Dublin Airport Update Presented by Pat Molloy

Similar documents
Update Presented by Siobhan O Donnell. 27 th July 2017

Dublin Airport Update Presented by Pat Molloy

Minutes. St. Margaret s Community Liaison Group

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport

Completion of concrete runways. Passenger numbers reach 200,000 per year. Passenger numbers. Celebrates 50th birthday.

Measuring, Managing and Mitigating Aircraft Related Noise

No. Item Responsible 1. Siobhan O Donnell went through the daa update.

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The Strategic Commercial and Procurement Manager

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

Concord Road Interchange. Standard hours of work

Dublin Airport - Noise Management Plan

Noise Action Plan Summary

Sustainable Procurement Policy for Heathrow Airport Limited

8 OAMARU AIRPORT ZONE

Government consultations : Airports National Policy Statement, UK Airspace Policy, Night Flights

IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax

LAPFORD PARISH COUNCIL

A Master Plan is one of the most important documents that can be prepared by an Airport.

Community Noise Consortium Meeting (CNC)

CA AUGUST 2018 Page 1 of 5

Powys Local Development Plan. Position Statement - Gypsy and Traveller Accommodation. Incorporating an action statement and implications for the LDP

Southwest Scotland Transport Mitigation Forum. 5 May 2015 Dumfries Arms Hotel, Cumnock

Airport Master Plan Update June 15, 2017

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

Section 1 approximately 90 metre section of road on the R610 from Toureen House to Passage West Library Road Closure of 4 weeks.

D L R C C T R A F F I C N E W S

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

REVALIDATION AND VALIDATION: PROCESSES AND PROCEDURES

AERODROME LICENCE APPLICATION PROCESS

Heathrow Consultation January March 2018

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board,

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

Connecting People Building Opportunities BRISBANE AIRPORT 2014 MASTER PLAN

TOWN OF PORT HEDLAND INNOVATE RECONCILIATION ACTION PLAN

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC)

Community Meeting for the Planned Ground Run-Up Enclosure. June 28, 2016

Notification to Suppliers

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Runway Crossings at Brisbane International Airport

Airport Master Plan Update June 15, 2017

Why are the underground fuel tanks being removed and replaced with above ground tanks?

EXPLANATORY STATEMENT

CHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN. 28 March 2014 V10

JANDAKOT AIRPORT HERITAGE MANAGEMENT PLAN

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

Skellig Michael Action Plan Appendix 2 Position as of January Objective: Action: Complete: In Progress: Not yet Commenced

Industry briefing NOVEMBER 2017

Air Operator Certification

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION

ORANGE AIRPORT METHOD OF WORKING PLAN. Orange Airport

ATTACHMENT A. P a g e 6 I t e m #

Response to the London Heathrow Airport Expansion Public Consultation

Appendix A COMMUNICATION BEST PRACTICES

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

INNOVATE RECONCILIATION ACTION PLAN

D L R C C T R A F F I C N E W S

Communication and consultation protocol

2009 Sustainability performance summary. Towards a sustainable Heathrow

The minutes from the previous meeting were signed-off by the Group.

SUPPLY AND OPERATE AMUSEMENTS AND RIDES IN THE FAMILY ZONE PRECINCT TAMWORTH COUNTRY MUSIC FESTIVAL. Friday, 20 January Sunday, 29 January 2017

Monaghan County Council Jobs Initiative Smarter Travel Projects 2011 Evaluation

Miontuairiscí / Meeting Minutes. Trim Municipal District. Ordinary Meeting

LIST OF APPLICATIONS DETERMINED UNDER DELEGATED POWERS. Period for Report: 5 March August 2016

In your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is

Terms of Reference. Canberra Airport Community Aviation Consultation Group

Major Scheme Business Case Summary Report for Programme Entry

SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES DURATION 6 MONTHS

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Day and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation

Cirque du Soleil. Feedback on a proposed 10 year agreement. The Adelaide City Council invites engagement from the community about.

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

ADVISORY CIRCULAR ON LAND USE AND ENVIRONMENTAL MANAGEMENT IN THE VICINITY OF AERODROMES

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

Dookie and District Action Plan

Ground Vehicle Operations Training READING REGIONAL AIRPORT

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Passenger Rights Complaints in 2015

Guidance material for land use at or near aerodromes

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Construction Staging Area Blue Jays Way (357 King Street West)

Abbey Chesterton bridge Questions & Answers

D L R C C T R A F F I C N E W S

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

02 Legal Requirements

Transcription:

Dublin Airport Update Presented by Pat Molloy

daa Actions from Previous Meetings Action Item Summary 1. PM to confirm the type of fencing that will be erected around the Toberburr road site 2. daa and RF to organise a separate meeting on fencing, farming and security 3. daa to continue engagement with local residents on the issue of drainage A separate site meeting was held with daa and Raymond Fox to discuss boundary fencing and discussions are continuing. The final fence type at the Toberburr road works will be same as that at the new Naul road - timber post and rail fencing as approved by Fingal County Council daa facilitated a separate meeting with Raymond Fox and Brendan O Donoghue on 16 th February 2017 which included a site visit. Items discussed included fencing and security. Additional meetings with both parties were also arranged to further discuss individual queries and various concerns have been addressed or are currently being addressed daa held a meeting with the residents of Dunbro Lane on the issue of drainage on 1st February 2017. A presentation was made by North Runway s Environmental Project Manager and by Aecom s Project Manager & Safety Lead. A further drainage meeting was held with Brendan and Vincent O Donoghue to explain the drainage scheme and concerns were addressed 4. PM to investigate timeframe for installation of water main 5. SOD to advise when report on Second Public Consultation will become available The timeframe for the installation of the replacement 36 water main is unknown to daa as it is an Irish Water capital project. Therefore, it is advised that Irish Water are contacted directly for further information on this matter The reports relating to the Consultation on Flight Paths and Change to Permitted Operations are available on the North Runway website for viewing and download under the Change to Permitted Operations webpage 6. SOD to investigate when DAEWG Minutes will be uploaded to Dublin Airport website The DAEWG Minutes are available on the Dublin Airport website for viewing and download under the Community Engagement webpage 7. PM to investigate effects of aircraft noise and emissions on animal welfare The impact of airport operations on animal welfare is currently being investigated as part of the Environmental Impact Statement (EIS) associated with the Proposed Change to Permitted Operations 8. PM to check when a temporary noise monitor can be placed at Newtown Cottages We have committed to revisiting those dwellings that were previously insulated, including Newtown Cottages. We are currently preparing to engage in a tender process for the Insulation Scheme. Also, as part of the EIS associated with the Proposed Change to Permitted Operations, noise monitoring took place a short distance away in Dunsoughly, the results of which will be 2 made available in the EIS

daa Actions from Previous Meetings Action Item 9. SOD to check if noise expert could be provided for St Margaret s The Ward Residents Group AGM 10. daa to continue investigation into longitudinal sections of aircraft height information 11. PM to check if 2012 noise contours are available 12. PM to clarify why the threshold setting for noise monitors is 66dB Summary daa are happy to provide an expert to present general information on noise and noise metrics. We are currently awaiting the date of the AGM from St. Margaret s The Ward Residents Group To be discussed Noise contour maps were produced in 2011 and were published in October 2012. These maps are available on the Dublin Airport website for viewing and download under the Community Affairs webpage daa s acoustic specialists, Bickerdike Allen Partners, will address this query at this evenings CLG meeting 13. PM to confirm Irish Water timelines for connection to new water line 14. daa to advise location and dates of insulation meeting 15. SOD to provide update on resurfacing project of existing runway An application for this service will need to be made through Irish Water. The timeline for applications is approximately three months however further clarification can be sought from Irish Water All eligible residents were advised of the insulation information meeting which took place on 15 th February 2017. A phone call was also placed to Deirdre Kennedy in response to this request providing the date and location of the meeting An update on the Runway 10/28 Overlay Project is provided within this presentation 16. PM to investigate employment opportunities for local residents during construction Any local resident wishing to apply for employment on the North Runway Construction Package 1 element of the project can do so by contacting Roadbridge directly on 045 440000 at www.roadbridge.ie. Further information on our Local Employment Initiative relating to the main construction package is provided within this presentation 3

North Runway Update

Construction Package 1 - Progress Ongoing implementation of the Construction Environmental Management Plan daa Ornithologist working with contractor and Airport Fire Department to manage the bird hazard risk Over 5km of temporary site security fencing and 1.4km of post and rail fencing erected Construction Package 2 compound fence substantially complete Road construction ongoing at the New Naul Road, Toberburr Road and Forrest Little Road All hedges and trees have been felled and the required mulching works completed Wood Initiative A community initiative has been implemented whereby 1m³ bags of wood will be made available free of charge to 50 of our neighbours The firewood deliveries will take place between 15 th and 26 th May Interested parties should contact the North Runway team on Freephone 1800 804422 or email northrunway@daa.ie by 12 noon on Friday, 5 th May, confirming their name, contact number, postal address and eircode If there are more than 50 applicants, names will be drawn at random from the responses received. 5

