DATA BOOK IV : COST ESTIMATE

Similar documents
DRAFT. Dorabelle Campground Rehabilitation

ADDENDUM NO. TWO AB

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1

Mason Street Bike/Pedestrian Trail Project


Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:

Sample Estimate Reports Estimate Reports were created in XL-Pro Software

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

Training Manual. Hand Rope Pump, P Model. Module 1: Production

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

TIMBER BOLLARDS TYPE I. TYPE ll TS mm Radius 150 x 100 white painted Timber post dia Timber Post. Ground Level NOTES:

Riverside County Transportation Department Summary of Bids

City of Redding Airports

Enhanced Emergency Shelter Kit (EESK)

TREASURE ISLAND FERRY SHELTER & BUS SHELTERS. Arts Commission Civic Design Review APRIL 18, 2016

Outline of the Shinryu Head Works

WEXEL BUILDING PRODUCTS. Roof Outlets. and. Floor Drains

User Manual for Separera 40

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

Community Park Capital Project. February 6, 2017

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

Hospital Link Project Project Update September 2015

Shallow IC of 5

The Galveston Seawall

Off-Site Solutions. CPM Headwalls. Concrete for Life

MADRAS ASBESTOS STORES

1963 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District

1964 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District

APPENDIX A. Condition Survey of Pavements Concrete Mixture Proportions Used in Pavements Deicer Usage on Pavements Core Locations and Core Catalog

Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF

Tenders. Manitoba Infrastructure

Specification for Grip blocking using Peat Dams

Stainless Steel Combined Drinking Fountain With Bottle Filler

North Cruise Berth Projects PortMiami

The Perfect Solution For Indoor And Outdoor Events.

Group similar facilities together separate dissimilar facilities.

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

HANLIX INT'L CO., LTD. Feature

The Events Structure Product Guide

MEXICO CITY S NEW INTERNATIONAL AIRPORT 2017 ACI-LAC Conference. November 2017

Hammer, Discus, Shot Put, Javelin

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

A new generation of Modular Stairs

Beds and Related Equipment for HSP

Air inlet. 1. Drilled Pipe - Typically drilled pipe uses more compressed air while producing inconsistent flow at high noise levels.

COATING AND STRUCTURAL CONCRETE COATING (ANTI-GRAFFITI) 1'-3" FINISHED GRADE 1'-3" 3" VENEER ALLOWANCE LEDGER W/ MECHANICAL ANCHOR BOLT

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION REGION 4 SALT LAKE CITY, UTAH. May 29, 1958

Entry class K 2.98 M plus

Installing a Drainage Chimney. Written by Nevin Sunday, 28 May :35 - Last Updated Tuesday, 18 July :52

Entry class K Order number:

,271

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

NFI kits. NFI kit contents were harmonized by the sector in June Kit contents were selected for a household of 7, based on:

Index. How To Specify TY-CM

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

INDEX. ARCHITECTURE Formosa

4-foot Economy Sign Post. 4-foot post is rated at 2 pounds per foot. 7-foot Economy Sign Post

Wilts and Berks Canal Trust

MODELS: 440 SM & 440 SMSS

14. Tent: Multi-purpose

The Holes Creek Bridge Replacement By Bradley McClelland

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

BOULDER CREEK CATTLE FENCING FOR KOKANEE HABITAT ENHANCEMENT 2010

GARFIELD BRIDGE. Building A Bridge to No-Where

SOFT TOP ROOF TENT INSTRUCTION MANUAL

it takes you back to the good old days of grandpa s childhood.

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project

Primrose Awnings Half Cassette Manual & Electric Instructions

Poly Shelters. Instruction Manual. Sunblocker Shade House 10' Wide x 30' Long SKU #1030SPC. Note: Photo may be of a different but similar model

70 WALL FABRICATION - SEALANT - ERECTION

Northern Rail Extension, Phase One

TECHNICAL SPECIFICATIONS OF TRAILER MOUNTED MOBILE BIO-TOILET (10 SEATER)

Recommendation: THAT the Council of the Township of Centre Wellington award the following two tenders:

Article 13, clause no of the Concession Agreement states that:

TEMPEST. giant heavy-duty commercial umbrella. premium outdoor living

In 2014 excavations at Gournia took place in the area of the palace, on the acropolis, and along the northern edge of the town (Fig. 1).

