COMPANY OVERVIEW
COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS De Villiers Consulting is the continuation of a proud legacy in structural engineering started in 1986. We pride ourselves in offering a personal approach to the engineering challenges on all our projects, regardless of size or scope. We never merely settle for the obvious solution but continue to interrogate all the possible options until we are satisfied that we have balanced structural requirements with economy of design and constructability. Lateral thinking and creativity is what differentiates us. The numerous past clients we have served in various capacities over many years can attest to a unique approach that has been adding real value to their projects. This portfolio showcases some of these projects. IP DE VILLIERS CP DE VILLIERS APPLIED INTELLIGENCE. INNOVATIVE SOLUTIONS.
RETAIL PROJECT EXPERIENCE
CANAL WALK SHOPPING CENTRE Cape Town Monex R1bn+ Date of completion: Completed 2000 Largest regional shopping centre in the Western Cape. 350,000m2 of post tensioned slab. 30 month contract period. 50,000 man hours of professional time.
COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS CAPE GATE Date of completion: Cape Town Abacus Asset Management R400m Completed 2005 Large regional shopping centre. Post tensioned slabs. PAARL MALL Date of completion: Paarl Flanagan & Gerrard R150m Completed 2006 Regional shopping centre in the Western Cape.
MOUNTAIN MILL Date of completion: Worcester Retail Africa R150m Completed 2005 Regional shopping centre in the Western Cape.
OFFICES PROJECT EXPERIENCE
WORLD TRADE CENTRE BAHRAIN Manama City, Bahrain Atkins (Middle East) Date of completion: 2007 Completed High-rise office and hotel (240m high) in Bahrain. Detail design done for Atkins. Precast floor construction. US$150m
COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS BOE/CLOCKTOWER DEVELOPMENT Date of completion: V&A Waterfront, Cape Town Nedbank R180m Completed 2002 Iconic corporate head office building in the V&A Waterfront with complex double basement construction below mean sea level. CLAREMONT PROJECTS Date of completion: Claremont, Cape Town Various N/A Completed Last project completed 2004 Structural engineering consultant for 9 building projects over 10 year period in the Claremont CBD. 2 more projects in planning currently (2015).
GLACIER BUILDING Date of completion: Tygervalley, Cape Town Ingenuity Properties R450m Completed 2009 Office Building on complex sloping site. Post tensioned slab construction; 3.5m cantilever slabs to boardroom areas. 4 Star Green Building.
MIXED USE PROJECT EXPERIENCE
BURJUMAN Dubai, UAE Murray & Roberts LLC (Middle East) R1bn+ Date of completion: Completed 2005 Mixed-use development including quadruple basement, retail centre and high rise office and apartment blocks. Management of detail design for the Contractor. Value engineering on core/shear wall requirements on high-rise buildings. Realized considerable savings over conceptual design by others.
COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS PARAMOUNT PLACE Date of completion: Claremont, Cape Town Ingenuity Properties R300m Completed 2004 Large and complex mixed-use development in Claremont CBD. Includes retail, upmarket residential and corporate head office. Post tensioned slab construction.
HOTEL/RESIDENTIAL PROJECT EXPERIENCE
THE PARAGON Cape Town Rawson Property R150m On site October 2015 Date of completion: Structure complete. Final completion April 2018. Multi storey residential building in Observatory. Double basement and 9 levels above ground.
COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS CULLINAN HOTEL Date of completion: Cape Town Private Developer R150m Completed 1999 High-rise hotel building. All post tensioned slab construction.
LAGOON BEACH HOTEL Milnerton, Cape Town Irish Development Consortium R220m Completed Date of completion: 2004 200 bed hotel; 172 apartments and basement parking. All post tensioned slab construction.
SPECIAL PROJECTS PROJECT EXPERIENCE
TRIANGLE HOUSE BUILDING We specialise in unlocking value in existing properties. Numerous complex structural alterations attest to this fact. The most recent example if the engineering of a complex 12-storey addition to the existing Triangle House Building in Cape Town. Although the client settled for a less elaborate scheme, the engineering of the complex alteration sets the tone for what is possible with existing buildings in the near future.
CURRENT PROJECTS PROJECT EXPERIENCE
117 STRAND STREET Cape Town Ingenuity Properties Currently on site Date of completion: July 2019 New mixed-use development in Cape Town CBD. 4 Star Green Building. Deep basement. R400m Image courtesy of Kotlowitz Marais Architects.
COMPANY OVERVIEW RETAIL OFFICES MIXED USE HOTEL/RESIDENTIAL CURRENT PROJECTS THE MODERN (DOCK RD) Cost (current value): Date of completion: Cape Town Ingenuity Properties R1.5bn In planning N/A Complex high-rise building in Cape Town CBD. Economic post tensioned slabs reduces overall building mass resulting in further savings in foundations and columns. New building built over existing listed building.
YACHT CLUB Cost (current value): Date of completion: V&A Waterfront, Cape Town Amdec R500m On site December 2018 Hotel and apartment complex over super-basement.
Unit 201/202 De Jonker Centre, Morkel Street, Stellenbosch 021 883 2788 admin@devilliersconsult.co.za