ISSUE SUMMARY: FUNCTIONAL CLASSIFICATION NETWORK UPDATE FOR PRINCIPAL ARTERIALS

Similar documents
O.C.G.A GEORGIA CODE Copyright 2014 by The State of Georgia All rights reserved. *** Current Through the 2014 Regular Session ***

ISSUE SUMMARY: FUNCTIONAL CLASSIFICATION NETWORK UPDATE /2015 COMPREHENSIVE REVIEW - PHASE 2

FY TIP Administrative Modifications 1st Quarter of 2013 (Processed March 15, 2013)

Final Project Funding Recommendations (2012 Solicitation Cycle)

CONTACT INFORMATION - APPENDIX A

MARTA SERVICE CHANGES

Revised January 9, 2019 Metropolitan Atlanta Rapid Transit Authority Proposed Bus Service Modifications for April 13, 2019

Annual Listing of Projects with Federal Funding Obligated for Federal Fiscal Year 2016

American Job Center Finder

Wednesday, January 10 6:30-8:00 p.m. Adamsville Rec Center 3201 MLK Jr. Drive SW Atlanta, GA 30311

Gwinnett County, Georgia Department of Planning & Development

Route 2 - Ponce de Leon Ave/Druid Hills. Route 3 - Martin Luther King Jr Dr/Auburn Ave

1.2 Corridor History and Current Characteristics

Plan 2040 Mini-Retreat Supplemental Material

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Assessment of Travel Trends

Development Cases Received

YOGA STUDIOS OF METRO ATLANTA (alphabetical)

I-75 in Hamilton County Project Termini

A RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EL PASO THAT:

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

The First State Bank 4806 N. Henry Blvd. Stockbridge, GA (770)

Thursday, November 1, :30 P.M. Bear Creek Senior/Recreation Center, 54 McDonough Street, Hampton, Georgia. Meeting Agenda (See Attached Agenda)

Housing Market Update U.S. and Southeast Federal Reserve Bank of Atlanta February 24, 2011

GAA Membership List Airport Members 6/17

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

ATLANTA HAWKS 2015 INSTANT WIN TICKET SWEEPSTAKES OFFICIAL RULES

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

NEVADA DEPARTMENT OF TRANSPORTATION

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

ROTARY CLUB OF ALBANY #4104 chartered March 1, 1917 Sponsored by the Rotary Club of Macon

Professional Providers Near You

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

(Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties)

Lake Erie Commerce Center Traffic Analysis

PROGRESS PARK CONNECTOR

LIHTC Properties in Georgia's 13th District. LIHTC (1997 to. Through 2016

Puerto Ricans in Georgia, the United States, and Puerto Rico, 2014

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

ATLANTA HAWKS 2016 FLY AWAY SWEEPSTAKES OFFICIAL RULES

The Transportation Corridor Overlay District

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

CHAPTER 6 NOISE EXPOSURE

Vehicle mileage by county

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

Existing Conditions GRTA Xpress

Action Recommendation: Budget Impact:

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE

LPA Location Federal Funds Awarded to LPA. Fairfield Avenue, SR 101 and Oxford Pike

STATE ROUTE CHANGE DESCRIPTION USRN DECISION IOWA

TBARTA: 2015 Master Plan and Tampa Bay Express Project

State Route 189 Project and Draft Resolution of Support. November 2014

PUBLIC INFORMATION SESSION #2

LIHTC Properties in Georgia's 13th District Satellit. LIHTC Source: e LIHTC. (David Scott - D) Through 2015

TRANSPORTATION ELEMENT

Basic Project Information

CENTURY SPRINGS EAST AND WEST LAKE FOREST DRIVE, ATLANTA, GA 30328

Special Committee on U. S. Route Numbering

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia

Resolution No.: Introduced: July 24, 2018 Adopted: July 24, 2018

Nashua Regional Planning Commission

Pedestrian Safety Review Spadina Avenue

Special Committee on U. S. Route Numbering

Hartsfield Jackson Update prepared for:

Horizon 1 Implementation Update

Driving Directions from Emory Midtown to Places of Interest

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

October 16, 2015 NEWS REPORT NO. 5137

Development Cases Issued/Approved

CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet

EXCEPTIONAL ATLANTA. Located in Buckhead, an affluent and thriving community of Atlanta, Georgia, Lenox Square

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

SPLOST I - PROJECT LIST

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

GAA Membership List Airport Members 8/8/2016

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

EXCEPTIONAL ATLANTA. Located in Buckhead, an affluent and thriving community of Atlanta, Georgia, Lenox Square

WELCOME US 83 Public Meeting

Non-Motorized Transportation

5.1 Traffic and Transportation

1.0 PURPOSE OF AND NEED FOR ACTION

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

Corridor Management Committee Meeting. April 2, 2014

I-70/I-71 Project Public Meeting Presented By

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor

11B. PUBLIC HEARING SECONDARY & UNPAVED ROAD CONSTRUCTION BUDGET PRIORITY LIST- SECONDARY AND UNPAVED ROADS

Unique Retail Opportunity in Downtown Atlanta Introductory Information Package. Revised: 8/5/13

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

University Region Non-Motorized Plan 2015

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

COVINGTON COUNTY Century 4 89 Gonzalez 10 Pensacola INTERSTATE De Funiak Springs INTERSTATE Chipley Escambia Bay

V. DATA COLLECTION PROGRAM

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT

MARTA & City of Atlanta Sales Tax Referendums. Public Hearings May 25 & 26, 2016 June 1 & 2, 2016

Transcription:

Draft for approval by TCC on 8/8; TAQC on 8/14 and ARC on 8/27/14 DATE: August 27, 2014 ISSUE SUMMARY: FUNCTIONAL CLASSIFICATION NETWORK UPDATE FOR PRINCIPAL ARTERIALS FROM: Tom Worthan, TAQC Chairman IMPORTANCE: Following each Census, functional classifications of roadways must be reviewed in each state. MPOs assist in this review. Functional classification determines eligibility for certain federal funding programs. Once the review is completed, any proposed changes must be approved by the Federal Highway Administration. Each state is provided a limited amount of mileage that can be allocated to this federal aid system. Based on the Urban Area Boundary adopted by ARC in January 2013 and approved by FHWA in October 2013, ARC and GDOT began a comprehensive review and update of the Highway System for the 18 county MPO area. Numerous meetings were conducted with local governments to identify proposed changes, of which approximately 1,000 were compiled by June 2014. ARC is initially focusing on Principal Arterials 1 which are described by FHWA in urban areas as being those which serve the major centers of activity of a metropolitan area, the highest traffic volume corridors, and the longest trip desires; and should carry a high proportion of the total urban area travel on a minimum of mileage. Principal Arterials consist of three functional classifications: 1) Interstates, 2) Other Freeways and Expressways, and 3) Other Principal Arterials (lacking access control). In July 2012, MAP-21 incorporated all Principal Arterials into the National Highway System (NHS) and in October 2013 (FFY 2013), FHWA and GDOT preliminarily identified all such facilities statewide for inclusion in the NHS. 2 It should be noted that functional classification changes can be made at any time through the regular MPO process. Therefore, any action taken during this comprehensive decennial review process can be reconsidered, if necessary and appropriate, following a request submitted by GDOT and/or a local government to ARC. ACTION REQUIRED: Adoption of the attached functional classification changes for the Principal Arterial network within the Atlanta UAB. 1 s involving Minor Arterials, Major Collectors, Minor Collectors and Local Streets will be considered for action in late 2014/early 2015. 2 Following FHWA approval of this 2014 action, the NHS would be updated if necessary.