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

C Locker. Options: Small compartment storage perfect for personal effects. Louvered doors, simple and convenient to open and close.

fiammausa.com Many interesting accessories for your Sprinter Van Conversion... and holidays are more comfortable. Fiamma for Sprinter

Primrose Awnings Full Cassette Manual & Electric Instructions

Primrose Awnings Half Cassette Manual & Electric Instructions

RamirentClimateSolve TM WE RENT OUT TENTS SO YOU ARE COVERED

Hammer, Discus, Shot Put, Javelin

TECHNICAL DATA SHEET EZE Hub Shoring System

P E R U. Investments of Barrick in Perú Toronto, March 2006

KP Lasnaya 1 River

Installation Instructions

Spiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8

WARDROBE FITTINGS Wardrobe Accessories P Clothes Hanger Accessories P Hangers & Shoe Racks P.

Dredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015

IP3 IP4 LP7 IP5 IP6 IP2 IP1. Phase 1

APPENDIX F. Structural Design Report

Installation Instructions

Transcription:

The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE

DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55 Common Excavation (Manual) cu.m 118.94 Structure Excavation (Dry) cu.m 143.47 Structure Excavation (Hydro.) cu.m 185.89 Embankment (Selected Borrow) cu.m 182.66 Sub-grade Preparation sq.m 8.10 Aggregate Sub-base Course cu.m 234.13 Aggregate Base Course (Regravelling) cu.m 338.32 Crushed Aggregate Base Course (Broken Stone) cu.m 377.73 Aggregate Surface Course cu.m 363.92 Bituminous Surface Treatment ton 24,539.36 Asphalt Cement ton 23,793.30 Reinforcing Steel kg 35.09 Structural Concrete - Class A cu.m 3,448.67 18" Diameter R.C. Pipes lin.m. 875.73 24" Diameter R.C. Pipes lin.m. 1,253.65 36" Diameter R.C. Pipes lin.m. 1,573.65 Riprap/Grouted Riprap (T=0.3m) cu.m 1,135.72 Stone Masonry (T=0.4m) cu.m 1,197.47 Hand Laid Rock Embankment (Boulder Facing) cu.m 628.53 Concrete Slope Protection (Concrete Facing) cu.m 2,536.14 Reinforced Concrete Facing cu.m 3,093.84 Curb and /or Gutter lin.m. 317.67 Lined Canal with Mortor Finish cu.m 1,147.48 Rubble Concrete Foundation cu.m 2,424.64 Reinforced Concrete Foundation cu.m 3,517.32 Dredging for Embankemnt cu.m 75.18 Source: DPWH - ALBAY DISTRICT ENGINEERING OFFICE IV - 1

DT IV List of (2/5) DREDGING cu.m 76.95 LEVEE Excavation cu.m 75.28 Clearing and Grubbing sq.m 9.02 Stripping sq.m 5.42 Embankment cu.m 166.70 Gravel Metalling cu.m 437.85 Sod Facing sq.m 32.50 Grouted Riprap sq.m 487.19 FLOODWALL Excavation cu.m 58.65 Concrete, Roughening cu.m 40.00 Concrete with Pumpcrete cu.m 2,482.63 Direct Pouring cu.m 2,482.63 Reinforcing Steel Bar ton 19,962.00 Formworks sq.m 176.88 Removal of Structures sq.m 57.84 Source: Adjusted unit price as of January 1999 for Lower Agusan Project Phase I IV - 2

DT IV List of (3/5) Earth Works Clearing and Grubbing sq.m 10.50 Excavation Common cu.m 165.10 Excavation Rock cu.m 701.90 Structure Backfill cu.m 140.00 Embankment Costruction & Compaction cu.m 166.00 Gravel Base Course cu.m 566.10 Concrete Structures Concrete Class "C" cu.m 3,508.60 Concrete Class "A-3" Substructure cu.m 6,385.50 Concrete Class "A-2" Superstructure cu.m 6,629.30 Concrete Class "A-2" Miscellaneous concrete cu.m 5,909.40 Concrete Class "A-2" Secondary concrete cu.m 5,632.40 Concrete Joints and Joint Materials PVC waterstop 200mm x 6mm lin.m 1,075.60 PVC waterstop 300mm x 7mm lin.m 1,280.10 Elastic joint filler sq.m 1,441.00 Joint sealant lin.m 169.30 Dowel bar dia.=32mm, length=1.8m nos. 846.30 Dowel bar dia.=25mm, length=1.0m nos. 559.30 Reinforcing Steel Bar Furnish & stockpile ton 25,606.20 Cut, bent & place ton 13,395.80 Filter Drain, Weephole and PVC Pipe Gravel bedding, ungraded materials cu.m 708.00 PVC weephole, dia.=100mm nos. 22,707.10 PVC pipe, dia.=50mm lin.m 266.50 PVC pipe, dia.=100mm lin.m 659.70 PVC pipe, dia.=150mm lin.m 1,441.30 Precast Concrete Pipes RC Pipe, dia.=600mm, Type A-2 lin.m 2,330.50 RC Pipe, dia.=600mm, Type A-1 lin.m 2,354.00 Piles and Piling Works Furnish RC pile 40x40 cm lin.m 2,649.10 Driving RC pile 40x40 cm lin.m 1,141.60 Masonry Works and Grouted Riprap CHB masonry, 150mm thick sq.m 581.10 CHB masonry, 100mm thick sq.m 492.00 Grouted riprap cu.m 2,031.00 Stone Works Rubble masonry cu.m 2,792.50 Rock/Boulder riprap (Dry) cu.m 1,178.10 Gabion type riprap cu.m 3,077.10 Sand bedding with graded materials cu.m 463.70 Source: Successful Bidding as of April 1998 for LADP Irrigation Project IV - 3

