UPDATE ON BALLAST WATER MANAGEMENT

Similar documents
Ballast Water Management in the USA

MARINE CIRCULAR MC-3/2016/1

NINTH ORDINARY MEETING OF THE OSC 9/8/3 RAC/REMPEITC-Caribe STEERING COMMITTEE 31 May 2018

Majestic Cruise Lines Freewinds

Commonwealth of Dominica. Office of the Maritime Administrator

Mission: Environmental / Ballast Water Management Program

Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish

Government Decree on Inspecting Foreign Ships in Finland (1241/2010)

MARINE CIRCULAR MC-1/2013/1

ICS Shipping Conference. (including MLC) 11 September 2013

IMO. RESOLUTION A.882(21) adopted on 25 November 1999 AMENDMENTS TO THE PROCEDURES FOR PORT STATE CONTROL (RESOLUTION A.787(19))

bbe MOLDAENKE GmbH Ballast Water Workshop 2014

LIST OF NEW IMO/ILO OBLIGATORY REQUIREMENTS entering into force in 2014

Presentation Content

Marine Protection Rules Part 141 Ship Design, Construction, Equipment and Operation Noxious Liquid Substances in Bulk

Cruise Industry Perspective on OWS and Waste Management

FORM A 3 PORT STATE PARTICULARS 3 FORM B 4 DEFICIENCIES FOUND AND FOLLOW UP ACTIONS**) 4 NOTICE OF DETENTION FOR THE MASTER 5

BALLAST WATER MANAGEMENT SYSTEMS

LISCR Notes and Advisories by Date

Ratification of Conventions

Official Journal of the European Union L 7/3

Marine Protection Rules Part 101B: Surveys and Inspections Noxious Liquid Substances Carried in Bulk

APPLICATION OF THE NO-SPECIAL-FEE SYSTEM IN THE BALTIC SEA AREA

Helsinki February 1986 HELCOM RECOMMENDATION 7/9 *)

The Polar Code and the Canadian Arctic

IMO / ILO REQUIREMENTS FROM 2014

CHALLENGES AND OPPORTUNITIES IN THE CRUISE MARKET SEPTEMBER 25, 2008 AAPA ANNUAL CONVENTION ANCHORAGE, ALASKA

GUIDELINES ON BUNKERING OPERATIONS AND SHIP TO SHIP CARGO TRANSFER OF OILS, SUBJECT TO ANNEX I OF MARPOL 73/78, IN THE BALTIC SEA AREA

INFORMATION AND GUIDANCE TRAINING REQUIREMENTS FOR PERSONNEL ON SHIPS OPERATING IN POLAR WATERS

IMO RECYCLING OF SHIPS

Policies for Establishing the Term of Validity of Airworthiness Certificate for Aircraft of Air Carrier

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

Validity: indefinitely

9820/1/14 REV 1 GL/kl 1 DGE 2 A

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

IMO Maritime security legislation In September 1986, the MSC approved MSC/Circ. 443 on Measures to prevent unlawful acts that threaten the safety of s

Commonwealth of Dominica. Office of the Maritime Administrator

Brief Company Introduction

HELLENIC MEDITERRANEAN PANEL. Managing Director s Overview Report. October 11, International Association of Independent Tanker Owners

INFORMATION BULLETIN No. 167

ASSEMBLY 35TH SESSION

Order on the discharge of oil from ships in the exclusive economic zone around Greenland

Marine Protection Rules

N Registry Airworthiness & Maintenance Requirements

Questions and Answers Cape Town Agreement of 2012

Official Journal of the European Union L 186/27

IMO CONSIDERATION OF THE DRAFT INTERNATIONAL CONVENTION FOR THE

SHIP RECYCLING. Your guide to compliance. Move Forward with Confidence

Criteria for an application for and grant of, or a variation to, an ATOL: fitness, competence and Accountable Person

To: Deputy Registrars, Owners, Managers, DPA, Masters

Abruzzo Airport. Commercial Policy Development Routes

Marine Protection Rules Part 300: Ballast Water Management

Maritime Security Policy

DMA RO Circular no. 002

SUMMARY AUDIT REPORT OF THE DIRECTORATE OF CIVIL AVIATION OF BURKINA FASO

PROGRESS TOWARDS THE DEVELOPMENT OF AN INTERNATIONAL POLAR CODE

Act on Aviation Emissions Trading (34/2010; amendments up to 37/2015 included)

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

CROSS-BORDER TRADE IN SERVICES

The European Commission's Proposal to Amend EU Regulation 261/2004. by Arpad Szakal

ANNEX II to EASA Opinion No 09/2017. COMMISSION REGULATION (EU) No /.. of XXX

Summary of Public Submissions. Received on

ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED ORGANIZATIONS

Subject: Night Flight Restriction Program Winter 2017 (2017-October-30 to March-31) and Summer 2018 (2018-April-1 to 2018-October-29)

