Content. 1. CEO report 2. Airspace and Environment 3. Community 4. Planning 5. Airport Transport Forum

Similar documents
Runway 35 South and West (Jet) Departure Flight Path Amendment

PBN Route Structure Alaska Sub-Committee AACA Co-Chair Dennis Parrish

Agenda Joint Meeting of The Park Board & City Council

BACKGROUNDER Vancouver International Airport - Economic Generator for British Columbia

ATM Network Performance Report

committee report Network Rail: Route Utilisation Strategy: Stations Draft for Consultation

ASISA STANDARD ON UNCLAIMED ASSETS

DIRECTORS GENERAL OF CIVIL AVIATION-MIDDLE EAST REGION. First Meeting (DGCA-MID/1) (Abu Dhabi, UAE, March 2011)

Facilities Worker. Job Information Pack. Employment Conditions. This information package includes:

The Haiti Information and Communications Technology (ICT) Working Group is providing Internet services in 16 sites across Haiti.

1 - OVERVIEW ACTIONS Andy Wright and Phil Holder welcomed the group. The intention is for the Consultative Committee to meet twice yearly.

Carbon Offsetting and Reduction Scheme for International Aviation (CORSIA) Overview Kurt Edwards Director General, IBAC NBAA BACE October 2018

QUT Digital Repository:

Report to the Minister for Planning

Runway Expansion Impact Assessment Oshawa Municipal Airport. Presentation To Development Services Committee City of Oshawa May 30, 2011

Posting Open Date: 08/20/2018 Posting Close Date: 10/08/2018 (Please note the posting will close at 11:59pm)

Aviation Business Development Program. Economic Development Committee May 18, 2015

ABORIGINAL AND TORRES STRAIT ISLANDER POLICY

What You Must Know About Your Immigration Status. Presented by the Office of International Affairs (OIA)

Access control and (pre-)registration

CCI Resource and Construction Conference And Construction Industry Dinner 28 June 2018

Terra Nova Development

General Manager, Engineering General Manager, Parks, Recreation & Culture

Shuttles are scheduled ONLY when there is a reservation. Without reservations we DO NOT travel.

Application for the Cleveland County Cattlemen's Association Dallas Ward Memorial Scholarship Deadline: April 15 of each year

EDUCATIONAL PROGRAM AviationCV. The Better Way. to Fly

PORTER AIRLINES INC. GENERAL CONDITIONS OF CARRIAGE

Community Noise Consortium Meeting (CNC)

Terra Nova Development

INTERIM MANAGEMENT STATEMENT FOR THE PERIOD FROM 1 JANUARY TO 25 APRIL 2012

Concur Travel Tips and Tricks

Optional Practical Training - STEM Extension

This section outlines travel policies and procedures for international and in-country travel and related meals and incidental expenses payments.

Peter Lovegrove Curriculum Vitae. Managing Director. 17 Brighton Road Highgate Hill QLD 4101

ALI ZAGHARI Deputy District Director Caltrans, District 7 Division of Traffic Operations

Tasmanian Tourism Snapshot

Mangawhai Village and Kaipara District Council Working in Partnership

Servas International - Nominations Committee Candidate Application Form -

Monday 1 st October. Registration and Document Checks

Attachment: Example of I-9 with I-94 information Good afternoon,

2018 Launch Mini-Grant Guidelines Page 1

Annual Report FY 2017/18 Port Hedland Ambient Air Quality Monitoring Program

MELBOURNE AIRPORT. CACG Members Present: Organisational/agency representatives. Subject matter experts / supporting staff

SAN DIEGO ROTARY CLUB 33 CAMP ENTERPRISE 2018 PROGRAM INFORMATION FOR

I-95/GIR FACT SHEET. Interstate 95 Section GIR - Girard Avenue Interchange Improvement Project City of Philadelphia

StART SEA-TAC STAKEHOLDER ADVISORY ROUND TABLE

National Business Ethics Survey 2013 Summary - US

Corporate Partnership. ss Great Britain Trust & The Brunel Institute

Manresa Island Reuse and Economic Impact Analysis Study Public Involvement Process & Summary June 2017

Contact Details for Visa Information

CHAPTER 1.0 INTRODUCTION

NATIONAL MINORITY AFFORDBLE HOME BUILDERS SUMMIT PRESENTERS SPONSORSHIP PACKAGES

CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT AIRPORT ADVISORY COMMITTEE. Minutes from the October 1, 2009 meeting Piedmont Conference Room 8:00 a.m.