DT IV List of (4/5) Earth Works Clearing and Grubbing, lightly vegetated area sq.m 37.70 Structure Excavation Common cu.m 34.80 Structure Excavation Rock cu.m 118.07 Structure Backfill cu.m 40.82 Disposal of Excavation Materials cu.m 11.76 Concrete Structures Concrete Class "A" (210 kg/cm2, 100 mm) cu.m 3,244.94 Concrete Class "C" (210 kg/cm2, 38 mm) cu.m 2,742.69 Concrete Class "E" (90 kg/cm2, 38 mm) cu.m 2,346.82 Concrete Class "AA" (210 kg/cm2, 19 mm) cu.m 2,708.05 Concrete Class "F" (210 kg/cm2, 19 mm) cu.m 6,580.12 Concrete Class "D" (160 kg/cm2, 100 mm) cu.m 2,790.16 Concrete Joints and Joint Materials Water stop (Dumbbell type with center bulb, width=20 cm) lin.m 535.80 Joints filler (thickness = 2 cm) sq.m 1,526.60 Dowel bar pcs. 104.70 Reinforcing Steel Bar kg 19.71 Grouted riprap cu.m 2,716.10 Steel sheets piles (U type, thickness = 11 cm) kg 30.33 Aluminum guaging staff (Thickness = 1 mm, width = 15 cm) lin.m 3,792.21 Handrail (dia. = 50 mm) kg 77.02 Source: Successful Bidding as of April 1997 for Pampanga Delta Development Project IV - 4

DT IV List of (5/5) Clearing and grubbing, lightly vegetated area sq.m 7.90 Excavation of diversion channel, common cu.m 43.01 Excavation of diversion channel, rock cu.m 103.80 Excavation of upstream and downstream of fixed weir, common cu.m 55.37 Structure excavation, common cu.m 47.76 Structure excavation, rock cu.m 98.00 Structure backfill cu.m 56.10 Embankment cu.m 67.84 Diisposal of excavated materials cu.m 43.21 Concrete Class "AA" (210 kg/cm2, 19 mm) cu.m 3,158.70 Concrete Class "A" (210 kg/cm2, 38 mm) cu.m 3,030.25 Concrete Class "B" (160 kg/cm2, 38 mm) cu.m 2,918.95 Concrete Class "C" (210 kg/cm2, 100 mm) cu.m 2,810.30 Concrete Class "D" (160 kg/cm2, 100 mm) cu.m 2,770.31 Concrete Class "E" (90 kg/cm2, 38 mm) cu.m 2,406.89 Concrete Class "F" (210 kg/cm2, 19 mm) cu.m 3,955.88 Concrete blocks for river bed protection pcs. 8,712.25 Road surfacing cu.m 555.34 Grouted riprap cu.m 1,772.89 Gabion cu.m 1,832.09 Gravel bed cu.m 630.22 Weep hole type A, weir apron pcs. 763.43 Weep hole type B, wall pcs. 62.39 Weep hole type C, grouted riprap pcs. 101.20 Steel sheet piles ton 40,898.81 Reinforcing steel bars ton 25,418.44 Dowel bar pcs. 66.31 Joints filler sq.m 605.28 Handrail ton 37,022.94 Steel pipe for conduit of maintenance flow, D = 1.6m lin.m 24,246.78 Steel ppipe for water level indicator, D = 0.7m lin.m 5,086.27 Steel ladder rungs (Steel steps) ton 27,735.96 Aluminum gauging staff lin.m 216.89 Water stop lin.m 681.95 Wooden pile pcs. 1,868.68 Asphalt waterproof roofing sq.m 581.80 Source: Engineer's Estimated as of August 1996 for Pampanga Delta Development Project