Lorena Gold Project Malachite AGM 29 November 2017

Similar documents
For personal use only

MARCH 2018 QUARTERLY ACTIVITIES REPORT

December 2017 Quarterly Report

Ramelius Resources Limited ASX:RMS

For personal use only

For personal use only

For personal use only

For personal use only

Haoma Mining NL A.B.N

On The Road To Silver Mining In Mexico

Genius Properties / Cerro de Pasco Resources Merger Opportunity. June 2018

For personal use only

On The Road To Silver & Gold Mining In Mexico

Kidman agrees to acquire 1Moz Mt Holland gold field in WA

Quarterly Activities Report Period Ended 31 March 2018

For personal use only

Kinross Production Continues on Plan

Quarterly Report for the Period Ending 30 September 2014

For personal use only

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

Australian Mines increases Marymia ground holding

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso

Quarterly Activities Report for the period ended 30 September 2018

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133

For personal use only

AUSIMM - Technical Meeting & AGM

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008

QUARTERLY REPORT 1 JULY 2017 to 30 SEPTEMBER 2017

For personal use only

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA

Newcrest Mining Limited

Market Announcement ASX:NTL, NZX:NTL For Immediate Release

Gruyere Project Development Update

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

KEY POINTS. Significant Resource increase at the Tier-1 mines:

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014.

QUARTERLY ACTIVITIES REPORT

For personal use only

Cadia Valley. Peter Smith Executive General Manager Australian Operations

Haoma Mining NL A.B.N

Investor Presentation July 2013

For personal use only

NEWCREST LOOKING TO THE FUTURE

Quarterly Activities Report Period Ended 31 December 2017

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED

Ramelius Resources Limited ASX:RMS

For personal use only

KEMPFIELD DRILLING COMMENCES, TARGETING Ag, Au, Pb AND Zn

For personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March

Market Release 11 March 2019

ORO VERDE LIMITED (ASX: OVL)

QUARTERLY OPERATIONS REPORT 30 JUNE Highlights: BOARD AND MANAGEMENT YAMARNA

On The Road To Silver Mining In Mexico

For personal use only

Lihir Operations PNG Mining and Petroleum Conference 24 November Peter Aitsi Country Manager, PNG

Quinto Resources Inc. (TSX-V: QIT)

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===

Candelaria and Ojos del Salado Chile

For personal use only

Highlights. Quarterly Activities Report: September Kurnalpi Project. Lindsays project

Northern Territory. Ark wishes to extend the strike and further define the size of the Golden Honcho deposit, with the

Artemis Resources Limited

Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited)

For personal use only

FOR THE THREE MONTHS ENDED 31 MARCH 2012

2011 Annual General Meeting. Greg Robinson Managing Director & CEO

DECEMBER 2017 QUARTERLY ACTIVITIES REPORT

For personal use only

Kinross Nevada tour highlights growth potential at Bald Mountain and Round Mountain

JUNE 2017 QUARTERLY ACTIVITIES REPORT

Exploration. General Manager Minerals Development

THE NEW HIGH- GRADE AUSTRALIAN GOLD DISCOVERY

BMO CAPITAL MARKETS GLOBAL METALS & MINING CONFERENCE PRESENTATION 25 FEB 2008

Angas Zinc Mine From Prediction to Production

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

Annual Mineral Resources and Ore Reserves Statement - 31 December 2016

Jellinbah Mine COAL SEAM GAS STATEMENT. For. Plains Extension MLAs. Jellinbah East Joint Venture. 31 March 2015

For personal use only

UNLOCKING THE POTENTIAL OF THE EAST MENZIES GOLDFIELD

For personal use only

Activities Report for the quarter ended 30 th June 2011

Australian Securities Exchange Notice

Quarterly Activities Report For The Period Ending 30 June 2018

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

For personal use only

Annual Mineral Resources and Ore Reserves Statement - 31 December 2017

Quarterly Activities Report For The Period Ending 31 March 2018

For personal use only

MATRIX METALS LIMITED

Novo Resources Corp. Suite West Georgia Street Vancouver, BC, V6E 3C9

South America Copper Site Visit Non-ferrous overview

GENERAL CONCEPT. Contents

SPITFIRE RESOURCES LIMITED SPITFIRE DIVERSIFIES WITH TASMANIAN COAL ACQUISITION

Zinc. Proven Mineral Reserves Probable Mineral Reserves Total Proven & Probable. As at December 31, 2018 Mineral Reserves (Proven and Probable)

GOLD RESOURCE CORPORATION REPORTS 2017 ALTA GRACIA EXPLORATION DRILL RESULTS, INCLUDING 1.29 METERS GRADING 4.33 G/T GOLD AND 1,710 G/T SILVER

Australian Resource Reviews Gold 2016

Australian Site Tour Mt Keith Operation. Jaco Harwig General Manager

PROJECTS & TECHNICAL SERVICES

Transcription:

Lorena Gold Project Malachite AGM 29 November 2017

Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors associated with exploration and mining. It is believed that the expectations reflected in these statements are reasonable but they may be affected by variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including but not limited to price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve estimations, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory changes, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates. All references to dollars, cents or $ in this presentation are to Australian currency unless otherwise stated. Such forward-looking statements only speak as to the date of this Presentation and MAR assumes no obligation to update such information. Competent Person Statement The information in this report that relates to the Lorena Gold Project resource is extracted from the report entitled Resource Update at Lorena created and released to the ASX on 27 January 2012 (which contained a separate Competent Person Statement by Geos Mining). The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person s findings are presented have not been materially modified from the original market announcement. 2

Lorena Gold Project The Lorena Gold project, 15km east of Cloncurry and 135km east of Mt Isa, Qld Located on 6 Mining Leases covering 2.2km2 Initial development to produce 30,000 to 35,000 ozs of gold over eighteen months from an open cut operation. Fully permitted with development commenced July 2017. 3

Lorena Project Site Footprint 14km to Cloncurry 2km of dirt road to site ML90193 ML90196 ML90192 ML7147 Access Point ML90195 ML90194 Fisher Creek Flinders Highway to Townsville Mt Isa Townsville Railway Line 4

Lorena Gold Joint Venture Malachite finalised a joint venture agreement with Ore Processing Services (OPS) and Cloncurry Gold Recovery (CGR) in July 2017. CGR is a joint venture between Chinova Resources (70%) and BIM Gold (30%). Chinova Resources holds a number of projects in the Mt Isa Inlier including the Osborne and Merlin projects. BIM Gold is part of the BIM Metals group: a private mining and contracting company, operating a number of projects in the Cloncurry and Mt Isa region. Lorena Gold JV Open Cut Interest Stage 1 Resources on Lorena MLs not included in open cut Malachite 55% 70% Tenement holder CGR 30% 15% BIM Metals is mine operator OPS 15% 15% Processing contract 5

Project Funding CGR and OPS are funding project development to the commencement of commercial production; CGR is funding the preliminary project capital requirements of $2.5m. CGR is completing preliminary capital works including construction of the tailings dam, water structures and carrying out initial mining; CGR is providing a CIL plant on site (CGR retains ownership) to treat both the gold concentrate and tailings; OPS acquired the existing Lorena Concentrator Plant (OPS retains ownership); and CGR, OPS, and BIM Metals are funding the joint venture s ongoing working capital requirements in relation to the project in proportion to each joint venture party s interest on an interest bearing loan basis; 6

Lorena Gold Project - Resource High grade gold arsenopyrite zones in a shear hosted structure structurally controlled Good continuity Significant Drill Hole Results at less than 80m depth include: 15m @ 18.8g/t Au 26m @ 21.1g/t Au 7m @ 20.0g/t Au Cutoff Measured Indicated Total Au g/t Tonnes Au g/t Au Oz Tonnes Au g/t Au Oz Tonnes Au g/t Au Oz 5.0 34,700 11.7 13,100 57,000 15.6 28,600 91,700 14.2 41,700 2.0 68,700 7.6 16,700 110,800 9.5 34,000 179,500 8.8 50,700 1.0 88,300 6.2 17,600 165,900 6.9 36,600 254,200 6.6 54,200 0.5 105,800 5.3 18,000 228,200 5.2 38,000 334,000 5.2 56,000 0 156,100 3.7 18,400 513,100 2.4 39,500 669,200 2.7 57,900 7

Lorena Gold Project Mining approximately 250,000t at 5.0g/t from an initial open cut operation (Stage 1). Around 30,000 to 35,000 ozs gold recovered from the open cut. Overall metallurgical recovery of around 75% for sulphides. Recovery of 90% to concentrate and 85% from concentrate to CIL. Ore is of medium hardness and non-refractory. Processing up to 15,000 tonnes per month. Operating costs forecast at around A$1,000/oz (including project plant charges). Commissioning of concentrator plant commenced in late Oct/early November 2017. CIL plant commissioning starting by end of this month. First gold production before year end with steady state operations expected by end of January 2018. 8

Lorena Project Site Layout Plant Site Pit Tailings Dam Waste Rock Dump 9

Lorena Project Mining 10

Lorena Project Tailings Dam and Processing Plant 11

Lorena Project Plant 12

Lorena Project Targeting Resources at Depth Potential to increase the mine life via an underground operation subject to delineating resources beneath the open cut. Drilling intersected 5.3m at 13g/t Au at a depth of 200m Survey highlighted 2 strong electromagnetic conductors that represent sulphide targets Each target is similar in size to the current resource Excellent potential for resource additions at depth Significant underground mining potential Malachite has 70% JV interest 14

Lorena Gold Project Underground (Stage 2) Portal designed to come off near bottom of pit in competent ground Conventional underground mining 5.3m at 13g/t Au at a depth of 200m is a mineable width for underground Lorena JV considering best approach for exploration via new review of data Forecast exploration in March 2018 Third party ore sources available prior to a potential underground operation. Initial Target Area 5.3m @ 13g/t Au Lorena Long Section - Targeting resources at depth 15