LIVE. WORK. PLAY. STATUS OF DEVELOPMENT FALL Produced for information by the Town of Markham

Similar documents
LIVE. WORK. PLAY. STATUS OF DEVELOPMENT SPRING Produced for information by the City of Markham

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

Director, Community Planning, Toronto and East York District

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

October 23, 2017 Council Workshop

Spadina Avenue Built Form Study Preliminary Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES. November 6, 2017 Regular Meeting of Council

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

FOR LEASE UP TO 8,700 SF

FOR LEASE UP TO 8,700 SF

SUBJECT: Downtown Mobility Hub draft New Precinct Plan and Policy Framework

3450 Dufferin Street - Official Plan Amendment, Zoning Amendment and Draft Plan of Subdivision Applications Request for Directions Report

TECHNOLOGY QUALITY OF LIFE CAREER CHOICES INNOVATION GTA RAPID TRANSIT URBAN LIVING TOP RANKED SCHOOLS FUN HOUSING OPTIONS ARTS NATURE STYLE CULTURE

Downtown Mobility Hub: Draft New Precinct Plan. Art Gallery of Burlington September 7, 2017

FOR LEASE UP TO 5,300 SF

Warden City Centre. for lease up to 100,000 sf. MOVE IN ready spaces FREE underground parking 3 per 1,000 sf SIGNAGE and branding available

OFFICE SPACE FOR LEASE TOWN CENTRE BOULEVARD MARKHAM, ON. 3,436 sf available Built-out suites in move-in condition Restaurant on-site

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

Toronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District

325 RENFREW DRIVE UNIONVILLE, ON OFFICE CONDOMINIUM FOR SALE

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

BUILDING SIGNAGE FOR LEASE UP TO 67,000 SF. Warden City Centre. NEW MODEL SUITES FREE underground parking

RAY YENKANA Willowbrook Cr, Dawson Creek BC Canada $2,847,000

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

Appendix VII TTC Routes

Director, Community Planning, North York District

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Council Briefing Minutes

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by:

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District

REGIONAL BOARD REPORT

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

Draft Planning Controls Planning Scheme Amendment GC81

Shadow Impact Assessment & 2323 Lake Shore Boulevard West. Etobicoke, Ontario

HOUSING UNITS,

11th and Vermont Streets Special General Land Use Plan (GLUP) Study

Is Scarborough City Centre A Transit Village?

Green Fields Leppington

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

PCAL Case Study Retail Areas: Rouse Hill Town Centre

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

CANNING CITY CENTRE. the new energy of the southeast

Director, Community Planning, Toronto and East York District

Establishing a National Urban Park in the Rouge Valley

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

DESIGN-BUILD OPPORTUNITY

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

Presentation to Brampton Real Estate Board

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

2016 Development Cost Charges (DCC) UPDATE

VAUGHAN METROPOLITAN CENTRE SUB-COMMITTEE OCTOBER 18, 2017 DEVELOPMENT ACTIVITY UPDATE: DOWNTOWN UNDER CONSTRUCTION VAUGHAN METROPOLITAN CENTRE

This economic statement provides analysis with respect to land at Tarneit North, and has been prepared on behalf of Amex Corporation.

Ministry of Transportation

The District of North Vancouver FACT SHEET

DEVELOPMENT MAP 2017/18

Urban Growth Centres in the Greater Golden Horseshoe

CREATING CONNECTIONS IN CLARINGTON

CORPORATION STREET, COVENTRY. Another prestigious development by Award Winning Developer 1/7

To subscribe, unsubscribe or comment, send an message to

RETAIL BUSINESS HOLIDAYS ACT EXEMPTIONS

Interim Growth Management Policies City of Brampton Council

Addison Hall Business Park LOTS FOR SALE, AURORA (FROM 2 ACRES)

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

ROCHESTER RIVERSIDE. City of learning, culture, tourism and enterprise.

