Other conditions that were issued with the positive record of decision included noise pollution and fuel transportation to the new airport site.

Similar documents
CIVIL AVIATION AUTHORITY

Birmingham Airport 2033

2006 ANNUAL GENERAL MEETING

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

integrated ANNUAL report 2012

PLANNING FOR GROWTH, INVESTING IN OUR FUTURE

Schiphol Group. Annual Report

INTEGRATED ANNUAL REPORT 2011

Whangarei Airport. Prepared by Carine Andries 10/20173

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers

Sustain Aviation Growth Under Air Transport Economic Regulations

8 OAMARU AIRPORT ZONE

EVERY AIRPORT CAN BENEFIT AND EVERY AIRPORT CAN CONTRIBUTE.

TERMINAL DEVELOPMENT PLAN

COMMERCIAL AND GENERAL AVIATION

Current and Forecast Demand

K.I.A where it all starts! Ghana Airports Company Ltd

Global Aviation Market. Connie Muller Mumbai International Airport Limited (MIAL)

AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited

THE GRAND SOLUTION FOR ISTANBUL'S CAPACITY PROBLEM

Update of the Airport Master Plan. Initial Runway & Land Use Alternatives

AVIATION. MichiganReportCard.com 5

Ronan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX

Presentation to Portfolio Committee on Tourism. September 1, Cape Town

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

The Government s Aviation Strategy Transport for the North (TfN) response

NARITA INTERNATIONAL AIRPORT OVERSEAS

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM

Airport Planning Area

8 Aviation Support. 8.1 Aerodrome Rescue and Fire Fighting Services. 8.2 Aircraft Refuelling. 8.3 Air Cargo

JUNE 2016 GLOBAL SUMMARY

SouthwestFloridaInternational Airport

The Civil Aviation Sector as a Driver for Economic Growth in Egypt

WE (NAMIBIA) PROVIDE THE GATEWAY TO AFRICA His Excellency Dr. Hage Geingob, President of Namibia

INTRODUCTION YYC LOOKING AHEAD

ATNS Operations Division. Air Traffic Flow Management

EMORAT (Evaluation & Monitoring of Operational Readiness + Airport Transfer)

OUR WORLD WORKS FOR YOU

The challenges of growth, the growth of challenges Airports Canada 2013 April 11, JAMES C. CHERRY CEO Aéroports de Montréal

Stimulating Airports is Stimulating the Economy

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE

Benefits of NEXTT. Nick Careen SVP, APCS. Will Squires Project Manager, Atkins. Anne Carnall Program Manager, NEXTT

Flight Procedure Design and Cartography

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Guideline: Rules and appropriate practices for disabled aircraft removal

Thank you, Director Heijl and Bon Jour. It s good to be back in Montreal for this important symposium.

Authored by Cr Bob Manning Mayor

Strategic Airport Management Programme April Airport Economics. presented by. Eileen Poh Assistant Director (ICAO Affairs)

INTRODUCTION YYC LOOKING AHEAD

OUR WORLD WORKS FOR YOU

US $ 1,800 1,600 1,400 1,200 1,000

EQUATORIAL LAUNCH AUSTRALIA

South Africa Airside Capacity Enhancement Study for Air Traffic Navigation Services. Task 7 Report: Development Impacts

IATA Fuel Efficiency Program

FBO Request for Proposal Lake Cumberland Regional Airport

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

AUSTRALIAN AIRPORTS ASSOCIATION AUSTRALIAN AIRPORTS DRIVING TOURISM GROWTH

NMa Study on the economic market power of Schiphol. Consultation Meeting February 25, 2010

CHAPTER 1 EXECUTIVE SUMMARY

Penzance Heliport Ltd.

Content. Invest in Calatayud

Federal Budget Submission. Prepared for the House of Commons Standing Committee on Finance. Greater Toronto Airports Authority

Industry perspective Current Market Outlook

AERODROME SAFETY COORDINATION

Outlıne of the Presentatıon

IAC 2011 Cape Town, October th

Ex-Ante Evaluation (for Japanese ODA Loan)

Agenda. Introduction YYC. Looking Ahead in 2014

CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS

A Master Plan is one of the most important documents that can be prepared by an Airport.

