APRON MANAGEMENT SERVICES

Similar documents
1.0 PURPOSE. a) Ensure safe movement with the objective of preventing collisions between aircraft, and between aircraft and obstacles;

SURFACE MOVEMENT GUIDANCE AND CONTROLS SYSTEMS

GUIDELINES FOR THE PREPARATATION AND MAINTENANCE OF AN AERODROME MANUAL

Runway Safety through Standardized Stop Bars Practices

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

Striving for Excellence in Aviation Ground Safety

Consideration will be given to other methods of compliance which may be presented to the Authority.

gives the requirements and rated or, a basic competent

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

NZQA registered unit standard version 4 Page 1 of 5. Maintain safety standards on the apron area of an airport. Aviation > Airport Operations

1.0 PURPOSE 2.0 REFERENCES 3.0 BACKGROUND

Sample Regulations for Water Aerodromes

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR SURVEILLANCE INSPECTION OF AERODROMES

AERODROME SAFETY COORDINATION

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA

CIVIL AVIATION REQUIREMENTS SECTION 9 AIR SPACE AND AIR TRAFFIC MANAGEMENT SERIES 'L', PART I

ADVISORY CIRCULAR AC-AD-005

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

TABLE OF CONTENTS 1.0 INTRODUCTION...

IFALPA. International Federation of Air Line Pilots Associations

Appendix D AIRSIDE VEHICLE DRIVING BEST PRACTICES

ICAO Annex 14 Standards and Aerodrome Certification

Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Review of air navigation matters 2.3 Air navigation specific activities: Aerodromes and Ground Aids (AGA)

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2

GCAA GUYANA CIVIL AVIATION AUTHORITY


INTERNATIONAL FIRE TRAINING CENTRE

East Midlands Airport 2018 Aerodrome Manual

Consideration will be given to other methods of compliance which may be presented to the Authority.

Aerodrome Certification Regulation B.S (2004 A.D)

AIR NAVIGATION ORDER

CHANGE CONTROL PROCEDURE

Air Law and ATC Procedures Subject: AIR LAW AND ATC PROCEDURES

2 ND ICAO MEETING ON THE SUSTAINABLE DEVELOPMENT OF AIR TRANSPORT IN AFRICA Accra, Ghana March 2017

AERODROME LICENCE APPLICATION PROCESS

University of Wisconsin Madison Unmanned Aircraft Systems (UAS) Policy

7/1/2014. Class II Driver s License Information and Study Guide

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

REGULATIONS (10) FOREIGN AIR OPERATORS

RUNWAY SAFETY GO-TEAM METHODOLOGY

Checklist & Guide for the development of a

II.B. Runway Incursion Avoidance

Athens International Airport

LFPG / Paris-Charles de Gaulle / CDG

HEMET RYAN AIRPORT Revision 1 08/01/2011 NON-POWERED SAILPLANE/GLIDER AIRPORT OPERATIONS MANUAL (AOM)

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN

REGULATION No. 990/2017 on the operation of remotely piloted aircraft CHAPTER I. General provisions Article 1 Objective

July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS.

CIVIL AVIATION REQUIREMENTS SECTION 4 AERODROME STANDARDS & LICENSING SERIES 'B' PART VI 22 ND MARCH 2012 EFFECTIVE: FORTHWITH

Advisory Circular. Regulations for Terrain Awareness Warning System

2.1 Private Pilot Licence (Aeroplane/Microlight)

Airport Operating Standard. Transfer of Explosive Cargo

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure)

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/26/13

Checklist & Guide for the development of a

Runway Crossings at Brisbane International Airport

Part 139 Aerodromes. Part 139 Compliance Matrix

OPERATIONAL SAFETY POLICY TRANSFER OF EXPLOSIVE CARGO MARCH This document is uncontrolled when printed

TABLE OF CONTENTS 1.0 INTRODUCTION...