Draft for approval by TCC on 8/8; TAQC on 8/14 and ARC on 8/27/14 A RESOLUTION BY THE ATLANTA REGIONAL COMMISSION ADOPTING UPDATES TO PRINCIPAL ARTERIALS FOR THE ATLANTA HIGHWAY FUNCTIONAL CLASSIFICATION SYSTEM WHEREAS, the Atlanta Regional Commission is the designated Metropolitan Planning Organization (MPO) for transportation planning within the Atlanta Metropolitan Area Boundary which currently includes all or portions of 18 counties; and WHEREAS, in March 2012, the US Census Bureau designated a twenty-three county Atlanta Urban Area based on results of the 2010 Census, and WHEREAS, in January 2013, the Atlanta Regional Commission did adopt an Urban Area Boundary based on this new Atlanta Urban Area designation, which is a boundary used as the demarcation of routes on the Federal-aid highway system for designation as either rural or urban and to define the limits of the Highway System pursuant to 23 CFR 470.105(a) and (b), and WHEREAS, on October 11, 2013, the Federal Highway Administration did approve the Urban Area Boundary for Atlanta, and WHEREAS, the Georgia Department of Transportation, in cooperation with the Atlanta Regional Commission and local governments within the 18 county area, has conducted a comprehensive review of the Principal Arterial network of the Atlanta Highway System based on the updated Atlanta Urban Area Boundary, and WHEREAS, recommended changes are proposed for the Principal Arterial network for the 18 county region s Highway System, as detailed in the attached Table 1, and WHEREAS, the changes outlined in Table 1 collectively result in a revised Principal Arterial network, as mapped in Figure 1, and WHEREAS, the Georgia Department of Transportation has indicated its intention that the National Highway System for Georgia be updated through separate action at a later date to align that system with the new Principal Arterial network, and WHEREAS, additional changes to the Atlanta Highway System for Minor Arterials, Major Collectors, Minor Collectors and Local Streets are still under review and will be presented for separate action at a later date, NOW, THEREFORE, BE IT RESOLVED that the Atlanta Regional Commission adopts the updated Principal Arterial network of the Atlanta Highway System for the 18 county area.

"Other Principal Arterial" being upgraded to "Other Freeway & Expressway" 2014 001 1076 Gwinnett GA 316 3 2 SR 120 (Duluth Highway) SR 20 / SR 124 (Buford Drive) reflects current work to grade separate intersections along this section of SR 316; section east of SR 20 / SR 124 will remain classified as an "Other Principal Arterial" "Other Principal Arterial" being downgraded to "Minor Arterial" 2014 002 122 Cobb Mars Hill Rd 3 4 SR 120 (Dallas Highway) Immediately south of US 41 (Cobb Parkway) s 2014 002, 2014 003 and 2014 004 are contiguous along a 2014 003 121 Cobb Mars Hill Rd 3 4 Immediately south of US 41 (Cobb Parkway) Immediately north of US 41 (Cobb Parkway) s 2014 002, 2014 003 and 2014 004 are contiguous along a 2014 004 120 Cobb Mars Hill Road / Kemp Ridge Road 3 4 Immediately north of US 41 (Cobb Parkway) SR 92 (Lake Acworth Drive) s 2014 002, 2014 003 and 2014 004 are contiguous along a 2014 005 118 Cobb SR 92 (Lake Acworth Drive / Cowan Road) 3 4 US 41 (Cobb Parkway) I 75 southbound exit/entrance Segment comprises portions of two roadways 2014 006 126 Coweta US 29 3 4 Coweta County / Fulton County line (near Tommy Lee Cook Road) SR 34 Bypass (Millard Farmer Industrial Boulevard) 2014 007 160 DeKalb Ashford Dunwoody Road 3 4 I 285 Immediately south of I 285 s 2014 007, 2014 008, 2014 009, 2014 010 and 2014 011 are contiguous along a 2014 008 159 DeKalb Ashford Dunwoody Road 3 4 Immediately south of I 285 Nancy Creek Drive s 2014 007, 2014 008, 2014 009, 2014 010 and 2014 011 are contiguous along a 2014 009 158 DeKalb Ashford Dunwoody Road 3 4 Nancy Creek Drive Harts Mill Road s 2014 007, 2014 008, 2014 009, 2014 010 and 2014 011 are contiguous along a 2014 010 157 DeKalb Ashford Dunwoody Road / Johnson Ferry Road 3 4 Harts Mill Road Chamblee City (near 2014 011 156 DeKalb Johnson Ferry Road 3 4 Keswick Drive) Chamblee City (near Keswick Drive) SR 141 (Peachtree Boulevard) Segment comprises portions of two roadways; changes 2014 007, 2014 008, 2014 009, 2014 010 and 2014 011 are contiguous along a s 2014 007, 2014 008, 2014 009, 2014 010 and 2014 011 are contiguous along a Page 1 of 8