Presentation Title: Aerodromes Licensing Requirements

Japanese policy on ship recycling

L 342/20 Official Journal of the European Union

The world merchant fleet in Statistics from Equasis

COMMISSION IMPLEMENTING REGULATION (EU)

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

EASA PART 21 + AMC/GM. Syllabus

Commonwealth of Dominica. Office of the Maritime Administrator

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Food and Agriculture Organisation (FAO) current work - global guidelines on ecolabelling and certification in capture fisheries and aquaculture

ICAO regional technical cooperation tools for the implementation of air navigation and safety improvements

ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC

AUDIT SUMMARY REPORT OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

AIRWORTHINESS ADVISORY CIRCULAR

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

(i) Adopted or adapted airworthiness and environmental standards;

To: Vessel Managers, Masters, Officers, Deputy Registrars, Surveyors and Other Interested Parties

ANNEX 7. RESOLUTION MSC.343(91) (adopted on 30 November 2012)

TARIFF OF HARBOUR DUES

HELCOM Ministerial Declaration on the implementation of the HELCOM Baltic Sea Action Plan

Office of Utility Regulation

United Nations Environment Programme

Technical. Policy Lead. Douglas

This Section 1 contains the requirements for the approval of Master Minimum Equipment Lists and Minimum Equipment Lists.

[Docket No. FAA ; Directorate Identifier 2007-NM-291-AD; Amendment ; AD R1]

Captain J. Ashley Roach, JAGC, USN (retired) Office of the Legal Adviser U.S. Department of State (retired) CIL Senior Visiting Principal Research

Commission Paper CP2/ April, Commission for Aviation Regulation 3 rd Floor, Alexandra House Earlsfort Terrace Dublin 2 Ireland

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid

Aerodrome Certification Applicable provisions

CAA consultation on its Environmental Programme

Update to Doc 8335 Manual of Procedures for Operations Inspection, Certification and Continued Surveillance

EUROPEAN MILITARY AIRWORTHINESS REQUIREMENTS. EMAR 21 (SECTION A and B)

Master Minimum Equipment Lists/Minimum Equipment Lists. Amendment Summary PART-MMEL/MEL. Amendment No. Effective Date Subpart Paragraph

Report on Passenger Rights Complaints for year ended 31 st December th December 2011

EASA rulemaking in ATM/ANS. Entry Point North annual AFIS Seminar 5th and 6th of September 2012, Malmö

Charter School Appeal Submission Packet Following Denial by a School District

Transcription:

NORTH AMERICAN PANEL March 21, 2016 UPDATE ON BALLAST WATER MANAGEMENT JOSEPH ANGELO DEPUTY MANAGING DIRECTOR

Ballast Water Management INTERTANKO Desired Outcome for Ballast Water Management: Tanker industry is able to achieve compliance with current and future discharge standards (both regionally and internationally) Focus: 1. Installation and Operation of appropriate and adequate ballast water management systems 2. Compliance and enforcement need strong, well defined and realistic international regulations

Ballast Water Management IMO IMO Ballast Water Management Convention Adopted in 2004 Entry into force requires ratification by 30 countries, 35% world s grt Currently, 49 countries, 34.82% grt Argentina, Finland, India, Italy and Panama in the process of ratification

Ballast Water Management IMO Main INTERTANKO Concerns with IMO Ballast Water Management Convention 1. Guidelines for approval of ballast water management systems (G8) not robust enough to provide reliable equipment 2. Availability of Ballast Water Management Systems (BWMS) to meet convention implementation schedule unrealistic 3. Procedures for port State control more onerous than type approval

Ballast Water Management IMO INTERTANKO (etal) made submission to MEPC 64 (October 2012) to address these issues 1. Port State Control should not be more rigorous than BWMS Type Approval testing procedures 2. IMO Assembly resolution should be developed with a realistic schedule for the installation of BWMS when treaty enters into force 3. G8 guidelines should be revised to require more rigorous Type Approval testing

Ballast Water Management IMO Port State Control MEPC 65 (May 2013) Trial Period (initially for 3 years) following entry into force To trial sampling and testing procedures During this period, port states will refrain from detaining a ship or initiating criminals sanctions in the event a BWMS does not meet the discharge standard (USA reserves its position) MEPC 67 (Oct 2014) adopts Guidelines for PSC with four stage approach

Ballast Water Management IMO IMO Guidelines for PSC Stage 1 Initial inspection. Focus on documentation and crew training to operate BWMS If there are clear grounds Stage 2 More detailed inspection. Check to ensure that BWMS operates properly Stage 3 Indicative sampling. Without unduly delaying ship, an indicative analysis of ballast water can be taken Stage 4 Detailed analysis. If indicative sampling exceeds D2 standard by a certain threshold, a detailed analysis of ballast water can be taken

