TRANSMITTAL. Please contact me with any questions. 7 Spruce Road, Freeport, ME T: (207)

Similar documents
Bear Creek Habitat Improvement Project

AGAWAM CONSERVATION COMMISSION April 26, 2018

Ditch flows slowly to the north

MORGAN CREEK GREENWAY Final Report APPENDICES

RIO VISTA MUNICIPAL AIRPORT

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

The Galveston Seawall

Update Report - Etobicoke Creek and South Mimico Creek Trails

Permeable RECREATIONAL TRAILS

Draft Length 10 Thorness Bay to Cowes Chain Ferry

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

ARTICLE 7 MOBILE HOME AND RECREATIONAL VEHICLE PARKS AND CAMPGROUNDS

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech

PLANNING BOARD MINUTES March 13, 2017 CASCO COMMUNITY CENTER 7:00 P.M. MEMBERS PRESENT: Stan Buchanan, Ray Grant & Lynne Potter Bob Barnes, Ted

Santa Cruz Wharf Improvement Project. Briefing Paper. Prepared by City of Santa Cruz. for

Peace Project Water Use Plan

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC

The Corporation of the Township of Wollaston By-law Being a by-law to licence recreational vehicles and tents in the Township of Wollaston

ORDINANCE NO. C-16- WHEREAS, the proposed minimum seawall elevation exceeds the current maximum by 0.7 feet (8.4 inches); and

Non-motorized Trail Plan & Proposal. August 8, 2014

Rye Planning Board_. Saturday, April 17, 2010 MINUTES OF THE SITE WALK

MEETING MINUTES 7:00 p.m. May 16, 2013 LOCATION: MONTVILLE TOWN HALL, Council Chambers

^ox, 7. Environment Agency. Hayling Island North Strategy *. M ^, v. * > -.

Using Managed Retreat to Address Coastal Erosion in Brewster

ROAD AND TRAIL PROJECT APPROVAL

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

Understanding user expectations And planning for long term sustainability 1

Flood History. Floodplain Descriptions

American Conservation Experience

Runway Roughness Evaluation- Boeing Bump Methodology

USDA TRAILS STRATEGY PROGRAM

1. Call to order. Acting Chair John D. Wilson called the meeting to order at 7:00 p.m. in the Veterans' Meeting Room.

Conservation of Critical Environmental Resources in Chatham Park

Reduction of Wave Runup on a Revetment by Addition of a Berm

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by.

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS

CITY PLANNING COMMISSION AGENDA ITEM NOS: 5.A, 5.B STAFF: MICHAEL SCHULTZ

Villiers Scheme Phases III & IV

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

Shapleigh Planning Board Minutes Tuesday, August 14, 2018

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles

Community Development

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project

COOPERATIVE LAKES MONITORING PROGRAM TRAINING FOR. Score the Shore

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Figure 1 shows the evaluation area around Tailings Basin Cells 2E/1E. Two areas were evaluated for potential wetland impacts including:

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

COOPERATIVE LAKES MONITORING PROGRAM TRAINING FOR. Score the Shore

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

Open Meeting. To update the Board on issues arising from the previous meeting.

how it started where we are now what is coming up NEW WESTMINSTER WATERFRONT PARK THE RIVER THE PAST THE PEOPLE

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Proposed Arthurs Point Special Housing Area. Housing Accords and Special Housing Areas Act Expression of Interest

LOUGHBOROUGH INLET. Jason Zroback. Direct Line: (604) TOLL FREE:

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

City of College Park s Update to the Zoning Ordinance

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail

Version Isolated & Non-Waters Only 1 of 3

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

Southsea Flooding and Coastal Erosion Risk Management Scheme

Request for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal

SHAPLEIGH PLANNING BOARD MINUTES Tuesday, April 10, 2018

FARMINGTON PLANNING BOARD 153 Farmington Falls Road March 14, :00 P.M. Minutes

STRATEGIES FOR PROTECTING YOUR PROPERTY

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North

Chesapeake Bay Preservation Area Board

Front Carport Design Standards, Requirements & Application

Electric System Serving Pierce County Current system and future investments

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk

CRAZY HORSE TRAIL GUIDE

Project Planning, Compliance, and Funding

COON CREEK WATERSHED DISTRICT Request for Board Action

CITY COUNCIL AGENDA MEMORANDUM

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan

Specification for Grip blocking using Peat Dams

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

I-3 DFW Extension Public Hearing. June 2, 2011

TOWNSHIP OF GEORGIAN BAY COMMITTEE OF ADJUSTMENT

Falmouth Zoning Board of Appeals DRAFT Minutes February 23, 2017 at 6:00 p.m. Selectmen s Meeting Room, Falmouth Town Hall

Proposed Cherry Grove Canals Dredging Project

Peter Axelson. Beneficial Designs, Inc. Minden, NV

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Rocky Mountain Field Institute

Changing Lanes. Click to edit Master title style. Community Consultation Meeting #1. Second level Third level. Fourth level.