2014 012 155 DeKalb SR 13 (Buford Highway) 3 4 I 285 2014 013 161 Fayette SR 74 (Joel Cowan Parkway) 3 4 SR 54 (Lanier Avenue) DeKalb County / Gwinnett County line (near Johnson Drive) Fayette County / Coweta County line (Line Creek) A portion of this segment at the southern end also carries the SR 85 designation 2014 014 700 Gwinnett Peachtree Industrial Boulevard 3 4 SR 20 (Nelson Brogdon Boulevard / Cumming Highway) Gwinnett County / Hall County line (near Cemetery Road) 2014 015 459 Henry SR 81 3 4 US 19 / US 41 SR 20 (Hampton Road) 2014 016 139 Newton West Street 3 4 SR 81 (Washington Street) SR 81 (Emory Street) 2014 017 516 Newton SR 142 (Industrial Park Boulevard) 3 4 I 20 westbound exit/entrance Flat Rock Road 2014 018 144 Newton US 278 3 4 I 20 Elks Club Road 2014 019 132 Spalding US 41 3 4 US 19 / SR 155 (Zebulon Road) Spalding County / Pike County line (at County Line Road) 2014 020 131 Spalding SR 155 (Zebulon Road / Hill Street) 3 4 US 19 / US 41 SR 16 (Taylor Street) 2014 021 130 Spalding SR 92 (McIntosh Road) 3 4 Cowan Road US 19 / US 41 2014 022 975 Walton SR 10 / US 78 Business (Spring Street) 3 4 "Minor Arterial" being upgraded to "Other Principal Arterial" SR 138 (Martin Luther King, Jr. Boulevard) US 78 exit/entrance (east of Monroe) 2014 023 1023 Clayton McDonough Road 4 3 Clayton County / Henry County line (near Babbs Mill Road) Clayton County / Fayette County line (Morning Creek) s 2014 023, 2014 040 and 2014 053 are contiguous along a 2014 024 1012 Cobb SR 92 (Dallas Acworth Highway) 4 3 Cobb County / Paulding County line (near Pickets Mill Place) US 41 (Cobb Parkway) s 2014 024, 2014 025, 2014 037, 2014 057, and 2014 058 are contiguous along a Page 2 of 8