Construction Package 1 Update Upcoming Works Irish Water works Archaeological site investigations - remaining 3 (of 11) New Naul Road, Toberburr Road and Forrest Little Road Construction works Drainage works to continue ESB Networks 10kV overhead lines to be diverted / undergrounded Utility and water main construction works to commence in May As work progresses, it is important to note that this is a live work site; to ensure the safety of staff and the general public, no unauthorised persons may enter the site at any time Waste Discovery of a soft spot of earth beside Forrest Road which contained bags of waste Excavation was stopped in that area and was immediately backfilled with soil in line with recommended procedures Specialist environmental consultants were called to carry out a risk assessment of the site; this work is ongoing We are liaising with the relevant authorities on the matter and have advised those residents in the vicinity of the find 6

Construction Package 1 Roadworks Dunbro Lane Temporary closure of part of Dunbro Lane necessary in order to carry out works associated with the new R108 diversion road linking to the L3132. Temporary bypass is being constructed Proposed closure for a period of two days on 16 th and 17 th May 2017 (pending approval from Fingal County Council) Access to all properties will be maintained from the eastern end of Dunbro Lane, and all necessary traffic management measures will be in place There are multiple existing locations on Dunbro Lane which can be used to pull-in, including entrances and field gates, and these locations will be swept, as required Temporary bypass will be in operation from 18 th May and will remain in place until the new Naul Road and signalised junction on St. Margaret s Bypass is opened to traffic c. August 2017 and will entail: Flashing amber traffic lights at either end of the works on Dunbro Lane to warn road users to proceed with caution through the works site Flagmen operating a Heavy Plant Crossing at the works site for the duration of the works Copies of the Traffic Management Plan are available to CLG members Other As per normal procedure, CLG members and local resident groups will continue to be informed of upcoming traffic management measures. The following is an outline of proposed works and approximate timelines (note: may be subject to change): Naul Road: Shuttle Works / Ducting Works - Early May St. Margaret s Bypass: Proposed weekend closure for new services crossing the road Mid May St. Margaret s Bypass: Proposed weekend closure for new services crossing the road Early June Toberburr Road: Closure for tie-ins - July Forrest Little Road: Shuttles for tie-ins - July 7

Construction Package 1 Statistics We want to minimise the impact of construction activities on our neighbours daa and Roadbridge have been closely monitoring construction activities over the past few months We have collated a number of statistics related to activities which took place between December 2016 and March 2017 We are complying with all controls and procedures as per the Environmental Protection Plan which has been approved by Fingal County Council, in order to minimise impacts of construction Activity Average number of staff (on site per working week) 49 Total number of staff inducted 184 Total hours worked 30,785 Night and out-of-hours works 0 Deliveries to site (from external material suppliers) 1,521 Road sweeping (number of times sweepers cleaned roads) 106 Ornithologist's site inspections 6 Bat specialist's site inspections 5 Archaeologists average number on site per week 17 8

Construction Package 2 - Local Employment Initiative Dublin Airport is the biggest employer in Fingal, supporting 16,000 direct jobs. The development of North Runway will facilitate the creation of over 31,000 jobs by 2037, with 7,000 of these created by 2023, and 1,200 created during the main construction of the runway. daa wants to further promote employment opportunities for local residents during construction. We have consulted with developers of other large-scale infrastructure projects regarding achievements and limitations of their employment initiatives. We are in discussions to develop the initiative in partnership with a local employment group which represents the entire Fingal area; their services focus broadly on social inclusion initiatives, including support to the unemployed, particularly those on the long-term live register. Given the specialist nature of North Runway, a portion of the workforce will be highly-skilled craft personnel sourced through established Irish and international channels. Other employment opportunities will be available in the fields of site support services, administration, security, cleaning, etc. Because of EU employment legislation, daa cannot compel any contractor to recruit specific individuals, but we will take steps to ensure the CP2 main contractor engages fully with our Local Employment Initiative. Available opportunities will be advised to our local employment group who will match these vacancies to suitably qualified individuals on the live register and put forward nominees for consideration by the main contractor. We will also request that the main contractor implement an apprenticeship scheme, if one does not already exist. Where possible, we will seek to implement the Local Employment Initiative on other contracts such as the noise insulation schemes. 9

Runway 10/28 Overlay

Rwy 10/28 Overlay and Associated Taxiways Works currently progressing on Taxiway B7. Works include overlay, drainage works and electrical upgrades to taxiways Advance works and survey works ongoing on Runway 10/28. Overlay works and electrical upgrade on Runway scheduled to commence mid-may Project scheduled to be complete April 2018 21 work shifts impacted due to weather events (fog/winds) which have prevented closure of Runway 10/28 or shortened work shift Statistics 12,000 tonnes of asphalt laid on the project to date 85 electrical pits installed 800m of 8 way ducting 16-34 Movements January 4 th April 14 th 2017 Total 16-34 Movements 1,317 16 Movements 1,037 34 Movements 280 11

END