2175 Lake Shore Boulevard West Official Plan and Zoning Amendment, and Removal of the Holding Provision Applications Final Report

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction

EMPLOYMENT,

WE HAVE THE EXPERIENCE

New Reduced Price! For Sale: Office. 335 Renfrew Drive. Boutique Suite in Markham. Grow your business here. lennard.com

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

A VISION FOR EL MIRAGE

405 TERMINAL AVENUE OTTAWA, ON

Airport Planning Area

Presentation to Planning Panel

LEASING OPPORTUNITIES

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

PO Box 257 PO Box 257 PARRAMATTA NSW 2124 PARRAMATTA NSW 2124

Pre-application submission for Committee: Phase 4 development at West Hendon

Brand New Prestigious Main Floor Retail Space

RW Bruhn Bridge and Approaches Project

2. RESOLUTION TO CLOSE MEETING

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

LUDLAM TRAIL CORRIDOR DISTRICT

MUSIC CITY CENTER, NASHVILLE KAY BAILEY HUTCHINSON CONVENTION CENTER, DALLAS ALBANY CAPITAL CENTER

FINCH HYDRO CORRIDOR TRAIL PROJECT

PILLSWORTH ROAD C A L E D O N PHASE I COMMENCING SPRING ,000 SF COLLIERS INTERNATIONAL FOR MORE INFORMATION, CONTACT

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY

Update: Manhattan Community Board 1 Land Use, Economic Development & Zoning committee February 12, 2018

Cv-c; Re: Hotel Development Charges in York Region. March 24, 2016

SOUL CONDOS. Mark Li INVESTMENT INSIGHT

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

1.2 Corridor History and Current Characteristics

Approve, subject to conditions, and with a County Board review in one (1) year. (June 2003)

Welcome. North. Westgate

Transcription:

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT Produced for information by the Town of Markham

Community TOWN OF MARKHAM CIVIC CENTRE 101 TOWN CENTRE BOULEVARD Completed in 1989. East of Town Centre Boulevard, west of Warden Avenue, north of Highway 7 East. 11.8 hectares GFA 14,607.5m². MARKHAM THEATRE FOR THE PERFORMING ARTS 171 TOWN CENTRE BOULEVARD East of Town Centre Boulevard, west of Warden Avenue, north of Highway 7 East, and south of Apple Creek Boulevard. Completed in 1985. Theatre seating: 528 available seats. Committed to the presentation of award winning, professional entertainment, and educational programs celebrating Canadian talent. YMCA MARKHAM 101 YMCA BOULEVARD Facilities: West of Kennedy Road, east of the GO Rail line, south side of YMCA Boulevard and north of Hwy. 407. Complete. Facility opened May 2006. 2.3 hectares combined Size 5,620m². Pool, gym, rock climbing wall.

Community/Commercial UNIONVILLE HIGH SCHOOL FOR THE ARTS 201 TOWN CENTRE BOULEVARD East of Town Centre Boulevard, west of Warden Avenue, and south of Apple Creek Boulevard. Completed in 1985. Addition added in 2001. 7.1 hectares Attended by students throughout York Region for its Arts York program. BILL CROTHERS SECONDARY SCHOOL 44 MAIN STREET West side of Main Street, South Unionville, South of Hwy. 7 and north of Unionville Gate. Phase I completed occupancy Fall 2008. 12.4 ha (including Valley land) Phase 1 approximately 21,000m² Approximately 1,500 students at capacity. Programme: Emphasis on healthy, active living for students across York Region, includes 3 fields and outdoor running track. HILTON SUITES 8500 WARDEN AVENUE Total GFA (Build out): West of Warden Avenue, east of South Town Centre Boulevard and south of Hwy. 7. Complete. (Refer to Leisureworld application). 4.3 hectares. 500 suites 48,000m² Hotel 43,800m² Convention centre 4,200m².