3.0 EXISTING PARK & RECREATION SPACE

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

Movement Strategy. November On behalf of Barton Oxford LLP

KP Lasnaya 1 River

MP : Headwaters of the Fraser River

2. STAKEHOLDER FEEDBACK // What We Heard

Appendix 4 St. Charles Basin

City of Surrey PLANNING & DEVELOPMENT REPORT File:

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

Morrison County Board of Adjustment. Minutes. July 7, 2015

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

Maine Historical Society. Coll Casco Bay Island Development Association Collection

Transcription:

BAKER DESIGN CONSULTANTS Civil, Marine and Structural Engineering To: Alex Jaegerman FAICP Director of Planning & Development Town of Yarmouth 200 Main Street PO Box 907 Yarmouth, ME 04096 From: Barney Baker, PE Date: May 31, 2016 Subject: Shoreland Application 14-65 Sullivan Embankment Copy: File, Wendy & JB Sullivan-Applicants, Tony Cowles- Cowles Studio Job No: 14-65 Reviewed For your use As per your request VIA: Personal Delivery Special Delivery Messenger U.S. Mail U.S. Express Mail Overnight Express UPS Separate Cover Fax Modem TRANSMITTAL \BDC-SRV\Projects\14\14-65 JB Sullivan Embankment\Permits\Yarmouth Shoreland\14-65 T-AJ-1.docx \ Attached is one (1) copy of a Shoreland application for a program of erosion control repairs to the on the property together with an application Fee of $250. Thirteen (13) additional sets, (four with full size drawings) will be provided under separate cover. My understanding is that the Town will provide me with a notification letter and a list of abutter addresses so that I can notify abutting property owners by certified mailing. On behalf of my clients, I would like to have this project placed on the Planning Board agenda for June 22. Please contact me with any questions. 7 Spruce Road, Freeport, ME 04032 T: (207) 846-9724 Email: b.baker@bakerdesignconsultants.com

Shoreland Application May 31, 2016 Sullivan Embankment Stabilization & Rehabilitation Yarmouth, Maine Applicant: Wendy & John B Sullivan 247 Sea Meadows Lane Yarmouth, Maine 04096 Submitted To: Alex Jaegerman FAICP Director of Planning & Development Town of Yarmouth 200 Main Street PO Box 907 Yarmouth, ME 04096 BAKER DESIGN CONSULTANTS Civil, Marine and Structural Engineering 7 Spruce Road; Freeport, Maine 04096

14-65 Sullivan Embankment TABLE OF CONTENTS SHORELAND APPLICATION APPLICATION... 1 Project Narrative... 5 Agent Authorization... 7 Property Deeds... 8 Site Pictures... 10 APPENDIX A State & Federal Regulatory Correspondence... 12 APPENDIX B Project Drawings... 13 \\BDC-SRV\Projects\14\14-65 JB Sullivan Embankment\Permits\Yarmouth Shoreland\14-65 Sullivan Shoreland Application 5.31.16.docx