2005 ANNUAL GENERAL MEETING

Edmonton International Airport Master Plan Open House Display Boards April 16, 2011

Provincial Review 2016: KwaZulu-Natal KwaZulu-Natal

WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018)

An Integrated Investment Incentives and Cargo Hub Airports to Stimulate Air Cargo Demand. June,2017

Introduction DRAFT March 9, 2017

LOCATED AT THE GATEWAY OF THE TROPICAL PROVINCE, RIDING ON THE GROWTH MOMENTUM OF THE COUNTRY, WE ARE ON THE RIGHT TRACK OF TAKING OFF.

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )

Transport. fact. Agencies. Transnet Limited

Guidance material for land use at or near aerodromes

Aviation Development

Alternatives Analysis EXECUTIVE SUMMARY

ACI perspective of The Airport Planning Challenge

Making travel easier and more affordable. easyjet s views on how aviation policy can improve the passenger experience and reduce costs

FACILITATION PANEL (FALP)

LATEST LOGISTICS AND FORWARDING NEWS

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN

Manchester Airports Group

LATEST LOGISTICS AND FORWARDING NEWS

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

Aviation, Rail, & Trucking 6-1

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO

FROM LANDING TO TAKE-OFF: WE CARE COMPANY PRESENTATION

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

Mayor Dave Bronconnier cc: All City of Calgary Alderman. Eastbound Extension of Airport Trail and Related Works

Australian Airport Association Stakeholder Dinner. 31 May 2018 Sydney, Australia. Speech by Angela Gittens

TRANSPORTATION: Airports and Aviation Services

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Transcription:

King Shaka International Airport, La Mercy The new King Shaka International Airport located at La Mercy, approximately 35 kilometers north of Durban s city centre, is really a national project that is fast becoming a major economic boost for the province of KZN and certainly for the country. It is also 1 st Greenfield airport to be built in the past 50 years in South Africa and possibly the only one currently being built in the world. The new airport is going to replacing the existing Durban International Airport, which will eventually be decommissioned and all aviation related business will be relocated to the King Shaka International Airport which is to open its doors on 1 st May 2010 with about 6 weeks before the start of the 2010 FIFA World Cup. Background With a project of this stature and expense it had to conduct extensive research and analysis for the relocation of the current airport to the new site. In July 2006 it was finally concluded that the existing airport will be relocated. It was decided that ACSA would develop, manage and own the airport while the Dube TradePort company will develop the cargo facility, trade and agri zone. Amongst the evaluations that were conducted was, naturally, a full environmental impact study. The assessment revealed a possible threat to the bird population in the vicinity, in particular the 3million barn swallows that migrate every year from Europe to roost in an area close to the airport. Known as the Mount Moreland Lake Victoria Conservancy Reedbed, this site is in the flight path of aircraft that will be using the airport. Concerns raised not only included the possible disturbance of the bird colony on the ground, but also the possible hazard of birds in flight putting aircraft safety at risk. The solution proposed is a special bird detection radar system that can monitor the movements of the birds. The added bonus is that this system will be able to detect the presence of bats at night, as well. This will be the first time in the world that a system of this kind, which will be integrated into the operational procedures of the airport, will be utilised in South Africa. Whilst the idea of bird strikes is alarming, this is a hazard that is regularly encountered by all airports worldwide. From the intensive research conducted by ACSA and the Mr. Mooreland community, it concluded that the birds and the airport can co-exist. This means that the swallows rarely fly as high as the aircraft and their main activities in the area are 30 minutes before dusk and just before dawn. It has been decided that flight schedulers will take these critical times into account and plan around them, to avoid unnecessary risk to the air carriers. Other conditions that were issued with the positive record of decision included noise pollution and fuel transportation to the new airport site. Dube TradePort The siting of the new airport complements the development of the Dube TradePort, which is situated adjacent to the airport, on 2060 ha of land that is perfectly accessible by the two major ports of Durban and Richards Bay and the rail and road links with 1