Commercial STRINGBRIDGE DEVELOPMENTS PRECINCT PLAN Projected Office Area: West of South Town Centre Boulevard, east of the Rodick Road, south of Hwy. 7, and north of Clegg Road. Precinct Plan adopted and implementing zoning amendments, 2 buildings completed (employment). Revised precinct plan to increase density was approved in June, 2005. Further amendments to introduce a park have been approved. 7.0 hectares. 105,000m² 7 buildings. H & R DEVELOPMENTS STRINGBRIDGE South side of Hwy.7, between South Town Centre Boulevard and Rodick Road. Site Plan endorsed by Council Summer 2007. Final approval pending. 0.86 ha (2.1 acres). Projected Office/ Commercial Area: 5507m² in one 4 storey office building. LIBERTY DEVELOPMENT CORPORATION LIBERTY SQUARE OFFICE BUILDINGS 3601 & 3621 HIGHWAY 7 EAST Total Office Area: South Side of Highway 7, east side of South Town Centre Boulevard. Draft Plan approved and Zoning By-law adopted in July, 2004. Site Plan endorsed by Council, May, 2005. Construction completed. 1.22 ha (3.0 acres). 24,651m² within 12 and 5 storey buildings, including grade related retail.

Commercial IBM CANADA LIMITED 8200 WARDEN AVENUE Total Office Area: West of Warden Avenue, south of Cedarland Drive, and north of Hwy 407. Phase 1 complete. 35.6 hectares Bright Horizons Child Care and Early Education 1,500m². 130,000m² Phase 1 complete 54,000m² Phase 2 anticipated 76,000m². MOTOROLA CANADA 8133 WARDEN AVENUE Total Office Area: East of Warden Avenue, west of the GO Rail corridor, south side of Enterprise Boulevard, and north of Highway 407. Phase 1 complete. 5.5 hectares. 42,000m² Phase 1 complete 21,000m². DOWNTOWN MARKHAM REMINGTON GROUP HONEYWELL CANADA 85 ENTERPRISE BOULEVARD South side of Enterprise Boulevard, east of Warden Avenue. Construction completed occupancy, Summer 2008. 2.4 ha (6.04 acres). Total Office Area: 14,319m².

Commercial/Residential Markham District Energy - Birchmount Energy Centre 7900 Birchmount Road West side of future Birchmount Road, immediately south of Highway 407. Site plan application under review. 1.34 ha District energy plant to provide hot or chilled water to developments in Markham Centre. Markham District Energy Inc. is wholly-owned by the Town of Markham. FIRST MARKHAM VILLAGE NORTH OF COX BOULEVARD Total Street Retail GFA: West of Town Centre Boulevard, east of Rodick Road, north of Cox Boulevard. Complete. 10.9 hectares. 525m². Total Commercial GFA: Total Residential Units: 3,400m². 506 townhouses. TRIDEL / DORSAY DEVELOPMENTS CIRCA 23 (PHASE II) & 33 (PHASE I) COX BOULEVARD Projected Office/ Commercial: Total Residential Units: West of Town Centre Boulevard, east of Rodick Road, south of Cox Boulevard and north of Highway 7. Phase l Construction completed, 390 apartments and 155 townhomes. Phase II Site Plan Approval 2006, under Construction, 391 apartments. Phase lll office/commercial pending. 7.5 hectares. 20,000m². 935 units. Projected Senior s Housing: 150 units.

Residential TIMES INVESTMENTS LIMITED MAJESTIC COURT 50 CLEGG ROAD & 60 SOUTH TOWN CENTRE BOULEVARD N/W corner of Clegg Road and South Town Centre Boulevard. Site Plan endorsed by Council, Fall 2006. Under Construction. 1.46 ha. Total Residential Units: 532 residential units with grade related retail along South Town Centre Boulevard and an approximate 1 acre park. LIBERTY DEVELOPMENT CORPORATION EKO MARKHAM CENTRE 55 & 75 SOUTH TOWN LAKE ROAD 30 & 32 CLEGG ROAD The site is located east of South Town Centre Boulevard south of Hwy. 7 and north of Clegg Road. Draft Plan Approval and Zoning By-law adopted July, 2004. Residential construction completed. 13,391m² 1.3 ha (3.3 acres). Total Residential Units: 4 buildings 9, 10, 13, and 16 storey 589 units. H & W DEVELOPMENTS The west half of the Block bounded by Clegg Road, South Town Centre Boulevard, Cedarland Drive and Warden Avenue. Owner has applied for zoning by-law amendment and site plan approval. 1.15 ha. Four residential buildings 16 storey, two 14 storey and 12 story 663 residential units.