2014 025 1008 Cobb SR 92 (Hiram Acworth Highway) 4 3 Cobb County / Paulding County line (near Due West Road) Cobb County / Paulding County line (near Meryton Park) s 2014 024, 2014 025, 2014 037, 2014 057, and 2014 058 are contiguous along a 2014 026 117 Cobb US 41 (Cobb Parkway) 4 3 Circle 75 Parkway / Spring Road Cobb County / Bartow County line (near Third Army Road) 2014 027 1074 Coweta SR 34 (Franklin Road) 4 3 Coweta County / Heard County line (near Joe Stephens Road) Thigpen Road / Pete Davis Road 2014 028 128 Coweta SR 34 (Bullsboro Drive) 4 3 US 29 (Jefferson Street) SR 54 I 85 northound exit/entrance 2014 029 127 Coweta US 29 4 3 SR 16 SR 34 Bypass (Millard Farmer 2014 030 1075 Coweta SR 34 (Franklin Road) 4 3 Thigpen Road / Pete Davis Road Industrial Boulevard) Coweta County / Fayette County 2014 031 129 Coweta SR 34 / SR 54 4 3 SR 34 (Bullsboro Drive) line (Line Creek) DeKalb County / Gwinnett County line (near Sandpiper 2014 032 356 DeKalb US 29 (Lawrenceville Highway) 4 3 US 78 (Stone Mountain Freeway) Drive) 2014 033 355 DeKalb SR 42 (North Druid Hills Road) 4 3 SR 13 (Buford Highway) SR 42 (Briarcliff Road) s 2014 027 and 2014 030 are contiguous along a s 2014 028 and 2014 031 are contiguous along a s 2014 027 and 2014 030 are contiguous along a s 2014 028 and 2014 031 are contiguous along a s 2014 032 and 2014 050 are contiguous along a s 2014 033 and 2014 034 are contiguous along a 2014 034 352 DeKalb North Druid Hill Road 4 3 SR 42 (Briarcliff Road) 2014 035 203 DeKalb US 23 (Moreland Avenue) 4 3 Fayetteville Road / Bailey Street US 78 (Stone Mountain Freeway) s 2014 033 and 2014 034 are contiguous along a eastbound entrance ramp I 285 eastbound exit/entrance s 2014 035 and 2014 045 are contiguous along a Page 3 of 8

2014 036 150 DeKalb SR 10 (Memorial Drive) 4 3 I 285 southbound exit/entrance US 78 (Stone Mountain Freeway) exit/entrance 2014 037 881 Douglas SR 92 (Dallas Highway) 4 3 SR 92 realignment (FUTURE near Brown Street) Douglas County / Paulding County line (near Gothards Creek) Southern limit reflects current construction of a realignment of SR 92 around Douglasville; new alignment will also be classified as an "Other Principal Arterial" once completed to create a continuous corridor; changes 2014 024, 2014 025, 2014 037, 2014 057, and 2014 058 are contiguous along a 2014 038 879 Douglas SR 92 (Fairburn Road) 4 3 2014 039A 880 Douglas SR 92 / SR 154 / SR 166 4 3 SR 154 / SR 166 SR 92 realignment (FUTURE near Hospital Drive) SR 154 / SR 166 Douglas County / Fulton County Northern limit reflects current construction of a realignment of SR 92 around Douglasville; new alignment will also be classified as an "Other Principal Arterial" once completed to create a continuous corridor; changes 2014 038, 2014 039A, 2014 043, 2014 044 and 2014 048 are contiguous along a s 2014 038, 2014 039A, 2014 043, 2014 044 and 2014 048 are contiguous along a ; changes 2014 039A and 2014 039B were submitted jointly under one GitHub request, but are split apart in this table for clarity 2014 039B 880 Douglas SR 154 / SR 166 4 3 SR 92 (Fairburn Road) Douglas County / Fulton County s 2014 039B, 2014 042 and 2014 047 are contiguous along a ; changes 2014 039A and 2014 039B were submitted jointly under one GitHub request, but are split apart in this table for clarity; Page 4 of 8