Advisory Circular. Aircraft Certification Authority Based on Foreign Qualifications

Andres Lainoja Eesti Lennuakadeemia

ECCAIRS Aviation Data Definition Standard

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1

San Bernardino International Airport Authority Building 795

Recent amendment to Annex 14, Volume I and an update on PANS-Aerodromes

ICAO LPRs from 1996 to now. Nicole Barrette. Kuwait, 9 November Technical Specialist (Licensing and Training Standards)

SYLLABUS. EASA 1321/2014 Part-M - ADVANCED (FLY Course code: 005-C-A) Issue of 01/02/2018 FLY EN

ASSEMBLY 35TH SESSION PLENARY. Statements by delegations of Contracting States and of Observers INDONESIAN AIRWORTHINESS SYSTEMS

Airport Rules and Regulations

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA

NZQA registered unit standard version 1 Page 1 of 5

Airmen s Academic Examination

Advisory Circular CT

SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES DURATION 6 MONTHS

Runway Safety Programme Global Runway Safety Action Plan

DEPARTMENT OF CIVIL AVIATION ANNEX 1 REPUBLIC OF MAURITIUS

Terms of Reference for rulemaking task RMT.0704

Air Accident Investigation Unit Ireland

Second ICAO Global Runway Safety Symposium, Lima, Peru, November 2017 Panel 3 - Root causes of runway accidents and incidents David Gamper,

The text of the amendment is arranged to show deleted, new or amended text, as shown below:

RMT.0464 ATS Requirements

Session 2. ICAO Requirements related to Cabin Safety. Overview

Memorandum of Understanding

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

Advisory Circular AC Laser Illumination Of Aircraft 21 May Revision 0

AERONAUTICAL INFORMATION CIRCULAR 13/15

Presentation Title: Aerodromes Licensing Requirements

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

AI AIRCRAFT SERIOUS INCIDENT INVESTIGATION REPORT PRIVATELY OWNED J A T

Aerial work and specialised operations

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI

Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular

PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS

Transcription:

AC-AD-029 APRON MANAGEMENT SERVICES GENERAL The Ghana Civil Aviation Authority (GCAA) Advisory Circulars from Aerodrome Safety and Standards (ASAS) contain information about standards, practices and procedures that the Authority has found to be an Acceptable Means of Compliance (AMC) with the associated Regulations. An AMC is not intended to be the only means of compliance with a regulation, and consideration will be given to other methods of compliance that may be presented to the Authority. PURPOSE This Advisory Circular provides methods, acceptable to the Authority, for showing compliance with Part 24 of the Ghana Civil Aviation (Aerodromes) Regulations, 2011, LI 2004, as well as explanatory and interpretative material to assist in showing compliance. REFERENCE The Ghana Civil Aviation (Aerodrome) Regulations 2011. ICAO Annex 14 Volume 1 Aerodrome Manual of Aerodrome Standards. STATUS OF THIS AC This is the first AC to be issued on this subject. FORWARD This document provides guidance to Aerodrome Operators in the implementation of an effective apron management services. i

TABLE OF CONTENTS 1. GENERAL... 1 2. INTRODUCTION... 1 3. CO-ORDINATION WITH AIR TRAFFIC SERVICES... 2 4. ALLOCATION OF AIRCRAFT STANDS... 2 5. RULES AND PROCEDURES FOR AIRCRAFT MARSHALLING... 3 6. PROCEDURES FOR ENGINE START UP... 3 7. LEADER (VAN) SERVICE... 3 iii

1. GENERAL The purpose of this Advisory Circular (AC) is to provide guidance to the Aerodrome Operators in adopting operational procedures and principles for apron management. The Aerodrome Operators shall use the combination of these procedures, in order to: a) Ensure safe movement with the objective of preventing collisions between aircraft, and between aircraft and obstacles; b) Ensure safe entry of aircraft into, and coordinate exit of aircraft from, the apron with the aerodrome control tower; and c) Ensure safe and expeditious movement of vehicles and appropriate regulation of other activities. 2. INTRODUCTION The apron is the area of highest intensity and variety of movements. It is the one place where aircraft, vehicles, passengers, airport employees and sometimes, casual visitors cross and inter-cross. To ensure that highest level of safety management is maintained and that actual incidences or accidents are minimized, the Aerodrome Operator shall have measures which: i. Ensure each service provider on the apron has the safety procedures for the operation service rendered on the apron. ii. Ensure that all employees working on the apron are indoctrinated with the principles and practices of safety and tested on that knowledge before working on the apron. iii. Have in place a programme of periodically reviewing and checking. iv. Accuracy of safety record and data on the apron. v. The validity of the safety procedures. vi. Safety awareness and practices of each employee working on the apron. vii. For safety management purposes, an Operator of an aerodrome shall make available the surface marking and signage to communicate safety information that abide passengers, drivers of vehicles and equipment and airport staff on the apron. viii. Ensure that access to the aprons by personnel and vehicles are limited to only those that have been specifically and individually cleared to work on the apron. ix. Ensure that each person working on the apron reports incidence or accidents of unsafe practices that have been observed. x. Ensures any personnel, who has been approved to work at certain portions of the manoeuvering area, does not stray outside the demarcated approved area of works and that prior permission is obtained from Air Traffic Control if personnel are required to go beyond the approved boundaries; xi. Ensures any airside organization which requires outside personnel or contractors to be on their premises abides to the terms and conditions associated with the issue of airport pass and the general rules applicable to 1