Residential LEISUREWORLD INC. HILTON SUITES West side of Warden Ave., south of the Hilton Suites Hotel, adjacent to Clegg Road extension. Preliminary report June, 2004. Public Meeting Sept. 2004. Recommendation report April 2006, Zoning By-law pending. Intensify Hilton Suites Hotel site 4.3 ha. 272 Seniors Condominium units. HIGHWAY 7 PRECINCT PLAN Project: Lands on the north and south sides of Highway 7 from Warden Avenue east to the GO Rail line and south to the Rouge River. A draft Precinct Plan has been prepared and is being refined in consultation with the effected landowners and the community. The Town of Markham is preparing a Precinct Plan for the subject lands with the assistance of Sweeny, Sterling, Finlayson and Co. Architects. It outlines the pattern of streets, blocks and lots; the distribution of residential, commercial and other uses; the built form, height and locations of buildings; and the locations of schools, parks and open spaces. The precinct plan will provide a framework to help transform Highway 7 to an urban boulevard and to ensure an appropriate transition to the existing community north of Highway 7. TIMES GROUP INC. MARKHAM CENTRE UPTOWN South side of Highway 7, between Warden Avenue and Sheridan Nurseries. Applications for draft plan of subdivision and zoning submitted. Under review - Public meeting in June 2009. Referred to Ontario Municipal Board (OMB) August 2009. 35.76 ha (88.4 acres), including approximately 9.3 ha (23 acres) of Rouge River valleyland. Preliminary concept plans submitted show apartments and an office tower ranging from 8 to 20 storeys. As proposed, these buildings would accomodate approximately 4,777 residential units and 500,000 ft2 of office and other commercial floor space.

Residential ARYEH CONSTRUCTION LTD East side of Warden Avenue, south of Highway 7. Applications for Official Plan Amendment, Draft Plan of Subdivision and zoning by-law amendment under review and appealed to Ontario Municipal (OMB) October 2009 1.86 ha (4.6 acres). 5 residential buildings Building heights up to 20 storeys 945 units. No image available EAST PRECINCT/MOBILITY HUB Project: Lands in the vicinity of the Unionville GO Station, north to the Rouge River, south to Highway 407 and east to Kennedy Road. A draft Precinct Plan/Mobility Hub Concept Plan is being prepared in consultation with the effected transportation agencies, landowners and the community. The Town of Markham is preparing a Precinct Plan/Mobility Hub Concept Plan with the assistance of Urban Strategies. The plan will provide a framework for the introduction of a Mobility Hub with associated infrastructure and land use scenarios and also identify opportunities to integrate the East Precinct with the Remington Group s lands on the opposite side of the GO tracks. MARKHAM CENTRE DEVELOPMENT CORPORATION Enterprise Boulevard between the Go Rail line and Rivis Road. Applications for Official Plan and Zoning By-law amendment under review. 2.1 ha (5.2 acres) on north side of Enterprise Boulevard 2.65 ha (6.5 acres) on south side of Enterprise Boulevard. North block: South Block: 3 residential buildings (25, 18 and 10 storeys) 611 residential units. 3 residential buildings (39, 18 and 10 storeys) 616 residential units surrounding 11,200m² two story retail podium plus future 10-storey 17,200m² office building Integrated transit station proposed linking VIVA to GO.