Ballast Water Management IMO Implementation schedule (availability of BWMS) IMO Assembly Resolution (A.1088(28)) adopted, Dec 4, 2013 recommends governments: implement the Convention based on the entry into force date of the Convention considers ALL vessels constructed (keel laid) before entry into force as existing vessels existing vessels to install a BWMS at the first renewal survey (IOPP Certificate under Annex I of MARPOL) after entry into force of the Convention HOWEVER

Ballast Water Management IMO Implementation schedule (availability of BWMS) Two new issues have come into play 1. Japan has submitted MEPC 69/4/17 which proposes to revise the text from the first renewal survey (of the IOPP Certificate) to the date determined by the Marine Environment Protection Committee 2. Liberia has submitted MEPC 6/4/13 which proposes to extend the period a ship would have to install a BWMS provided two sequential ballast water exchanges are conducted in each ballast water tank

Ballast Water Management IMO BWMS Type Approvals Outcome of MEPC 67, October 2014 Success!!(?) Adopts an MEPC Resolution 253(67) which agrees 1. To immediately begin a comprehensive review of G8 guidelines (and Plan of Action to do so) 2. Shipowners that have installed BWMS approved to existing G8 guidelines should not be penalized 3. Port States should refrain from applying criminal sanctions or detaining the ship, based on sampling during the trial period (US reserves its position) Agrees that proposals to implement decision to not penalize shipowners should be submitted to MEPC 68 (May 2015)

Ballast Water Management IMO INTERTANKO and other industry associations submitted MEPC 68/2/16 to clarify MEPC 253(67) BWMS approved to existing G8 shall not be required to be replaced when new G8 guidelines become applicable BWMS approved to existing G8 shall not be required to be replaced for the life of the ship, provided they are installed, operated and maintained correctly PSC should not detain ship, or fine or take criminal action against shipowner, if such BWMS does not comply with discharge standard

Ballast Water Management IMO Outcome of MEPC 68 (May 2015) Agrees on Roadmap for non-penalization of early movers Receives report of Correspondence Group on Revision of G8 guidelines 1. Industry list of 6 minimum issues to be addressed in revision of G8 expanded to 34 2. Notes progress is made on some, but not all 3. Re-establishes CG to continue review and report results to MEPC 69 (April 2016)

Ballast Water Management IMO Roadmap for non-penalization of early movers Installed BWMS approved to the current type approval guidelines should not be required to be replaced due to the application of the new guidelines If current BWMS are installed, maintained and operated correctly then they should not be required to be replaced for the life of the ship or the BWMS, whichever comes first, due to occasional lack of efficacy Early movers should not be penalized (sanctioned, warned, detained or excluded) solely due to occasional exceedance of BWMS (D-2) standard Footnote: non-penalization may be subject to review as additional information becomes available

Ballast Water Management IMO Roadmap for non-penalization of early movers Outstanding Issue Shipowners who have installed, prior to the application of the revised Guidelines (G8), ballast water management systems (BWMS) approved in accordance with the Guidelines (G8) When does the application of the revised G8 start? 1. When they are adopted? 2. A specified period after they are adopted? 3. When there are BWMS approved to the revised G8?

Ballast Water Management USCG Final Regulations issued March 23, 2012 BWM plan and recordkeeping (same as IMO) BWM discharge standard (same as IMO), review in 4 yrs Schedule for installation of BWMS similar to IMO, BUT NO intent to align schedule with Resolution A.1088 BWMS not required if no discharge of ballast water into US waters (12 miles) Acceptance of Alternative (AMS) BWMS for 5 years All ships must eventually install CG approved BWMS Ships may request an extension to compliance date for installation of a USCG approved BWMS

Ballast Water Management USCG INTERTANKO assisting Members with USCG regulations Implementation Schedule Decision Tree

USCG Ballast Water Decision Tree

Ballast Water Management USCG INTERTANKO assisting Members with USCG regulations Implementation Schedule Decision Tree Model Extension Request (MER) Letter

Ballast Water Management USCG US Coast Guard Extension requests January 1, 2016 extension date given to ships whose drydockings was scheduled for 2014 January 1, 2017 extension date given to ships whose drydockings was scheduled for 2015 January 1, 2018 extension date being given to ships whose drydockings are scheduled in 2016 September 10 CG issues Policy letter CG-OES No. 13-1 October 22 CG issues Marine Safety Information Bulletin, No 13-15

Ballast Water Management USCG Sept 2015 ISTEC/Environment Committee requested Secretariat to request USCG to 1. Issue blanket extensions for ships until USCG approved BWMS are available 2. Provide extensions to ships first scheduled drydocking, rather than the 1 st of each year 3. Consider anti-trust, consumer protection implications when first BWMS is USCG approved to ensure cost is reasonable

Ballast Water Management USCG US Coast Guard Extension requests MSIB No. 13-15, issued October 20 Extensions will be granted to the vessel's next scheduled drydocking after the vessel's required implementation date Vessel's first scheduled drydocking date will be determined based upon when the vessel enters the drydock Existing extension letters with a January 1 dated will not be re-issued. Change will be made when a vessel applies for a supplemental extension Supplemental extensions will be required to be submitted Clarifications have been provided regarding what will be considered a scheduled drydocking.