14-65 Sullivan Embankment APPLICATION Yarmouth Shoreland Application Page 1

14-65 Sullivan Embankment Yarmouth Shoreland Application Page 2

14-65 Sullivan Embankment Yarmouth Shoreland Application Page 3

14-65 Sullivan Embankment Yarmouth Shoreland Application Page 4

14-65 Sullivan Embankment Project Narrative The Sullivan property is located on Sea Meadows Lane and includes approximately 500 LF of shore frontage on Casco Bay. The residential home on the property is part of a well-established neighborhood. The entire property is zoned as low Density Residential and is entirely within the Shoreland Overlay District. Refer to the Site Pictures that start on page 10 and plans located in APPENDIX B Project Drawings that start on page 13. The project includes the stabilization of an existing coastal slope with geotextile, plantings and coir logs to address active erosion. The work serves to protect from further property loss that would eventually encroach upon the existing septic system. A. PURPOSE AND NEED OF PROPOSED IMPROVEMENTS An overview of site work is provided on Sheet C-0 SITE PLAN OVERVIEW. The primary activity stabilizes a section of the coastal embankment on the Sullivan property that is located on Sea Meadows Lane in Yarmouth. Several coastal trees are in danger of failing due to undermining of the roots system. If coastal erosion proceeds unchecked, the coastal trees and septic system will eventually be impacted. The proposed work also improves an existing access to the shore that will be used temporarily for construction access for the bank stabilization work. The access is necessary to maintain a safe passage to the shore for use by the property owner. Improvements are also made to the front lawn to control runoff on the property from Sea Meadows Lane. B. EMBANKMENT STABILIZATION The major elements of the proposed embankment stabilization are discussed below and shown on Drawing C-1 EXISTING CONDITIONS, with the proposed improvements shown on C-2 SITE PLAN and C-3 TYPICAL SECTION. Embankment regrading- The existing slope will be cutback to a 1.75: 1 slope. Excess material will be removed from the property. Slope Reinforcement and Plantings- The slope is further stabilized with a soil mat geotextile and plantings. Coir Logs-The toe of the slope is reinforced with biodegradable coir logs placed parallel to the slope. These densely packed jute tubes protect the slope from wave action in the short-term to minimize damage while the plantings get established. Less resilient than stone, but more cost effective, they need to be replaced periodically to function in the long-term. When replacement is required, they can be carried to the site and staked without the need for heavy equipment. Vertical Drains- Vertical drains are added where surface or groundwater is encountered. These are placed to collect and transport water to the toe of the slope. C. CHECK DAM WALKWAY Route (Refer to Sheet S-1). There is a natural drainage channel that transports runoff to the beach area. This is also the traditional access to the beach for the property and is currently improved with a timber walkway. In order to prevent damage to trees at the top of the coastal slope from construction activity all regrading operations will be undertaken from the beach. The Page 5 Yarmouth Shoreland Application

14-65 Sullivan Embankment existing channel will be used to get construction equipment onto the beach for the regrading operation and at the completion of the work will be improved as shown on the plan. To minimize damage to the beach and adjacent marsh during construction, the work will be undertaken by wide tracked vehicles during the winter and the vehicle path will be temporarily stabilized with mats at turning locations. D. VISUAL IMPACT CONSIDERATIONS The proposed embankment stabilization is a vegetated solution without the impact of stone armor or structure. Yarmouth Shoreland Application Page 6

14-65 Sullivan Embankment Agent Authorization John and Wendy Sullivan 247 Sea Meadows Lane Yarmouth, ME 04096 By signing below, I authorize Barney Baker, PE of Baker Design Consultants to act as agent for the purpose of permit communication on applications filed for improvements to our property at 247 Sea Meadows Lane on Cousins Island in Yarmouth. Yarmouth Shoreland Application Page 7

14-65 Sullivan Embankment Property Deeds The following documents are provided to show right, title or interest for the project. Warranty Deed CCRD Document Deed Book 29193, Page 84 Yarmouth Shoreland Application Page 8

14-65 Sullivan Embankment Yarmouth Shoreland Application Page 9

14-65 Sullivan Embankment Site Pictures Sullivan Embankment South End North End Bing Maps Bird s Eye View April 2016- Recent erosion at Tree Base Yarmouth Shoreland Application Page 10

14-65 Sullivan Embankment May 2016 View of section of eroding slope near south end of property Existing Boardwalk to shore Yarmouth Shoreland Application Page 11

APPENDIX A State & Federal Regulatory Correspondence 14-65 Sullivan Embankment An NRPA Permit has been filed with Maine DEP and the Army Corps of Engineers. A copy of the permits received for the work will be provided to the Town as soon as they are received. DEP regulates work within 75-ft of the coastal wetland as defined by the Highest Annual Tide (HAT) line. The Army Corps of Engineers jurisdiction extends to work that is seaward of the HAT line. A letter of project notification has been sent to the Maine State Historic Preservation office for comment in accordance with Shoreland Application requirements. The response will be copied to the Town as soon as it is received. Based on a preapplication meeting with DEP (Chris Coppi) and discussion with the Yarmouth Code Enforcement Officer (Bill Longley), the removal of the trees whose root systems have been compromised and the drainage improvements to the front lawn are entirely within the purview of the Yarmouth Shoreland Ordinance. It is requested that the Town consider a Shoreland permit that is conditional on receiving the state and Federal permits so that the trees that are in danger of falling and creating additional erosion) and the drainage work to the front yard can be completed. Yarmouth Shoreland Application Page 12

14-65 Sullivan Embankment APPENDIX B Project Drawings G-1 Cover Sheet G-2 Notes C-0 Site Plan Overview C-1 Existing Conditions C-2 Slope Stabilization Plan C-3 Typical Sections C-4 Details S-1 Check Dam Walkway X-1 Existing Sections L-1 Landscape Plan Yarmouth Shoreland Application Page 13