Fayette County / Clayton County s 2014 023, 2014 040 and 2014 053 are contiguous 2014 040 1073 Fayette McDonough Road 4 3 SR 54 (Lanier Avenue) line (Morning Creek) along a 2014 041 151 Forsyth SR 141 (Peachtree Parkway) 4 3 2014 042 1021 Fulton 2014 043 1010 Fulton 2014 044 1009 Fulton SR 154 / SR 166 (Campbellton Road) 4 3 SR 138 (Beverly Engram Parkway) 4 3 SR 92 (Campbellton Fairburn Road) / SR 138 (Beverly Engram Parkway) 4 3 Forsyth County / Fulton County line (McGinnis Ferry Road) SR 70 (Fulton Industrial Boulevard / Cascade Palmetto Highway) US 29 (Roosevelt Highway / Broad Street) SR 70 (Cascade Palmetto Highway) 2014 045 154 Fulton US 23 (Moreland Avenue) 4 3 Fayetteville Road / Bailey Street SR 400 southbound exit/entrance I 285 southbound exit/entrance I 85 southboundr exit/entrance US 29 (Roosevelt Highway / Broad Street) US 23 / US 29 / US 78 / US 278 (Ponce de Leon Avenue) s 2014 041, 2014 046 and 2014 049 are contiguous along a s 2014 039B, 2014 042 and 2014 047 are contiguous along a s 2014 038, 2014 039A, 2014 043, 2014 044 and 2014 048 are contiguous along a s 2014 038, 2014 039A, 2014 043, 2014 044 and 2014 048 are contiguous along a ; segment comprises portions of two roadways; s 2014 035 and 2014 045 are contiguous along a 2014 046 152 Fulton SR 141 (Medlock Bridge Road) 4 3 2014 047 1022 Fulton SR 154 / SR 166 (Campbellton Road) 4 3 Fulton County / Gwinnett County Fulton County / Douglas County Fulton County / Forsyth County line (McGinnis Ferry Road) SR 70 (Fulton Industrial Boulevard / Cascade Palmetto Highway) s 2014 041, 2014 046 and 2014 049 are contiguous along a s 2014 039B, 2014 042 and 2014 047 are contiguous along a 2014 048 1015 Fulton SR 92 / SR 154 4 3 Fulton County / Douglas County SR 70 (Cascade Palmetto Highway) s 2014 038, 2014 039A, 2014 039B, 2014 043, 2014 044 and 2014 048 are contiguous along a 2014 049 153 Gwinnett SR 141 (Peachtree Parkway) 4 3 SR 141 (Peachtree Industrial Boulevard) Gwinnett County / Fulton County s 2014 041, 2014 046 and 2014 049 are contiguous along a Page 5 of 8

Gwinnett County / DeKalb County line (near Sandpiper s 2014 032 and 2014 050 are contiguous along a 2014 050 1007 Gwinnett US 29 (Lawrenceville Highway) 4 3 Drive) Jimmy Carter Boulevard s 2014 051A and 2014 051B are contiguous along a ; changes 2014 051A and 2014 051B were submitted jointly under one GitHub request, but are split 2014 051A 149 Gwinnett Sugarloaf Parkway 4 3 Peachtree Industrial Boulevard SR 20 (Grayson Highway) apart in this table for clarity 2014 052A 566 Henry SR 20 (Keys Ferry Street) 4 3 US 23 / SR 42 southbound (Atlanta Street / Griffin Street) SR 155 (Zack Hinton Parkway) s 2014 052A and 2014 052B complete the principal arterial connection along the one way pair through downtown McDonough; changes 2014 052A and 2014 052B were submitted jointly under one GitHub request, but are split apart in this table for clarity 2014 052B 566 Henry 2014 053 556 Henry SR 20 (John Frank Ward Boulevard) 4 3 SR 155 (Sims Street) Jonesboro Road / Jonesboro Henry County / Clayton County Street 4 3 line US 23 / SR 42 southbound (Atlanta Street / Griffin Street) US 23 / SR 42 (Atlanta Street) 2014 054 549 Henry SR 20 (McDonough Hampton Road) 4 3 US 19 / US 41 Dorsey Road Newton County / Henry County Dr. Martin Luther King, Jr. 2014 055 1028 Newton SR 81 4 3 line (South River) Avenue (Covington Bypass) s 2014 052A and 2014 052B complete the principal arterial connection along the one way pair through downtown McDonough; changes 2014 052A and 2014 052B were submitted jointly under one GitHub request, but are split apart in this table for clarity s 2014 023, 2014 040 and 2014 053 are contiguous along a s 2014 054 and 2014 069 are contiguous along a ; segment along a short piece of Richard Petty Boulevard at the western end of the corridor to complete the connection to US 19 / US 41 Page 6 of 8