Gauteng. Wholly funded by the Kzn Department of Economic Development, the Dube TradePort is intended to be a world class freight logistics facility that will be geared to attract a wide range of activities that will stimulate economic advancement in the region. The Dube TradePort platform is split into three sections namely: Trade Zone, Agri Zone and Support Zone (joint venture with ACSA). The Trade Zone, which includes the cargo handling terminal at the airport, will stimulate the import and export of high value goods by air to and from KwaZulu Natal. The Support Zone has been designed to cater to the corporate sector as well as the suppliers of services and tourist accommodation through the provision of offices, buildings, conference and entertainment facilities, while the AgriZone will involve the cultivation of high value farming products for export. Anyone traveling by road between Johannesburg and Durban will testify to the enormous volume of road freight traffic that uses the route daily. When completed, the Dube TradePort and the King Shaka International Airport will alleviate the pressure on this route by facilitating that the more than 50 000 tons of manufactured goods produced in the region will be air freighted directly from the local airport in the future. King Shaka International Airport Timelines 6 June 2007 R7.2bn design & construction contract awarded to the Ilembe Consortium 23 August 2007 Positive EIA (environmental impact assessment) record of decision (ROD) issued 30 September 2007 Ground breaking ceremony 31 August 2007 site work commenced 30 September 2008 Control Tower topped out 30 June 2009 Terminal Building topped out 30 October 2009 Runway will be completed First quarter 2010 Durban International Airport, will be decommissioned. New International Airport will be commissioned 29 April 2010 Contractual completion Facts and Figures Earthworks 2

As at end of August 2009 6.3Mm³ bulk earthworks had been completed site wide (the equivalent of 2500 Olympic swimming pools) Construction sites Six construction sites were set up for the earthworks to prepare the runway, taxiways and aircraft parking areas (the size of 100 soccer pitches) Personnel on site In Mid-2008, there were 2,100 contractors and subcontractors on site along with 200 earth-moving machines. In October 2009 7,732 people worked on site. Total building materials used By August 2009, the total project had used 100 000 m3 of building material. Concrete The project has required 100 000 tons of concrete. Asphalt At the end of August 137.5K tonnes of asphalt had been placed across the site. Terminal building Structural steel The Terminal Building required 4,900t of structural steel (half of the amount that was used to build the Eiffel tower, in Paris). Levels The Terminal Building consists of three levels: Ground Floor (arrivals), First floor (departures) and the Mezzanine level (airline offices) and extensive retail facilities. Total floor area The total size of the terminal flooring is 103,000m² (equivalent to 27 soccer pitches). Courier and parcel facility An international courier and parcel facility designed to handle 1000 bags/parcels per hour in and out, as well as a local parcel and courier facility designed to handle 400 bags/parcels per hour in and out. Capacity 3

The initial AIRPORT capacity will allow for 7.5 million passengers a year with opportunities for significant expansion, should it be required (figures are projected at 45 million passengers by 2060). Aircraft stands on the apron The passenger terminal will initially have 18 Passenger aircraft stands and by 2060, there will be parking space on the apron for 96 aircraft. Runway and taxiways The runway is 3.7km x 60 metres wide and will be able to will accommodate the latest New Generation Large Aircraft (NGLA) including the Airbus A380, with the space to expand to 4km. The runway and 10 taxiways cover 400, 000² and required 230,000t of asphalt (the equivalent of 35km of a four-lane highway). Cargo building State-of- the-art 160 000m2 cargo facilities. (DIA currently has 39 000m2 cargo facilities). Annually, 90, 000 tons of goods from Durban's harbour are trucked to JHB airport for export. Most of this will now remain in Durban and will be flown out directly from the new airport. Support Zone This includes platforms for future development of conference, hotel and entertainment facilities which will be a joint venture between ACSA and DTP. Fuel The fuel farm is located with four fuel tanks. The fuel will be brought by truck from the refinery located near the existing airport. Landscaped gardens Large areas that surround the terminal is being landscaped and designed to enhance the overall aesthetics of the airport. Parking Multi-storey parkade caters for 1500 vehicles while there is a total of 6500 vehicle parking pays at the new airport. Road infrastructure N2 Interchange. 4