FLIGHTS OF FANCY How Wing Shape Affects Flight

Reconciliation Action Plan

CHAPTER 1 INTRODUCTION

DOT 3 Hour Rule GoJet SOC Master Plan

Draft Evaluation Criteria for the Tonto National Forest Wilderness Recommendation Process

Camp BUCKO 2018 Volunteer Application

ERA AIR SAFETY GROUP REPORT FOR 2016

Cairo, August 11, 2010 TMG Holding reports for 1H 2010: EGP 3.5 BN consolidated revenue,11% higher than same

High Hopes for Colorado

GREEN TRAVEL PLANNING FOR AN OFFICE MOVE: PUTTING THEORY INTO PRACTICE - THE HALCROW CITY PARK TRAVEL PLAN. Jonathan Plant Halcrow Group Limited

Competition and regulatory issues in. the civil aviation sector. Liberty Mncube Chief Economist Competition Commission of South Africa

OPTIONAL PRACTICAL TRAINING FOR F-1 STUDENTS

Youth Advisory Committee Meeting AGENDA

All Requests for Stamping, Banners, and Space Reservations must be done through TitanLink. Complete the form at:

APPENDIX D Safety Performance Review

NORTH COAST TOURISM STUDIO CANNON BEACH, ORE.

Parks and Recreation. Goals

National Search and Rescue Committee (NSARC) Secretariat Issue Paper

Job Description Document

Camp Caillet Crisis Response Plan

Concern Worldwide Haiti

CHAPTER 1: INTRODUCTION

MINUTES OF VOLLEYBALL TASMANIA GENERAL MEETING. 1. INTRODUCTIONS & APOLOGIES DATE 22 nd August New Sydney Hotel, Hobart MEETING CALLED BY

Ms Joan Street. Mr T Zimmerman MP, Federal member Vacant, State member Mayor J Gibson, North Sydney Council Mr Ian Mutton 236 residents 23 apologies

ATR72 LTC/TRI/TRE. Vietnam.

BCHA Volunteer Hours Reporting Guide

Alien Flight Student Program

PISTOL SHOOTING QUEENSLAND. MONTHLY UPDATE April For PSQ Members

GETTING INTERNATIONAL. Session 2.- Getting used to it.

Screening, Qualifying & Instructing Passengers

IndusInd Bank Ltd. Unclaimed Deposit Policy

AGENCY DEBIT MEMO (ADM) POLICY

English Version ATC BRIEFING GUIDE. GR IVAO [COMPANY NAME] [Company address]

Camp Scholarship Application

New York Action Team SWAP Federal Aviation Administration. Teterboro User Group Brief. Leo Prusak, Manager of Tactical Operations.

!!!!!! Vision & Strategy!!

Ohio State Alumni Band Europe Trip Itinerary For The Ohio State University Marching Band Alumni

Minutes of the North Lanarkshire PPF Reference Group 22 nd January 2013, 7pm Syndicate Room 3, Ronald Miller Centre, WGH

Detailed Information Lauterbrunnen 2019 Hotel Staubbach

Meeting Minutes NORTHWEST FLORIDA REGION CFASPP STEERING COMMITTEE MEETING June 18, Tallahassee Regional Airport

Business Paihia Incorporated Information Pack Empowering Better Business

Distance Learning Course Information

Meeting 2 Workshop Summary

Lower prices drive WA first time buyers on to the housing ladder

May 2017 Mecklenburg County. Photo taken in Louisburg, NC

Summer Camp Employment Information

Business Paihia Incorporated Information Pack Empowering Better Business

Transcription:

Cntent 1. CEO reprt 2. Airspace and Envirnment 3. Cmmunity 4. Planning 5. Airprt Transprt Frum

1. CEO Reprt This reprt cmprises key business updates since the last meeting f the cmmittee n July 26th, 2018 PASSENGER TRAVEL STAFF TRAVEL 1.1 BUSINESS PERFORMANCE In August, LCY annunced the return f Aer Lingus t the airprt. Aer Lingus, in partnership with CityJet, will perate LCY t Dublin, the airprt s 3rd busiest rute. The news als makes nward cnnectins, t ne f Aer Lingus 13 Nrth American destinatins, far easier. Aer Lingus are scheduled t cmmence services frm Octber 29th. BA CityFlyer has added 4 new Embraer E-190 aircraft t their LCY fleet, bringing the ttal fleet number t 26. Additinally, frm Nvember 11th, BACF will launch a daily service t Rme and a fifth daily service will be added t Zurich n week days. July 2018 was the busiest ever mnth at LCY with 471, 519 passengers travelling thrugh the airprt a 15.7% increase n July 2017. Current end f year passenger prjectin is 4.7-4.8m. Airprt Service Quality (ASQ) scres shwed an increase in verall passenger satisfactin frm 4.07 (ut f 5) in Quarter 1 t 4.24 in Quarter 2. 1.2 LCY STAKEHOLDERS RELATIONS LCY, alng with ther UK airprts, met with the Aviatin Minister and senir DfT fficials t discuss aviatin and Brexit matters. LCY held meetings with a number f MP s including Stephen Timms, Jim Fitzpatrick and the new leaders f Havering and Greenwich cuncils. LCY met with the Crssrail t Ebbsfleet team t understand their bjectives, lbbying prgramme and t evaluate ways in which the teams culd wrk tgether. 1.3 LCY MEDIA ENGAGEMENT LCY s smartphne amnesty stry was cvered by Sky News, the Evening Standard and LBC The BBC s Travel Shw recded an episde frm LCY The BBC Asian Netwrk Breakfast shw bradcasted frm LCY n Celebrity Summer Jbs fcussing n ramp services psitins at the airprt

1. CEO Reprt 1.4 LCY IN THE COMMUNITY CADP partner BAM Nuttall held an inaugural bring yur daughter t wrk day which saw 20 children accmpany their parents t wrk learn abut careers in engineering. LCY attended and spnsred the Ryal Dcks Ferry Festival prviding infrmatin n airprt activity as well as the Nise Actin Plan Cnsultatin PASSENGER TRAVEL STAFF TRAVEL

2. Airspace & envirnment This reprt cmprises updates n airprt mvements, runway utilisatin, aircraft nise cmplaints, air quality perfrmance and cnstructin Sund insulatin scheme prgress between April t June 2018. 2.1 AIRCRAFT INFORMATION RUNWAY UTILIZATION Passenger numbers increased by 9% in theq2 2018 in cmparisn t Q2 2017 with aircraft mvements nly increasing by 1.2%. Key Stats Dashbard April May June Ttal Aircraft Scheduled Mvements 2017 6,041 6,693 6,702 19,436 2018 6,236 6,786 6,653 19,675 Variance +3.2% +1.4% +0.7% +1.2% 2.2 RUNWAY UTILISATION RUNWAY UTILISATION The use f either end f the runway fr departures and arrivals is based n wind directin as aircraft must take ff int the wind. Wind directin therefre changes where aircraft will fly in general when arriving leaving the airprt because each end f the runway has its wn rutes..