Residential DOWNTOWN MARKHAM REMINGTON GROUP PRECINCT PLAN East of Warden Avenue, north of Hwy. 407, south of Rouge River, west of the GO Line. Draft Plan approval endorsed by Council July 2003. Zoning By-Law approved in July 2004. Draft Plan and Precinct Plan revisions endorsed by Council in June 2006. 98.3 hectares, mixed use development. 3900 residential units, total office/business Park 362,750m² and 33,755m² retail. Total Valley Land: 19.1 hectares and buffer adjacent to valley. 10 acre Central Amenity. Remington Revised Precinct Plan - 2006 DOWNTOWN MARKHAM REMINGTON GROUP BENCHMARK MANOR PHASE I North east quadrant of Enterprise Boulevard and West Valley Drive. Site Plan endorsed by Council, June 2006. Under Construction. 6.18 ha (15.3 acres). 175 townhome units, including a local park 0.3 ha (0.74 acre). DOWNTOWN MARKHAM REMINGTON GROUP BIJOU PHASE I ROUGE BIJOU & BIJOU TERRACE 1 & 21 UPPER DUKE CRESCENT North east corner of West Valley Drive and the Civic Mall. Site Plan endorsed by Council, June 2006. Under Construction. Occupancy commenced. 0.51 ha (1.26 acres). 188 apartment units, within 10 and 7-storey buildings, linked by a 1-storey lobby and oriented along the Civic Mall.

Residential DOWNTOWN MARKHAM REMINGTON GROUP BIJOU PHASE II PROMENADE & ARBOUR 39 & 57 UPPER DUKE CRESCENT North side of the Civic Mall, east of West Valley Drive. Site Plan endorsed by Council, November 2006. Under Construction. Occupancy commenced. 0.68 ha (1.69 acres). 244 apartment units, within 2 buildings, seven storeys each. DOWNTOWN MARKHAM REMINGTON GROUP VERDALE PROJECT 111, 131, 151 UPPER DUKE CRESCENT Buildings G,H,I; West side of Verclaire Gate, south of West Valley Drive. Under Construction. 0.82 ha (2.0 acres). 450 apartment units, within three buildings, 2 buildings @ 6 & 10 storeys and 1 building @ 6 & 14 storeys. DOWNTOWN MARKHAM REMINGTON GROUP BIRCHMOUNT BUILDINGS (BUILDINGS E & F) Northwest corner of the Civic Mall and Birchmount Road extension. Site Plan endorsed by Council December, 2008. 0.75 hectares (1.8 acres). 376 units within two buildings 6 & 10 storeys (Building F ) and 11 and 14 storeys (Building E ) mixed-use buildings, including 3,274m² (35,242 square feet) of grade-related retail.

Residential/Park Land MAIN STREET RETIREMENT (UNIONVILLE) INC. 34 MAIN STREET West side of Main Street south, north of Unionville Gate and Enterprise Boulevard. Application for a retirement residence. Preliminary presentation to Markham Centre Advisory in September 2008. Public meeting in Fall 2008. Council endorsement in April 2009 1.4 ha. Approximately 283 units within 2 buildings, up to 9 storeys each, to be constructed in two phases. MARKHAM CENTRE URBAN PARK North of Enterprise Boulevard, south of the Rouge River and west of re-aligned Tributary 4. Design Charette/Workshop held April 2004. Winning Design Concept selected May 2004. Design unveiled on-site June 2004. The winning team retained to undertake the detailed design of the park. Public meeting February 2006. 4.0 ha (10.0 acre). Total Park Land (Phase 1): 0.87 ha (2.15 acres). The Civic Mall is envisioned as a unique urban space and multi use corridor, accommodating safe movement of pedestrians, cycling and transit Preliminary design concept incorporates principles of sustainability and reflects a high quality public realm. CIVIC MALL PARK (PHASE 1) North of Enterprise Boulevard between West Valley Drive and Birchmount Road extension. Detailed design work is on-going specific to the Phase I construction of the transit way from West Valley Drive to Birchmount Road. Total Park Land (Phase 1): 0.87 ha (2.15 acres). The Civic Mall is envisioned as a unique urban space and multi use corridor, accommodating safe movement of pedestrians, cycling and transit Preliminary design concept incorporates principles of sustainability and reflects a high quality public realm.

SUMMER 2009