Newton County / Rockdale Newton County / Walton County s 2014 056, 2014 059, 2014 060, 2014 066 and 2014 056 523 Newton SR 138 4 3 County line line 2014 067 are contiguous along a Segment comprises portions of two roadways; changes SR 92 (Dallas Acworth Highway Paulding County / Cobb County 2014 024, 2014 025, 2014 037, 2014 057, and 2014 058 2014 057 331 Paulding / Hiram Acworth Highway) 4 3 line (near Pickets Mill Place) are contiguous along a 2014 058 328 Paulding SR 92 (Hiram Acworth Highway / Hiram Douglasville Highway) 4 3 2014 059 141 Rockdale SR 138 4 3 Paulding County / Cobb County line (near Due West Road) Paulding County / Douglas County line (near Gothards Creek) I 20 eastbound exit/entrance 2014 060 420 Rockdale SR 138 4 3 Sigman Road US 19 / US 41 southbound 2014 061 632 Spalding SR 16 (Taylor Street) 4 3 exit/entrance SR 16 (Arthur K. Bolton 2014 062 134 Spalding Parkway) 4 3 McDonough Road 2014 063 133 Spalding Paulding County / Cobb County line (near Meryton Park) Sigman Road Rockdale County / Newton County line Hammond Drive Spalding County / Butts County line SR 16 (Arthur K. Bolton Parkway) 4 3 Barrow Road McDonough Road s 2014 024, 2014 025, 2014 037, 2014 057, and 2014 058 are contiguous along a s 2014 056, 2014 059, 2014 060, 2014 066 and 2014 067 are contiguous along a s 2014 056, 2014 059, 2014 060, 2014 066 and 2014 067 are contiguous along a s 2014 062 and 2014 063 are contiguous along a s 2014 062 and 2014 063 are contiguous along a Walton County / Oconee County s 2014 064 and 2014 065 are contiguous along a 2014 064 1078 Walton US 78 (Athens Highway) 4 3 Mt. Vernon Road line (Apalachee River) 2014 065 1077 Walton US 78 (Athens Highway) 4 3 Vicinity of Edmondson Road Mt. Vernon Road US 78 exit/entrance (west s 2014 056, 2014 059, 2014 060, 2014 066 and 2014 066 1030 Walton SR 138 4 3 Lakeshore Drive of Monroe) 2014 067 are contiguous along a 2014 067 1029 Walton SR 138 4 3 Walton County / Newton County line Lakeshore Drive s 2014 056, 2014 059, 2014 060, 2014 066 and 2014 067 are contiguous along a 2014 068 148 Walton US 78 (Athens Highway) 4 3 Walton County / Gwinnett County line US 78 (expressway bypass around Monroe) Page 7 of 8

"Minor Arterial" being upgraded to "Other Freeway & Expressway" s 2014 051A and 2014 051B are contiguous along a ; changes 2014 051A and 2014 051B were submitted jointly under one GitHub request, but are split 2014 051B 149 Gwinnett Sugarloaf Parkway 4 2 SR 20 (Grayson Highway) SR 316 apart in this table for clarity "Major Collector" being upgraded to "Other Principal Arterial" SR 20 (McDonough Hampton s 2014 054 and 2014 069 are contiguous along a 2014 069 531 Henry Road) 5 3 Dorsey Road SR 81 Page 8 of 8

Proposed Principal Arterial Network Review Cherokee «20 Forsyth Gwinnett Paulding «6 Cobb 285 «10 «92 «120 575 75 «400 85 20 285 DeKalb «124 «316 Barrow Walton Douglas «5 Fulton Rockdale 20 Clayton «85 75 155 «74 «3 Henry «81 Fayette «34 Coweta 675 «138 Newton Spalding Interstate (FC-1) Other Frwy and Expr (FC-2) Principal Arterials (FC-3) MPO Boundary