Number f Cmplaints 2. Airspace & envirnment 2.3 NOISE, COMPLAINTS & ENQUIRIES During Q2 2018 all Nise Mnitrs (NMT s) were fully peratinal and data received fr each day. LCY launched the cnsultatin n the new Nise Actin Plan t cver 2018-2023 in July 2018. During Q2 LCY received a ttal f 129 cmplaints relating t the peratin. 41% was frm ne individual. In the same perid last year, 88 cmplaints were received representing a 46.6% increase. This is partly attributed t an increase in 09 runway usage ver the same perid with 52.8% (09 runway usage) in Q2 2018 cmpared t 34.6% in Q2 2017. The largest amunt f cmplaints was related t aircraft nise. 120 Type f cmplaints fr Q2 100 80 60 40 20 IMAGE placehlder 2018 2017 0 Aircraft Grund Aircraft Aircraft Lw flying Early/Late 1. Other Nn LCY Enquiry Nise Nise frequency Flight Paths A/C Ops Reasn fr Cmplaint Cmplaint breakdwn - the mnthly breakdwn f ttal cmplaints and events generating a cmplaint relating t Lndn City Airprt: April 2018 May 2018 June 2018. 30 cmplaints (60% were frm ne individual) 44 cmplaints (52.27% were frm the same individual) 55 cmplaints Origin f cmplaints: the charts belw shw the breakdwn f cmplaints related t the number f cmplainants and frm which brughs these were received fr Q2 2018 and 2017. IMAGE placehlder

2. Airspace & envirnment IMAGE placehlder 2.4 SOUND INSULATION SCHEME Prtn, Elektrn, Neutrn, Switch Huse 181 surveyed and 123 have been fitted (as f 20th July 2018). The prject is prgressing well and is expected t be cmpleted by September 2018. Treatment will als cmmence in prperties in Drew Huse and Wards Wharf Apprach in the next few mnths, alng with ther smaller buildings. 1. 2.5 CONSTRUCTION SOUND INSULATION SCHEME LCY has added 201 prperties int the scheme as a result f a prpsal t accelerate the CADP prgramme and shrten the duratin f cnstructin. These prperties have recently been ffered the wrks via letter, and have been added t the table abve since the last reprt. Zne A Zne B Zne C Ttal Prperties 83 148 363 Surveyed 71 92 89 Fitted 48 25 63 Rejected wrks 5 6 46 Surveys cmplete 86% 62% 25% Installatin Cmplete 58% 17% 17% The CSIS scheme is anticipated t be finished by the end f 2018. The increase in uptake f the prgramme can be explained due t the fllwing actins which were undertaken: IMAGE placehlder Lndn Brugh f Newham (LBN) have made the wrks cmpulsry fr all lcal authrity wned prperties LCY have enlisted an LBN Cmmunity Liaisn Officer t increase uptake Cmmissined a prttype windw t display in cmmunal areas fr eligible buildings Letters and psters have been circulated within the catchment area Scafflding fr Dunedin Huse and Westland Huse (2 f the 3 main twer blcks) has cmmenced. In 2018, the airprt has received a ttal f 34 cnstructin nise related cmplaints frm a ttal f 16 peple 41% f the cmplaints were made by 2 cmplainants.

2. Airspace & envirnment SOUND INSULATION SCHEME 2.6 AIR QUALITY The graphs belw shw the levels f nitrgen dixide and particulate matter less then 10µg/m3 (PM10), tw air pllutants, ver the last 5 years at LCY cmpared t the bjective levels published in the UK Air Quality Strategy. The data shws that the levels f these tw pllutants are well belw the bjective levels, indicating that air quality at LCY is acceptable. The PM10 cncentratins have als been drpping ver the last 5 years, reflecting LCY s effrts in reducing emissins. 50 PM10 Annual Cncentratins µg/m 3 40 30 20 10 IMAGE placehlder City Aviatin Huse Objective level 0 2013 2014 2015 2016 2017 2018* 1. *2018 data is based n Q1-2 data nly, prir t any bias-adjustment ratificatin IMAGE placehlder