xii. pedestrians and workers in the airside and that they adhere strictly to the rules and procedures governing the airside; Ensure that any organization contracted to work on the airside area submits a Plan of Construction and/or a Safety Management Plan that shall be in force for the whole duration of the contract. As a minimum, the Safety Management Plan shall include the following: 1. Training on safety in relation to: a) Hazards to himself/herself and others emanating from his/her occupation. b) Hazards to equipment, other employees and third parties, structures and installations. 2. The Issue and enforcement of the wearing of approved safety protective equipment. 3. Make provision or procedures for handling of accidents and injury to its personnel. 4. Provide the name and other details of the person designated as the Safety Officer(s) for the firm. 5. Plan for giving its staff refresher courses on safety at least once every 6 months. 3. CO-ORDINATION WITH AIR TRAFFIC SERVICES a) The transfer points of responsibility between control tower and apron Management are at the holding points of the taxiways. b) For arriving aircraft the tower controller shall release the aircraft to apron control after it crosses the points indicated in (a) above. However, he may release the aircraft earlier once the pilot reports that he has the marshaller in sight. c) For departing aircraft, the marshaller shall release the aircraft to the tower before it crosses the transfer points in (a) above. However, he may release the aircraft earlier once it is definitely heading to the taxiway and is clear of all obstacles. d) Control tower or the Briefing Unit shall inform Apron Management of the estimated time of arrival (ETA) of each arriving aircraft and, if not otherwise indicated, the apron of its destination. Tower shall advise the Apron Control of the landing of each aircraft as soon as it touches down. e) Apron Management shall advise the tower of the aircraft stand or place that it has allocated to an arriving aircraft as early as possible and before it reaches the point of transfer of control 4. ALLOCATION OF AIRCRAFT STANDS a) The allocation of Aircraft Stands or parking bays is the responsibility of the aerodrome operator. b) In assessing the demand for aircraft stands on particular day or for a particular period of that day, the aerodrome operator shall consider: 2

i) The scheduled aircraft movement. ii) The number of stands already occupied by aircraft especially those whose departure have been delayed, and. c) In allocating stands or bays, the aerodrome operator shall consider the following: - i) The type of aircraft i.e. weight, wingspan, fuselage length, fuelling requirements etc. ii) The airports movement schedule for the day. iii) The principle of first come first served. iv) Duration of the intended parking. 5. RULES AND PROCEDURES FOR AIRCRAFT MARSHALLING Marshalling is a service provided to an arriving aircraft so that it can move safely from the edge of the apron to its allocated parking stand/bay and from that position to the edge of the apron when it departs. The marshalling of aircraft shall be carried out in accordance to the provisions adopted from GCARs-Aerodromes and Manual of Standards (MOS). The marshalling and parking of aircraft shall ensure that aircraft are guided and parked clear of other aircraft, vehicles, and fixed or stationery objects by at least the following margins: - 1) Light aircraft - 3 meters 2) Mid-size aircraft - 4.5 meters 3) Large aircraft - 7.5 meters 6. PROCEDURES FOR ENGINE START UP The Pilot normally seeks from the control tower a clearance to start up engines. Before allowing an aircraft to start engines, the aerodrome operator through the designated officer or an aircraft operator s engineer shall ensure that the aircraft is in a state in which it can safely do so in relation to people and equipment around and behind the aircraft. 7. LEADER (VAN) SERVICE The Aerodrome operator shall develop procedures for Leader (Van) Service to provide guidance on movement areas of aerodrome for: a) Vehicle operation not familiar with apron layout; b) An experienced pilot when taxiing in imperfect visibility condition; and Any other situations deemed leader van services necessary. 3