The traffic, engineering and transport planning aimed to maximize accessibility and flexibility to and around the new airport. The plans also provide sufficient flexibility to ensure that all future (2060) projected transportation modes and requirements have been considered. The proposed N2 interchange which forms part of the development, will be the primary access road to the airport. A link road between the airport and the N2 has been constructed. Job creation The airport could create 165000-260000 jobs over the next 20 years. Capital cost of the project Although the capital cost of the project was originally estimated at R6,8-billion, a negotiated acceleration programme amounting to R400-million has increased the capital cost to R7,2-billion. Retail facilities Kauai King Shaka NWJ The Stables Wine Estate Airport Bookshop Pty Ltd Link Pharmacy Cosmic Candy La Mercy (Pty) Ltd Euro Blitz 45 (Pty) Ltd Thebe Tourism group Retail EM Native Collection CC Tie Stop Fego Caffe' Dinaledi Airport Concessions (Pty) Ltd Duty Free Rhapsody's 10 Car Rental Companies Operational Readiness and Transfer Program 5

The multibillion airport project is almost 90% complete and the ORAT program is well on track with the teams working hard on the program to make it a reality. The daunting but exciting task of relocating the airport overnight to the new site is exactly what is being planned. Behind the scenes is a team headed by Bongiwe Pityi (AGM Airport Operations) for ACSA who has a team of local and international consultants working on the ORAT. The plan is that on 30 th April the last aircraft will land at DIA and after the passengers have left the airport those aircraft will have to be relocated to the new airport. The equipment and resources will also be relocated for most of that week but certainly overnight of the 30 th April. The next day 1 ST May 2010, considering it being a Saturday and a relatively quieter from an operational perspective, the new airport will commence operations. This process on the actual relocation will be issued, regularly to the public via the various mediums to show the progress and readiness of the airport and how it will affect and impact on the public. With the new airport at La Mercy just 3 months away from opening and the ORAT (Operational Readiness and Airport Transfer) team consisting of about 24 work stream leaders is well on track to have that airport operationally ready for 1 st May 2010. This commenced in November last year when the Familiarization program kicked off which involved taking the current 3400 work force from the current airport and familiarize them with the new airport and the team has already exposed almost 2000 staff to their new home. This has injected positive energy with most staff belonging to various organizations committing and confirming their wish of still serving at new International Airport at La Mercy. On 14 th January 2010 the 1 st Basic End User Trial started which involved the participation of key stakeholders such as airlines, ground handlers and ACSA. This program will test the various components of airport operations including flight data, passenger handling, check in and boarding processes, hold baggage screening, etc. This is another major milestone that the ORAT team can be proud when on 15 th December 2009 the South African Civil Aviation Authority successfully conducted calibration tests on the runway lighting and navigational aids. It was an emotive moment to watch test flight flying over the new airport to conduct that test. The collaborative approach of various stakeholders, including the building contractor, Air Traffic Navigation Services, ACSA ORAT Team, The navigation aids installer (SAAB) was a testament to how important it is that important milestones are met in order for the airport to be ready and licensed timeoulsy in order for all aeronautical data to be published on time. Once the new airport is fully operational by May 2010, the current airport will be decommissioned as an airport and all aviation business will then be relocated and conducted at the new airport. Which basically means that all scheduled aircraft; 6

domestic and international will be operating from the new airport from 1 st 2010. May The current airport once decommissioned as an airport and is being planned to be disposed of which will be decided by a task team that consists of ACSA, Dti, National/Provincial Government and ethekwini Municipality. 7