2. Airspace & envirnment The table belw details LCY s air quality perfrmance during Q2 f 2018. Again the cncentratins f nitrgen dixide and PM10 are well belw the bjective levels published in the UK Air Quality Strategy, indicating that air quality at LCY is acceptable. NO 2 PM10 Objective Level Q2 2018 Perfrmance Perid Mean (μg/m 3 ) 40 CAH: 27.3 ND 23.0 N. 1-Hur Mean > 200 18 (annually) 0 μg/m 3 Perid Mean (μg/m 3 ) 40 21.6 N. 24-Hur Means >50 μg/m 3 35 (annually) 1 IMAGE placehlder 2.7 ENVIRONMENTAL PERFORMANCE LCY has a waste recycling target f 70% by the end f 2018. In Q2 f 2018, 55% f waste was recycled. The airprt undertakes the fllwing activities t reach this target: Staff awareness campaigns Reduce bins in the ffice areas Segregating waste In July 2018, the airprt achieved accreditatin t the internatinal standard ISO14001:2015 fr Envirnmental Management Systems in July 2018. This is t ensure that the airprt effectively manages envirnmental risk and cntinuusly imprves its sustainability perfrmance. 1. IMAGE placehlder

3. Cmmunity 3.1 EDUCATION 3.2 EMPLOYABILITY & SKILLS DEVELOPMENT Between June and August Lndn City Airprt engaged with a ttal f 646 students thrugh ur educatinal prgrammes which were delivered acrss 7 key brughs which included: Newham, Twer Hamlets, Greenwich, Redbridge, Barking and Dagenham, Waltham Frest and Havering. Primary schl - A ttal f 64 primary schl students received and airprt tur. Secndary schl - 300 East Lndn students received an airprt related challenge thrugh which they develped their Science, Technlgy, Engineering and Math s (STEM) skills. Schls which participated were: Kingsfrd Cmmunity Schl (Newham), Seven Kings Schl (Redbridge), Heathcte Schl and Science Cllege (Waltham Frest), Harris Academy Rainham (Havering), and Cpers Cmpany and Cbrn Schl (Havering). The winning grup was Kingsfrd Cmmunity Schl. The prize fr the winners will be an airside tur f the airprt, and the chance t visit the Emirates Aviatin Experience, where the winners can test their take-ff and landing skills n the Flight Simulatr. Befre the prgramme, nly 40% f students agreed r strngly agreed that they had a gd understanding f pssible career paths at the airprt, by the end this was 98%. Lcal Recruitment - Lndn City Airprt has ver 2000 staff emplyed acrss the site making it ne f the largest emplyers f lcal residents in East Lndn. In the secnd quarter f 2018, 54% f the new recruits directly hired by the airprt are residents in Newham and 68% f new recruits hired directly by the airprt live frm East Lndn. 35% f the nsite recruits are residents in Newham and 76% f the nsite new recruits cme frm East Lndn. In 2018 a ttal f 30 residents living in the E16 Ryal Dcks and Canning Twn area were recruited by the nsite cmpanies. CADP Recruitment - LCY is wrking clsely with Newham Wrkplace n cnstructin jbs and recently Wrkplace attended the airprt s Cntractrs Frum. Take ff Int Wrk - is a flagship lcal emplyment scheme in cllabratin with Newham Wrkplace which prvides Newham residents ver the age f 18 with a variety f training, wrk experience and first-hand access t nsite jb pprtunities. In 2018 a ttal f 33 Newham residents were supprted int a jb at the airprt thrugh the prgramme. Wrk Experience - a ttal f 5 students undertk wrk experience at the airprt in which they get familiar with different departments. Lndn City Airprt als facilitated 19 additinal wrk experience placements fr a cllabratin with 15 Billin EBP.