Ballast Water Management USCG US Coast Guard APPROVED BWM Systems 33 BWMS manufacturers have submitted Letter of Intent (LOI) to pursue USCG approval (56 AMS accepted by USCG) USCG aware of 16 systems undergoing testing Only after the testing is completed by USCG accepted Independent Laboratory (IL) and the results have been evaluated, will a BWMS manufacturer then submit an application to the USCG for approval of their BWMS

Ballast Water Management USCG US Coast Guard APPROVED BWM Systems USCG has received four applications for BWMS type approval Trojan Marinex, Alfa Laval PureBallast, DESMI RayClean and Hyde Marine Guardian (all three make use of UV treatment) They requested approval of a method for assessing the number of viable organisms, to be used as an alternative to the required method that assesses numbers of living organism, as required in USCG BWMS regulations USCG denied the request Decision is currently under appeal

Ballast Water Management USCG US Coast Guard APPROVED BWM Systems CG indicates that they expect to have a USCG approved BWMS sometime in the second half of 2016 After BWMS are USCG approved, extension program will be modified as necessary using a practical approach CG will not wait to issue a type approval certificate if an application demonstrates that all criteria for type approval have been met Best guess Each ship will be evaluated on a case by case basis, based upon suitability of available USCG approved BWMS for that particular ship and hopefully combined with ship s next scheduled drydocking

Ballast Water Management Shipowner dilemma!! US is not party to IMO BWM treaty (which may enter into force in the near future). USCG regs: Allow use of Alternate Management System (AMS) for five years After five years, require installation of USCG approved BWMS Currently no BWMS is USCG approved Ship operator must decide to either install AMS and hope it gets USCG approval OR request an extension and hope there is a CG approved BWMS available for installation on their ship prior to the required installation date under the IMO BWM Convention.

Ballast Water Management If I owned a tanker, I would Conduct preparatory work to determine: a. which type of BWMS is best for my ship b. there is proper space to install the BWMS I want on my ship Request extension from US Coast Guard Once I know when IMO BWM convention will enter into force, request the issuance of new MARPOL Annex 1 IOPP Certificate When available, purchase USCG approved BWMS that is best for my ship

Ballast Water Management USEPA EPA Vessel General Permit issued December 19, 2013 To a large extent EPA VGP requirements are the same as USCG (discharge standard, compliance schedule, etc.) Approval of BWMS is not required BWMS monitoring required (functionality, equipment calibration, effluent, biocides) New ship (keel laid after December 1, 2013) is required to install a BWMS to comply with the VGP, i.e. no acceptance of USCG extension provision in the VGP EPA /USCG MoU EPA Enforcement Policy, 27 Dec 2013 Vessel with USCG extension is non-compliant (if discharges in US waters 3 miles), but EPA regards as a low-enforcement priority, provided all other regs are met

Ballast Water Management USEPA Potential issue with EPA Enforcement Policy?? Charter party agreements require tanker to be in compliance with all applicable laws and regulations Tanker that receives CG extension would be in compliance with CG requirements Tanker that has CG extension and discharges ballast water within US waters (3 miles) would be in violation of EPA Vessel General Permit Would this violate charter party agreements??? Thus far, not aware of any comments from oil majors or charterers on this issue

Ballast Water Management USEPA US COURT OF APPEALS RULING ON EPA VGP BALLAST WATER REQUIREMENTS (Oct 5) EPA acted arbitrarily and capriciously in, among other things, selecting the IMO ballast water standard as the standard in the VGP Decision based in part on the EPA s Science Advisory Board (SAB) report which identified a number of technologies that can achieve standards higher than IMO for one or more organism sizes Court has remanded the matter back to EPA for review Court also ruled that the 2013 VGP shall remain in place until EPA issues a new VGP

California BWM In 2006 California legislation mandates BWM standard (in some cases 100 times greater the USCG standard) to be met in 2010/2012 In 2013 CA State Lands Commission (CSLC) acknowledges that the standard is NOT technically achievable. CA passed legislation (SB 814) to delay implementation dates until 2016/2018 In February 2015, CSLC recognizes that implementation must be further delayed and initiates legislation (AB 1312) to delay implementation dates until Jan 1, 2020 and first scheduled drydocking after Jan 1, 2020 CA legislature approved bill and Governor has signed Takes effect January 1, 2016

THANK YOU!