wells to Charing Cross semi-fast services (XX21 / XX51 TBW CHX and XX00 / XX30 CHX-TBW) are diverted to Cannon Street PM peak 16.45 Charing Cross to Barnehurst via Greenwich service starts from Cannon Street at 16.49 17.06 Charing Cross to Charing Cross via Greenwich service starts from Crayford at 18.01 18.34 Charing Cross to Dartford service via Greenwich starts from Cannon Street at 18.36 16.20 Charing Cross to Orpington service starts from Blackfriars at 16.21 16.46 Cannon Street to Ramsgate service starts from Blackfriars at 16.46 17.08 Cannon Street to Broadstairs service starts from Blackfriars at 17.01 18.09 Cannon Street to Orpington service starts from Blackfriars at 18.07 Evening off peak (post 20.00 until closedown) The Tunbridge Wells to Charing Cross semi-fast services (XX21 / XX51 TBW CHX and XX00 / XX30 CHX-TBW) are diverted to Cannon Street 3

The Hayes to Charing Cross services (XX14 / XX44 HYS CHX and XX17 / XX47 CHX HYS) are diverted to Cannon Street The Sevenoaks / Orpington to Charing Cross services (XX06 / XX36 SEV CHX and XX06 / XX36 CHX SEV) are diverted to Cannon Street The Dartford to Charing Cross services via Greenwich (XX01 / XX31 DFD CHX and 0026 / 0056 CHX DFD) are diverted to Cannon Street. 2. High Speed services We have received much demand from passengers, Kent County Council, Trains 4 Deal and Dover District Council for a continuation of the high speed service from Deal and Sandwich, and if possible extending this to an all day service. We are therefore proposing an all-day circular service connecting Ramsgate and Dover Priory. This will mean the high speed services will begin to additionally serve Martin Mill and Walmer for the first time. This will result in a number of passenger benefits including: Two direct services to London rather than the existing one train per hour New direct journey opportunities between North and East Kent Two additional services from Margate and Broadstairs The potential to reduce splitting and joining at Faversham which adds to journey times and performance risk. This service will replace the existing lightly-used off-peak mainline service, meaning passengers from Martin Mill, Walmer, Deal and Sandwich wishing to travel to London and not wanting to go to St. Pancras will need to change at Ashford (for Charing Cross) or Rochester (for Victoria). In order to moderate the financial impact of replacing a classic service with Highspeed, we have proposed to create a route-based price mechanism which will ensure that passengers from these four stations will not pay a premium when travelling to St Pancras via Faversham in the off-peak. This change in fares structure would be subject to approval from the Department for Transport. Should these proposals be approved, it will also mean a reduction in the off-peak service pattern at Westenhanger and Sandling from two to one train per hour in line with the current level of service at weekends. Westenhanger and Sandling received one train per hour in the off-peak (midweek) in the 2009 timetable; however this was increased to two trains per hour in response to demand from the racecourse. The racecourse has now closed and passenger numbers are relatively low in the off-peak. When special events take place we will enhance services to cater for the demand. 3. High Speed services for Snodland It is anticipated that passenger demand for services at Snodland will grow significantly due to housing developments in the area. To meet this growth we are a proposing to stop high speed services at Snodland in the peak; creating a minimal journey time increase of two to three minutes on the Maidstone West services. This is subject to the delivery of a scheme to enhance the station facilities and provide car parking and bus interchange. 4

4. Mainline The DfT has announced that the Southeastern/ First Capital Connect (FCC) shared services operating between Ashford and Blackfriars via Maidstone, which currently continue to Bedford, will terminate at Blackfriars from December 2014 when the FCC franchise is re-let as part of TSGN. This may enable us to operate a third peak service between Maidstone East and Blackfriars using the rolling stock which would previously have continued north from Blackfriars. To improve journey times and improve performance we will also be ending the process of detaching and joining trains at Faversham and Ashford which in itself causes confusion and anxiety for some customers. The impact of this proposal and the potential interchange opportunities are detailed below: Chatham Mainline: Loss of 1 train per hour direct from Victoria, Bromley South, Longfield & Meopham to stations between Whitstable to Ramsgate o A connection is available out of the Victoria to Dover service at Faversham into the High Speed service to Ramsgate via Herne Bay of 8 minutes in the up and down direction There will no longer be a fast service from Dover to Victoria. One train will be all stations to Faversham then semi fast to Victoria, the other service will be fast to Faversham (calling at Canterbury East) then a slow service to Victoria. Southeastern Mainline: Loss of direct service from all stations from Charing Cross (off peak) via Tonbridge to Martin Mill, Walmer, Deal & Sandwich. A connection is available at Dover of 12 minutes out of the Charing Cross service for stations beyond Dover. Only one train per hour from Charing Cross (off peak) via Tonbridge for stations between Ashford & Dover. There is no connection on the other half hour. Westenhanger & Sandling are reduced to an hourly service off peak and lose direct service to Martin Mill, Walmer, Deal, Sandwich & Ramsgate Only one train per hour from Charing Cross (off peak) via Tonbridge for stations between Ashford & Ramsgate via Canterbury West. A connection is available at Ashford out of the Charing Cross to Dover service at Ashford (5 minutes in the down direction and 7 minutes in the up direction) Chilham & Chartham are now served off peak by a service to Victoria and do not serve stations to Charing Cross via Tonbridge. A connection is available at Ashford out of the Charing Cross to Dover service (5 minutes in the down direction and 7 minutes in the up direction) We also wish to introduce a direct hourly off-peak service between the Maidstone East line and Canterbury West. Finally, we have listened carefully to stakeholder and passenger representations from Longfield and Meopham and opted not to reduce off-peak stops at these stations. 5. Metro In response to calls from passengers for more late night services in the metro area, we propose to operate additional services between Dartford and Victoria via Peckham Rye and Denmark Hill at 30 minute intervals later into the evening. 5

We also propose to stop the hourly off-peak Victoria Gillingham Dover stopping services at Denmark Hill to enhance connections into the London Overground and Thameslink Routes. 6. Weekend Operation Saturday services will reflect the Monday to Friday off peak service. The Sunday service is in development in conjunction with the Thameslink Programme to ensure the best possible balance between providing a suitable service against the significant additional engineering access to Charing Cross and Cannon Street required by the Programme. How to submit your feedback: Feedback on these draft proposals is required by 7 February 2014 in order for Southeastern to comply with industry planning timescales. Submit your feedback in writing to: Mike Gibson Public Affairs Manager Southeastern Friars Bridge Court 41-45 Blackfriars Road London, SE1 8PG Or email: mike.gibson@southeasternrailway.co.uk If you need more information before responding, please do not hesitate to contact us. Yours sincerely Mike Gibson Public Affairs Manager Southeastern 6