3. Cmmunity 3.3 COMMUNITY INVESTMENT 3.5 BUSINESS ENGAGEMENT Spnsrship the airprt spnsred the fllwing events: The Ryal Dcks Ferry Festival; The pride flat frm METRO charity, which prvides health cmmunity and yuth services in Lndn; The Summer f Festivals in Barking and Dagenham Havering Shw Fundraising since the start f the partnership the airprt has raised 935,824 fr Richard Huse Children s Hspice. Natinal Citizen Challenge the airprt hsted the Natinal Citizen Challenge where 20 15-17 year lds frm East Lndn vlunteered their time by develping a cmmunity prject. 3.4 COMMUNITY ENGAGEMENT The airprt engaged with the lcal cmmunity thrugh the leaflet the Lndn City Airprt Cnsultative Cmmittee, the Ryal Dcks Cmmunity Frum and several cmmunity events. Ahead f the cmmencing f the piling and decking wrks n Saturday 23rd f June, a letter has been distributed amng 6,100 lcal residents. This is part f a wider cmmunity engagement prgramme which included the fllwing cmmunity events: Launch f the Ferry Festival at Ryal Dcks Learning and Activity Centre; Summer festival in Britannia Village; Ryal Dcks Ferry Festival in Ryal Victria Gardens Ryal Dcks Meet the Buyer event A vide f the successful Ryal Dcks Meet the Buyer event has been shared n scial media channels. The 3 mnth review f the event shwed a cntracts win f 1.01 millin with 20% f the suppliers which attended the event received. In August the Steering Grup met t plan the next Ryal Dcks Meet the Buyer event. Mayr Business Breakfast The airprt attended the Newham Business breakfast at Stratfrd East Theatre t discuss cmmunity engagement activities in Newham. 3.6 FUTURE COMMUNITY ACTIVITIES The airprt has created a vide abut the piling and decking which is part f the City Airprt Develpment Prgramme. The vide can be fund here: https://www.yutube.cm/watch?v=pzrzfw4sje0&featur e=yutu.be The airprt will spnsr the Thames Estuary Grwth Day n the 31st f Octber. The airprt will issue a Cmmunity Magazine which will be shared with lcal residents in the Ryal Dcks area. The first issue will be shared in Octber. The airprt, in cllabratin with East Lndn Business Alliance, will hst the 3rd annual STEM in Aviatin event n Thursday 15th f Nvember. A ttal f 400 students will learn abut STEM subjects in the aviatin industry. During these events the airprt als cnsulted with residents abut the draft Nise Actin Plan. Cnstructin Nise Cmplaint Prcedure - Lcal residents can get int cntact with the airprt t raise a cmplaint thrugh fur different channels: 24 hur telephne line, 7 days a week n the number: 0203 858 0261 An email address: cmmunity@lndncityairprt.cm Verbal cmmunicatin with the Cmmunity Relatins Ambassadr Aarn Uthman

4. Planning This reprt cmprises key planning updates cvering the City Airprt Develpment Prgramme since the last meeting f the cmmittee n July 26th, 2018 4.1 CITY AIRPORT DEVELOPMENT PROGRAMME (CADP) Recent CADP Apprvals On 16 August 2018 Lndn Brugh f Newham (LBN) apprved sme minr changes t the design f the CADP Decked Car Park including tweaks t the apprved building ftprint and enclsing the upper car park deck with a rf (LBN Ref. 18/02109/NONMAT). Sme revised details were als apprved under Cnditin 73 (Parking Areas) t align with the minr changes (LBN Ref. 18/02102/AOD). The changes d nt alter the apprved number f parking spaces. Upcming Planning Submissins t LBN An applicatin fr sme minr nn-material design changes t the elevatins f the Terminal and East Pier will be submitted t LBN shrtly. These minr changes are required fllwing detailed design develpment and sme tweaks t imprve custmer experience 4.2 CADP PLANNING COMPLIANCE Since the last LCACC meeting in July 2018, all 97 planning cnditins and bligatin in the Sectin 106 Agreement have been fully cmplied with. Fllwing publicatin f the 2017 Annual Perfrmance Reprt (APR) n 30 June 2018, LBN s Airprt Mnitring Officer will present LCY s 2017 perfrmance t the LBN Strategic Develpment Cmmittee in Octber 2018 [DATE TBC]. The 2017 APR can be viewed n the LCACC website at this link: http://lcacc.rg/meeting-papers-key-dcuments/airprt-annual-perfrmance-reprt/ 10

4. Planning 4.3 BEYOND CADP LCY has reviewed hw the LCACC was engaged in the prductin f the current Master Plan, and have als spken t the LCACC Vice-Chair t further understand what was dne. There will be pprtunities via future LCACC meetings and its Cmmunity and Envirnment Sub-Cmmittees t share infrmatin ahead f the frmal publicatin f the draft Master Plan smetime in 2019. LCY has recently appinted specialist cmmunicatins and cnsultatin advisrs and a strategy t engage with the LCACC will be shared at the December meeting t ensure there are n surprises. We have als discussed cmmencing the update f the Master Plan with the LBN, the GLA and TfL in recent weeks.

5. Airprt Transprt Frum The last meeting f the ATF was held n the 9th August 2018. The next ATF meeting is scheduled fr 15 Nvember 2018. This reprt cvers the three Wrk Grup tpics being prgressed 2018 and als summarises the surface access and transprt fcused activities prgressed since the last LCACC meeting. 5.1 ATF WORKING GROUPS Travel Plans - The travel plans are being drafted and internal review is being prgressed. Cmments will be sught frm ATF members in Q3 2018. Publicatin f the dcument is planned t be Dec 2018. Elizabeth Line Cnnectin In terms f a shrt term link (2018 t 2019) discussins with ExCeL fr a shuttle bus using their taxi pick up area have been psitive. A cst fr prviding this is being cnsidered by LCY s Leadership Team. A decisin n this is likely t be made by Oct 2018. Discussins with TfL n including the airprt n in-carriage signage are still prgressing. A review is currently underway as part f a Lndn-wide mapping update prir t the cmmencement f the Elizabeth Line. Fr the medium term (2020-2021), the ptin t cnnect Pplar DLR t Canary Wharf Elizabeth Line statin acrss the Nrth Quay site - desn t lk feasible at present. LCY understand that Canary Wharf Grup is lking t submit a planning applicatin in December 2018 and start cnstructin arund December 2019. LCY will keep talking t them t see if any pprtunity fr a pedestrian link arises. TfL has apprached the airprt t supply input t their feasibility wrk fr develpment f the Pplar DLR dept and Billingsgate Market area. The airprt is t send a nte t the TfL team by the end f August 2018. Lng term ambitin remains a dedicated statin and the airprt has had psitive discussins with Crssrail t Ebbsfleet (C2E) grup wh are campaigning fr an extensin f the Wlwich branch t Ebbsfleet Internatinal statin. Cycling and Walking The dckless cycle hire initiative led by LBN and Ryal Dcks Team is in a prcess t agree a new prvider. The airprt has an area allcated fr the bikes and awaits the appintment t be made. The airprt will wrk with LBN as they mve int design develpment f new cycle and pedestrian rutes thrugh the brugh. Design develpment f Nrth Wlwich Rad is expected t be started this year and the airprt will prvide input n a link between Hartmann Rad and Cnnaught Bridge.

5. Airprt Transprt Frum 5.2 UPDATE ON SURFACE ACCESS AND TRANSPORTATIION MATTERS Travel Plans - The travel plans are being drafted and internal review is being prgressed. Cmments will be sught frm ATF members in Q3 2018. Publicatin f the dcument is planned t be Dec 2018. The ATF recmmended measures t reduce staff car parking at the airprt in the frm f car sharing initiative. The airprt are lking t appint Liftshare, a prvider f car sharing website and apps, t run a car sharing service fr the airprt emplyees. Residents Parking Zne (standing ATF agenda item): N cncerns have been raised with the airprt directly since the previus meeting. It is acknwledged hwever that sme nuisance parking may still be ccurring in the area; but the ATF members cnfirmed its view that it is n wrse than in any ther area f the brugh. The airprt has been wrking with TfL and KAD t lk at prviding additinal DLR staff at varius pints arund the airprt. The purpse f this is t prvide passengers with early advice with nward travel and/r sale f Oyster cards s as t reduce queuing in the DLR statin area.